This document is an addendum to the Request for Bid (RFB) for the Kitchen & Laundry project at the Clarinda Correctional Facility (CCF) in Clarinda, Iowa. The project is being managed by the Iowa Department of Corrections. This addendum revises certain drawings and specifications related to the foodservice equipment, insulation, transfer switch, and lighting for the project. Key changes include revisions to the foodservice equipment plan and schedule, additional details for the workcounters, changes to the insulation requirements, and updates to the electrical schedules and drawings. The bid is due on March 7, 2024 at 2:00 PM local time through the IMPACS Electronic Procurement System.

The addendum also includes information on approved substitutions for the thermal insulation and detention security equipment. Contractors must acknowledge receipt of this addendum on the bid form. This project is part of a larger renovation at the CCF, with previous bid packages already awarded. This addendum is specifically for the HVAC and plumbing scope of work under Bid Package BP-06.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum

14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com

ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS

Addendum Number: 2.0

Addendum Issue Date: March 1, 2024 Owner: State of Iowa Department of Corrections – Clarinda

Correctional Facility

Project Name: Clarinda Correctional Facility – Kitchen & Laundry

RFB Number: 922300-03

Containing: 4 Pages; 3 Drawings; 0 Specifications

This addendum amends the drawings and specifications of the above reference project and is hereby incorporated into the contract documents as part thereof. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.

Drawings:

General: NA

Life Safety: NA

Civil: NA

Structural: NA

Architectural:

Item No. 1. A5.2 – WALL SECTIONS

Reference view 2 - WALL SECTION @ DRYER CHASE

1. REVISE note reading “3” RIGID INSULATION” to read “R-16 RIGID INSULATION”

2. ADD 1 layer of 5/8” moisture resistant type X gypsum board over the R-30 RIGID INSULATION at the dryer chase cap only

Foodservice Equipment:

Item No. 2. FS103 – FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3

Reference Foodservice Equipment Schedule – Area C

3. REVISE schedule as shown in updated attached sheet

Item No. 3. FS103 – FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3

Reference Foodservice Equipment Plan – Area 3

1. REVISE drawings to reflect a 108” x 30” Mobile Workcounter.

Item No. 4. FS200 – FOODSERVICE EQUIPMENT ELEVATIONS AND SECTIONS

Reference Foodservice Elevations views 3, 4, 5 and 6.

1. REVISE drawings to include additional details for fabrication for (2) Item 77 – Workcounter clawrence Text Box

Farnsworth Group, Inc.

Addendum 1.0

Item No. 5. FSE100 – FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE & DETAILS

Reference Foodservice Equipment Electrical Schedule

1. REVISE schedule as shown in updated attached sheet

Fire Protection: NA

Plumbing: NA

Mechanical: NA

Electrical:

Item No. 6. E1.4 – LEVEL 01 PLAN – AREA A – POWER

E1.5 – LEVEL 02 PLAN – AREA A – POWER

E1.6 – LEVEL 01 PLAN – AREA B – POWER

E1.7 – LEVEL 02 PLAN – AREA B – POWER

E1.8 – LEVEL 01 PLAN – AREA A – SYSTEMS

E1.9 – LEVEL 01 PLAN – AREA B – SYSTEMS

E1.10 – LEVEL 02 PLAN – AREA A – SYSTEMS

E1.11 – LEVEL 02 PLAN – AREA B – SYSTEMS

1. ADD Bid Alternate Note block to say the following:

ALTERNATE NO. 2:

BASE BID CONDITION:

PROVIDE KITCHEN EQUIPMENT AS NOTED IN FSE DOCUMENTS WITH THE EXCEPTION OF

NOTED ALTERNATE EQUIPMENT BUT DO NOT PROVIDE INSTALLATION OR HOOKUP

SERVICES.

ALTERNATE BID CONDITION:

PROVIDE ALL NOTED ALTERNATE BAKERY EQUIPMENT AND FULL INSTALLATION OF ALL

EQUIPMENT.

ALTERNATE NO. 3:

BASE BID CONDITION:

PROVIDE KITCHEN EQUIPMENT AS NOTED IN FSE DOCUMENTS WITH THE EXCEPTION OF

NOTED ALTERNATE EQUIPMENT. PROVIDE ALL ROUGH-INS TO NOTED ALTERNATE

EQUIPMENT BUT DO NOT PROVIDE INSTALLATION OR HOOKUP SERVICES.

ALTERNATE BID CONDITION:

PROVIDE ALL NOTED ALTERNATE NO. 3 EQUIPMENT AND FULL INSTALLATION OF ALL

EQUIPMENT.

Item No. 7. E6.1 – ELECTRICAL SCHEDULES

1. REVISE Transfer Switch Schedule type GCC-1 from 100A to 60A.

Item No. 8. E6.3 – ELECTRICAL SCHEDULES

1. REVISE Luminaire Schedule fixture F4 approved manufacturers to include “Cooper LD6C”.

2. REVISE Luminaire Schedule fixture F4A approved manufacturers to include “Cooper LD6C”.

3. REVISE Luminaire Schedule fixture W4 approved manufacturers to include “Cooper McGraw-Edison

IST”.

Technology: NA

Specifications:

Item No. 9. Section 07 2100 – THERMAL INSULATION

Reference 2.01 APPLICATIONS

1. REVISE item C to read as follows: Insulation inside prefabricated Concrete Wall Panels: Integral

Insulation (RI-2)

Reference 2.02 FOAM BOARD INSULATION MATERIALS

2. REVISE item A.1 to read as follows: Type and Compressive Resistance: Type IV, 25 psi (173 kPa), minimum.

3. REVISE items 7 a,b,&c as follows:

a. DuPont de Nemours, Inc; Styrofoam Brand Square Edge: building.dupont.com/#sle.

b. Kingspan Insulation LLC; GreenGuard XPS Type IV, 25 psi: www.kingspan.com/#sle.

c. Owens Corning Corporation; FOAMULAR Type 250 Extruded Polystyrene (XPS) Insulation:

www.ocbuilingspec.com/#sle.

3. ADD item C. as follows:

C. Integral Insulation (RI-2): Rigid expanded (EPS), extruded (XPS), or polyisocyanurate (ISO) insulation.

1. Design and construct panels to maintain overall R-value of 16 minimum, with less than one percent change due to penetrations and connections, when calculated in accordance with ASHRAE 90.1, isothermal planes method.

