RFB927930-02 - WRC Phase 3 Issuance 2 - Project Manual (3 of 4).pdf

PDF 2 MB Posted

Attached to
WRC Phase 3 Issuance 2
Solicitation number
RFB927930-02
Issued by
Dallas County, Woodbine City, Iowa

About this file

This document is a project manual for a state and local contract opportunity issued by the Iowa Department of Administrative Services for asbestos abatement work at the Woodward Resource Center located in Woodward, Iowa, within Dallas County and Woodbine City. The work includes the removal and disposal of asbestos-containing materials such as pipe insulation, drywall mud, flooring, and window glazing across multiple buildings on the campus. Key requirements include the use of proper personal protective equipment, worker decontamination procedures, negative air pressure containment, and waste packaging and disposal protocols. The contractor will be responsible for all preparation, abatement, cleaning, and final clearance testing, with the environmental consultant overseeing the project.

The contract will be awarded to the lowest responsive and responsible bidder. Pricing should account for all labor, materials, and disposal costs associated with the comprehensive asbestos abatement scope of work. No specific set-aside requirements are mentioned, and the incumbent contractor is not identified. Funding for the project will come from the state and local government budgets. The contract term is not explicitly stated, but the work is described as a discrete "Phase 3 Issuance 2" within the larger Woodward Resource Center program.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Woodward Resource Center

02081 - 11

C. Respirators shall not be removed while in the work area.

D. Only NIOSH-approved respirators shall be used.

E. Additional respiratory protection such as organic vapor cartridges, may be needed when handling some solvents, coatings, or stripping products. Consult the MSDS, manufacturer, or industrial hygienist, and obtain the proper cartridges and usages as necessary.

3.5 HYGIENE PRACTICES

A. Eating, drinking, smoking, chewing gum or tobacco, and applying of cosmetics are not allowed in the work area.

B. All persons entering the work area are required to wear appropriate PPE, and follow the entry and exit procedures posted in the Personnel Decontamination Enclosure System.

C. PPE shall include, at a minimum:

1. Full body disposable suits, hard hat, eye protection, respirator, and proper footwear.

2. Gloves.

3. Non-disposable footwear and clothing shall remain in the work area and shall be disposed of as contaminated waste when the job is completed.

4. Authorized visitors shall be provided with suitable PPE.

3.6 PROHIBITED ACTIVITIES.

A. Dry removal or dry sweeping.

B. Use of compressed air for cleaning.

C. Use of high speed power tools not equipped with a HEPA-filtered local exhaust system.

3.7 WORK AREA ISOLATION AND PREPARATION

A. General Preparation. Contractor shall:

1. Post:

a. OSHA asbestos warning signs at every entrance to the work area.

b. Decontamination and work procedures in equipment rooms and clean rooms.

c. EPA NESHAP asbestos rules (40 CFR Part 61, subparts A & M) in the clean room.

d. OSHA Asbestos Construction Standards (29 CFR 1926.1101) in the clean room.

e. Entry and Exit Log

f. List of telephone numbers in the clean room for:

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11111111111111111111111111

02081 - 12

(1) local hospital and/or local emergency squad.

(2) owner security office (if applicable).

(3) owner representative reachable 24 hours per day.

(4) contractor’s headquarters.

(5) architects or consultants directly involved in the project.

2. Secure the work area from entry by unauthorized persons using black polyethylene sheeting as a construction area barrier and post construction warning signs.

3. Separate work areas from occupied areas.

a. Seal off all doorways and corridors which will not be used for passage during work.

b. Install isolation barriers in all openings larger than 4’ x 8’, consisting of double-layer 6-mil poly to prevent access to the contained areas.

4. Have an approved fire extinguisher in the equipment room.

5. Install and maintain walk-off mats to the general work entrance.

B. Interior Preparation

1. Install negative air machine in the work area. The equipment shall exhaust through a HEPA filter to the outside of the building or the exhaust will be double filtered. The equipment shall remain in operation twenty-four hours a day until decontamination of the work area and final air sampling and analysis is completed. Seal openings around exhaust ducts. Exhaust from the negative air movement equipment shall not be allowed to be released within the buildings unless unfeasible as determined by the EC. All HEPA filtered air movement equipment shall be maintained according to this specification or regulations.

2. Coordinate with the Facility or Mechanical Contractor for the shut down and isolation of heating, ventilating, air conditioning (HVAC) systems which are within the work area.

3. Seal off all windows, corridors, doorways, bathrooms, closets, skylights, ducts, grilles, diffusers, and other penetrations or openings with 6-mil poly and tape.

4. Protect and cover floors, in those areas in which no abatement is to be performed with 6-mil poly with seams staggered and taped, and extending 12” up walls. Maintain for the duration of the project.

5. Protect and cover the walls in the work area.

6. Protect and cover non-movable fixed objects from which no abatement will be conducted (e.g. fixed cabinets, shelves, etc.). Pipe insulation on steam / condensate piping will be removed along with the pipe itself.

