RFB922300-03 Kitchen & Laundry - Addendum 2.0.pdf
PDF 3 MB Posted
- Attached to
- CCF Kitchen and Laundry Addition
- Solicitation number
- RFB922300-03
- Issued by
- Page County, Iowa
About this file
This document is an addendum to the Request for Bid (RFB) for the Kitchen & Laundry project at the Clarinda Correctional Facility (CCF) in Clarinda, Iowa. The project is being managed by the Iowa Department of Corrections. This addendum revises certain drawings and specifications related to the foodservice equipment, insulation, transfer switch, and lighting for the project. Key changes include revisions to the foodservice equipment plan and schedule, additional details for the workcounters, changes to the insulation requirements, and updates to the electrical schedules and drawings. The bid is due on March 7, 2024 at 2:00 PM local time through the IMPACS Electronic Procurement System.
The addendum also includes information on approved substitutions for the thermal insulation and detention security equipment. Contractors must acknowledge receipt of this addendum on the bid form. This project is part of a larger renovation at the CCF, with previous bid packages already awarded. This addendum is specifically for the HVAC and plumbing scope of work under Bid Package BP-06.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum
14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com
ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS
Addendum Number: 2.0
Addendum Issue Date: March 1, 2024 Owner: State of Iowa Department of Corrections – Clarinda
Correctional Facility
Project Name: Clarinda Correctional Facility – Kitchen & Laundry
RFB Number: 922300-03
Containing: 4 Pages; 3 Drawings; 0 Specifications
This addendum amends the drawings and specifications of the above reference project and is hereby incorporated into the contract documents as part thereof. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.
Drawings:
General: NA
Life Safety: NA
Civil: NA
Structural: NA
Architectural:
Item No. 1. A5.2 – WALL SECTIONS
Reference view 2 - WALL SECTION @ DRYER CHASE
1. REVISE note reading “3” RIGID INSULATION” to read “R-16 RIGID INSULATION”
2. ADD 1 layer of 5/8” moisture resistant type X gypsum board over the R-30 RIGID INSULATION at the dryer chase cap only
Foodservice Equipment:
Item No. 2. FS103 – FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3
Reference Foodservice Equipment Schedule – Area C
3. REVISE schedule as shown in updated attached sheet
Item No. 3. FS103 – FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3
Reference Foodservice Equipment Plan – Area 3
1. REVISE drawings to reflect a 108” x 30” Mobile Workcounter.
Item No. 4. FS200 – FOODSERVICE EQUIPMENT ELEVATIONS AND SECTIONS
Reference Foodservice Elevations views 3, 4, 5 and 6.
1. REVISE drawings to include additional details for fabrication for (2) Item 77 – Workcounter clawrence Text Box
Farnsworth Group, Inc.
Addendum 1.0
Item No. 5. FSE100 – FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE & DETAILS
Reference Foodservice Equipment Electrical Schedule
1. REVISE schedule as shown in updated attached sheet
Fire Protection: NA
Plumbing: NA
Mechanical: NA
Electrical:
Item No. 6. E1.4 – LEVEL 01 PLAN – AREA A – POWER
E1.5 – LEVEL 02 PLAN – AREA A – POWER
E1.6 – LEVEL 01 PLAN – AREA B – POWER
E1.7 – LEVEL 02 PLAN – AREA B – POWER
E1.8 – LEVEL 01 PLAN – AREA A – SYSTEMS
E1.9 – LEVEL 01 PLAN – AREA B – SYSTEMS
E1.10 – LEVEL 02 PLAN – AREA A – SYSTEMS
E1.11 – LEVEL 02 PLAN – AREA B – SYSTEMS
1. ADD Bid Alternate Note block to say the following:
ALTERNATE NO. 2:
BASE BID CONDITION:
PROVIDE KITCHEN EQUIPMENT AS NOTED IN FSE DOCUMENTS WITH THE EXCEPTION OF
NOTED ALTERNATE EQUIPMENT BUT DO NOT PROVIDE INSTALLATION OR HOOKUP
SERVICES.
ALTERNATE BID CONDITION:
PROVIDE ALL NOTED ALTERNATE BAKERY EQUIPMENT AND FULL INSTALLATION OF ALL
EQUIPMENT.
ALTERNATE NO. 3:
BASE BID CONDITION:
PROVIDE KITCHEN EQUIPMENT AS NOTED IN FSE DOCUMENTS WITH THE EXCEPTION OF
NOTED ALTERNATE EQUIPMENT. PROVIDE ALL ROUGH-INS TO NOTED ALTERNATE
EQUIPMENT BUT DO NOT PROVIDE INSTALLATION OR HOOKUP SERVICES.
ALTERNATE BID CONDITION:
PROVIDE ALL NOTED ALTERNATE NO. 3 EQUIPMENT AND FULL INSTALLATION OF ALL
EQUIPMENT.
Item No. 7. E6.1 – ELECTRICAL SCHEDULES
1. REVISE Transfer Switch Schedule type GCC-1 from 100A to 60A.
Item No. 8. E6.3 – ELECTRICAL SCHEDULES
1. REVISE Luminaire Schedule fixture F4 approved manufacturers to include “Cooper LD6C”.
2. REVISE Luminaire Schedule fixture F4A approved manufacturers to include “Cooper LD6C”.
3. REVISE Luminaire Schedule fixture W4 approved manufacturers to include “Cooper McGraw-Edison
IST”.
Technology: NA
Specifications:
Item No. 9. Section 07 2100 – THERMAL INSULATION
Reference 2.01 APPLICATIONS
1. REVISE item C to read as follows: Insulation inside prefabricated Concrete Wall Panels: Integral
Insulation (RI-2)
Reference 2.02 FOAM BOARD INSULATION MATERIALS
2. REVISE item A.1 to read as follows: Type and Compressive Resistance: Type IV, 25 psi (173 kPa), minimum.
3. REVISE items 7 a,b,&c as follows:
a. DuPont de Nemours, Inc; Styrofoam Brand Square Edge: building.dupont.com/#sle.
b. Kingspan Insulation LLC; GreenGuard XPS Type IV, 25 psi: www.kingspan.com/#sle.
c. Owens Corning Corporation; FOAMULAR Type 250 Extruded Polystyrene (XPS) Insulation:
www.ocbuilingspec.com/#sle.
3. ADD item C. as follows:
C. Integral Insulation (RI-2): Rigid expanded (EPS), extruded (XPS), or polyisocyanurate (ISO) insulation.
1. Design and construct panels to maintain overall R-value of 16 minimum, with less than one percent change due to penetrations and connections, when calculated in accordance with ASHRAE 90.1, isothermal planes method.