2. Compressive Resistance: 25 psi.

3. Connectors: Non-conducting connectors designed and manufactured for use in insulated composite panels.

4. ADD item D. as follows:

a. Extruded Polystyrene (XPS)-3 Board Insulation: Comply with ASTM C578 with either natural skin or cut cell surfaces.

i. Type and Compressive Resistance: Type IV, 25 psi (276 kPa), minimum.

ii. Flame Spread Index (FSI): Class A - 0 to 25, when tested in accordance with ASTM E84.

iii. Smoke Developed Index (SDI): 175 or less, when tested in accordance with ASTM E84.

iv. Type and Thermal Resistance, R-value: Type IV, 5.0 (0.88), minimum, per 1 inch thickness at

75 degrees F mean temperature.

v. Board Edges: Square.

vi. Type and Water Absorption: Type IV, 0.3 percent by volume, maximum, by total immersion.

vii. Products:

a. DuPont de Nemours, Inc; Styrofoam Brand Scoreboard: building.dupont.com/#sle.

b. Kingspan Insulation LLC; GreenGuard XPS Type IV: www.kingspan.com/#sle.

c. Owens Corning Corporation; FOAMULAR NGX Type 250 Next Generation Extruded:

www.ocbuildingspec.com/#sle.

d. Substitutions: See Section 01 6000 - Product Requirements.

Section 11 4000 - FOODSERVICE EQUIPMENT

Reference Section 3.06 ITEM SPECIFICATIONS

REVISE as follows:

Item No. 10. 109 Change to:

Food Processor (BY OWNER)

Item No. 11. 141 Change to:

MOBILE WORKCOUNTER (ADD ALTERNATE – ALT 3)

Two

Advance Tabco Model SS-309 or equal by Eagle Group or Metro Industries *R103

“Substitutions”: As approved by Architect prior to bid”

Features: Length and width per Plan; 36" high; 14 gauge stainless steel top and understructure;

stainless steel welded undershelf; stainless steel legs and underbracing; rolled rim edge; paint on sound deadening top; four 5" diameter swivel casters, all with brakes; correctional package tamper proof hardware

Item No. 12. Section 26 3600 – TRANSFER SWITCH

Reference - Article 2.02 PORTABLE GENERATOR (GCC-#)

1. REVISE paragraph B to read: Pad mount, powder coat painted NEMA 3R housing with lockable door, 60 amps, 600 volt. Color-coded cam-lock connectors. Submit product data and dimensioned drawings. Color selection by Architect.

Product Approvals:

The following manufacturers are approved as substitute products of the named Base Bid manufacturer(s). Approval is contingent upon manufacturers fulfilling all specification requirements, tangible and intangible, equally as well as specified product.

References/Item Manufacturer/Supplier

07 2100 Thermal insulation Atlas; EnergyShield XR

11 1900 Detention Security Equipment 1.07.A.1 Southern Folger Contracting, Inc.

E6.3 /Type F4 Portfolio LD6C series

E6.3 /Type F4A Portfolio LD6C series

E6.3 /Type W1 McGraw-Edison IST series

Bids are Due: March 7, 2024 / 2:00 PM local time to IMPACS Electronic Procurement System.

END OF ADDENDUM

Issued By:

FARNSWORTH GROUP, INC.

Kelsey Vetter, AIA

Project Architect

Attachments:

Drawings: FS103, FS200, FSE100

Specifications: NA

Other: Approved Substitution Request Forms – 07 2100, 11 1900

BB

F

FF FF2 DR

R E

F x

0"

24" x 60" 24" x 60" 24" x 60"

6"

24" x 48"

24" x 80"

24" x 80"24" x 80"

24" x 80"

BB

F

FF FF2 DR

R E

F

8"

18" x 48"

21" x 72"

24" x 48"

COLD FOOD

PRODUCTION AND

ASSEMBLY

HOT FOOD PRODUCTION AND ASSEMBLY

DISHROOM

STAFF BREAK AREA

DIRECTOR'S OFFICE

POT AND PAN

STORAGE

POT AND PAN

WASHING

SUPERVISORS OFFICE

CHEMICAL AND LAUNDRY

101B

129132

101B

102102

105105

105 105

101A

101B

101A

101A

101A

172172

143 143

143143

143 143

A1

AF

AE

AD

AC

AB

PD

PE

A2 A3

A4

FS203

FS2032

FS202 3

FS2011

143 143

W

W

W

W

W

TRAY CART

ASSEMBLY

CART WASH

FS202 2

FS2015

FS201 4

FS201 2

FS2021

FS2013

SOILED

CLEAN

STAFF RR

101B

TRAY CART

PARKING

DURING

ASSEMBLY

193193

193193193193

193193193193193193

H.S.

H.S.

H.S.

H.S.

H.S.

H.S.

101A

TRAY CART

PARKING

DURING

ASSEMBLY

H.S.

195 194

R

101B

101B

RACK PARKING

POT AND PAN

STORAGE

POT AND PAN

STORAGE

TRAY DRYING

RACKS

147 147

MOP SINK NOT

PROVIDED BY

SECTION 114000

BIB LOCATION, SEE MECH.

TRADE'S DRAWINGS

111 111

111 111

111111111111

105 105

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

RFB922300-03

/2

/2

:1 :1

P

M FS103

FOODSERVICE

EQUIPMENT PLAN

AND SCHEDULE -

AREA 3

MM/BB

EG/RB

0240202.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

02/09/2024

EG/TP

BID SET

1/4" = 1'-0"

1 FOODSERVICE EQUIPMENT PLAN - AREA 3

FOODSERVICE EQUIPMENT SCHEDULE - AREA C

ITEM # QTY DESCRIPTION REMARKS

100 7 HAND SINK

101A 5 PAN STORAGE SHELVING

101B 6 PAN STORAGE SHELVING BY OWNER

102 3 MOBILE LUG RACK

103 1 UTILITY CART BY OWNER

104 1 WORKCOUNTER W/SINKS

105 8 MOBILE TRASH BIN BY OWNER

106 1 OPEN NUMBER

107 1 SPRAY RINSE

108 1 WALL SHELF

109 1 FOOD PROCESSOR BY OWNER

110 1 OPEN NUMBER

111 21 STAINLESS STEEL CORNER GUARD

112 1 REACH-IN REFRIGERATOR, 2-SEC. ADD ALTERNATE - ALT 3

113 1 MOBILE EQUIPMENT STAND

114 1 SLICER ADD ALTERNATE - ALT 3

115 2 DOUBLE WIDE WORKTABLE

116 1 HORIZONTAL CUTTER/MIXER ADD ALTERNATE - ALT 2

117 1 FLOOR TROUGH

118 1 HOSE STATION

119 1 HOSE STATION SECURITY CABINET

120-127 1 OPEN NUMBER

128 5 CHEMICAL STORAGE SHELVING

129 1 MOBILE WORKTABLE

130 1 OPEN NUMBER

131 2 CHEMICAL STORAGE SHELVING BY OWNER

132 1 STACKED WASHER/DRYER

133 1 OPEN NUMBER

134 3 STAINLESS STEEL WALL CAP

135-139 1 OPEN NUMBER

140 2 MOBILE WORKTABLE

141 2 MOBILE WORKTABLE ADD ALTERNATE - ALT 3

142 5 MOBILE WARMING CABINET

143 16 MOBILE RACK BY OWNER

144 1 80 QUART MIXER ADD ALTERNATE - ALT 3

145 1 WORKCOUNTER W/SINKS

146 1 WORKCOUNTER W/SINKS

147 2 SHEET PAN DOLLY

148 1 EXHAUST HOOD (TYPE I)