7. Asbestos materials shall not be disturbed during the preparation phase.

8. Maintain emergency and fire exits.

9. In abatement work areas install a three chamber Worker Decontamination

Enclosure System, consisting of clean room, shower room, and equipment room separated by air locks, all with curtained doorways, of sufficient size to serve the size of the crew. If appropriate, apply for a waiver for an offsite decontamination area for buildings / areas where a full decontamination unit cannot be installed.

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11212121212121212121212112121

02081 - 13

a. Where an adjacent decon unit is not feasible (i.e., for multiple tented glovebag operations), the AC shall (only with an approved variance from the EC):

(1) set up the decon unit within the work area barriers

(2) establish a negative pressure of at least 0.02” water column (wc) between the equipment room and adjacent spaces, including the clean room

(3) provide at least 4 air changes per hour within the decon unit

10. Once operational, the system shall be inspected daily. Damages and defects will be repaired immediately upon discovery.

C. Exterior Preparation (for areas that interface with interior work)

1. 6 mil poly sheeting shall be placed over the ground, foundation, or other surfaces below the abatement area.

2. Unauthorized entry shall be prevented by using appropriate barriers, such as warning tape, fencing, or other suitable barriers.

3. Nearby air intakes, grilles, and other openings into the building interior shall be sealed off with 6 mil poly and tape.

3.8 ABATEMENT PROCEDURES

A. Removal:

1. Asbestos materials shall be wetted and kept wet during removal.

2. ACM waste shall be bagged or containerized as it is removed.

3. Work areas shall be kept wet until visible material is cleaned up.

4. Asbestos waste shall be removed from the work area daily.

a. The waste shall be placed and sealed in a properly labeled 6-mil poly bag.

b. The bag shall be cleaned and placed in a second properly labeled 6-mil poly bag. This bag shall be sealed by securing with duct tape, folding over taped area and goose necking with duct tape.

3.9 CLEANING AND DECONTAMINATION

A. All visible accumulations of ACM, debris, tools, and unnecessary equipment shall be removed from the work area.

B. First clean:

1. Wet clean all surfaces and remove excess water.

2. Remove outer layer of poly and dispose as ACM waste (splash guards and poly protecting the underlying surfaces).

3. Critical barriers on windows, doors, penetrations, and other openings shall remain in place and negative air system shall remain in continuous operation until final clearance tests have passed.

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11313131313131313131313113131

02081 - 14

C. Visual inspection: EC and contractor jointly inspect the work area for visible residue and excess water and, if observed, repeat the clean/ wait cycle until residues are not detected and work area is dry.

D. Remove all tools, cleaning materials, remaining wastes from the work area.

E. Apply lock-down encapsulants where specified in the Documents.

F. Notify EC that work area is ready for final clearance testing.

3.10 FINAL CLEARANCE

A. Final clearance testing shall be performed after the final cleaning and visual inspection has been completed and where no visible water or condensation remains.

B. All work areas shall be tested and analyzed by either PCM or Transmission Electron Microscopy (TEM) methodologies.

C. If final clearance test(s) fail, the AC shall be responsible for repeating the cleaning sequence as necessary until final clearance tests are successful, at no additional cost to the owner. The AC shall also be responsible for paying for the additional time and expenses incurred by the EC for conducting the repeat clearance sampling, analysis and project oversight.

D. Upon completion of a successful visual inspection and test, a “punch list” walkthrough shall be conducted for each area that contained special wastes, non-hazardous special waste or hazardous waste within five working days (per building) of completion of the work by the Contractor. The Contractor, Environmental Consultant and the Owner will participate in the walkthrough. All punch list items shall be completed within five working days of walkthrough. The items will include all deficiencies found in the inspections of the AC’s work which is to be corrected. When the deficiencies have been removed, the AC shall request a re-inspection by the EC.

3.11 SPECIAL PROCEDURES

A. Glovebag Procedure. Glovebags may be used to remove small sections of ACM pipe insulation encountered.

1. Typical preparation/notification requirements apply.

2. Glovebag removal will require a single layer, 6 mil poly tent containment with negative pressure air filtration.

3. Monitoring will be performed by the EC.

4. Glovebag construction shall be 6 mil poly with seamless bottom, suitable for the intended use (straight runs, fittings, elbows, vertical pipes, etc.)

without modification.

5. At least two licensed workers shall perform glovebag operations.

6. Workers shall wear full body PPE and at least a ½ mask APR equipped with a P-100 cartridge. Note here, too, that OSHA still requires an

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11414141414141414141414114141

02081 - 15 exposure assessment and respirators that are appropriate for the expected airborne fiber concentrations.

7. Prior to use, all loose or damaged material adjacent to the operation shall be wrapped in two layers of 6 mil poly or otherwise be rendered intact.