2. Compressive Resistance: 25 psi.
3. Connectors: Non-conducting connectors designed and manufactured for use in insulated composite panels.
4. ADD item D. as follows:
a. Extruded Polystyrene (XPS)-3 Board Insulation: Comply with ASTM C578 with either natural skin or cut cell surfaces.
i. Type and Compressive Resistance: Type IV, 25 psi (276 kPa), minimum.
ii. Flame Spread Index (FSI): Class A - 0 to 25, when tested in accordance with ASTM E84.
iii. Smoke Developed Index (SDI): 175 or less, when tested in accordance with ASTM E84.
iv. Type and Thermal Resistance, R-value: Type IV, 5.0 (0.88), minimum, per 1 inch thickness at
75 degrees F mean temperature.
v. Board Edges: Square.
vi. Type and Water Absorption: Type IV, 0.3 percent by volume, maximum, by total immersion.
vii. Products:
a. DuPont de Nemours, Inc; Styrofoam Brand Scoreboard: building.dupont.com/#sle.
b. Kingspan Insulation LLC; GreenGuard XPS Type IV: www.kingspan.com/#sle.
c. Owens Corning Corporation; FOAMULAR NGX Type 250 Next Generation Extruded:
www.ocbuildingspec.com/#sle.
d. Substitutions: See Section 01 6000 - Product Requirements.
Section 11 4000 - FOODSERVICE EQUIPMENT
Reference Section 3.06 ITEM SPECIFICATIONS
REVISE as follows:
Item No. 10. 109 Change to:
Food Processor (BY OWNER)
Item No. 11. 141 Change to:
MOBILE WORKCOUNTER (ADD ALTERNATE – ALT 3)
Two
Advance Tabco Model SS-309 or equal by Eagle Group or Metro Industries *R103
“Substitutions”: As approved by Architect prior to bid”
Features: Length and width per Plan; 36" high; 14 gauge stainless steel top and understructure;
stainless steel welded undershelf; stainless steel legs and underbracing; rolled rim edge; paint on sound deadening top; four 5" diameter swivel casters, all with brakes; correctional package tamper proof hardware
Item No. 12. Section 26 3600 – TRANSFER SWITCH
Reference - Article 2.02 PORTABLE GENERATOR (GCC-#)
1. REVISE paragraph B to read: Pad mount, powder coat painted NEMA 3R housing with lockable door, 60 amps, 600 volt. Color-coded cam-lock connectors. Submit product data and dimensioned drawings. Color selection by Architect.
Product Approvals:
The following manufacturers are approved as substitute products of the named Base Bid manufacturer(s). Approval is contingent upon manufacturers fulfilling all specification requirements, tangible and intangible, equally as well as specified product.
References/Item Manufacturer/Supplier
07 2100 Thermal insulation Atlas; EnergyShield XR
11 1900 Detention Security Equipment 1.07.A.1 Southern Folger Contracting, Inc.
E6.3 /Type F4 Portfolio LD6C series
E6.3 /Type F4A Portfolio LD6C series
E6.3 /Type W1 McGraw-Edison IST series
Bids are Due: March 7, 2024 / 2:00 PM local time to IMPACS Electronic Procurement System.
END OF ADDENDUM
Issued By:
FARNSWORTH GROUP, INC.
Kelsey Vetter, AIA
Project Architect
Attachments:
Drawings: FS103, FS200, FSE100
Specifications: NA
Other: Approved Substitution Request Forms – 07 2100, 11 1900
BB
F
FF FF2 DR
R E
F x
0"
24" x 60" 24" x 60" 24" x 60"
6"
24" x 48"
24" x 80"
24" x 80"24" x 80"
24" x 80"
BB
F
FF FF2 DR
R E
F
8"
18" x 48"
21" x 72"
24" x 48"
COLD FOOD
PRODUCTION AND
ASSEMBLY
HOT FOOD PRODUCTION AND ASSEMBLY
DISHROOM
STAFF BREAK AREA
DIRECTOR'S OFFICE
POT AND PAN
STORAGE
POT AND PAN
WASHING
SUPERVISORS OFFICE
CHEMICAL AND LAUNDRY
101B
129132
101B
102102
105105
105 105
101A
101B
101A
101A
101A
172172
143 143
143143
143 143
A1
AF
AE
AD
AC
AB
PD
PE
A2 A3
A4
FS203
FS2032
FS202 3
FS2011
143 143
W
W
W
W
W
TRAY CART
ASSEMBLY
CART WASH
FS202 2
FS2015
FS201 4
FS201 2
FS2021
FS2013
SOILED
CLEAN
STAFF RR
101B
TRAY CART
PARKING
DURING
ASSEMBLY
193193
193193193193
193193193193193193
H.S.
H.S.
H.S.
H.S.
H.S.
H.S.
101A
TRAY CART
PARKING
DURING
ASSEMBLY
H.S.
195 194
R
101B
101B
RACK PARKING
POT AND PAN
STORAGE
POT AND PAN
STORAGE
TRAY DRYING
RACKS
147 147
MOP SINK NOT
PROVIDED BY
SECTION 114000
BIB LOCATION, SEE MECH.
