RFB918604-01 - Drawings.pdf

PDF 12 MB Posted

Attached to
Hoover 3rd Floor Renovations
Solicitation number
RFB918604-01
Issued by
Polk County, Iowa

About this file

The provided document is a set of drawings (RFB918604-01 - Drawings.pdf) related to the Hoover 3rd Floor Renovations contract opportunity issued by the Department of Public Defense in the state of Iowa. This contract opportunity seeks proposals from qualified Respondents to modernize the Supervisory Control and Data Acquisition (SCADA) system. The document does not provide details on the project timeline, response due dates, site visits, or contract term.

The pricing terms, set asides, incumbent information, funding requirements, and other salient details are not included in the provided document. This document appears to be focused on providing the technical drawings related to the renovation project rather than the full solicitation details.

View the file

Other files

File Type Posted
RFB918604-01 - Bid Form.pdf PDF
RFB918604-01 - Hoover 3rd Floor Schedule (FINAL).pdf PDF
Project Manual RFB918604-01.html HTML file
Pre-Bid Meeting - Google Meet.html HTML file
Bid Opening - Google Meet.html HTML file
RFB918604-01 - Notice.pdf PDF
RFB918604-01 - Project Manual.pdf PDF
Bid Documents and Drawings.html HTML file
1258264-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XX

09 2116; MTL

FRAMING

09 2116; GYP BD

09 2116; GYP BD

07 2100;

ACOUSTIC BATT

INSUL

ASSEMBLY WIDTH

*BRACE ALL INTERIOR

PARITIONS @ HEAD CONDITION

ABOVE CEILING AS NECESSARY

L- LightGage Metal Stud Assemblies

M- CMU

S- Structural Metal Stud Assemblies W- Wood Stud Assemblies X- Exterior Wall

CORE MATERIAL

X#.#

WALL TYPE

DESIGNATION

NOMINAL CORE SIZE

Wall Type Naming Key

1. SEAL ALL PENETRATIONS THROUGH NON-FIRE RATED INTERIOR PARTITIONS

AND FLOOR SLABS NOT ON GRADE WITH ACOUSTIC SEALANT. ALL INTERIOR

WALLS ARE WALL TYPE "L4.3" UNLESS NOTED OTHERWISE

GENERAL NOTES

GENERAL FILL

BATT INSULATION

CONCRETE

GYPSUM BOARD

WOOD BLOCKING

RIGID INSULATION

STEEL

PLYWOOD

MINERAL FIBER

BOARD INSULATION

BRICK

CONCRETE

MASONRY UNIT

WOOD SHIM

GRANULAR

DRAINAGE FILL

FOAM-IN-PLACE

INSULATION

MATERIAL SYMBOLS

DETAIL SECTION

ELEVATION

WALL SECTION

BUILDING SECTION

WALL TYPE

DOOR NUMBER

WINDOW TAG

REVISION TAG

ELEVATIONS

ROOM IDENTIFICATION

DETAIL IDENTIFICATION

SHEET WHERE SHOWN

SHEET WHERE SHOWN

ELEVATION IDENTIFICATION

SECTION IDENTIFICATION

SHEET WHERE SHOWN

SECTION IDENTIFICATION

SHEET WHERE SHOWN

ROOM NAME

ROOM NUMBER

A-401

1 Ref

R e f

1 Ref

R e f

CASEWORK ELEVATION TAG

AWS SERIES

HEIGHT

WIDTH

DEPTH

NOTE:

HEIGHT IS TO TOP OF

COUNTER

NOTE:

DEPTH IS TO FACE OF

FINISHED WALL TO FACE

OF CABINET DOOR

G2

Issued by

1132 A

Room name

A-101

A1

SIM

A1

A-101

SIM

Name Elevation

A1

A-101

SIM

A1

A-101

SIM

ROOF TAG

FLOOR TAG

F1

R1

REFERENCE INDICATIONS

MODIFIED

DESCRIPTION

MODIFIED DESIGNATOR

LOCKED

SPECIALITY WALL FINISH

KEY NAME OF

INTERIOR MATERIAL

LINE OF INTERIOR

MATERIAL EXTENTS

212M24" 36"

24"

Modified Description

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

VICINITY MAP

INDEX OF DRAWINGS

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

G-001

TITLE SHEET AND

DRAWING INDEX

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

9186.04 - DHS CC STRATEGIC SPACE PLANNING

HOOVER 3RD FLOOR DEPT OF ADMIN SERVICES

1305 E Walnut Street Thrid Floor, Des Moines, IA 50319

100% CONSTRUCTION DOCUMENTS08/22/2024

GENERAL INFORMATION DRAWINGS

G-001 TITLE SHEET AND DRAWING INDEX

G-002 CODE INFORMATION

ARCHITECTURAL DRAWINGS

A-103 THIRD LEVEL FLOOR PLANS

A-113 THIRD LEVEL REFLECTED CEILING PLANS

A-411 INTERIOR ELEVATIONS

A-601 DOOR SCHEDULES, ROOM FINISH SCHEDULES

INTERIOR DRAWINGS

AF-103 THRID LEVEL FLOOR FINISH PLAN

FIRE PROTECTION DRAWINGS

FA-001 FIRE ALARM COVER

FA-103 THIRD LEVEL FIRE DETECTION & ALARM PLAN

F-103 THIRD LEVEL FIRE PROTECTION PLAN

MECHANICAL DRAWINGS

M-000 MECHANICAL GENERAL NOTES & SYMBOLS

MD-103 THIRD LEVEL MECHANICAL DEMOLITION

M-103 THIRD LEVEL MECHANICAL HVAC PLAN

M-301 MECHANICAL DETAILS

ELECTRICAL DRAWINGS

E-000 ELECTRICAL GENERAL NOTES & SYMBOLS

ED-103 THIRD LEVEL ELECTRICAL DEMOLITION

E-103 THIRD LEVEL ELECTRICAL POWER

E-203 THIRD LEVEL ELECTRICAL LIGHTING

E-301

TELECOMMUNICATION DRAWINGS

T-000 TECHNOLOGY COVER

TD-103 THIRD LEVEL TECHNOLOGY DEMOLITION PLAN

T-103 THIRD LEVEL TECHNOLOGY COMMUNICATIONS PLAN

T-203 THIRD LEVEL TECHNOLOGY SOUND MASKING PLAN

T-300 TECHNOLOGY DETAILS

@ AT

AC ACOUSTICAL COMPONENT

ACST ACOUSTICAL

ADJ ADJACENT OR ADJUSTABLE

AFF ABOVE FINISH FLOOR

AL ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APCC ARCHITECTURAL PRECAST CONCRETE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ATC ACOUSTICAL TILE CEILING