149 1 STAINLESS STEEL WALL PANEL

150 1 UTILITY DISTRIBUTION SYSTEM

151 1 FIRE PROTECTION SYSTEM

152 1 OPEN NUMBER

153 1 DEMAND CONTROL VENTILATION SYSTEM

154 2 60 GALLON KETTLE

155 2 80 GALLON KETTLE

156 1 FLOOR TROUGH

157 1 OPEN NUMBER

158 2 STEAMER, 2-SEC. ADD ALTERNATE - ALT 3

159 1 OPEN NUMBER

160 1 STEAMER, 2-SEC. ADD ALTERNATE - ALT 3

161 1 STEAMER, 2-SEC.

162 1 HOSE REEL

163 2 RACK OVEN, 2-SEC.

164 2 OVEN RACK, DOUBLE

165-167 1 OPEN NUMBER

168 3 HOSE REEL SECURITY CABINET

169 1 FIRE PROTECTION SYSTEM

170 1 FIRE PROTECTION SYSTEM

171 1 OPEN NUMBER

172 2 POT AND PAN CART

173 1 POT & PAN SINK

174 1 DISPOSER

175 1 SPRAY RINSE

176-180 1 OPEN NUMBER

181 1 CART WASH STAINLESS STEEL WALL PANEL

182 1 HOSE STATION

183 1 FLOOR TROUGH

184 2 HOSE REEL

185 2 EYE/FACE WASH STATION

186 1 SOILED DISHTABLE

187 2 DISPOSER

188 1 HOSE STATION SECURITY CABINET

189 1 FLIGHT-TYPE DISHMACHINE W/DRYER

190 1 EXHAUST DUCT RISER

191 2 SPRAY RINSE

192 1 FLOOR TROUGH

193 12 DRYING RACK BY OWNER

194 1 FLOOR TROUGH

195 1 CONDENSATE HOOD

2.0 03/01/2024 ADDENDUM 2.0

2.0

2.0

2.0

SD-4

SD-2a

SOAP & TOWEL

DISP. NOT IN

SECTION 114000

SD-9a

FSH

OPEN STORAGE

SD-1a

SD-3

SD-28

SD-17

SD-7

DOOR LOCK

SD-70

SD-4

SD-6 SD-7

SD-30

120/1 20A CONV.

DR. (1 OF 3)

RECEPTACLE

FOR #833

/4

RICHLITE CUTTING BOARD

THICKNESS TO BE 3/4" -

OVERALL HEIGHT TO BE 3'-0"

INCLUDING CUTTING BOARD

SD-1a

SD-3

79 78

81 SD-70

SD-63

"SD-30

SD-7 SD-4

(2) RECEPTACLES SIDE

BY SIDE FOR #71 & 79

120/1 20A CONV.

DR. (2 OF 2)3

/4

RICHLITE CUTTING BOARD

THICKNESS TO BE 3/4" -

OVERALL HEIGHT TO BE 3'-0"

INCLUDING CUTTING BOARD

SD-1a

SD-3

68 66 6665 66 66

SOAP & TOWEL

DISP. NOT IN

SECTION 114000

FSH

120/1 20 A CONV. DR.

MOUNTED

HORIZONTALLY (1 OF 2)

120/1 20 A CONV. DR.

MOUNTED

HORIZONTALLY (2 OF 2)

RECEPT. FOR ITEM 71

SD-39

SD-7

SD-17

SD-9a

SD-2a

SD-1a

SD-3

SD-4

DOOR LOCK

A

FS203

SIM

84 71

79 78

120/1 20A CONV.

DR. (1 OF 2)

SD-70 SD-4 SD-7

SD-30

SD-6

RICHLITE CUTTING BOARD

THICKNESS TO BE 3/4" -

OVERALL HEIGHT TO BE 3'-0"

INCLUDING CUTTING BOARD

/4

"SD-1a

SD-3

120/1 20A CONV.

DR. (3 OF 3)

82 120/1 20A CONV.

DR. (2 OF 3)

"SD-30

SD-7 SD-4

SD-6

RICHLITE CUTTING BOARD

THICKNESS TO BE 3/4" -

OVERALL HEIGHT TO BE 3'-0"

INCLUDING CUTTING BOARD

/4

SD-1a

SD-3

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

RFB922300-03

/2

/2

:2 :0

P

M FS200

FOODSERVICE

EQUIPMENT

ELEVATIONS AND

SECTIONS

MM/BB

EG/RB

0240202.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

02/09/2024

EG/TP

BID SET

RRA KEYNOTE LEGEND

KEYNOTE KEYNOTE TEXT

SD-1a TABLE EDGE - TURN DOWN

SD-2a BACKSPLASH - AT WALL

SD-3 FRAMEWORK

SD-4 TABLE & SINK LEGS

SD-6 REMOVABLE UNDERSHELF

SD-7 CABINET CONSTRUCTION

SD-9a GENERAL USE 16"x20"x10" DP.