TRADE'S DRAWINGS
111 111
111 111
111111111111
105 105
DATE:
DRAWN:
REVIEWED:
SHEET TITLE:
SHEET NUMBER:
PROJECT NO.:
PROJECT:
ISSUE:
# DATE: DESCRIPTION:
DESIGNED:
RFB922300-03
/2
/2
:1 :1
P
M FS103
FOODSERVICE
EQUIPMENT PLAN
AND SCHEDULE -
AREA 3
MM/BB
EG/RB
0240202.00
CLARINDA
CORRECTIONAL
FACILITY - KITCHEN &
LAUNDRY ADDITION
STATE OF IOWA DEPARTMENT
OF CORRECTIONS
2000 N 16TH ST, CLARINDA, IA
51632
02/09/2024
EG/TP
BID SET
1/4" = 1'-0"
1 FOODSERVICE EQUIPMENT PLAN - AREA 3
FOODSERVICE EQUIPMENT SCHEDULE - AREA C
ITEM # QTY DESCRIPTION REMARKS
100 7 HAND SINK
101A 5 PAN STORAGE SHELVING
101B 6 PAN STORAGE SHELVING BY OWNER
102 3 MOBILE LUG RACK
103 1 UTILITY CART BY OWNER
104 1 WORKCOUNTER W/SINKS
105 8 MOBILE TRASH BIN BY OWNER
106 1 OPEN NUMBER
107 1 SPRAY RINSE
108 1 WALL SHELF
109 1 FOOD PROCESSOR BY OWNER
110 1 OPEN NUMBER
111 21 STAINLESS STEEL CORNER GUARD
112 1 REACH-IN REFRIGERATOR, 2-SEC. ADD ALTERNATE - ALT 3
113 1 MOBILE EQUIPMENT STAND
114 1 SLICER ADD ALTERNATE - ALT 3
115 2 DOUBLE WIDE WORKTABLE
116 1 HORIZONTAL CUTTER/MIXER ADD ALTERNATE - ALT 2
117 1 FLOOR TROUGH
118 1 HOSE STATION
119 1 HOSE STATION SECURITY CABINET
120-127 1 OPEN NUMBER
128 5 CHEMICAL STORAGE SHELVING
129 1 MOBILE WORKTABLE
130 1 OPEN NUMBER
131 2 CHEMICAL STORAGE SHELVING BY OWNER
132 1 STACKED WASHER/DRYER
133 1 OPEN NUMBER
134 3 STAINLESS STEEL WALL CAP
135-139 1 OPEN NUMBER
140 2 MOBILE WORKTABLE
141 2 MOBILE WORKTABLE ADD ALTERNATE - ALT 3
142 5 MOBILE WARMING CABINET
143 16 MOBILE RACK BY OWNER
144 1 80 QUART MIXER ADD ALTERNATE - ALT 3
145 1 WORKCOUNTER W/SINKS
146 1 WORKCOUNTER W/SINKS
147 2 SHEET PAN DOLLY
148 1 EXHAUST HOOD (TYPE I)
149 1 STAINLESS STEEL WALL PANEL
150 1 UTILITY DISTRIBUTION SYSTEM
151 1 FIRE PROTECTION SYSTEM
152 1 OPEN NUMBER
153 1 DEMAND CONTROL VENTILATION SYSTEM
154 2 60 GALLON KETTLE
155 2 80 GALLON KETTLE
156 1 FLOOR TROUGH
157 1 OPEN NUMBER
158 2 STEAMER, 2-SEC. ADD ALTERNATE - ALT 3
159 1 OPEN NUMBER
160 1 STEAMER, 2-SEC. ADD ALTERNATE - ALT 3
161 1 STEAMER, 2-SEC.
162 1 HOSE REEL
163 2 RACK OVEN, 2-SEC.
164 2 OVEN RACK, DOUBLE
165-167 1 OPEN NUMBER
168 3 HOSE REEL SECURITY CABINET
169 1 FIRE PROTECTION SYSTEM
170 1 FIRE PROTECTION SYSTEM
171 1 OPEN NUMBER
172 2 POT AND PAN CART
173 1 POT & PAN SINK
174 1 DISPOSER
175 1 SPRAY RINSE
176-180 1 OPEN NUMBER
181 1 CART WASH STAINLESS STEEL WALL PANEL
182 1 HOSE STATION
183 1 FLOOR TROUGH
184 2 HOSE REEL
185 2 EYE/FACE WASH STATION
186 1 SOILED DISHTABLE
187 2 DISPOSER
188 1 HOSE STATION SECURITY CABINET
189 1 FLIGHT-TYPE DISHMACHINE W/DRYER
190 1 EXHAUST DUCT RISER
191 2 SPRAY RINSE
192 1 FLOOR TROUGH
193 12 DRYING RACK BY OWNER
194 1 FLOOR TROUGH
195 1 CONDENSATE HOOD
2.0 03/01/2024 ADDENDUM 2.0
2.0
2.0
2.0
SD-4
SD-2a
SOAP & TOWEL
DISP. NOT IN
SECTION 114000
SD-9a
FSH
OPEN STORAGE
SD-1a
SD-3
SD-28
SD-17
SD-7
DOOR LOCK
SD-70
SD-4
SD-6 SD-7
SD-30
120/1 20A CONV.
DR. (1 OF 3)
RECEPTACLE
FOR #833
/4
RICHLITE CUTTING BOARD
THICKNESS TO BE 3/4" -
OVERALL HEIGHT TO BE 3'-0"
INCLUDING CUTTING BOARD
SD-1a
SD-3
79 78
81 SD-70
SD-63
"SD-30
SD-7 SD-4
(2) RECEPTACLES SIDE
BY SIDE FOR #71 & 79
120/1 20A CONV.
DR. (2 OF 2)3
/4
RICHLITE CUTTING BOARD
THICKNESS TO BE 3/4" -
OVERALL HEIGHT TO BE 3'-0"
INCLUDING CUTTING BOARD
SD-1a
SD-3
68 66 6665 66 66
SOAP & TOWEL
DISP. NOT IN
SECTION 114000
FSH
120/1 20 A CONV. DR.
MOUNTED
HORIZONTALLY (1 OF 2)
120/1 20 A CONV. DR.
MOUNTED
HORIZONTALLY (2 OF 2)
RECEPT. FOR ITEM 71
SD-39
SD-7
SD-17
SD-9a
SD-2a
SD-1a
SD-3
SD-4
DOOR LOCK
A
FS203
SIM
84 71
79 78
120/1 20A CONV.
DR. (1 OF 2)
SD-70 SD-4 SD-7
SD-30
SD-6
RICHLITE CUTTING BOARD
THICKNESS TO BE 3/4" -
OVERALL HEIGHT TO BE 3'-0"
INCLUDING CUTTING BOARD
/4
"SD-1a
SD-3
120/1 20A CONV.
DR. (3 OF 3)
82 120/1 20A CONV.
DR. (2 OF 3)
"SD-30
SD-7 SD-4
SD-6
RICHLITE CUTTING BOARD
THICKNESS TO BE 3/4" -
OVERALL HEIGHT TO BE 3'-0"
INCLUDING CUTTING BOARD
/4
SD-1a
SD-3
DATE:
DRAWN:
REVIEWED:
SHEET TITLE:
SHEET NUMBER:
PROJECT NO.:
PROJECT:
ISSUE:
# DATE: DESCRIPTION:
DESIGNED:
RFB922300-03
/2
/2
:2 :0
P
M FS200
FOODSERVICE
EQUIPMENT
ELEVATIONS AND
SECTIONS
MM/BB
EG/RB
0240202.00
CLARINDA
CORRECTIONAL
FACILITY - KITCHEN &
LAUNDRY ADDITION
STATE OF IOWA DEPARTMENT
OF CORRECTIONS
2000 N 16TH ST, CLARINDA, IA
51632
02/09/2024
EG/TP
BID SET
RRA KEYNOTE LEGEND
KEYNOTE KEYNOTE TEXT
SD-1a TABLE EDGE - TURN DOWN
SD-2a BACKSPLASH - AT WALL
SD-3 FRAMEWORK
SD-4 TABLE & SINK LEGS
SD-6 REMOVABLE UNDERSHELF
SD-7 CABINET CONSTRUCTION
SD-9a GENERAL USE 16"x20"x10" DP.