AV AUDIO VISUAL

AW ARCHITECTURAL WOODWORK

BD BOARD

BEJ BRICK EXPANSION JOINT

BLDG BUILDING

BLKG BLOCKING

BO_ BOTTOM OF ____

BRG BEARING

CG CORNER GUARD

CIPC CAST-IN-PLACE CONCRETE

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CPT CARPETING / CARPET TILE

CW CURTAIN WALL

DBL DOUBLE

DEMO DEMOLITION / DEMOLISH

DF DRINKING FOUNTAIN

DIA DIAMETER

DN DOWN

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DW DISHWASHER

DWG DRAWING(S)

EA EACH

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EX EXPOSED

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FACP FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FE FIRE EXTINGUISHER ON BRACKET

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FACE OR FLOOR

FIN FINISH

FLEX FLEXIBLE

FLR FLOOR

FTG FOOTING

FURN FURNITURE/FURNISHINGS

G GROUT

GA GAGE

GALV GALVANIZED

GFR GLASS-FIBER-REINFORCED

GYP GYPSUM

GYP BD GYPSUM BOARD

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

IB INTEGRAL BASE

INSUL INSULATION

INT INTERIOR

JT JOINT

LKR LOCKER

MAS MASONRY

MAT ENTRY WALK-OFF MAT

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MIRR MIRROR OR MIRRORED

MTL METAL

MTLP METAL PANEL

L4.X METAL STUD ASSEMBLIES W/ 1 LAYER

GYP BD EACH SIDE AND ACOUSTIC INSULATION

Mark Stud Size

Assembly Width

UL Design Rating Comments

L4.3 3 5/8" 4 7/8" PNT-1

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER OR DIMENSION

OF/CI OWNER FURNISHED, CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED, OWNER INSTALLED

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

PCC PRECAST CONCRETE

PCONC POLISHED CONCRETE

PEF POURED EPOXY FLOORING

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT(ED)

PR PAIR

R RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REBAR REINFORCING BAR(S)

REF REFERENCE

REFR REFRIGERATOR

REINF REINFORCE OR REINFORCING

REQD REQUIRE(D)

RF RESILIENT FLOORING

RM ROOM

RO ROUGH OPENING

RR RESTROOM

RST REINFORCING STEEL

RWP RIGID SHEET WALL PROTECTION

SATC SUSPENDED ACOUSTICAL TILE CEILING

SCHED SCHEDULE

SCONC SEALED CONCRETE

SECT SECTION

SF SQUARE FOOT OR FEET

SHT SHEET

SHTHG SHEATHING

SIM SIMILAR

SIPS STRUCTURAL INSULATED PANELS

SLNT SEALANT

SLNT/BR SEALANT AND BACKER ROD

SOG SLAB-ON-GRADE

SSM SOLID SURFACING MATERIAL

SST STAINLESS STEEL

STD STANDARD

STF STOREFRONT

STL STEEL

STRUCT STRUCTURAL

SUSP SUSPENDED

T TREAD OR TILE

T&B TOP AND BOTTOM

TAC TACKBOARD

TELECOM TELECOMMUNICATION(S)

TOB TOP OF BEAM

TOC TOP OF CONCRETE/COUNTER

TOF TOP OF FRAME

TOJ TOP OF JOIST

TOM TOP OF MASONRY

TOS TOP OF SLAB OR STEEL

TOW TOP OF WALL

TYP TYPICAL

TZ TERRAZZO

UON UNLESS OTHERWISE NOTED

VAR VARIES

VERT VERTICAL

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WB WALL BUMPER

WC WALL COVERING

WD WOOD

WDP WOOD PANEL

WWF WELDED WIRE FABRIC

PROJECT SITE

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.

I am a duly licensed Architect under the laws of the State of Iowa.

Signature Date

License renewal date:

Pages or sheets covered by this seal:

License #:

June 30, 2026

G SHEETS & A SHEETS

Lyndley E. Kent

07563

08/22/2024Signature Date

License renewal date:

Pages or sheets covered by this seal:

I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

08/22/2024

December 31, 2025

F SHEETS & M SHEETS

CHAD D. BASS

LIST OF ABBREVIATIONS

1. REFER TO SPECIFICATION SECTION 09 2116 - GYPSUM BOARD ASSEMBLIES FOR MINIMUM STUD THICKNESS, MAXIMUM STUD SPACING, AND PERFORMANCE CRITERIA FOR NON-LOAD- BEARING METAL-FRAMED GYPSUM BOARD WALL AND SHAFT WALL ASSEMBLIES; INCLUDING MAXIMUM DEFLECTION, ACOUSTICAL-RATED, FIRE-RESISTANCE-RATED, AND SMOKE- RESISTANCE-RATED REQUIREMENTS. CONSTRUCT ACOUSTICAL-RATED, FIRE-RESISTANCE-RATED, AND SMOKE-RESISTANCE-RATED WALLS ACCORDING TO THEIR RESPECTIVE ASSEMBLY TEST REPORTS. ENSURE MATERIALS USED WITHIN AN ASSEMBLY COMPLIES WITH MANUFACTURER’S DATA AND THE PRODUCT QUALITIES INDICATED IN THEIR RESPECTIVE

ASSEMBLY SPECIFICATIONS AND TEST REPORTS.

2. PENETRATIONS THROUGH, AND THE PERIMETER OF FIRE-RESISTANCE-RATED WALLS, SHALL BE FILLED WITH AN APPROPRIATE FIRESTOPPING SYSTEM MEETING PERFORMANCE REQUIREMENTS INDICATED ON DRAWINGS AND AS SPECIFIED IN SECTION 07 8400 - FIRESTOPPING.

3. EXTEND WALL FRAMING TO BOTTOM OF EXISTING CEILING IN ALL LOCATIONS, UNLESS SPECIFICALLY NOTED OTHERWISE, ALLOWING FOR DEFLECTION WHILE MAINTAINING APPROPRIATE

ACOUSTICAL-RATING.

4. ACOUSTICAL-RATED WALLS SHALL HAVE ACOUSTIC SOUND BATT INSULATION WITHIN STUD SPACE FOR THE ENTIRE LENGTH AND HEIGHT OF WALL AND ACOUSTIC SEALANT AT ENTIRE PERIMETER OF GYPSUM BOARD, INCLUDING PENETRATIONS, EXCEPT WHERE FIRESTOPPING IS PROVIDED.