8. Work Practices shall include:

a. Install to completely cover the circumference of pipe or other structure. Pipe insulation diameter shall not exceed ½ the bag working length above the glove sleeves.

b. Smoke test for leaks and seal any leaks prior to use.

c. Single use and not moved.

d. Wet removal methods on the materials to be removed and wet cleaning to remove all visible ACM from the pipe or structure surfaces.

e. Not to be used on surfaces greater than 1500F.

f. Spray down the interior surfaces of the bag, substrate, and removed ACM.

g. Wet down remaining ACM surfaces or seal with encapsulant.

h. Seal off the lower portion of the bag containing the ACM waste by twisting several times and sealing with tape.

i. Collapse glovebag with a HEPA vacuum.

j. Place the detached glovebag directly into a 6 mil poly waste disposal bag and gooseneck-seal it in the waste disposal bag for disposal.

k. Dispose in accordance with this specification.

3.12 WASTE DISPOSAL AND EQUIPMENT LOAD-OUT

A. Preparing equipment for load-out

1. Remove gross debris from equipment and wet-wipe all surfaces.

2. Seal openings to prevent escape of internal contamination; or open up equipment, remove filters, and make equipment interiors accessible for cleaning and decontamination.

B. Packaging asbestos wastes:

1. All asbestos-containing wastes, including removed ACM and debris, containment poly, critical barrier materials, suits, respirator cartridges, vacuums and negative air machine HEPA filters, water filters, and other asbestos-containing items shall be properly packaged in 6 mil poly for disposal.

2. Use double 6 mil poly bags with “gooseneck” seal, or other impermeable containers.

3. Wrap large or irregular items in 2 layers of 6 mil poly sheeting and seal with tape.

4. Sharp, jagged, or other items that may puncture poly shall be packaged in rigid impermeable containers such as drums or boxes, or wrapped in burlap or other protective covering before sealing in double bags or double layers of 6 mil poly.

5. Label containers:

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11515151515151515151515115151

02081 - 16

a. OSHA warning label.

b. DOT performance-oriented hazardous material label.

c. Name and address of generator and abatement location.

C. Removing items from the work area:

1. Packaged asbestos wastes, non-porous debris (such as doors, hardware, and other items that can be decontaminated), and equipment shall be wet cleaned, moved into the equipment decontamination enclosure system, cleaned a second time, and moved into the holding area.

2. Containers and equipment shall be removed from the holding area by workers in clean PPE and respirators who enter from the uncontaminated side (outside). The equipment decontamination enclosure system shall not be used to enter or exit the work area.

D. Storage of packaged asbestos wastes shall be in a completely enclosed dumpster or other suitable container that can be secured. The secured area shall be kept locked at all times to prevent unauthorized access.

E. Shipment of items from the project.

1. Decontaminated tools and equipment may be shipped by normal carrier to warehouse, another jobsite, or other destination.

2. For asbestos wastes:

a. Line shipping container with 6 mil poly prior to loading packaged asbestos wastes.

b. Post NESHAP placards during loading.

c. Persons performing loading operations shall wear PPE including respirators.

d. Containers and packages shall be tightly packed together to prevent shifting during transport. Large components or heavy items shall be secured to prevent shifting, and shall not be stacked on top of bags.

e. Execute the NESHAP-required Waste Shipment Record (WSR) to be signed by the generator, transporter, and landfill. All WSRs shall be returned to the EC within 30 days of shipment.

F. Disposal of packaged asbestos wastes.

1. Only landfills approved and permitted by the State of Iowa for accepting asbestos wastes may be used for disposal.

3.13 DEMOBILIZATION

A. EC shall visually inspect the work area for evidence of visible debris prior to releasing the area for tear-down. Detection of contamination will require additional cleaning and re-testing of the work area.

B. Remove critical barriers and seals.

END OF SECTION 02081

000000000202020202020202022220022020002002 81818181818118181818181181811811 - 11616161616161616161616116161

Drawings – Medical Center Building

4503 E 50th Street, Suite 800 Des Moines, IA 50317

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Medical Building

Basement

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

Legend Asbestos on steam and condensate piping

TSI on domestic water supply connections

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

Asbestos Drywall Mud

Medical Building First Floor

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

Asbestos Drywall Mud

Medical Building Second Floor

1251 224th St.

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

Asbestos Blue Vinyl Flooring

Medical Building South Wing First Floor

1251 224th St.

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

Medical Building South Wing - Basement

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

Asbestos on steam and condensate piping

Drawings – Elmcrest Building

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Elmcrest Second Floor

Legend

Asbestos Light Brown Flooring

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

Asbestos on steam and condensate piping

Asbestos Mastic Black/Yellow

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Elmcrest

First Floor

Legend

Blue Vinyl Flooring

1251 224th St.

Woodward, IA 50276

Asbestos Mastic Black/Yellow

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/7/2023 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Elmcrest

Basement

Legend Asbestos on steam and condensate piping

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

X

X

X

X X

Asbestos Window GlazingXXX

Drawings – Administration Building

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/11/23 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

Asbestos Laminate Flooring

Asbestos Containing Drywall Mud (<1%)

Admin Building First Floor

1251 224th St.