SD-17 HINGED SOLID DOOR - INTEGRAL PULL
SD-28 WALL CABINET W/SHELF
SD-30 UTILITY CURB
SD-39 STAINLESS STEEL CORNER GUARD
SD-70 SHEET PAN DOLLY
1/2" = 1'-0"
1 ITEM 22 - WORKCOUNTER W/ SINK
1/2" = 1'-0"
5 ITEM 77 - WORKCOUNTER 3
1/2" = 1'-0"
4 ITEM 77 - WORKCOUNTER 2
INGREDIENT ASSEMBLY
BAKERY PREP
1/2" = 1'-0"
2 ITEM 62 - WORKCOUNTER W/ SINK
1/2" = 1'-0"
3 ITEM 77 - WORKCOUNTER 1
1/2" = 1'-0"
6 ITEM 77 - WORKCOUNTER 4
2.0 03/01/2024 ADDENDUM 2.0
ELECTRICAL LEGEND
S
COMPRESSOR
BRING SERVICE DOWN FROM ABOVE
DISTANCE ABOVE FINISHED FLOOR
JUNCTION BOX
HORSEPOWER
KILOWATT
WATTS
PHASE
AMPERES
VOLTS
SWITCH
SINGLE RECEPTACLE
DUPLEX RECEPTACLE
COMP
DN+
JB
HP
KW
W
PH
AMP
V
SW
SR
DR
MOTOR
SOLENOID
CEILING TO A DISTANCE ABOVE
FINISHED FLOOR
AFF
CLG
DFA
ET
ELEC
FSEC
ABOVE FINISHED FLOOR
CEILING
DOWN FROM ABOVE
ELECTRICAL TRADES
ELECTRICAL
FOODSERVICE EQUIPMENT CONTRACTOR
FLOOR RECEPTACLEFR
DATA OUTLET
VOICE OUTLET
EMPTY JUNCTION BOX
ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE
WITH TIME DELAY RELAY
DISPOSER
ALTERNATE
CONTROL
LOCATION
DISCONNECT
FURNISHED BY
ELECTRICAL
TRADES AND
LOCATED PER
LOCAL CODE
DISPOSER
CONTROL
INTERCONNECTION
FROM J-BOX BY
ELECTRICAL TRADES
SOLENOID VALVE FURNISHED BY
FSEC, INSTALLED BY PLUMBING
TRADES AND INTERWIRED BY
ELECTRICAL TRADES
TIME DELAY RELAY
FURNISHED BY FSEC,
INTERWIRED BY
ELECTRICAL TRADES
ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE
WALK-IN REFRIGERATOR/FREEZER
JUNCTION BOX WITH
OUTLET FOR DRAINLINE
HEATER ON FREEZER
(EXPOSED CONDUIT FOR
THIS CONDITION IS
ACCEPTABLE)
SECURE COIL WITH NYLON FASTENERS
CONDUIT DOWN THRU WALK-IN TOP
INTO LIGHT FIXTURE
HEATED PRESSURE
RELIEF PORT ON
FREEZER
BUILDING SPRINKLER
CONNECTION IF REQUIRED
BY CODE(NOT IN 114000
CONTRACT)
FSEC WILL PREWIRE ALL ELECTRICAL
COMPONENTS EXCEPT BLOWER COIL
TO THIS JUNCTION BOX FOR ONE FINAL
CONNECTION BY ELECTRICAL TRADES
JUNCTION BOX & CONDUIT WITHIN WALL
PANEL FOR DOOR & WINDOW HEATERS
JUNCTION BOX & CONDUIT WITHIN
WALL PANEL FOR LIGHT SWITCH &
DIGITAL THERMOMETER
NOTES:
1. IT IS THE RESPONSIBILITY OF THE FSEC TO FURNISH, INSTALL AND INTERCONNECT CONDUIT AND
WIRING FOR ELECTRICAL COMPONENTS INCLUDING LIGHTS, SWITCHES, THERMOMETERS, DOOR,
WINDOW, PRESSURE RELIEF PORT HEATERS AND RECEPTACLE FOR DRAINLINE HEATER TO EASILY ACCESSIBLE JUNCTION BOX ON TOP OF WALK-IN FOR FINAL CONNECTION BY ELECTRICAL TRADES
2. ALL INTERCONNECTING CONDUIT RUN ABOVE WALK-IN PANELS OR WITHIN WALL PANELS. EXPOSED CONDUIT INSIDE WALK-IN WILL NOT BE ACCEPTABLE EXCEPT FOR THE CONNECTIONS SHOWN AND
NOTED IN THE ABOVE ILLUSTRATION.
3. SEAL PENETRATIONS THROUGH CEILING, WALLS AND INSIDE ELECTRICAL CONDUIT OUTSIDE AND
INSIDE WALK-IN WITH DOW CORNING #999A SILICONE SEALANT.
4. PROVIDE HOLES FOR SPRINKLER HEAD (IF REQUIRED) AND ELECTRICAL CONDUIT.
5. PROVIDE 1/2" OD PVC CONDUIT AT ALL PENETRATIONS THRU INSULATED PANELS
SD-191
CONDUIT DOWN THRU WALK-IN
TOP TO JUNCTION BOX ON COIL
(EXPOSED CONDUIT ACCEPTABLE
FOR THIS LOCATION)
ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE
GAYLORD DCV SYSTEM
ELECTRICAL WIRING DETAIL
WIRING NOTES:
1. ALL WIRING OF ELECTRICAL EQUIPMENT MUST BE DONE TO MEET NEC AND LOCAL CODES.
2. (2) WIRES AND GROUND FROM DCV CONTROL CABINET TO NON-INTERRUPTIBLE SUPPLY
VOLTAGE SERVICE BY ELECTRICAL CONTRACTOR.
3. (1) CAT 5 CABLE FROM DCV CONTROL CABINET TO THE PRIMARY HOOD AVHC BY ELECTRICAL
CONTRACTOR.
4. (2) WIRES FROM DCV CONTROL CABINET TO FIRE SUPPRESSION SYSTEM MICRO SWITCHES BY
ELECTRICAL CONTRACTOR.
5. (6) WIRE LOW VOLTAGE CABLE FROM DCV CONTROL CABINET TO EACH VFD BY ELECTRICAL
CONTRACTOR.
LEGEND
FIELD WIRING BY E.C.
AVHCAVHCAVHC
HOOD (PRIMARY) ADD'L SECTION(S) ADD'L HOOD(S)
120 VAC
LIGHTS
120 VAC
LIGHTS
WIRING BY GAYLORD
CAT 5 FIELD WIRING BY E.C.