5. UL LISTINGS ON THIS DRAWING SHEET ONLY APPLY TO WALLS THAT ARE REQUIRED TO BE FIRE-RESISTANCE-RATED AND SMOKE-RESISTANCE-RATED. REFER TO CODE SHEET G-002 FOR IDENTIFICATION AND EXTENT OF WALLS REQUIRED TO BE FIRE-RESISTANCE-RATED AND SMOKE-RESISTANCE-RATED.

6. WALLS REQUIRED TO BE FIRE-RESISTANCE-RATED AND SMOKE-RESISTANCE-RATED SHALL BE IDENTIFIED WITH A LABEL ABOVE THE CEILING ON EACH SEGMENT OF WALL, LOCATED NO MORE THAN 20’-0” ON CENTER ON BOTH SIDES OF WALL OR AS OTHERWISE REQUIRED BY AHJ.

7. FIRE-RESISTANCE-RATED AND SMOKE-RESISTANCE-RATED WALLS SHALL EXTEND AND SEAL TO INTERIOR FACE OF EXTERIOR SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.

8. CUT GYPSUM TO CONTOURS OF ROOF DECK FLUTES AND SEAL WITH ACOUSTIC SEALANT ON EACH SIDE.

GENERAL WALL TYPES NOTES

Signature Date

License renewal date:

Pages or sheets covered by this seal:

I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.

08/22/2024

December 31, 2025

E SHEETS & T SHEETS

ERIC HEYNEN

CODE PLAN LEGEND

SYMBOL DESCRIPTION NOTES

FIRE EXTINGUISHER

FIRE EXTINGUISHER

CABINET

COMPLY WITH

IFC906

1 HR RATED SEPARATION

2 HR RATED SEPARATION

3 HR RATED SEPARATION

1 HOUR FIRE RESISTANCE RATED

CONSTRUCTION.

3/4 HOUR RATED DOOR ASSEMBLIES (UNO)

FIRE & SMOKE DAMPERS.

2 HOUR FIRE RESISTANCE RATED

CONSTRUCTION.

1 1/2 HOUR RATED DOOR ASSEMBLIES (UNO)

FIRE & SMOKE DAMPERS.

3 HOUR FIRE RESISTANCE RATED

CONSTRUCTION.

2 HOUR RATED DOOR ASSEMBLIES

(UNO)

FIRE & SMOKE DAMPERS.

OCCUPANCY AREA TAG

MEANS OF EGRESS

DOOR TAG

NUMBER OF CALCULATED

OCCUPANTS

OCCUPANT LOAD

FACTOR (SQ. FT. /

PERSON)

TOTAL NUMBER OF

OCCUPANTS EXITING

CAPACITY OF EXIT

ELEMENT

ACTUAL EXIT WIDTH

(INCHES)

SQ. FT. OF AREA

NUMBER OF ADVANCING

OCCUPANTS

DIRECTION OF TRAVEL

TRAVEL DISTANCE

TRAVEL PATH

XXX

XXX

XX.X

STAIR

XXX

XXX

XX.X

TOTAL NUMBER OF

OCCUPANTS EXITING

CAPACITY OF EGRESS

STAIR

ACTUAL STAIR WIDTH

(INCHES)

MEANS OF EGRESS

STAIR TAG

XXX SF XXX

XX

FEC

FE

FECFEC

Path Length

156 SF

185 SF

177 SF

325 SF

150 205 SF

150 181 SF

288 SF

270 SF

167 SF

971 SF

3,589 SF

5,269 SF

27 SF

300 54 SF

25 SF

300 39 SF

300 31 SF

154'

FE

2,381 SF

32.88

32.88

32.88

44.88

38.88

FEC

NEW FIRE

EXTINGUISHER &

BRACKET

USE AND OCCUPANCY CLASSIFICATION LEGEND

A-3: ASSEMBLY

B: BUSINESS

S-1: STORAGE

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

G-002

CODE

INFORMATION

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

2015 International Building Code (New Building Code Analysis)

IBC Chapter 1 – Administration

105.1 Before construction an application shall be submitted to the building official to obtain the required permit.

107.3.1 An approved set of plans including plan review comments is to be kept on the job site and be available to the building inspectors.

IBC Chapter 2 – Definitions *Include applicable definitions if needed*

IBC Chapter 3 – Use and Occupancy B (Business Group) Level 3 A-3 (Assembly Group) Level 3

IBC Chapter 5 – Building Heights and Areas Allowable Heights and Areas (Construction Type IB, Sprinklered):

Heights/ Stories - 160ft/ 12 Stories Area - UL

Actual Heights and Areas Heights/ Stories - 58 ft / 4 Stories (renovation - 1 story) Area - 14,173 sf

IBC Chapter 6 – Type of Construction Type: I-B

Tbl 601 Fire-resistance Rating for Building Elements Structural frame 2 hr Bearing walls 2 hr Non-bearing walls 0 hr Floor Construction 2 hr Roof Construction 1 hr

IBC Chapter 7 – Fire and Smoke Protection

Tbl 705.5 Fire-resistance Rating for Exterior Walls 5ft ≤ X < 10ft 1 hr

Tbl 705.8 Maximum Area of Openings 5ft ≤ X < 10ft 25% 10ft ≤ X < 15ft 45%

713.4 Shaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four or more stories, and not less than 1 hour where connecting less than four stories.

IBC Chapter 9 – Fire Protection Systems

903.2.8 An automatic sprinkler system in accordance with NFPA is provided.

906.1 Portable fire extinguishers shall be installed in occupancy groups B & R-2. Each dwelling unit shall be provided with a portable fire extinguisher with minimum rating of 1-A:10-B:C.

Tbl 906.3 Except in Group R-2, a 2-A rated extinguisher shall be located within a maximum travel distance of 75 feet.

IBC Chapter 10 – Means of Egress

Tbl 1004.5 Maximum Floor Area Per Occupant Business Areas 150 gross = 94 Occupants Assembly (A-3) 15 net = 64 Occupants Storage (S-1) 300 gross = 5 Occupants

Tbl 1017.2 Exit Access Travel Distance Group B (Sprinklered) 300ft Group A (Sprinklered) 250ft

IBC Chapter 11 – Accessibility

1110.15 Controls, operating mechanisms and hardware intended for operation, switches, and electrical outlets, in accessible spaces, shall be accessible.