Woodward, IA 50276

ASBESTOS MATERIALS DRAWING

Asbestos Window GlazingXXX

XX

X

DESIGNED BY: Atlas SCALE: NTS

DRAWN BY: EM DATE: 12/11/23 FILE: SiteMap.PPT

REVIEWED BY: EM

PROJECT NO: 204BS06333

Legend

1251 224th St.

Woodward, IA 50276

Admin Building Second Floor

ASBESTOS MATERIALS DRAWING

Walnut Room

Asbestos Ceiling Tile Pucks

THIS PAGE

INTENTIONALLY

LEFT BLANK

WRC Decentralization Phase 3 IDAS Project # 9279.30 SH Project # 2142203394

Issued for Bid 01-11-2024

Demolition 02 4100 - 1

SECTION 02 4100

DEMOLITION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Selective demolition of building elements for alteration purposes.

B. Abandonment and removal of existing utilities and utility structures.

1.2 RELATED REQUIREMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. See Division 01 for submittal procedures, quality requirements, alterations of work, and closeout requirements.

B. Division 01 - Summary: Description of items to be salvaged or removed for re-use by Contractor.

C. Division 01 - Product Requirements

D. Division 01 - Execution: Project conditions; protection of bench marks, survey control points, and existing construction to remain; reinstallation of removed products; temporary bracing and shoring.

1.3 DEFINITIONS

A. Demolition: Dismantle, raze, destroy or wreck any building or structure or any part thereof.

B. Remove: Detach or dismantle items from existing construction and dispose of them off site, unless items are indicated to be salvaged or reinstalled.

C. Remove and Salvage: Detach or dismantle items from existing construction in a manner to prevent damage. Clean, package, label and deliver salvaged items to Owner in ready-for-reuse condition.

D. Remove and Reinstall: Detach or dismantle items from existing construction in a manner to prevent damage. Clean and prepare for reuse and reinstall where indicated.

E. Existing to Remain: Designation for existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.

1.4 REFERENCE STANDARDS

A. 29 CFR 1926 - Safety and Health Regulations for Construction Current Edition.

B. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations 2022, with Errata (2021).

1.5 SUBMITTALS

A. See Section 01 3300 - Administrative Requirements for submittal procedures.

B. Demolition Plan: Submit demolition plan as required by OSHA and AHJs.

1. Indicate extent of demolition, removal sequencing, bracing and shoring, and location and construction of barricades and fences.

2. Demolition firm qualifications.

SH Project # 2142203394

02 4100 - 2

Issued for Bid 01-11-2024

C. Project Record Documents: Accurately record actual locations of capped and active utilities and subsurface construction.

D. The Contractor shall submit utility service termination certificates, copies of demolition notices, and permits to the Architect/Engineer prior to removal.

E. The Contractor shall submit demolition procedures and operational sequence for review and acceptance by the Architect/Engineer if a portion of the existing facility is to remain in operation during construction and phasing is not specified in the plans or specifications.

F. Schedule indicating proposed sequence of operations for selective demolition work to Architect/Engineer for review prior to start of work. Include coordination for shutoff, capping, and continuation of utility services as required, together with details for dust and noise control protection.

PART 2 PRODUCTS – NOT USED

PART 3 EXECUTION

3.1 DEMOLITION

A. Remove other items indicated, for salvage and relocation.

3.2 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with requirements in Division 01.

B. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Obtain required permits.

2. Comply with applicable requirements of NFPA 241.

3. Use of explosives is not permitted.

4. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.

5. Provide, erect, and maintain temporary barriers and security devices.

6. Use physical barriers to prevent access to areas that could be hazardous to workers or the public.

7. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

8. Do not close or obstruct roadways or sidewalks without permits from authority having jurisdiction.

9. Conduct operations to minimize obstruction of public and private entrances and exits. Do not obstruct required exits at any time. Protect persons using entrances and exits from removal operations.

10. Obtain written permission from owners of adjacent properties when demolition equipment will traverse, infringe upon, or limit access to their property.

Issued for Bid 01-11-2024

Demolition 02 4100 - 3

C. Do not begin removal until receipt of notification to proceed from Owner.

D. Protect existing structures and other elements to remain in place and not removed.

1. Stop work immediately if adjacent structures appear to be in danger.

E. Minimize production of dust due to demolition operations. Do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.

F. Hazardous Materials:

1. If hazardous materials are discovered during removal operations, stop work and notify Architect/Engineer and Owner; hazardous materials include regulated asbestos containing materials, lead, PCBs, and mercury.

2. Hazardous Materials: Comply with 29 CFR 1926 and state and local regulations.

G. Perform demolition in a manner that maximizes salvage and recycling of materials.

1. Dismantle existing construction and separate materials.

2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse.