SD-17 HINGED SOLID DOOR - INTEGRAL PULL

SD-28 WALL CABINET W/SHELF

SD-30 UTILITY CURB

SD-39 STAINLESS STEEL CORNER GUARD

SD-70 SHEET PAN DOLLY

1/2" = 1'-0"

1 ITEM 22 - WORKCOUNTER W/ SINK

1/2" = 1'-0"

5 ITEM 77 - WORKCOUNTER 3

1/2" = 1'-0"

4 ITEM 77 - WORKCOUNTER 2

INGREDIENT ASSEMBLY

BAKERY PREP

1/2" = 1'-0"

2 ITEM 62 - WORKCOUNTER W/ SINK

1/2" = 1'-0"

3 ITEM 77 - WORKCOUNTER 1

1/2" = 1'-0"

6 ITEM 77 - WORKCOUNTER 4

2.0 03/01/2024 ADDENDUM 2.0

ELECTRICAL LEGEND

S

COMPRESSOR

BRING SERVICE DOWN FROM ABOVE

DISTANCE ABOVE FINISHED FLOOR

JUNCTION BOX

HORSEPOWER

KILOWATT

WATTS

PHASE

AMPERES

VOLTS

SWITCH

SINGLE RECEPTACLE

DUPLEX RECEPTACLE

COMP

DN+

JB

HP

KW

W

PH

AMP

V

SW

SR

DR

MOTOR

SOLENOID

CEILING TO A DISTANCE ABOVE

FINISHED FLOOR

AFF

CLG

DFA

ET

ELEC

FSEC

ABOVE FINISHED FLOOR

CEILING

DOWN FROM ABOVE

ELECTRICAL TRADES

ELECTRICAL

FOODSERVICE EQUIPMENT CONTRACTOR

FLOOR RECEPTACLEFR

DATA OUTLET

VOICE OUTLET

EMPTY JUNCTION BOX

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

WITH TIME DELAY RELAY

DISPOSER

ALTERNATE

CONTROL

LOCATION

DISCONNECT

FURNISHED BY

ELECTRICAL

TRADES AND

LOCATED PER

LOCAL CODE

DISPOSER

CONTROL

INTERCONNECTION

FROM J-BOX BY

ELECTRICAL TRADES

SOLENOID VALVE FURNISHED BY

FSEC, INSTALLED BY PLUMBING

TRADES AND INTERWIRED BY

ELECTRICAL TRADES

TIME DELAY RELAY

FURNISHED BY FSEC,

INTERWIRED BY

ELECTRICAL TRADES

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

WALK-IN REFRIGERATOR/FREEZER

JUNCTION BOX WITH

OUTLET FOR DRAINLINE

HEATER ON FREEZER

(EXPOSED CONDUIT FOR

THIS CONDITION IS

ACCEPTABLE)

SECURE COIL WITH NYLON FASTENERS

CONDUIT DOWN THRU WALK-IN TOP

INTO LIGHT FIXTURE

HEATED PRESSURE

RELIEF PORT ON

FREEZER

BUILDING SPRINKLER

CONNECTION IF REQUIRED

BY CODE(NOT IN 114000

CONTRACT)

FSEC WILL PREWIRE ALL ELECTRICAL

COMPONENTS EXCEPT BLOWER COIL

TO THIS JUNCTION BOX FOR ONE FINAL

CONNECTION BY ELECTRICAL TRADES

JUNCTION BOX & CONDUIT WITHIN WALL

PANEL FOR DOOR & WINDOW HEATERS

JUNCTION BOX & CONDUIT WITHIN

WALL PANEL FOR LIGHT SWITCH &

DIGITAL THERMOMETER

NOTES:

1. IT IS THE RESPONSIBILITY OF THE FSEC TO FURNISH, INSTALL AND INTERCONNECT CONDUIT AND

WIRING FOR ELECTRICAL COMPONENTS INCLUDING LIGHTS, SWITCHES, THERMOMETERS, DOOR,

WINDOW, PRESSURE RELIEF PORT HEATERS AND RECEPTACLE FOR DRAINLINE HEATER TO EASILY ACCESSIBLE JUNCTION BOX ON TOP OF WALK-IN FOR FINAL CONNECTION BY ELECTRICAL TRADES

2. ALL INTERCONNECTING CONDUIT RUN ABOVE WALK-IN PANELS OR WITHIN WALL PANELS. EXPOSED CONDUIT INSIDE WALK-IN WILL NOT BE ACCEPTABLE EXCEPT FOR THE CONNECTIONS SHOWN AND

NOTED IN THE ABOVE ILLUSTRATION.

3. SEAL PENETRATIONS THROUGH CEILING, WALLS AND INSIDE ELECTRICAL CONDUIT OUTSIDE AND

INSIDE WALK-IN WITH DOW CORNING #999A SILICONE SEALANT.

4. PROVIDE HOLES FOR SPRINKLER HEAD (IF REQUIRED) AND ELECTRICAL CONDUIT.

5. PROVIDE 1/2" OD PVC CONDUIT AT ALL PENETRATIONS THRU INSULATED PANELS

SD-191

CONDUIT DOWN THRU WALK-IN

TOP TO JUNCTION BOX ON COIL

(EXPOSED CONDUIT ACCEPTABLE

FOR THIS LOCATION)

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

GAYLORD DCV SYSTEM

ELECTRICAL WIRING DETAIL

WIRING NOTES:

1. ALL WIRING OF ELECTRICAL EQUIPMENT MUST BE DONE TO MEET NEC AND LOCAL CODES.

2. (2) WIRES AND GROUND FROM DCV CONTROL CABINET TO NON-INTERRUPTIBLE SUPPLY

VOLTAGE SERVICE BY ELECTRICAL CONTRACTOR.

3. (1) CAT 5 CABLE FROM DCV CONTROL CABINET TO THE PRIMARY HOOD AVHC BY ELECTRICAL

CONTRACTOR.

4. (2) WIRES FROM DCV CONTROL CABINET TO FIRE SUPPRESSION SYSTEM MICRO SWITCHES BY

ELECTRICAL CONTRACTOR.

5. (6) WIRE LOW VOLTAGE CABLE FROM DCV CONTROL CABINET TO EACH VFD BY ELECTRICAL

CONTRACTOR.

LEGEND

FIELD WIRING BY E.C.

AVHCAVHCAVHC

HOOD (PRIMARY) ADD'L SECTION(S) ADD'L HOOD(S)

120 VAC

LIGHTS

120 VAC

LIGHTS

WIRING BY GAYLORD

CAT 5 FIELD WIRING BY E.C.

