RFB927930-02 - WRC Phase 3 Issuance 2 - Bid Form.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- WRC Phase 3 Issuance 2
- Solicitation number
- RFB927930-02
- Issued by
- Dallas County, Woodbine City, Iowa
About this file
This document is a Bid Form for the Woodward Resource Center (WRC) Phase 3 Issuance 2 project, which is being solicited by the Department of Administrative Services for the state of Iowa. The project covers abatement work, general construction for the Administration Building, Medical Center, Food Service, and Elmcrest Buildings, as well as work for the Dispatch Garage Decentralization. The bid form includes base bids, unit prices, and alternates for the various work packages. The project is located in Dallas County and Woodbine City, Iowa.
The bid form provides detailed line items for the scope of work, with contractor-entered values and automatic calculations. It includes base bid amounts, allowances for wall patching, and unit prices for additional abatement work. Alternates are also listed for the Medical Center Storage Room, Elmcrest 2nd Floor Ceilings, and Medical Center 2nd Floor Ceilings. The total base bid for the general construction work package is $40,000.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| WRC Decentralization Phase 3 & Fire Alarm Phase 2 & Chapel Sprinkler | |
| Contractor Entered Value | |
| Automatic Calculation | |
| BP #01-1 - Abatement | |
| BP #01-1 Base Bid |
| BP #01-1 Unit Price #1 - Extra TSI and Piping Abatement | |||
| BP #01-1 Unit Price #2 - Extra Drywall Abatement | |||
| BP #01-1 Unit Price #3 - Extra Flooring Abatement | |||
| BP #09-1 - General Construction | |||
| BP #09-1 Base Bid for the Administration Building | |||
| BP #09-1 Base Bid for the Administration Building (Includes $10,000 allowance for wall patching) | $ 10,000.00 | ||
| BP #09-1 Base Bid Administration Building Total | $ 10,000.00 | ||
| BP #09-1 Base Bid for the Medical Center, Food Service and Elmcrest Buildings | |||
| BP #09-1 Base Bid for the Medical Center, Food Service and Elmcrest Buildings (Includes $30,000 allowance for wall patching) | $ 30,000.00 | ||
| BP #09-1 Base Bid for the Medical Center, Food Service and Elmcrest Buildings Total | $ 30,000.00 | ||
| BP #09-1 Total Base Bid Total | $ 40,000.00 | ||
| BP #09-1 Alternate #01 - Medical Center Storage Room B04 | |||
| BP #09-1 Alternate #02 - Elmcrest 2nd Floor Ceilings | |||
| BP #09-1 Alternate #03 - Medical Center 2nd Floor Ceilings | |||
| BP #09-1 Unit Price #01 - Patching Hourly Rate | |||
| BP #23-1 - Dispatch Garage Decentralization | |||
| BP #23-1 Base Bid |
File details come from the government source that posted it. Updated .