H. Accurately record locations of capped utilities and subsurface obstructions on the Contractor's record drawing set.

3.3 EXISTING UTILITIES

A. Coordinate work with utility companies. Notify utilities before starting work, comply with their requirements, and obtain required permits.

B. Protect existing utilities to remain from damage.

C. Do not disrupt public utilities without permit from authority having jurisdiction.

D. Do not close, shut off, or disrupt existing life safety systems that are in use without at least 7 days prior written notification to Owner.

E. Do not close, shut off, or disrupt existing utility branches or take-offs that are in use without at least 3 days prior written notification to Owner.

F. Locate and mark utilities to remain; mark using highly visible tags or flags, with identification of utility type; protect from damage due to subsequent construction, using substantial barricades if necessary.

G. Remove exposed piping, valves, meters, equipment, supports, and foundations of disconnected and abandoned utilities.

H. Prepare building demolition areas by disconnecting and capping utilities outside the demolition zone. Identify and mark, in same manner as other utilities to remain, utilities to be reconnected.

I. Contractor is responsible for the adjustment of all gas vents, manholes, castings, and water valves to match the new surface. Adjustments shall be coordinated with the utility companies and the cost for all adjustments shall be incidental to construction. Any damage to said structures and appurtenances, that occurs during construction, shall be repaired by the Contractor at no additional cost to the Owner.

02 4100 - 4

Issued for Bid 01-11-2024

3.4 SELECTIVE DEMOLITION FOR ALTERATIONS

A. Existing construction and utilities indicated on drawings are based on casual field observation and existing record documents only.

1. Verify construction and utility arrangements are as indicated.

2. Report discrepancies to Architect/Engineer before disturbing existing installation.

3. Beginning of demolition work constitutes acceptance of existing conditions that would be apparent upon examination prior to starting demolition.

B. Remove existing work as indicated and required to accomplish new work.

1. Remove items indicated on drawings.

C. Services including, but not limited to, HVAC, Plumbing, Fire Protection, Electrical, and

Telecommunications: Remove existing systems and equipment as indicated.

1. Maintain existing active systems to remain in operation, and maintain access to equipment and operational components.

2. Where existing active systems serve occupied facilities but are to be replaced with new services, maintain existing systems in service until new systems are complete and ready for service.

3. Verify that abandoned services serve only abandoned facilities before removal.

4. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings. Remove back to source of supply where possible, otherwise cap stub and tag with identification.

D. Protect existing work to remain.

1. Prevent movement of structure. Provide shoring and bracing as required.

2. Perform cutting to accomplish removal work neatly and as specified for cutting new work.

3. Repair adjacent construction and finishes damaged during removal work.

4. Patch to match new work.

3.5 DEBRIS AND WASTE REMOVAL

A. Remove debris, junk, and trash from site.

B. Remove materials not to be reused on site; do not burn or bury.

C. Leave site in clean condition, ready for subsequent work.

D. Clean up spillage and wind-blown debris from public and private lands.

END OF SECTION

SH Project # 2142203394

Issued for Bid 01-11-2024

Pipe and Tube Railings 05 5213 - 1

SECTION 05 5213

PIPE AND TUBE RAILINGS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel pipe and tube railings.

1.2 REFERENCE STANDARDS

A. ADA Standards - 2010 ADA Standards for Accessible Design 2010.

B. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products 2017.

C. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware 2023.

D. ASTM A36/A36M - Standard Specification for Carbon Structural Steel 2019.

E. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes 2021a.

F. ASTM A513/A513M - Standard Specification for Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing 2020a.

G. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless 2022.

H. ASTM A780/A780M - Standard Practice for Repair of Damaged and Uncoated Areas of Hot- Dip Galvanized Coatings 2020.

I. ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel 2023.

J. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink) 2020.

K. ASTM E488/E488M - Standard Test Methods for Strength of Anchors in Concrete Elements 2022.

L. ASTM F1941 - Standard Specification for Electrodeposited Coatings on Threaded Fasteners 2010.

M. ASTM F2329/F2329M - Standard Specification for Zinc Coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners 2015.

N. ICC (IBC) - International Building Code Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

O. AWS D1.1/D1.1M - Structural Welding Code - Steel 2020, with Errata (2023).

P. SSPC-PA 1 - Shop, Field, and Maintenance Coating of Metals 2016.

Q. SSPC-Paint 20 - Zinc-Rich Coating (Type I - Inorganic, and Type II - Organic) 2019.

R. SSPC-SP 6 - Commercial Blast Cleaning 2007.

05 5213 - 2

Issued for Bid 01-11-2024

1.3 COORDINATION

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.

B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

C. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements.

1.4 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer licensed in the State in which the Project is located to design railings.

B. Structural Performance of Railings: Railings shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Handrails and Top Rails of Guards:

a. Uniform load of 50 lb/ft applied in any direction.

b. Concentrated load of 200 lb applied in any direction.

c. Uniform and concentrated loads need not be assumed to act concurrently.