CAT 5 FIELD WIRING BY GAYLORD

LIGHT INTERWIRING IF

HOODS ARE ADJACENT

DCV CONTROL

CABINET

COMMAND

CENTER

AMBIENT

TEMPERATURE

SENSOR

NOTE 2

NOTE 3

NOTE 4

NOTE 5

FIRE

SUPPRESSION

SYSTEM

EF VFD

SF VFD/VAV

BMS

REMOTE

FIELD

SERVER

BUILDING

WIRELESS

BROADBAND

NOTE:

1. ELECTRICAL COMPONENTS AND INTERWIRING BY ELECTRICAL TRADES UNLESS NOTED OTHERWISE.

2. CONDUIT CONCEALED IN WALL WHEREVER POSSIBLE. EXPOSED CONDUIT TO BE CHROME-PLATED.

ROBERT RIPPE & ASSOCIATES, INC. © 2011 ROBERT RIPPE

WIRING DIAGRAM - ELECTRIC GAS VALVE

WET CHEMICAL FIRE PROTECTION SYSTEM

A .F

.F

A .F

.F

ELECTRICAL PANEL

WITH POWER SHUT-

OFF DEVICE(S) FOR

ELECTRIC COOKING

EQUIPMENT

MANUAL RESET

FURNISHED BY FSEC

FIRE PROTECTION

SYSTEM ENCLOSURE

BY FSEC, MOUNT

FLUSH WITH CEILING

CONDUIT BELOW

CEILING AND

OCTAGONAL

JUNCTION BOX

BY ELECTRICAL

TRADES

REMOTE MANUAL

PULL (VERIFY

LOCATION)

CEILING

LOCATE

GAS VALVE

PER LOCAL

CODE

JUNCTION

BOX

EMPTY

CONDUIT

ABOVE CEILING

BY FSEC

WIRING TO

SUPPLY FAN

WIRING TO POWER

SHUT-OFF DEVICE(S)

ELECTRICAL GAS

VALVE FURNISHED BY

FSEC INSTALLED BY

MECHANICAL TRADES

WIRING TO BUILDING

FIRE ALARM

POWER TO COOKING

EQUIPMENT

POWER

SUPPLY

DATE:

DRAWN:

REVIEWED:

SHEET TITLE:

SHEET NUMBER:

PROJECT NO.:

PROJECT:

ISSUE:

# DATE: DESCRIPTION:

DESIGNED:

RFB922300-03

/2

/2

:4 :4

P

M FSE100

FOODSERVICE

EQUIPMENT

ELECTRICAL

SCHEDULE &

DETAILS

MM

EG/RB

0240202.00

CLARINDA

CORRECTIONAL

FACILITY - KITCHEN &

LAUNDRY ADDITION

STATE OF IOWA DEPARTMENT

OF CORRECTIONS

2000 N 16TH ST, CLARINDA, IA

51632

02/09/2024

EG/TP

BID SET

FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE

ITEM # DESCRIPTION VOLTS PHASE AMPS WATTS HP

CONN.

TYPE

RI

HEIGHT REMARKS

7A WALK-IN REFRIGERATOR/FREEZER COMPLEX 120 V 1 20.0 A DIRECT 114" DFA / NOTE W / SEE DETAIL SD-191

7B FREEZER FLOOR HEAT A 208 V 1 DIRECT 48" DFA / COOK'S ISSUANCE FLOOR HEAT / NOTE W / SEE DETAIL SD-188 / 30 AMP BREAKER / (1) CIRCUIT

7B FREEZER FLOOR HEAT B 208 V 1 DIRECT 48" DFA / MAIN FREEZER FLOOR HEAT / NOTE W / SEE DETAIL SD-188 / 30 AMP BREAKER / (3) CIRCUITS ON ONE CONTACTOR

8A RACKED REFRIGERATION SYSTEM A 208 V 3 138.9 A DIRECT 0" NOTE D & W / MAX FUSE SIZE 175.0 AMPS / MIN CIRCUIT AMPACITY 148.4 AMPS

8B REFRIGERATION SYSTEM COIL - PRODUCE

REFRIGERATOR

B 120 V 1 1.8 A DIRECT 96" NOTE W / (2) COILS @ 1.8 AMPS EACH

8C REFRIGERATION SYSTEM COIL - MEAT & DAIRY

REFRIGERATOR

C 120 V 1 1.8 A DIRECT 96" NOTE W / (2) COILS @ 1.8 AMPS EACH

8D REFRIGERATION SYSTEM COIL - TEMPERING

REFRIGERATOR

D 208 V 1 13.7 A DIRECT 96" NOTE W

8E FREEZER SYSTEM COIL - MAIN FREEZER E 208 V 1 22.8 A DIRECT 96" NOTE W / (2) COILS @ 22.8 AMPS EACH

8F FREEZER SYSTEM COIL - BAKERY FREEZER F 208 V 1 9.1 A DIRECT 96" NOTE W

8G REFRIGERATION SYSTEM COIL - BAKERY

REFRIGERATOR

G 120 V 1 1.8 A DIRECT 96" NOTE W

11 HEATED AIR CURTAIN A 480 V 3 22.0 A 1/2, 1/2 DIRECT 96" PROVIDE 30 AMP CIRCUIT

11 HEATED AIR CURTAIN B 480 V 3 28.3 A 1/2, 1/2 DIRECT 96" PROVIDE 35 AMP CIRCUIT

12 AIR CURTAIN 120 V 1 3.4 A 1/5, 1/5 DIRECT 96" PROVIDE 15 AMP CIRCUIT

13 MANUAL SLIDING DOOR (FRZ) 120 V 1 3.0 A DIRECT 86" ELECTRICAL TRADES TO PROVIDE AND INSTALL FROSTOP DISCONNECT KEYSWITCH / FINAL CONNECTIONS BY ELECTRICAL TRADES

26 BENCH SCALE 120 V 1 RECEPT. 18" AC ADAPTER W/INTERNAL BATTERY

34 FOOD CUTTER 120 V 1 13.0 A 1 RECEPT. 60" INTERCHANGEABLE PLUG IN LOCATION W/ITEM #114 / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH IN AND CAP AS NEEDED

40 MOBILE HOT/COLD TRANSPORT CART 120 V 1 RECEPT. 0" VFY. UTILITIES W/OWNER / (13) CIRCUITS SERVICED THRU #41A & B

41A UTILITY DISTRIBUTION SYSTEM 120 V 1 DIRECT 126" (6) 20.0 AMP CIRCUITS TO SERVICE (6) #40 / FSEC TO PREWIRE RECEPTACLES IN UDS / FINAL CONNECTIONS BY ELECTRICAL TRADES / SEE SHEET FSE101

41B UTILITY DISTRIBUTION SYSTEM 120 V 1 DIRECT 126" (7) 20.0 AMP CIRCUITS TO SERVICE (7) #40 / FSEC TO PREWIRE RECEPTACLES IN UDS / FINAL CONNECTIONS BY ELECTRICAL TRADES / SEE SHEET FSE102

62 WORKCOUNTER W/SINK 120 V 1 DIRECT 10" NOTE A / STUB UP THRU ADJACENT WALL / (3) 20.0 AMP CIRCUITS TO SERVICE (1) #71 & (2) CONV. DRS

63 140 QUART MIXER 208 V 3 14.8 A 5 DIRECT 60" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