CAT 5 FIELD WIRING BY GAYLORD
LIGHT INTERWIRING IF
HOODS ARE ADJACENT
DCV CONTROL
CABINET
COMMAND
CENTER
AMBIENT
TEMPERATURE
SENSOR
NOTE 2
NOTE 3
NOTE 4
NOTE 5
FIRE
SUPPRESSION
SYSTEM
EF VFD
SF VFD/VAV
BMS
REMOTE
FIELD
SERVER
BUILDING
WIRELESS
BROADBAND
NOTE:
1. ELECTRICAL COMPONENTS AND INTERWIRING BY ELECTRICAL TRADES UNLESS NOTED OTHERWISE.
2. CONDUIT CONCEALED IN WALL WHEREVER POSSIBLE. EXPOSED CONDUIT TO BE CHROME-PLATED.
ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE
WIRING DIAGRAM - ELECTRIC GAS VALVE
WET CHEMICAL FIRE PROTECTION SYSTEM
A .F
.F
A .F
.F
ELECTRICAL PANEL
WITH POWER SHUT-
OFF DEVICE(S) FOR
ELECTRIC COOKING
EQUIPMENT
MANUAL RESET
FURNISHED BY FSEC
FIRE PROTECTION
SYSTEM ENCLOSURE
BY FSEC, MOUNT
FLUSH WITH CEILING
CONDUIT BELOW
CEILING AND
OCTAGONAL
JUNCTION BOX
BY ELECTRICAL
TRADES
REMOTE MANUAL
PULL (VERIFY
LOCATION)
CEILING
LOCATE
GAS VALVE
PER LOCAL
CODE
JUNCTION
BOX
EMPTY
CONDUIT
ABOVE CEILING
BY FSEC
WIRING TO
SUPPLY FAN
WIRING TO POWER
SHUT-OFF DEVICE(S)
ELECTRICAL GAS
VALVE FURNISHED BY
FSEC INSTALLED BY
MECHANICAL TRADES
WIRING TO BUILDING
FIRE ALARM
POWER TO COOKING
EQUIPMENT
POWER
SUPPLY
DATE:
DRAWN:
REVIEWED:
SHEET TITLE:
SHEET NUMBER:
PROJECT NO.:
PROJECT:
ISSUE:
# DATE: DESCRIPTION:
DESIGNED:
RFB922300-03
/2
/2
:4 :4
P
M FSE100
FOODSERVICE
EQUIPMENT
ELECTRICAL
SCHEDULE &
DETAILS
MM
EG/RB
0240202.00
CLARINDA
CORRECTIONAL
FACILITY - KITCHEN &
LAUNDRY ADDITION
STATE OF IOWA DEPARTMENT
OF CORRECTIONS
2000 N 16TH ST, CLARINDA, IA
51632
02/09/2024
EG/TP
BID SET
FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE
ITEM # DESCRIPTION VOLTS PHASE AMPS WATTS HP
CONN.
TYPE
RI
HEIGHT REMARKS
7A WALK-IN REFRIGERATOR/FREEZER COMPLEX 120 V 1 20.0 A DIRECT 114" DFA / NOTE W / SEE DETAIL SD-191
7B FREEZER FLOOR HEAT A 208 V 1 DIRECT 48" DFA / COOK'S ISSUANCE FLOOR HEAT / NOTE W / SEE DETAIL SD-188 / 30 AMP BREAKER / (1) CIRCUIT
7B FREEZER FLOOR HEAT B 208 V 1 DIRECT 48" DFA / MAIN FREEZER FLOOR HEAT / NOTE W / SEE DETAIL SD-188 / 30 AMP BREAKER / (3) CIRCUITS ON ONE CONTACTOR
8A RACKED REFRIGERATION SYSTEM A 208 V 3 138.9 A DIRECT 0" NOTE D & W / MAX FUSE SIZE 175.0 AMPS / MIN CIRCUIT AMPACITY 148.4 AMPS
8B REFRIGERATION SYSTEM COIL - PRODUCE
REFRIGERATOR
B 120 V 1 1.8 A DIRECT 96" NOTE W / (2) COILS @ 1.8 AMPS EACH
8C REFRIGERATION SYSTEM COIL - MEAT & DAIRY
REFRIGERATOR
C 120 V 1 1.8 A DIRECT 96" NOTE W / (2) COILS @ 1.8 AMPS EACH
8D REFRIGERATION SYSTEM COIL - TEMPERING
REFRIGERATOR
D 208 V 1 13.7 A DIRECT 96" NOTE W
8E FREEZER SYSTEM COIL - MAIN FREEZER E 208 V 1 22.8 A DIRECT 96" NOTE W / (2) COILS @ 22.8 AMPS EACH
8F FREEZER SYSTEM COIL - BAKERY FREEZER F 208 V 1 9.1 A DIRECT 96" NOTE W
8G REFRIGERATION SYSTEM COIL - BAKERY
REFRIGERATOR
G 120 V 1 1.8 A DIRECT 96" NOTE W
11 HEATED AIR CURTAIN A 480 V 3 22.0 A 1/2, 1/2 DIRECT 96" PROVIDE 30 AMP CIRCUIT
11 HEATED AIR CURTAIN B 480 V 3 28.3 A 1/2, 1/2 DIRECT 96" PROVIDE 35 AMP CIRCUIT
12 AIR CURTAIN 120 V 1 3.4 A 1/5, 1/5 DIRECT 96" PROVIDE 15 AMP CIRCUIT
13 MANUAL SLIDING DOOR (FRZ) 120 V 1 3.0 A DIRECT 86" ELECTRICAL TRADES TO PROVIDE AND INSTALL FROSTOP DISCONNECT KEYSWITCH / FINAL CONNECTIONS BY ELECTRICAL TRADES
26 BENCH SCALE 120 V 1 RECEPT. 18" AC ADAPTER W/INTERNAL BATTERY
34 FOOD CUTTER 120 V 1 13.0 A 1 RECEPT. 60" INTERCHANGEABLE PLUG IN LOCATION W/ITEM #114 / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH IN AND CAP AS NEEDED
40 MOBILE HOT/COLD TRANSPORT CART 120 V 1 RECEPT. 0" VFY. UTILITIES W/OWNER / (13) CIRCUITS SERVICED THRU #41A & B
41A UTILITY DISTRIBUTION SYSTEM 120 V 1 DIRECT 126" (6) 20.0 AMP CIRCUITS TO SERVICE (6) #40 / FSEC TO PREWIRE RECEPTACLES IN UDS / FINAL CONNECTIONS BY ELECTRICAL TRADES / SEE SHEET FSE101
41B UTILITY DISTRIBUTION SYSTEM 120 V 1 DIRECT 126" (7) 20.0 AMP CIRCUITS TO SERVICE (7) #40 / FSEC TO PREWIRE RECEPTACLES IN UDS / FINAL CONNECTIONS BY ELECTRICAL TRADES / SEE SHEET FSE102
62 WORKCOUNTER W/SINK 120 V 1 DIRECT 10" NOTE A / STUB UP THRU ADJACENT WALL / (3) 20.0 AMP CIRCUITS TO SERVICE (1) #71 & (2) CONV. DRS
63 140 QUART MIXER 208 V 3 14.8 A 5 DIRECT 60" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
64 WATER METER W/TEMPERATURE RANGE 120 V 1 5.0 A RECEPT. 54" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
67 SPIRAL MIXER 208 V 3 32.0 A 15 DIRECT 48" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
69 SHEETER 120 V 1 8.3 A RECEPT. 60" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
71 DIGITAL BENCH SCALE A 120 V 1 DUPLEX 0" AC ADAPTER W/INTERNAL BATTERY
71 DIGITAL BENCH SCALE B 120 V 1 DUPLEX 0" SERVICED THRU #77A / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED / AC ADAPTER W/INTERNAL BATTERY