IBC Chapter 29 – Plumbing

Tbl 2902.1 Minimum Number of Plumbing Fixtures, (or Tbl 422.1 of the Iowa State Plumbing Code) Required

Group B 1 WC per 25 1 Lav per 40 1 WC per 50 after 50 1 Lav per 80 exceeding 80

Group A 1 WC per 125 (M) 1 WC per 65 (F) 1 per 200 Total Group B: 2 (M)

Group B: 2 (F) Group A: 1 (M) Group A: 1 (F) 3 WC's Lav: Group B - 2 + Group A - 1 = 3 total Lavs

Drinking Fountains Group B 1 per 100 Group A 1 per 500 Total Group B: 1

Group A: 1

Provided Men 5 WCs, 3 Urinals 7 Lav Women 8 WCs 7 Lav Drinking Fountains 2 Total 16 WCs. (or Urinals) 14 Lavs 2 Drinking Fountains

*Per International Plumbing Code section 419.2 Substitution for water closets. In each bathroom or toilet room, urinals shall not be substituted for more than 67 percent of the required water closets in assembly and educational occupancies. Urinals shall not be substituted for more than 50 percent of the required water closets in all other occupancies.

IBC Chapter 30 – Elevators

3001.2 An emergency two-way communication system with visible text and audible modes shall be provided that:

1. When operating in each mode, include a live interactive system that allows back and forth conversation between the elevator occupants and emergency personnel.

2. Is operational when the elevator is operational.

3. Allows elevator occupants to select the text-based or audible modes.

1/16" = 1'-0"

LEVEL 3 USE & OCCUPANCY PLAN

Code Review (IEBC Analysis)

Project:9186.04 - DHS CC Strategic Space Planning Hoover 3rd Floor Dept of Admin Services

Address: 1305 E Walnut St Des Moines, IA 50319

Date: 2024.08.19

Applicable Codes 2015 International Building Code 2021 State Mechanical (Based on 2021 International Mechanical Code) 2015 International Fire Code 2020 National Electrical Code 2021 State Plumbing Code (Based on 2021 Uniform Plumbing Code) 2012 International Energy Conservation Code

Project Description Level 3 renovation of Hoover Building - DAS offices.

Primary: Group B, offices include professional or service-type transactions, including storage of records and accounts.

BASIC INFORMATION

Renovation 14,173 GSF (North portion of level 3 floor plate) Construction Type: I-B Occupancy Groups B (Level 3), A-3 (Level 3)

Chapter 1 - Scope and Administration Demolition work to follow IEBC Chapter 15 All sub-contractors will need to apply for and obtain their own specialty permits.

An approved set of plans including plan review comments is to be kept on the job site and be available to the building inspectors.

Chapter 2 - Definitions See IBC 2021

Proposed Building Type 1-A

Alterations – Level 2

14,159 GSF

3 stories above grade Building height: 58'-0" above grade plane average parapet height.

Fully sprinklered per Section 903 of the 2021 International Fire Code.

Chapter 4 – Repairs Construction Type: I-A

403 Fire Protection Repairs shall be done in a manner that maintains the level of fire protection provided.

(Table 601 IBC) REQ. PROVIDED Structural Frame including columns, girders & trusses 3 hr 3 hr Bearing Walls--Exterior 3 hr 3 hr Bearing Walls--Interior 3 hr 3 hr Nonbearing walls & partitions--Exterior 1 hr 1 hr* Nonbearing walls & partitions--Interior 0 hr Varies Floor Construction including supporting beams & joists 2 hr 2 hr Roof Construction including supporting beams & joists 1 hr 1 hr**

* New additions will be rated to 1 hr. Existing exterior walls will meet or exceed a 2hr rating.

Chapter 6 – Classification of Work

602.1 Scope

Level 1 alterations include the removal and replacement or the covering of existing materials, elements, equipment, or fixtures using new materials, elements, equipment, or fixtures that serve the same purpose.

602.2 Application

Level 1 alterations shall comply with the provisions of chapter 7.

603.1 Scope

Level 2 alterations include the reconfiguration of space, the addition or elimination of any door or window, the reconfiguration or extension of any system, or the installation of any additional equipment.

603.2 Application

Level 2 alterations shall comply with the provisions of Chapter 7 for Level 1 alterations as well as the provisions of Chapter 8.

606.1 General

Structural repairs shall be in compliance with section 606 and Section 601.2 and the detailing provisions of the International Building Code for new buildings of similar structure, purpose and location

707 Alterations - Level 1

702.1 Interior Finishes

Newly installed interior wall and ceiling finishes shall comply with Chapter 8 of the International Building Code.

702.2 Interior Floor Finish

New interior floor finish, including new carpeting used as an interior floor finish material, shall comply with Section 804 of the International Building Code.

702.3 Interior Trim

Newly installed interior trim materials shall comply with Section 806 of the International Building Code.

702.6 Materials and Methods

New work shall comply with the materials and methods requirements in the International Building Code, International Energy Conservation Code, International Mechanical Code, and International Plumbing Code, as applicable, that specify material standards, detail of installation and connection, joints, penetrations, and continuity of any element, component, or system in the building.

704.1 Means of Egress

Alterations shall be done in a manner that maintains the level of protection provided for the means of egress.

Chapter 8 – Alterations Level 2

801.2 Alteration Level 1 compliance

In addition to the requirements of this chapter, all work shall comply with the requirements of Chapter 7.

801.3 Compliance

New construction elements, components, systems and spaces shall comply with the requirements of the International Building Code.

Exceptions:

Windows may be added without requiring compliance with the light and ventilation requirements of the International Building Code.

803 Fire Protection The requirements of this section shall be limited to work areas in which Level 2 alterations are being per-formed, and where specified they shall apply throughout the floor on which the work areas are located or otherwise beyond the work area.

803.2 Automatic sprinkler systems

Automatic sprinkler systems shall be provided in accordance with the requirements of Sections 803.2.1 through

803.2.4. Installation requirements shall be in accordance with the International Building Code.

803.2.2 Groups A, B, E, F-1, H, I, M, R-1, R-2, R-4, S-1 and S-2.

In buildings with occupancies in Groups A, B, E, F-1, H, I, M, R-1, R-2, R-4, S-1 and S-2, work areas that have exits or corridors shared by more than one tenant or that have exits or corridors serving an occupant load greater than 30 shall be provided with automatic sprinkler protection where both of the following conditions occur:

805.8 Exit Signs

Exit signs shall be in accordance with this section, as applicable.