64 WATER METER W/TEMPERATURE RANGE 120 V 1 5.0 A RECEPT. 54" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

67 SPIRAL MIXER 208 V 3 32.0 A 15 DIRECT 48" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

69 SHEETER 120 V 1 8.3 A RECEPT. 60" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

71 DIGITAL BENCH SCALE A 120 V 1 DUPLEX 0" AC ADAPTER W/INTERNAL BATTERY

71 DIGITAL BENCH SCALE B 120 V 1 DUPLEX 0" SERVICED THRU #77A / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED / AC ADAPTER W/INTERNAL BATTERY

74 ROLL-IN PROOFER, 2 DOUBLE RACKS 208 V 3 5000 W DIRECT 90" NEUTRAL WIRE CIRCUITRY NEEDED TO PROVIDE 120V CONTROL / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

77 BAKERY WORKCOUNTER W/RICHLITE TOP A 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (2) CONV. DRS & #71B & 79

77 BAKERY WORKCOUNTER W/RICHLITE TOP AA 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (3) CONV. DRS & (1) #83

77 BAKERY WORKCOUNTER W/RICHLITE TOP B 208 V 3 DIRECT 10" NOTE A / STUB UP THRU CURB / (1) 20.0 AMP CIRCUIT TO SERVICE #78

78 DIVIDER ROUNDER 208 V 3 10.0 A 3/4 DIRECT 0" SERVICED THRU #77B / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

79 BREAD SLICER 120 V 1 7.0 A 1/2 RECEPT. 0" SERVICED THRU #77A / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

83 BUN SLICER 120 V 1 6.8 A 816 W 1/3 RECEPT. 0" SERVICED THRU #77AA / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

85 ROLL-IN BLAST CHILLER A 208 V 3 10.6 A 3400 W DIRECT 106"

85 BLAST CHILLER REMOTE CONDENSING UNIT B 208 V 3 53.3 A 16400 W 9 DIRECT 0"

87 RACK OVEN, 2-SEC. 120/208 V 3 1800 W DIRECT 90" NOTE I & L / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

89 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #87

89 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA DEDICATED, NON-INTERRUPTED CIRCUIT

90 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #87

90 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT

91 ICE MAKER 208 V 1 4.2 A RECEPT. 66"

109 FOOD PROCESSOR 120 V 1 12.0 A 1.5 RECEPT. 52" VFY. UTILITIES W/OWNER

112 REACH-IN REFRIGERATOR, 2-SEC. 120 V 1 10.7 A 1/3 RECEPT. 84" ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

114 SLICER 120 V 1 6.0 A 720 W 1/2 RECEPT. 60" INTERCHANGEABLE PLUG IN LOCATION W/ITEM #34 / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

116 HORIZONTAL CUTTER/MIXER 208 V 3 22.0 A 5 RECEPT. 18" PROVIDE 30 AMP CIRCUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH IN AND CAP AS NEEDED

132 STACKED WASHER/DRYER A 120 V 1 .9 RECEPT. 30" PROVIDE 15 AMP CIRCUIT

132 STACKED WASHER/DRYER B 120 V 1 1/3 RECEPT. 30" PROVIDE 15 AMP CIRCUIT

142 MOBILE WARMING CABINET A 120 V 1 12.0 A 1500 W RECEPT. 0" (1) SERVICED THRU #145 A (2) SERVICED THRU #146

142 MOBILE WARMING CABINET B 120 V 1 12.0 A 1500 W RECEPT. 30"

144 80 QUART MIXER 208 V 3 12.0 A 3 DIRECT 0" SERVICED THRU #145 B / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

145 WORKCOUNTER W/SINKS A 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (4) 20.0 AMP CIRCUITS TO SERVICE (3) CONV. DRS & (1) #142A

145 WORKCOUNTER W/SINKS B 208 V 3 DIRECT 10" NOTE A / STUB UP THRU CURB / (1) 20.0 AMP CIRCUIT TO SERVICE #144

146 WORKCOUNTER W/SINKS 120 V 1 DIRECT 10" NOTE A / STUB UP THRU CURB / (6) 20.0 AMP CIRCUITS TO SERVICE (4) CONV. DRS & (2) #142

148 EXHAUST HOOD (TYPE I) A 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL

148 EXHAUST HOOD (TYPE I) B 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL

148 EXHAUST HOOD (TYPE I) C 120 V 1 400 W DIRECT 108" DFA / NOTE I / SEE DETAIL

150 UTILITY DISTRIBUTION SYSTEM 120/208 V 3 20.0 A DIRECT 110" DFA / NOTE Y

151 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE #148 A, B & C

151 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT

153 DEMAND CONTROL VENTILATION SYSTEM 120 V 1 15.0 A DIRECT 36" SEE DETAIL / TO SERVICE HOOD #148

154 60 GALLON KETTLE 120 V 1 10.0 A RECEPT. 0" NOTE L / SERVICED THRU #150

155 80 GALLON KETTLE 120 V 1 10.0 A RECEPT. 0" NOTE L / SERVICED THRU #150

158 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

160 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT / ADD ALTERNATE / ELECTRICAL TRADES TO ROUGH-IN AND CAP AS NEEDED

161 STEAMER, 2-SEC. A 120 V 1 2.0 A DIRECT 0" NOTE L / SERVICED THRU #150 / FLEXIBLE CONDUIT

163 RACK OVEN, 2-SEC. 120/208 V 3 1800 W DIRECT 90" NOTE I & L

169 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #163

169 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT

170 FIRE PROTECTION SYSTEM A 120 V 1 DIRECT NOTE J, K & L / AT CEILING / WIRING FOR CONTROLS / SEE DETAIL / TO SERVE (1) #163

170 ELECTRIC GAS VALVE B 120 V 1 DIRECT 120" DFA / DEDICATED, NON-INTERRUPTED CIRCUIT

174 DISPOSER 208 V 3 8.8 A 3 DIRECT 18" NOTE C / SEE DETAIL

182 HOSE STATION 120 V 1 2 RECEPT. 84"

187 DISPOSER 208 V 3 8.8 A 3 DIRECT 18" NOTE C / SEE DETAIL

189 FLIGHT-TYPE DISHMACHINE W/DRYER A 480 V 3 86.3 A DIRECT 80" DFA / NOTE I

SCHEDULE NOTES - ELECTRICAL

NOTE: SCHEDULE NOTES PERTAIN TO INDIVIDUAL ITEMS AS INDICATED IN THE FOODSERVICE EQUIPMENT

ELECTRICAL SCHEDULE.