74 ROLL-IN PROOFER, 2 DOUBLE RACKS 208 V 3 5000 W DIRECT 90" NEUTRAL WIRE CIRCUITRY NEEDED TO PROVIDE 120V CONTROL / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
77 BAKERY WORKCOUNTER W/RICHLITE TOP A 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (2) CONV. DRS & #71B & 79
77 BAKERY WORKCOUNTER W/RICHLITE TOP AA 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (3) CONV. DRS & (1) #83
77 BAKERY WORKCOUNTER W/RICHLITE TOP B 208 V 3 DIRECT 10" NOTE A / STUB UP THRU CURB / (1) 20.0 AMP CIRCUIT TO SERVICE #78
78 DIVIDER ROUNDER 208 V 3 10.0 A 3/4 DIRECT 0" SERVICED THRU #77B / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
79 BREAD SLICER 120 V 1 7.0 A 1/2 RECEPT. 0" SERVICED THRU #77A / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
83 BUN SLICER 120 V 1 6.8 A 816 W 1/3 RECEPT. 0" SERVICED THRU #77AA / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
85 ROLL-IN BLAST CHILLER A 208 V 3 10.6 A 3400 W DIRECT 106"
85 BLAST CHILLER REMOTE CONDENSING UNIT B 208 V 3 53.3 A 16400 W 9 DIRECT 0"
87 RACK OVEN, 2-SEC. 120/208 V 3 1800 W DIRECT 90" NOTE I & L / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
89 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #87
89 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA DEDICATED, NON-INTERRUPTED CIRCUIT
90 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #87
90 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT
91 ICE MAKER 208 V 1 4.2 A RECEPT. 66"
109 FOOD PROCESSOR 120 V 1 12.0 A 1.5 RECEPT. 52" VFY. UTILITIES W/OWNER
112 REACH-IN REFRIGERATOR, 2-SEC. 120 V 1 10.7 A 1/3 RECEPT. 84" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
114 SLICER 120 V 1 6.0 A 720 W 1/2 RECEPT. 60" INTERCHANGEABLE PLUG IN LOCATION W/ITEM #34 / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
116 HORIZONTAL CUTTER/MIXER 208 V 3 22.0 A 5 RECEPT. 18" PROVIDE 30 AMP CIRCUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH IN AND CAP AS NEEDED
132 STACKED WASHER/DRYER A 120 V 1 .9 RECEPT. 30" PROVIDE 15 AMP CIRCUIT
132 STACKED WASHER/DRYER B 120 V 1 1/3 RECEPT. 30" PROVIDE 15 AMP CIRCUIT
142 MOBILE WARMING CABINET A 120 V 1 12.0 A 1500 W RECEPT. 0" (1) SERVICED THRU #145 A (2) SERVICED THRU #146
142 MOBILE WARMING CABINET B 120 V 1 12.0 A 1500 W RECEPT. 30"
144 80 QUART MIXER 208 V 3 12.0 A 3 DIRECT 0" SERVICED THRU #145 B / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
145 WORKCOUNTER W/SINKS A 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (3) CONV. DRS & (1) #142A
145 WORKCOUNTER W/SINKS B 208 V 3 DIRECT 10" NOTE A / STUB UP THRU CURB / (1) 20.0 AMP CIRCUIT TO SERVICE #144
146 WORKCOUNTER W/SINKS 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (6) 20.0 AMP CIRCUITS TO SERVICE (4) CONV. DRS & (2) #142
148 EXHAUST HOOD (TYPE I) A 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL
148 EXHAUST HOOD (TYPE I) B 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL
148 EXHAUST HOOD (TYPE I) C 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL
150 UTILITY DISTRIBUTION SYSTEM 120/208 V 3 20.0 A DIRECT 110" DFA / NOTE Y
151 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE #148 A, B & C
151 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT
153 DEMAND CONTROL VENTILATION SYSTEM 120 V 1 15.0 A DIRECT 36" SEE DETAIL / TO SERVICE HOOD #148
154 60 GALLON KETTLE 120 V 1 10.0 A RECEPT. 0" NOTE L / SERVICED THRU #150
155 80 GALLON KETTLE 120 V 1 10.0 A RECEPT. 0" NOTE L / SERVICED THRU #150
158 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
160 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED
161 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT
163 RACK OVEN, 2-SEC. 120/208 V 3 1800 W DIRECT 90" NOTE I & L
169 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #163
169 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT
170 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #163
170 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT
174 DISPOSER 208 V 3 8.8 A 3 DIRECT 18" NOTE C / SEE DETAIL
182 HOSE STATION 120 V 1 2 RECEPT. 84"
187 DISPOSER 208 V 3 8.8 A 3 DIRECT 18" NOTE C / SEE DETAIL
189 FLIGHT-TYPE DISHMACHINE W/DRYER A 480 V 3 86.3 A DIRECT 80" DFA / NOTE I
SCHEDULE NOTES - ELECTRICAL
NOTE: SCHEDULE NOTES PERTAIN TO INDIVIDUAL ITEMS AS INDICATED IN THE FOODSERVICE EQUIPMENT
ELECTRICAL SCHEDULE.
A THE FSEC WILL PROVIDE RECEPTACLES IN FABRICATED EQUIPMENT AS REQUIRED AND WILL PREWIRE ELECTRICAL COMPONENTS IN COUNTER TO JUNCTION BOXES IN COUNTER BASE FOR FINAL CONNECTION BY ELECTRICAL TRADES. INTERCONNECTIONS BETWEEN SECTIONS OF FABRICATED COUNTERS BY FSEC.