805.8.1 Work Areas

Means of egress in all work areas shall be provided with exit signs in accordance with the requirements of the

International Building Code.

2021 LIFE SAFETY - OCCUPANT LOADS

Number Name 2021 Space Function Per IBC Chapter 10 Area 2021 Occupancy Load Factor 2021 Occupant Load

H374 CONFERENCE

ROOM

Assembly W/out Fixed Seats-Unconcentrated (tables and chairs)

185 SF 15 13

H366 CONFERENCE

ROOM

Assembly W/out Fixed Seats-Unconcentrated (tables and chairs)

288 SF 15 20

H364 CONFERENCE

ROOM

Assembly W/out Fixed Seats-Unconcentrated (tables and chairs)

270 SF 15 19

H362 CONFERENCE

ROOM

Assembly W/out Fixed Seats-Unconcentrated (tables and chairs)

167 SF 15 12

H372 OFFICE Business Areas 156 SF 150 2

H368 OFFICE Business Areas 177 SF 150 2

H342 OPEN OFFICE Business Areas 325 SF 150 3

H344 OFFICE Business Areas 205 SF 150 2

H346 OFFICE Business Areas 181 SF 150 2

H352 OPEN OFFICE Business Areas 971 SF 150 7

H370 OFFICE Business Areas 3,589 SF 150 24

H354 OPEN OFFICE Business Areas 5,269 SF 150 36

H340 OPEN OFFICE Business Areas 2,381 SF 150 16

H348 ELEC Mercantile- Storage, Stock, Shipping Areas 27 SF 300 1

H350 COMM Mercantile- Storage, Stock, Shipping Areas 54 SF 300 1

H361 ELEC Mercantile- Storage, Stock, Shipping Areas 25 SF 300 1

H363 COMM Mercantile- Storage, Stock, Shipping Areas 39 SF 300 1

H366 STOR Mercantile- Storage, Stock, Shipping Areas 31 SF 300 1

14,339 SF 163

1. ALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED.

2. WALLS TO BE TYPE L4.3, UNLESS OTHERWISE NOTED.

3. REPAIR AND PATCH CONCRETE FLOOR WHERE DAMAGED OR UNFINISHED

RESULTING FROM DEMOLITION WORK.

4. WHEREVER DEMOLITION OF WALLS, CEILINGS, FLOORS, CASEWORK, OR OTHER

ITEMS RESULTS IN EXPOSED, UNFINISHED EDGES, PLANES, OR FACES OF ADJOINING

WALLS, CEILINGS, FLOORS, ETC., THESE UNFINISHED ELEMENTS SHALL BE REPAIRED,

PATCHED AND FINISHED WITH LIKE/COMPATIBLE MATERIALS AS REQUIRED TO MATCH

ADJACENT SURFACE, UNLESS OTHERWISE NOTED IN THE DOCUMENTS.

5. WHERE REMOVAL OF ITEMS REQUIRED BY THIS CONTRACT, INCLUDING PLUMBING,

MECHANICAL, ELECTRICAL, AND TELECOM ITEMS, LEAVES HOLES IN THE EXISTING

WALLS, FLOORING, FLOOR SLAB, CEILINGS, AND/OR ROOF DECK, CONTRACTOR

SHALL PATCH ALL HOLES LEFT FROM REMOVAL OF THESE ITEMS TO MATCH

ADJACENT ASSEMBLY AND SURFACE PRIOR TO REFINISHING.

6. REFER TO THE UNDERSLAB MEP PIPING PLANS FOR ADDITIONAL AREAS OF PATCHING

CONCRETE FLOORS FOR UNDERSLAB PIPING NOT SHOWN ON THE ARCHITECTURAL

PLANS.

7. ALL WALL MOUNTED FIRE EXTINGUISHERS AND BRACKETS TO BE PROTECTED /

REINSTALLED AFTER PAINTING OF WALL SURFACE.

GENERAL FLOOR PLAN NOTES

5 6 7 8 10 11

35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0"

B

C

A

12943

2'-0"

14'-10"

/4

24'-6"

15'-0"

OFFICE

H342

OFFICE

H344

OFFICE

H346

OFFICE

H368

OFFICE

H372

CONFERENCE

ROOM

H374

CONFERENCE

ROOM

H366

CONFERENCE

ROOM

H364

CONFERENCE

ROOM

H362

OPEN OFFICE

H352

H 342 H

H

H374

H366

H364

H362

OPEN OFFICE

H340

OPEN OFFICE

H354

OPEN OFFICE

H360

OPEN OFFICE

H370

H 360-A

ELEC

H361

COMM

H363

STOR

H365

H

H

H

H

H368 H372

ELEC

H348

COMM

H350

H

H

2'-0"

H

H

359-AH

H -A

H340

CORRIDOR

H359

CORRIDOR

H353

WALL TO BE FILLED,

PATCHED, & FINISHED

TO MATCH ADJACENT

A L

IG

N

A-411

A4

B4

/2

ALIGN

ALIGN

EXISTING PUSH BUTTON FOR

DOOR H360A TO REMAIN

(EXACT LOCATION: VIF)

H

4'-0"

12 3600; SSM

COUNTERTOP

A L

IG

N

A-411

C4

A-411 C5

A-411

D5

A-411

D4

A-411 E5

H352-A

A-411

A2

EXISTING WINDOW

TO REMAIN

V

IF

EXISTING DOOR H360

TO BE MODIFIED WITH

HALF GLASS CUT OUT

NEW CLERESTORY GLAZING

SEE ELEVATION A4 / A-411

A L

IG

N

EXISTING WINDOW TO

BE FILLED - FINISH TO

MATCH ADJACENT

CR

EXISTING

CR

EXISTING

CR

EXISTING

A-411

A2

EXISTING PUSH BUTTON FOR

DOOR H360 TO REMAIN

(EXACT LOCATION: VIF)

A L

IG

N

E Q

E Q

A-411

E4 6'-2"

OWNER

PROVIDED

REFRIGERATOR

OWNER

PROVIDED

REFRIGERATOR

PATCH & REPAIR

WALL AS NECESSARY

FOR PAINTING

PATCH WALL WITH

METAL STUDS AND

DRYWALL WHERE

FEC WAS REMOVED

OWNER

PROVIDED

REFRIGERATOR

CENTER WALL ON MULLION CENTER WALL ON MULLION

SALVAGE EXISTING MAILSLOT IN

THE CORRIDOR H359 AND INSTALL

@ THIS LOCATION 42" AFF

5 6 7 8 10 11

B

C

2'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 2'-0"