A THE FSEC WILL PROVIDE RECEPTACLES IN FABRICATED EQUIPMENT AS REQUIRED AND WILL PREWIRE ELECTRICAL COMPONENTS IN COUNTER TO JUNCTION BOXES IN COUNTER BASE FOR FINAL CONNECTION BY ELECTRICAL TRADES. INTERCONNECTIONS BETWEEN SECTIONS OF FABRICATED COUNTERS BY FSEC.

C. WIRE THRU TIME DELAY RELAY, SOLENOID VALVE AND CONTROL PANEL TO DISPOSER.

D. ALL REFRIGERATION SYSTEMS ARE LOCATED APPROXIMATELY WHERE SHOWN ON THE PLAN UNLESS OTHERWISE NOTED. THE FOLLOWING ITEMS ARE NOT BY THE FSEC: ROOF CURBS/CONCRETE PADS;

SLEEVED & SEALED PENETRATIONS IN ROOFS/FLOORS/CEILINGS/WALLS. VERIFY EXACT LOCATON WITH

ARCHITECT/ENGINEER.

I. ELECTRICAL TRADES TO WIRE AUTOMATIC CONTROLS OR INTERLOCK DEVICE BETWEEN EQUIPMENT AND

EXHAUST FAN SO EXHAUST FAN TURNS ON ONCE EQUIPMENT IS OPERATIONAL.

J. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM WITH BUILDING ALARM SYSTEM AND TO

MAKE-UP AIR FAN SHUT-OFF.

K. FIRE PROTECTION SYSTEM REQUIRES 24 HOUR, EMERGENCY SEPARATE ELECTRICAL SERVICE. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM WITH ELECTRICAL GAS SHUT-OFF VALVE FOR ALL COOKING EQUIPMENT BELOW HOODS. ELECTRICAL TRADES TO ALSO INTERWIRE FIRE PROTECTION SYSTEM

WITH BUILDING ALARM SYSTEM.

L. ELECTRICAL TRADES TO INTERWIRE FIRE PROTECTION SYSTEM TO POWER SHUT-OFF DEVICE, SUPPLIED BY ELECTRICAL TRADES, SO THAT POWER TO ALL ELECTRIC COOKING EQUIPMENT AND CONVENIENCE RECEPTACLES BELOW HOODS IS SHUT OFF UPON ACTIVATION OF THE FIRE PROTECTION SYSTEM.

W. INTERCONNECT THIS EQUIPMENT WITH BUILDING EMERGENCY POWER.

Y. WHEN A UTILITY DISTRIBUTION SYSTEM IS SPECIFIED, ELECTRICAL TRADES SHALL:

1.INSTALL MAIN SERVICE FEEDERS AND OVERCURRENT PROTECTION DEVICES; INSTALL ELECTRICAL

CONDUIT AND WIRING FROM ROUGH-IN LOCATION TO RACEWAY TERMINALS IN VERTICAL CHASE BY SYSTEM

MANUFACTURER.

2.CONNECT UL LISTED POWER SUPPLY CORDS AND PREWIRED FLEXIBLE CONDUIT SET, ALL PROVIDED BY

SYSTEM MANUFACTURER WITH APPROPRIATE EQUIPMENT ITEMS.

3.INTERCONNECT FIRE PROTECTION SYSTEM MICROSWITCH OR RELAY TO POWER SHUT-OFF DEVICE FOR

MAIN SERVICE FEEDERS.

4.PROVIDE 24 VOLT POWER SUPPLY CIRCUIT FROM CONTROL BOX IN RISER TO AUTOMATIC STEAM SHUT-OFF

VALVE, SEE DETAIL.

5.SPECIAL NOTE – NO MODIFICATION OF ANY MANUFACTURED RACEWAY SHALL BE UNDERTAKEN BY ANY

ENTITY WITHOUT THE EXPRESS, WRITTEN APPROVAL AND/OR SUPERVISION OF THE RACEWAY

MANUFACTURER.

THE FSEC WILL:

1.INTERCONNECT FIELD JOINTS BY BOLTING BUSBAR AND/OR WIRING TOGETHER. ALL FITTINGS, BOLTS, ETC.

SHALL BE PRE-FITTED AND FURNISHED BY THE SYSTEM MANUFACTURER. THE CONTROL WIRE FIELD JOINT

WILL BE PROVIDED WITH A QUICK-DISCONNECT DEVICE.

2.INSPECT FOR LOOSE CONNECTIONS CAUSED BY SHIPPING AND TIGHTEN AS REQUIRED.

GENERAL NOTES - ELECTRICAL

NOTE: GENERAL NOTES REFER TO GENERAL CONDITIONS. ALL CONDITIONS MAY NOT EXIST ON THIS

PROJECT.

1. THESE DRAWINGS ARE FOR USE BY THE PROJECT ENGINEERS IN PREPARING THEIR DRAWINGS. THESE DRAWINGS ARE INCIDENTAL TO OUR SERVICES AND MUST BE REVIEWED AND APPROVED BY A PROPERLY LICENSED DESIGN PROFESSIONAL BEFORE BEING USED FOR ANY OTHER PURPOSES. RIPPE ASSOCIATES

IS NOT LICENSED AS A DESIGN PROFESSIONAL AND DOES NOT HOLD ITSELF OUT AS SUCH.

2. SERVICES SHOWN ON THIS PLAN ARE EQUIPMENT REQUIREMENTS FOR FOODSERVICE EQUIPMENT ONLY.

LOCATIONS, SIZES AND HEIGHTS ABOVE FINISHED FLOOR ARE APPROXIMATELY AS REQUIRED BY EQUIPMENT TO BE FURNISHED. SINCE MULTIPLE SOURCES FOR THE EQUIPMENT MAY BE SPECIFIED, SLIGHT VARIATIONS IN UTILITY LOADS, CONNECTION SIZES AND NEMA PLUG CONFIGURATIONS CAN OCCUR. DESIGN BUILDING UTILITY SYSTEM ACCORDINGLY AND ADD NOTES TO THE ELECTRICAL CONTRACT DOCUMENTS INDICATING SLIGHT VARIATIONS ARE TO BE INCLUDED IN ELECTRICAL TRADES

WORK AT NO ADDITIONAL COST.

3. THESE DRAWINGS ARE NOT TO BE USED TO ROUGH-IN AND/OR TO SET SLEEVES BY, SINCE REQUIRED

ALLOWANCES MUST BE MADE FOR MULTIPLE EQUIPMENT SOURCES AND FOR VALVES, FITTINGS,

DISCONNECTS, ETC. WHICH WILL BE FURNISHED UNDER ELECTRICAL TRADES. FSEC IS RESPONSIBLE FOR

PREPARING DIMENSIONED ROUGH-IN AND SLEEVE LOCATION PLANS PER SPECIFICATIONS TO

ACCOMMODATE THE EXACT EQUIPMENT BEING PROVIDED.