C. WIRE THRU TIME DELAY RELAY, SOLENOID VALVE AND CONTROL PANEL TO DISPOSER.
D. ALL REFRIGERATION SYSTEMS ARE LOCATED APPROXIMATELY WHERE SHOWN ON THE PLAN UNLESS OTHERWISE NOTED. THE FOLLOWING ITEMS ARE NOT BY THE FSEC: ROOF CURBS/CONCRETE PADS;
SLEEVED & SEALED PENETRATIONS IN ROOFS/FLOORS/CEILINGS/WALLS. VERIFY EXACT LOCATON WITH
ARCHITECT/ENGINEER.
I. ELECTRICAL TRADES TO WIRE AUTOMATIC CONTROLS OR INTERLOCK DEVICE BETWEEN EQUIPMENT AND
EXHAUST FAN SO EXHAUST FAN TURNS ON ONCE EQUIPMENT IS OPERATIONAL.
J. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM WITH BUILDING ALARM SYSTEM AND TO
MAKE-UP AIR FAN SHUT-OFF.
K. FIRE PROTECTION SYSTEM REQUIRES 24 HOUR, EMERGENCY SEPARATE ELECTRICAL SERVICE. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM WITH ELECTRICAL GAS SHUT-OFF VALVE FOR ALL COOKING EQUIPMENT BELOW HOODS. ELECTRICAL TRADES TO ALSO INTERWIRE FIRE PROTECTION SYSTEM
WITH BUILDING ALARM SYSTEM.
L. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM TO POWER SHUT-OFF DEVICE, SUPPLIED BY ELECTRICAL TRADES, SO THAT POWER TO ALL ELECTRIC COOKING EQUIPMENT AND CONVENIENCE RECEPTACLES BELOW HOODS IS SHUT OFF UPON ACTIVATION OF THE FIRE PROTECTION SYSTEM.
W. INTERCONNECT THIS EQUIPMENT WITH BUILDING EMERGENCY POWER.
Y. WHEN A UTILITY DISTRIBUTION SYSTEM IS SPECIFIED, ELECTRICAL TRADES SHALL:
1.INSTALL MAIN SERVICE FEEDERS AND OVERCURRENT PROTECTION DEVICES; INSTALL ELECTRICAL
CONDUIT AND WIRING FROM ROUGH-IN LOCATION TO RACEWAY TERMINALS IN VERTICAL CHASE BY SYSTEM
MANUFACTURER.
2.CONNECT UL LISTED POWER SUPPLY CORDS AND PREWIRED FLEXIBLE CONDUIT SET, ALL PROVIDED BY
SYSTEM MANUFACTURER WITH APPROPRIATE EQUIPMENT ITEMS.
3.INTERCONNECT FIRE PROTECTION SYSTEM MICROSWITCH OR RELAY TO POWER SHUT-OFF DEVICE FOR
MAIN SERVICE FEEDERS.
4.PROVIDE 24 VOLT POWER SUPPLY CIRCUIT FROM CONTROL BOX IN RISER TO AUTOMATIC STEAM SHUT-OFF
VALVE, SEE DETAIL.
5.SPECIAL NOTE – NO MODIFICATION OF ANY MANUFACTURED RACEWAY SHALL BE UNDERTAKEN BY ANY
ENTITY WITHOUT THE EXPRESS, WRITTEN APPROVAL AND/OR SUPERVISION OF THE RACEWAY
MANUFACTURER.
THE FSEC WILL:
1.INTERCONNECT FIELD JOINTS BY BOLTING BUSBAR AND/OR WIRING TOGETHER. ALL FITTINGS, BOLTS, ETC.
SHALL BE PRE-FITTED AND FURNISHED BY THE SYSTEM MANUFACTURER. THE CONTROL WIRE FIELD JOINT
WILL BE PROVIDED WITH A QUICK-DISCONNECT DEVICE.
2.INSPECT FOR LOOSE CONNECTIONS CAUSED BY SHIPPING AND TIGHTEN AS REQUIRED.
GENERAL NOTES - ELECTRICAL
NOTE: GENERAL NOTES REFER TO GENERAL CONDITIONS. ALL CONDITIONS MAY NOT EXIST ON THIS
PROJECT.
1. THESE DRAWINGS ARE FOR USE BY THE PROJECT ENGINEERS IN PREPARING THEIR DRAWINGS. THESE DRAWINGS ARE INCIDENTAL TO OUR SERVICES AND MUST BE REVIEWED AND APPROVED BY A PROPERLY LICENSED DESIGN PROFESSIONAL BEFORE BEING USED FOR ANY OTHER PURPOSES. RIPPE ASSOCIATES
IS NOT LICENSED AS A DESIGN PROFESSIONAL AND DOES NOT HOLD ITSELF OUT AS SUCH.
2. SERVICES SHOWN ON THIS PLAN ARE EQUIPMENT REQUIREMENTS FOR FOODSERVICE EQUIPMENT ONLY.
LOCATIONS, SIZES AND HEIGHTS ABOVE FINISHED FLOOR ARE APPROXIMATELY AS REQUIRED BY EQUIPMENT TO BE FURNISHED. SINCE MULTIPLE SOURCES FOR THE EQUIPMENT MAY BE SPECIFIED, SLIGHT VARIATIONS IN UTILITY LOADS, CONNECTION SIZES AND NEMA PLUG CONFIGURATIONS CAN OCCUR. DESIGN BUILDING UTILITY SYSTEM ACCORDINGLY AND ADD NOTES TO THE ELECTRICAL CONTRACT DOCUMENTS INDICATING SLIGHT VARIATIONS ARE TO BE INCLUDED IN ELECTRICAL TRADES
WORK AT NO ADDITIONAL COST.
3. THESE DRAWINGS ARE NOT TO BE USED TO ROUGH-IN AND/OR TO SET SLEEVES BY, SINCE REQUIRED
ALLOWANCES MUST BE MADE FOR MULTIPLE EQUIPMENT SOURCES AND FOR VALVES, FITTINGS,
DISCONNECTS, ETC. WHICH WILL BE FURNISHED UNDER ELECTRICAL TRADES. FSEC IS RESPONSIBLE FOR
PREPARING DIMENSIONED ROUGH-IN AND SLEEVE LOCATION PLANS PER SPECIFICATIONS TO
ACCOMMODATE THE EXACT EQUIPMENT BEING PROVIDED.
4. ALL 120V DUPLEX RECEPTACLES TO BE MINIMUM 20 AMP. CIRCUIT AND MOUNTED VERTICALLY, UNLESS
OTHERWISE NOTED ON PLAN.
5. ELECTRICAL TRADES TO PROVIDE ALL NECESSARY DISCONNECT SWITCHES FOR EQUIPMENT INSTALLED
AHEAD OF EQUIPMENT CONTROL OR SWITCH.