A

12943

9'-10 1/2"

9'-11"

OFFICE

H342

OFFICE

H344

OPEN OFFICE

H352

OPEN OFFICE

H340

OPEN OFFICE

H370

CONF

H368

CONF

H356

CONF

H358

CONF

H346

H 342 H

H

H 360-A

H

H

3 H

ELEC

H361

COMM

H363

STOR

H365

ELEC

H348

COMM

H350

H

H

H340

H

359-AH

UP

EXISTNG WINDOW SHADES TO REMAIN

COVER & PROTECT THROUGH CONSTRUCTION

LINE OF EXISTING

SOFFIT OVERHEAD

D1

D2D3

D1

D1

D3

D1

D4D5

D6

D7

D7

D8

D9D9 D9

D9

OPEN OFFICE

H360

D10

D10 D10

D10

D10

D10

D10

D10

D10

D10

D10

D10

D10

D10 D10

D10

D10

D10

D11

D12

LINE OF EXISTING

SOFFIT OVERHEAD

REMOVE & REINSTALL

EXISTING "MIRROR" WHILE

PAINTING SURROUNDING

WALL.

DEMOLISH PORTION OF WALL FOR

INSTALLATION OF NEW DOOR

D2

D2

D2

V

IF

V

IF

H 360H

D13

D14

D12

D9

D12

D15 D16

LINE OF EXISTING

SOFFIT OVERHEAD

PATCH & REPAIR WALLS WHEN

RAISED FLOOR IS REMOVED TO

MATCH ADJACENT FINISH &

PREP FOR PAINT, TYP

D18

E.O. RAISED FLOOR

D12 D12

D12

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

A-103

THIRD LEVEL

FLOOR PLANS

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

1/8" = 1'-0"A1

THIRD LEVEL FLOOR PLAN

1/8" = 1'-0"C1

THIRD LEVEL DEMOLITION PLAN

DEMO NOTES

D1 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING FIXTURES & CEILING W/ ATTIC STOCK

PROVIDED BY OWNER.

D2 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING WALL.

D3 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING WINDOW / MULLION.

D4 DEMOLISH EXISTING OVERHEAD COILING DOOR. PATCH / FILL & FINISH WALL (MATCH ADJACENT).

D5 DEMOLISH EXISTING MAILBOXES. PATCH / FILL & FINISH WALL (MATCH ADJACENT).

D6 DEMOLISH EXISTING WINDOW. PATCH / FILL @ FINISH WALL (MATCH ADJACENT).

D7 DEMOLISH RAISED FLOOR & EXISTING RAMP IN OPEN OFFICE H370.

D8 DEMOLISH EXISTING LAMINATE FLOORING. INSTALL NEW LAMINATE TILE.

D9 REMOVE EXISTING CARPET. INSTALL NEW CARPET.

D10 REMOVE EXISTING WALL BASE & REPAIR WALL AS NEEDED.

D11 DEMOLISH EXISTING WOOD SHELF IN CORRIDOR H359.

D12 CONTRACTOR TO DEMOLISH EXISTING CHAIR RAILS & WALLPAPER. CONTRACTOR TO PATCH, PAINT & REPAIR WALLS.

D13 CONTRACTOR TO REMOVE EXISTING UNDERFLOOR SMOKE DETECTOR PANEL. PATCH & REPAIR EXISTING WALL.

D14 CONTRACTOR TO REMOVE EXISTING DEVICE SERVING DEVICES BELOW THE RAISED FLOOR. PATCH & REPAIR EXISTING WALL.

D15 CONTRACTOR TO DEMOLISH EXISTING COUNTERTOP & CASEWORK.

D16 REMOVE EXISTING FIRE EXTINGUISHER CABINET. CONTRACTOR TO PATCH W/ MTL STUD DRYWALL, FLUSH WITH SURROUNDING WALL. PAINT TO MATCH ADJACENT

MASONRY WALL COLOR.

D17 CONTRACTOR TO DEMOLISH EXISTING SLOTTED WOOD CEILING.

D18 REMOVE EXISTING MAIL SLOT(S) FOR INSTALLATION IN NEW LOCATION. PATCH / FILL & FINISH WALL - TO MATCH ADJACENT.

1. REMOVE ALL MEPT SYSTEM COMPONENTS WITHIN AREAS OF THE WORK OF THIS

CONTRACT THAT ARE NOTED AS ABANDONED OR TO BE ABANDONED BY THE WORK

OF THIS CONTRACT.

2. REFER TO MECHANICAL PLANS FOR LOCATIONS OF ADDITIONAL OPENINGS TO BE

CUT IN EXISTING WALLS FOR NEW DUCTWORK AND PIPING.

3. ALL EXISTING WALL SIGNAGE ARE TO BE PROTECTED WHILE PAINTING AND

REINSTALLED IN ITS ORIGINAL LOCATION UNLESS NOTED OTHERWISE.

4. ALL EXISTING DOOR HARDWARE (CLOSERS, REQUREST TO EXIT DEVICES, CARD

READERS, ETC.) ARE TO BE PROTECTED WHILE PAINTING DOORS & FRAMES.

5. ALL EXISTING STONE BASE TO BE PROTECTED / SALVAGED.

6. REFER TO MEP DRAWINGS FOR ADDITIONAL DEMOLITION OF DEVICE(S).

GENERAL DEMOLITION NOTES

EXISTING WOOD CEILING

CEILING LEGEND

EXISTING TYPE AR

CEILING (RADIANT PANEL)

EXISTING SLOT DIFFUSER

EXISTING TROFFER

5 6 7 8 10 11

B

C

A

12943

EXISTING / EXPOSED

WOOD BEAM

EXISTING

DRYWALL

SOFFIT

EXISTING

DRYWALL

SOFFIT

WALLS EXTEND TO

UNDERSIDE OF

CEILING, TYP

WALLS EXTEND TO

UNDERSIDE OF

CEILING, TYP

WALLS EXTEND TO

UNDERSIDE OF

CEILING, TYP

WALLS EXTEND TO

UNDERSIDE OF

CEILING, TYP

2'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 2'-0"