4. ALL 120V DUPLEX RECEPTACLES TO BE MINIMUM 20 AMP. CIRCUIT AND MOUNTED VERTICALLY, UNLESS

OTHERWISE NOTED ON PLAN.

5. ELECTRICAL TRADES TO PROVIDE ALL NECESSARY DISCONNECT SWITCHES FOR EQUIPMENT INSTALLED

AHEAD OF EQUIPMENT CONTROL OR SWITCH.

6. THE FSEC IS RESPONSIBLE FOR SETTING THE EQUIPMENT IN PLACE. FINAL CONNECTION FOR THIS

EQUIPMENT IS THE RESPONSIBILITY OF THE ELECTRICAL TRADES.

7. HOLES IN FOODSERVICE EQUIPMENT FOR ELECTRICAL SERVICES PROVIDED BY FSEC.

8. BUILDING POWER PANEL BREAKERS SERVING FOODSERVICE EQUIPMENT SHOULD BE EQUIPPED WITH GROUND FAULT INTERRUPT PROTECTION IN ACCORDANCE WITH NATIONAL ELECTRIC CODE FOLLOWED BY MUNICIPALITY AND/OR LOCAL CODE. DO NOT PROVIDE GROUND FAULT INTERRUPT RECEPTACLES AT THE EQUIPMENT UNLESS RECEPTACLE IS READILY ACCESSIBLE WITHOUT HAVING TO MOVE EQUIPMENT

OR EMPLOY A STEP LADDER.

9. UTILITY CONNECTIONS SHOWN ARE THOSE REQUIRED TO SERVICE FOOD SERVICE EQUIPMENT ONLY.

MECHANICAL TRADES SHOULD VERIFY WITH OWNER WHETHER ADDITIONAL UTILITIES ARE REQUIRED FOR EXISTING, FUTURE OR VENDOR FURNISHED NON-FOODSERVICE EQUIPMENT LOCATED WITHIN THE AREA

SHOWN ON THIS PLAN.

10. DESIGN INCOMING UTILITY SERVICES TO ACCOMMODATE 100% OF THE LOADS INDICATED; DO NOT APPLY DIVERSITY FACTOR AS ALL EQUIPMENT CAN BE OPERATING SIMULTANEOUSLY DURING PEAK SERVICE

PERIODS.

2.0 03/01/2024 ADDENDUM 2.0

DOC CCF Kitchen & Laundry Addition Clarinda, Iowa

DAS#9223.00

RFB922300-03

PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 2

02-09-2024 [Type

SUBSTITUTION REQUEST FORM

Project:

To:

Re:

Substitution Request Number:

From:

Date:

A/E Project Number:

Specification Title: Description:

Section: Page: Article/Paragraph:

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

History: New product 2-5 years old 5-10 yrs old More than 10 years old

Differences between proposed substitution and specified product:

Point-by-point comparative data prepared by contractor and attached - REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

Project: Architect:

Address: Owner:

Date Installed:

Proposed substitution affects other parts of Work: No Yes; explain

Supporting Data Attached: Drawings Product Data Samples Tests Reports

DOC Clarinda Correctional Facility Kitchen & Launtry Addition

Matthew Hartman

Farnsworth Group 2/15/24

The Samuels Group 0240202

Thermal Insulation XPS Board Insulation

072100 2 2.02

Atlas EnergyShield XR

Atlas East Moline, IL

EnergyShield XR

Polyiso alternate to XPS application in below grade and perimeter of foundation

DOC CCF Kitchen & Laundry Addition Clarinda, Iowa

DAS#9223.00

RFB922300-03

PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 3

02-09-2024 [Type

SUBSTITUTION REQUEST FORM

(Continued)

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

• Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

• Proposed substitution does not affect dimensions and functional clearances.

• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by:

Signed by:

Firm:

Address:

Telephone:

Attachments:

A/E's REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01 3300.

Substitution approved as noted - Make submittals in accordance with Specification Section 01 3300.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E

Matthew Hartman

Roofing Representatives

900 Kacina Rd Hiawatha, IA 52233

319-321-3272

2.26.2024

DOC CCF Kitchen & Laundry Addition Clarinda, Iowa

DAS#9223.00

RFB922300-03

PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 2

02-09-2024 [Type

SUBSTITUTION REQUEST FORM

Project:

To:

Re:

Substitution Request Number:

From:

Date:

A/E Project Number:

Specification Title: Description:

Section: Page: Article/Paragraph:

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

History: New product 2-5 years old 5-10 yrs old More than 10 years old

Differences between proposed substitution and specified product:

Point-by-point comparative data prepared by contractor and attached - REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

Project: Architect:

Address: Owner:

Date Installed:

Proposed substitution affects other parts of Work: No Yes; explain

Supporting Data Attached: Drawings Product Data Samples Tests Reports

See qualification package

None

See qualification package

Detention Security Equipment Detention Security Equipment

111900 111900-5 111900/1.7/A.2

Southern Folger Contracting

2/23/24

DOC CCF Kitchen and Laundry Addition Clarinda, IA

Southern Folger Contracting, Inc.

PO Box 58

Southern Folger Contracting, Inc.

Newcastle, CA 95658 916-900-6593

Substitution request to have Southern Folger Contracting listed as approved DEC to bid project

See qualification package

DOC CCF Kitchen & Laundry Addition Clarinda, Iowa

DAS#9223.00

RFB922300-03

PROJECT 9223.00 SUBSTITUTION PROCEDURES 01 2500 - 3

02-09-2024 [Type

SUBSTITUTION REQUEST FORM

(Continued)

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

• Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

• Proposed substitution does not affect dimensions and functional clearances.

• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by:

Signed by:

Firm:

Address:

Telephone:

Attachments:

A/E's REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01 3300.

Substitution approved as noted - Make submittals in accordance with Specification Section 01 3300.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E

Southern Folger Contracting

Southern Folger Contracting

PO Box 58 Newcastle, CA 95658

256-466-9186

SFC qualification package

2.26.2024

FS103 - FOODSERVICE EQUIPMENT PLAN AND SCHEDULE - AREA 3
FS200 - FOODSERVICE EQUIPMENT ELEVATIONS AND SECTIONS
FSE100 - FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE & DETAILS
Southern Folger Contracting - Substitution Request - FG NET
Clarinda Correctional Facility RFA - Atlas XR - FG NET
ProjectID: 1006071058
Specs
01100~01500 Mtgs_Submit_Temp_131_180
Page 149
Page 150

File details come from the government source that posted it. Updated .