6. THE FSEC IS RESPONSIBLE FOR SETTING THE EQUIPMENT IN PLACE. FINAL CONNECTION FOR THIS
EQUIPMENT IS THE RESPONSIBILITY OF THE ELECTRICAL TRADES.
7. HOLES IN FOODSERVICE EQUIPMENT FOR ELECTRICAL SERVICES PROVIDED BY FSEC.
8. BUILDING POWER PANEL BREAKERS SERVING FOODSERVICE EQUIPMENT SHOULD BE EQUIPPED WITH GROUND FAULT INTERRUPT PROTECTION IN ACCORDANCE WITH NATIONAL ELECTRIC CODE FOLLOWED BY MUNICIPALITY AND/OR LOCAL CODE. DO NOT PROVIDE GROUND FAULT INTERRUPT RECEPTACLES AT THE EQUIPMENT UNLESS RECEPTACLE IS READILY ACCESSIBLE WITHOUT HAVING TO MOVE EQUIPMENT
OR EMPLOY A STEP LADDER.
9. UTILITY CONNECTIONS SHOWN ARE THOSE REQUIRED TO SERVICE FOOD SERVICE EQUIPMENT ONLY.
MECHANICAL TRADES SHOULD VERIFY WITH OWNER WHETHER ADDITIONAL UTILITIES ARE REQUIRED FOR EXISTING, FUTURE OR VENDOR FURNISHED NON-FOODSERVICE EQUIPMENT LOCATED WITHIN THE AREA
SHOWN ON THIS PLAN.
10. DESIGN INCOMING UTILITY SERVICES TO ACCOMMODATE 100% OF THE LOADS INDICATED; DO NOT APPLY DIVERSITY FACTOR AS ALL EQUIPMENT CAN BE OPERATING SIMULTANEOUSLY DURING PEAK SERVICE
PERIODS.
2.0 03/01/2024 ADDENDUM 2.0
DOC CCF Kitchen & Laundry Addition Clarinda, Iowa
DAS#9223.00
RFB922300-03
PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 2
02-09-2024 [Type
SUBSTITUTION REQUEST FORM
Project:
To:
Re:
Substitution Request Number:
From:
Date:
A/E Project Number:
Specification Title: Description:
Section: Page: Article/Paragraph:
Proposed Substitution:
Manufacturer: Address: Phone:
Trade Name: Model No.:
History: New product 2-5 years old 5-10 yrs old More than 10 years old
Differences between proposed substitution and specified product:
Point-by-point comparative data prepared by contractor and attached - REQUIRED BY A/E
Reason for not providing specified item:
Similar Installation:
Project: Architect:
Address: Owner:
Date Installed:
Proposed substitution affects other parts of Work: No Yes; explain
Supporting Data Attached: Drawings Product Data Samples Tests Reports
DOC Clarinda Correctional Facility Kitchen & Launtry Addition
Matthew Hartman
Farnsworth Group 2/15/24
The Samuels Group 0240202
Thermal Insulation XPS Board Insulation
072100 2 2.02
Atlas EnergyShield XR
Atlas East Moline, IL
EnergyShield XR
Polyiso alternate to XPS application in below grade and perimeter of foundation
DOC CCF Kitchen & Laundry Addition Clarinda, Iowa
DAS#9223.00
RFB922300-03
PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 3
02-09-2024 [Type
SUBSTITUTION REQUEST FORM
(Continued)
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.
• Proposed substitution does not affect dimensions and functional clearances.
• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
Submitted by:
Signed by:
Firm:
Address:
Telephone:
Attachments:
A/E's REVIEW AND ACTION
Substitution approved - Make submittals in accordance with Specification Section 01 3300.
Substitution approved as noted - Make submittals in accordance with Specification Section 01 3300.
Substitution rejected - Use specified materials.
Substitution Request received too late - Use specified materials.
Signed by: Date:
Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E
Matthew Hartman
Roofing Representatives
900 Kacina Rd Hiawatha, IA 52233
319-321-3272
2.26.2024
DOC CCF Kitchen & Laundry Addition Clarinda, Iowa
DAS#9223.00
RFB922300-03
PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 2
02-09-2024 [Type
SUBSTITUTION REQUEST FORM
Project:
To:
Re:
Substitution Request Number:
From:
Date:
A/E Project Number:
Specification Title: Description:
Section: Page: Article/Paragraph:
Proposed Substitution:
Manufacturer: Address: Phone:
Trade Name: Model No.:
History: New product 2-5 years old 5-10 yrs old More than 10 years old
Differences between proposed substitution and specified product:
Point-by-point comparative data prepared by contractor and attached - REQUIRED BY A/E
Reason for not providing specified item:
Similar Installation:
Project: Architect:
Address: Owner:
Date Installed:
Proposed substitution affects other parts of Work: No Yes; explain
Supporting Data Attached: Drawings Product Data Samples Tests Reports
See qualification package
None
See qualification package
Detention Security Equipment Detention Security Equipment
111900 111900-5 111900/1.7/A.2
Southern Folger Contracting
2/23/24
DOC CCF Kitchen and Laundry Addition Clarinda, IA
Southern Folger Contracting, Inc.
PO Box 58
Southern Folger Contracting, Inc.
Newcastle, CA 95658 916-900-6593
Substitution request to have Southern Folger Contracting listed as approved DEC to bid project
See qualification package
DOC CCF Kitchen & Laundry Addition Clarinda, Iowa
DAS#9223.00
RFB922300-03
PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 3
02-09-2024 [Type
SUBSTITUTION REQUEST FORM
(Continued)
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.
• Proposed substitution does not affect dimensions and functional clearances.
• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
Submitted by:
Signed by:
Firm:
Address:
Telephone:
Attachments:
A/E's REVIEW AND ACTION
Substitution approved - Make submittals in accordance with Specification Section 01 3300.
Substitution approved as noted - Make submittals in accordance with Specification Section 01 3300.
Substitution rejected - Use specified materials.
Substitution Request received too late - Use specified materials.
Signed by: Date:
Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E
Southern Folger Contracting
Southern Folger Contracting
PO Box 58 Newcastle, CA 95658
256-466-9186
SFC qualification package
2.26.2024
| FS103 - FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3 |
| FS200 - FOODSERVICE EQUIPMENT ELEVATIONS AND SECTIONS |
| FSE100 - FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE & DETAILS |
| Southern Folger Contracting - Substitution Request - FG NET |
| Clarinda Correctional Facility RFA - Atlas XR - FG NET |
| ProjectID: 1006071058 |
| Specs |
| 01100~01500 Mtgs_Submit_Temp_131_180 |
| Page 149 |
| Page 150 |