OFFICE

H342

OFFICE

H344

OFFICE

H346

OPEN OFFICE

H340

OPEN OFFICE

H352

CONFERENCE

ROOM

H362

CONFERENCE

ROOM

H364

OPEN OFFICE

H360

CONFERENCE

ROOM

H366

OFFICE

H368

OFFICE

H372

CONFERENCE

ROOM

H374

OPEN OFFICE

H370

EXISTING DRYWALL SOFFIT

NEW DRYWALL SOFFIT

EXISTING LIGHT FIXTURE

(EXTENDS OVER WALL)

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

RED: EXISTING LIGHT FIXTURE

TO BE REMOVED & REPLACED

WITH OPAQUE PANEL FROM

OWNER PROVIDED ATTIC

STOCK, TYP

GREEN: EXISTING OPAQUE MTL

CEILING PANELS TO BE REPLACED

WITH LIGHT FIXTURE(S) FROM

OWNER PROVIDED ATTIC STOCK

OR FROM LIGHTS REMOVED

DURING THIS PROJECT, TYP

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

PNT-4

(ALL EXISTING MTL

CEILING PANELS)

PNT-4

(ALL EXISTING MTL

CEILING PANELS)

PNT-4

(ALL EXISTING MTL

CEILING PANELS)

5 6 7 8 10 11

B

C

A

12943

D1 D1 D1

D4 D6

EXISTING / EXPOSED

WOOD BEAM

V

IF

DEMOLISH PORTION OF WALL FOR

INSTALLATION OF NEW DOOR

2'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 2'-0"

OFFICE

H342

OFFICE

H344

OFFICE

H346

OPEN OFFICE

H340

OPEN OFFICE

H352

OPEN OFFICE

H360

OPEN OFFICE

H370

OFFICE

H368

D17

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

A-113

THIRD LEVEL

REFLECTED

CEILING PLANS

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

1. AREAS WITH NO CEILING MATERIAL INDICATED ARE EXPOSED STRUCTURE.

2. CONTRACTOR TO REVIEW CEILING LAYOUT AS SHOWN AND NOTIFY ARCHITECT OF

ANY CONFLICTS WITH STRUCTURAL, ELECTRICAL, MECHANICAL, PLUMBING,

TELECOM, OR FIRE PROTECTION SYSTEMS, ETC. BEFORE PROCEEDING WITH

CONSTRUCTION.

3. CEILING ELEVATIONS ARE REFERENCED FROM THE FINISHED FLOOR OF THE ROOM IN

WHICH IT IS INSTALLED, UNLESS OTHERWISE NOTED.

4. THE REFLECTED CEILING PLAN(S) SHOW(S) AREAS TO RECEIVE NEW CEILING TILE

AND GRID. REMOVE EXISTING TILE AND GRID IN THESE AREAS.

5. INSTALL NEW CEILING TILE AND GRID AT THE SAME HEIGHT AS THE EXISTING CEILING

GRID UNLESS OTHERWISE NOTED.

6. REMOVE EXISTING CEILING TILES AND SUSPENSION GRID AS REQUIRED TO PERFORM

THE WORK OF THIS CONTRACT. REINSTALL TILES AND SUSPENSION SYSTEM. AT

COMPLETION OF THE WORK REPLACE ALL TILES, GRID, AND SUSPENSION SYSTEM

DAMAGED DURING THE EXECUTION OF THE WORK OF THIS CONTRACT. REPLACE ALL

TILES WITH HOLES, DISCOLORATION OR OTHER DEFECTS RESULTING FROM

REMOVAL OF PLUMBING, MECHANICAL, ELECTRICAL, OR TELECOM ITEMS, FIREALARM

DEVICES, CONDUIT, ETC. REMOVED AS PART OF THIS CONTRACT.

7. CUT GYPSUM TO CONTOURS OF ROOF DECK FLUTES AND SEAL WITH ACOUSTIC

SEALANT ON EACH SIDE.

8. ALL EXISTING METAL CEILING TILES & GRIDS ARE TO BE PAINTED (REMOVED &

PAINTED IF NECESSARY AND PLACED BACK IN THEIR ORIGINIAL LOCATION) UNLESS

OTHERWISE NOTED.

9. ALL EXISTING LIGHT TROFFERS & DIFFUSERS (TO BE PROTECTED DURING THE

PAINTING OF THE EXISTING CEILING TILES IF NECESSARY) ARE TO REMAIN IN THE

SPACE UNLESS OTHERWISE NOTED.

GENERAL RCP NOTES

1/8" = 1'-0"A1

THIRD LEVEL REFLECTED CEILING PLAN

1/8" = 1'-0"C1

THIRD LEVEL REFLECTED CEILING DEMOLITION PLAN

DEMO NOTES

D1 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING FIXTURES & CEILING W/ ATTIC STOCK

PROVIDED BY OWNER.

D2 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING WALL.

D3 FURNITURE VENDOR TO DEMOLISH WALL PRIOR TO START OF PROJECT. CONTRACTOR TO PATCH & REPAIR EXISTING WINDOW / MULLION.

D4 DEMOLISH EXISTING OVERHEAD COILING DOOR. PATCH / FILL & FINISH WALL (MATCH ADJACENT).

D5 DEMOLISH EXISTING MAILBOXES. PATCH / FILL & FINISH WALL (MATCH ADJACENT).

D6 DEMOLISH EXISTING WINDOW. PATCH / FILL @ FINISH WALL (MATCH ADJACENT).

D7 DEMOLISH RAISED FLOOR & EXISTING RAMP IN OPEN OFFICE H370.

D8 DEMOLISH EXISTING LAMINATE FLOORING. INSTALL NEW LAMINATE TILE.

D9 REMOVE EXISTING CARPET. INSTALL NEW CARPET.

D10 REMOVE EXISTING WALL BASE & REPAIR WALL AS NEEDED.

D11 DEMOLISH EXISTING WOOD SHELF IN CORRIDOR H359.

D12 CONTRACTOR TO DEMOLISH EXISTING CHAIR RAILS & WALLPAPER. CONTRACTOR TO PATCH, PAINT & REPAIR WALLS.

D13 CONTRACTOR TO REMOVE EXISTING UNDERFLOOR SMOKE DETECTOR PANEL. PATCH & REPAIR EXISTING WALL.

D14 CONTRACTOR TO REMOVE EXISTING DEVICE SERVING DEVICES BELOW THE RAISED FLOOR. PATCH & REPAIR EXISTING WALL.

D15 CONTRACTOR TO DEMOLISH EXISTING COUNTERTOP & CASEWORK.

D16 REMOVE EXISTING FIRE EXTINGUISHER CABINET. CONTRACTOR TO PATCH W/ MTL STUD DRYWALL, FLUSH WITH SURROUNDING WALL. PAINT TO MATCH ADJACENT

MASONRY WALL COLOR.