2. Infill of Guards:

a. Concentrated load of 50 lb applied horizontally on an area of 1 sq. ft..

b. Infill load and other loads need not be assumed to act concurrently.

C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

D. Comply with ICC (IBC) and ADA Standards for all railings.

1.5 ACTION SUBMITTALS

A. Product Data: For the following:

1. Manufacturer's product lines of mechanically connected railings.

2. Railing brackets.

3. Grout, anchoring cement, and paint products.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

C. Delegated-Design Submittal: For railings, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

Pipe and Tube Railings 05 5213 - 3

1.6 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers certifying that shop primers are compatible with topcoats.

1.7 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

1.8 DELIVERY, STORAGE, AND HANDLING

A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

1.9 FIELD CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

PART 2 PRODUCTS

2.1 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.

B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails unless otherwise indicated.

1. Provide type of bracket with flange tapped for concealed anchorage to threaded hanger bolt and that provides 1 1/2 inch clearance from inside face of handrail to finished wall surface.

2.2 STEEL AND IRON

A. Tubing: ASTM A500/A500M (cold formed) or ASTM A513/A513M.

B. Pipe: ASTM A53/A53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.

C. Plates, Shapes, and Bars: ASTM A36/A36M.

2.3 FASTENERS

A. General: Provide the following:

1. Ungalvanized-Steel Railings: Plated steel fasteners complying with ASTM B633 or ASTM F1941, Class Fe/Zn 5 for zinc coating.

2. Hot-Dip Galvanized Railings: Type 304 stainless-steel or hot-dip zinc-coated steel fasteners complying with ASTM A153/A153M or ASTM F2329/F2329M for zinc coating.

3. Provide exposed fasteners with finish matching appearance, including color and texture, of railings.

05 5213 - 4

Issued for Bid 01-11-2024

B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads.

C. Fasteners for Interconnecting Railing Components:

1. Provide concealed fasteners for interconnecting railing components and for attaching them to other work, unless otherwise indicated.

2. Provide tamper-resistant flat-head machine screws for exposed fasteners unless otherwise indicated.

D. Post-Installed Anchors: Torque-controlled expansion anchors capable of sustaining, without failure, a load equal to 6 times the load imposed when installed in unit masonry and 4 times the load imposed when installed in concrete, as determined by testing according to ASTM E488/E488M, conducted by a qualified independent testing agency.

1. Material for Interior Locations: Carbon-steel components zinc-plated to comply with ASTM B633 or ASTM F1941, Class Fe/Zn 5, unless otherwise indicated.

2.4 MISCELLANEOUS MATERIALS

A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.

B. Etching Cleaner for Galvanized Metal: Complying with MPI#25.

C. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.

D. Shop Primers: Provide primers that comply with Division 9 Painting Sections.

E. Intermediate Coats and Topcoats: Provide products that comply with Division 9 Painting Sections.

F. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C1107/C1107M. Provide grout specifically recommended by manufacturer for interior and exterior applications.

G. Anchoring Cement: Factory-packaged, nonshrink, nonstaining, hydraulic-controlled expansion cement formulation for mixing with water at Project site to create pourable anchoring, patching, and grouting compound.

2.5 FABRICATION

A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.

B. Shop assemble railings to greatest extent possible to minimize field splicing and assembly.

Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.

C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

Pipe and Tube Railings 05 5213 - 5

E. Fabricate connections that are exposed to weather in a manner that excludes water. Provide weep holes where water may accumulate.

F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.

G. Connections: Fabricate railings with welded connections unless otherwise indicated.

H. Welded Connections: Cope components at connections to provide close fit, or use fittings designed for this purpose. Weld all around at connections, including at fittings.

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap.

3. Remove flux immediately.

4. At exposed connections, finish exposed surfaces smooth and blended so no roughness shows after finishing and welded surface matches contours of adjoining surfaces.

I. Nonwelded Connections: Connect members with concealed mechanical fasteners and fittings.

Fabricate members and fittings to produce flush, smooth, rigid, hairline joints.

1. Fabricate splice joints for field connection using an epoxy structural adhesive if this is manufacturer's standard splicing method.

J. Form Changes in Direction as Follows:

1. As detailed.

2. By bending or by inserting prefabricated elbow fittings.

K. For changes in direction made by bending, use jigs to produce uniform curvature for each repetitive configuration required. Maintain cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of components.

L. Close exposed ends of railing members with prefabricated end fittings.

M. Provide wall returns at ends of wall-mounted handrails unless otherwise indicated. Close ends of returns unless clearance between end of rail and wall is 1/4 inch or less.

N. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, flanges, miscellaneous fittings, and anchors to interconnect railing members to other work unless otherwise indicated.

1. At brackets and fittings fastened to plaster or gypsum board partitions, provide crush-resistant fillers or other means to transfer loads through wall finishes to structural supports and prevent bracket or fitting rotation and crushing of substrate.

O. Provide inserts and other anchorage devices for connecting railings to concrete or masonry work. Fabricate anchorage devices capable of withstanding loads imposed by railings.

Coordinate anchorage devices with supporting structure.

P. For railing posts set in concrete, provide steel sleeves not less than 6 inch long with inside dimensions not less than 1/2 inch greater than outside dimensions of post, with metal plate forming bottom closure.

Q. For removable railing posts, fabricate slip-fit sockets from steel tube or pipe whose ID is sized for a close fit with posts; limit movement of post without lateral load, measured at top, to not more than one-fortieth of post height. Provide socket covers designed and fabricated to resist being dislodged.

1. Provide chain with eye, snap hook, and staple across gaps formed by removable railing sections at locations indicated. Fabricate from same metal as railings.

05 5213 - 6

Issued for Bid 01-11-2024

R. Toe Boards: Where indicated, provide toe boards at railings around openings and at edge of open-sided floors and platforms. Fabricate to dimensions and details indicated.

2.6 STEEL AND IRON FINISHES

A. Galvanized Railings:

1. Hot-dip galvanize exterior steel railings, including hardware, after fabrication.

2. Comply with ASTM A123/A123M for hot-dip galvanized railings.

3. Comply with ASTM A153/A153M for hot-dip galvanized hardware.

4. Do not quench or apply post galvanizing treatments that might interfere with paint adhesion.

5. Fill vent and drain holes that are exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.

B. For galvanized railings, provide hot-dip galvanized fittings, brackets, fasteners, sleeves, and other ferrous components.

C. Preparing Galvanized Railings for Shop Priming: After galvanizing, thoroughly clean railings of grease, dirt, oil, flux, and other foreign matter, and treat with etching cleaner.

D. For nongalvanized-steel railings, provide nongalvanized ferrous-metal fittings, brackets, fasteners, and sleeves; however, galvanize anchors to be embedded in exterior concrete or masonry.

E. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with SSPC-

SP 6

F. Primer Application: Apply shop primer to prepared surfaces of railings unless otherwise indicated. Comply with requirements in SSPC-PA 1, "Shop, Field, and Maintenance Painting of Steel," for shop painting. Primer need not be applied to surfaces to be embedded in concrete or masonry.

1. Shop prime uncoated railings with universal shop primer unless zinc-rich primer is indicated.

2. Do not apply primer to galvanized surfaces.

G. Shop-Painted Finish: Comply with Division 9 Painting Sections.

1. Color: As indicated by manufacturer's designations.

H. High-Performance Coating: Apply epoxy intermediate and polyurethane topcoats to prime-coated surfaces. Comply with coating manufacturer's written instructions and with requirements in SSPC-PA 1, "Shop, Field, and Maintenance Painting of Steel," for shop painting. Apply at spreading rates recommended by coating manufacturer.

1. Color: As indicated by manufacturer's designations.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine plaster and gypsum board assemblies, where reinforced to receive anchors, to verify that locations of concealed reinforcements are clearly marked for Installer. Locate reinforcements and mark locations if not already done.

Pipe and Tube Railings 05 5213 - 7

3.2 INSTALLATION, GENERAL

A. Fit exposed connections together to form tight, hairline joints.

B. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack.

1. Do not weld, cut, or abrade surfaces of railing components that are coated or finished after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.

2. Set posts plumb within a tolerance of 1/16 inch in 3 feet.

3. Align rails so variations from level for horizontal members and variations from parallel with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet.

C. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.

D. Adjust railings before anchoring to ensure matching alignment at abutting joints.

E. Fastening to In-Place Construction: Use anchorage devices and fasteners where necessary for securing railings and for properly transferring loads to in-place construction.

3.3 RAILING CONNECTIONS

A. Welded Connections: Use fully welded joints for permanently connecting railing components.

Comply with requirements for welded connections in "Fabrication" Article whether welding is performed in the shop or in the field.

B. Expansion Joints: Install expansion joints at locations indicated but not farther apart than required to accommodate thermal movement. Provide slip-joint internal sleeve extending 2 inch beyond joint on either side, fasten internal sleeve securely to one side, and locate joint within 6 inch of post.

3.4 ANCHORING POSTS

A. Use metal sleeves preset and anchored into concrete for installing posts. After posts are inserted into sleeves, fill annular space between post and sleeve with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions.

B. Form or core-drill holes not less than 5 inch deep and 3/4 inch larger than OD of post for installing posts in concrete. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions.

C. Cover anchorage joint with flange of same metal as post, welded to post after placing anchoring material.

D. Leave anchorage joint exposed with 1/8 inch buildup, sloped away from post.

E. Anchor posts to metal surfaces with oval flanges, angle type, or floor type as required by conditions, connected to posts and to metal supporting members as follows:

1. For steel pipe railings, weld flanges to post and bolt to metal supporting surfaces.

F. Install removable railing sections, where indicated, in slip-fit metal sockets cast in concrete.

05 5213 - 8

Issued for Bid 01-11-2024

3.5 ATTACHING RAILINGS

A. Anchor railing ends at walls with round flanges anchored to wall construction and welded to railing ends.

B. Anchor railing ends to metal surfaces with flanges bolted to metal surfaces and welded to railing ends.

C. Attach railings to wall with wall brackets. Locate brackets as indicated or, if not indicated, at spacing required to support structural loads.

D. Secure wall brackets and railing end flanges to building construction as follows:

1. For concrete and solid masonry anchorage, use drilled-in expansion shields and hanger or lag bolts.

2. For hollow masonry anchorage, use toggle bolts.

3. For wood stud partitions, use hanger or lag bolts set into studs or wood backing between studs. Coordinate with carpentry work to locate backing members.

4. For steel-framed partitions, use self-tapping screws fastened to steel framing or to concealed steel reinforcements.

3.6 ADJUSTING AND CLEANING

A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop painting to comply with SSPC-PA 1 requirements for touching up shop-painted surfaces.

1. Apply by brush or spray to provide a minimum 2.0 mil dry film thickness.

B. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas, and repair galvanizing to comply with ASTM A780/A780M.

3.7 PROTECTION

A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.

SH Project # 2142203394

Issued for Bid 01-11-2024

Rough Carpentry 06 1000 - 1

SECTION 06 1000

ROUGH CARPENTRY

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Nonstructural dimension lumber framing.

B. Sheathing.

C. Fire retardant treated wood materials.

D. Communications and electrical room mounting boards.

E. Concealed wood blocking, nailers, and supports.

1.2 REFERENCE STANDARDS

A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware 2023.

B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials 2022.

C. AWPA U1 - Use Category System: User Specification for Treated Wood 2022.

D. PS 1 - Structural Plywood 2009 (Revised 2019).

E. PS 2 - Performance Standard for Wood Structural Panels 2018.

F. PS 20 - American Softwood Lumber Standard 2021.

G. SPIB (GR) - Standard Grading Rules 2021.

1.3 SUBMITTALS

A. See Section 01 3300 - Submittal Procedures for submittal procedures.

B. Product Data: Provide technical data on fire-retardant treatment materials.

1.4 DELIVERY, STORAGE, AND HANDLING

A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

B. Fire Retardant Treated Wood: Prevent exposure to precipitation during shipping, storage, and installation.

PART 2 PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.

1. If no species is specified, provide species graded by the agency specified; if no grading agency is specified, provide lumber graded by grading agency meeting the specified requirements.

06 1000 - 2

Issued for Bid 01-11-2024

2. Grading Agency: Grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee at www.alsc.org, and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.

2.2 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Grading Agency: Southern Pine Inspection Bureau, Inc; SPIB (GR).

B. Sizes: Nominal sizes as indicated on drawings, S4S.

C. Moisture Content: S-dry or MC19.

D. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:

1. Lumber: S4S, No. 2 or Standard Grade.

2. Boards: Standard or No. 3.

3. Fire Retardant Treated.

2.3 CONSTRUCTION PANELS

A. Communications and Electrical Room Mounting Boards: PS 1 A-D plywood, or medium density fiberboard; 3/4 inch thick; flame spread index of 25 or less, smoke developed index of 450 or less, when tested in accordance with ASTM E84.

1. Fire Retardant Treated.

2.4 ACCESSORIES

A. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

2. Drywall Screws: Bugle head, hardened steel, power driven type, length three times thickness of sheathing.

3. Anchors: Toggle bolt type for anchorage to hollow masonry.

2.5 FACTORY WOOD TREATMENT

A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.

1. Fire-Retardant Treated Wood: Mark each piece of wood with producer's stamp indicating compliance with specified requirements.

B. Fire Retardant Treatment:

1. Interior Type A: AWPA U1, Use Category UCFA, Commodity Specification H, low temperature (low hygroscopic) type, chemically treated and pressure impregnated;

capable of providing a maximum flame spread index of 25 when tested in accordance with ASTM E84, with no evidence of significant combustion when test is extended for an additional 20 minutes.

a. Kiln dry wood after treatment to a maximum moisture content of 19 percent for lumber and 15 percent for plywood.

Rough Carpentry 06 1000 - 3

b. Interior rough carpentry items are to be fire retardant treated.

c. Treat rough carpentry items as indicated.

d. Do not use treated wood in applications exposed to weather or where the wood may become wet.

PART 3 EXECUTION

3.1 INSTALLATION - GENERAL

A. Select material sizes to minimize waste.

B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.

C. Where treated wood is used on interior, provide temporary ventilation during and immediately after installation sufficient to remove indoor air contaminants.

3.2 BLOCKING, NAILERS, AND SUPPORTS

A. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim.

B. In walls, provide blocking attached to studs as backing and support for wall-mounted items, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated.

C. Provide the following…

This is the start of the file's text. The full file is on GovTribe.