D17 CONTRACTOR TO DEMOLISH EXISTING SLOTTED WOOD CEILING.

D18 REMOVE EXISTING MAIL SLOT(S) FOR INSTALLATION IN NEW LOCATION. PATCH / FILL & FINISH WALL - TO MATCH ADJACENT.

EQEQEQEQ

09 6500;

RESILIENT BASE08 8000; GLAZING

COLUMN

EXISTING

COLUMN

EXISTING

12 3600; SSM

COUNTERTOP

09 6500;

RESILIENT BASE

REFRIGERATOR

NIC

20'-0"

4'-0"

24" 34" 112 24"

24" 34" 112 24"

C2

A-411

NEW FIRE

EXTINGUISHER &

BRACKET

EQ EQ

A F

F

09 6500;

RESILIENT BASE

EXPANSION JOINT REVEAL

NEW WALL EXTENTS

A

F F

MONITOR

NIC

@ MONITOR MOUNTING

4'-0"

09 6500;

RESILIENT BASE

06 1000; WD

BLOCKING

EQ EQ

*ALL AV / IT LOCATIONS TO BE COORDINATED W/ OWNER PRIOR TO INSTALLATION

UTILITIES

W D

B L

O C

K

IN

G

" UTILITIES

/4

EQ EQ

MONITOR NIC

@ MONITOR &

CAMERA MOUNTING

4'-0"4'-0"

09 6500;

RESILIENT BASE

06 1000; WD

BLOCKING

06 1000; WD

BLOCKING

A F

F

*ALL AV / IT LOCATIONS TO BE COORDINATED W/ OWNER PRIOR TO INSTALLATION

UTILITIES

06 1000; WD

BLOCKING

MONITOR NIC

@ MONITOR

MOUNTING

W D

B L

O C

K

IN

G

/4

UTILITIES

MONITOR

NIC

@ MONITOR & CAMERA

MOUNTING

06 1000; WD

BLOCKING

09 6500;

RESILIENT BASE

EQ EQ

4'-0"

A F

F

/2

*ALL AV / IT LOCATIONS TO BE COORDINATED W/ OWNER PRIOR TO INSTALLATION

UTILITIES

06 1000; WD

BLOCKING

W D

B L

O C

K

IN

G

/4 " 09 6500;

RESILIENT BASE

@ MONITOR &

CAMERA MOUNTING

A F

F

/2

EQEQ

06 1000; WD

BLOCKING

MONITOR

NIC

4'-0"

*ALL AV / IT LOCATIONS TO BE COORDINATED W/ OWNER PRIOR TO INSTALLATION

UTILITIES

06 1000; WD

BLOCKING

W D

B L

O C

K

IN

G

/4

A F

F

09 6500;

RESILIENT BASE

@ MONITOR MOUNTING

MONITOR

NIC

06 1000; WD

BLOCKING

4'-0"

*MONITOR SIZE & BLOCKING LOCATION TO BE

VERIFIED BY DAS PRIOR TO INSTALLATION.

EQ EQ

*ALL AV / IT LOCATIONS TO BE COORDINATED W/ OWNER PRIOR TO INSTALLATION

UTILITIES

W D

B L

O C

K

IN

G

/4

A

L4.3

EXISTING EXTERIOR

GLAZING & MULLION

EXTERIOR ALUMINUM

SILL BEYOND

END CAP

MULLION MATE

A L

IG

N

A L

IG

N

V

IF

09 2116; GYP BD

EDGE TRIM

LINE OF

EXISTING STONE

STOOL BEYOND

LINE OF

EXISTING STONE

SILL BEYOND

EXISTING STEEL

WINDOW

REINFORCEMENT - VIF

MINERAL WOOL

INSULATION

ALIGN

EQ EQ

24" 34" 112 24"

12 3600; SSM

COUNTERTOP

09 6500;

RESILIENT BASE

REINSTALL EXISTING FIRE

EXTINGUISHER & BRACKET

REMOVE EXISTING FIRE

EXTINGUISHER CABINET.

CONTRACTOR TO PATCH W/

DRYWALL, FLUSH WITH

SURROUNDING WALL. PAINT TO

MATCH ADJACENT MASONRY WALL

COLOR.

OWNER PROVIDED REFRIGERATOR

(RELOCATE AS SHOWN ON DRAWINGS)

24" 34" 112 24"

C2

A-411

OPEN

EXISTING FIRE EXTINGUISHER SIGNAGE

T Y

P

/8

M A

X

12 3600; SSM

COUNTERTOP

09 6500;

RESILIENT BASE

2'-0"

12 3600; SSM

BACKSPLASH

06 4100; PLASTIC

LAMINATE

A L

IG

N

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

A-411

INTERIOR

ELEVATIONS

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

1/4" = 1'-0"A4

OFFICE H360 - SOUTH

1/4" = 1'-0"B4

OFFICE H340 - NORTH

1/4" = 1'-0"C4

CONFERENCE ROOM H374 - SOUTH

1/4" = 1'-0"C5

CONFERENCE ROOM H366 - EAST

1/4" = 1'-0"D4

CONFERENCE ROOM H362 - SOUTH

1/4" = 1'-0"D5

CONFERENCE ROOM H364 - NORTH

1/4" = 1'-0"E5

CONFERENCE ROOM H342 - EAST

3" = 1'-0"A2

PLAN DTL @ INTERIOR PARTITION / EXTERIOR WALL / WINDOW

1/4" = 1'-0"E4

OPEN OFFICE H340 - SOUTH

1 1/2" = 1'-0"C2

SECTION DTL @ TYP CASEWORK

F N

PLAN VIEW

INDICATION OF

GLAZING OR

LOUVER, TYP.

VARIES

EXISTING LIGHT

V A

R

IE

S

E X

IS

T

IN

G

L

IG

H T

GHM1 HM3

S E

E S

C H

E D

U L E

2"

SCHEDULE

SEE 2"

S E

E S

C H

E D

U L E

2"

SCHEDULE

SEE 2"

HM2

S E

E S

C H

E D

U L E

2"

SCHEDULE

SEE

2"

SCHEDULE

SEE

2"

VIF

2"

EQEQEQ

20'-0"

HM4

EQ

1. ALL EXISTING SIGNAGE ON DOORS OR FRAMES TO BE PROTECTED DURING PAINTING AND / OR

REMOVED AND REINSTALLED IN THEIR ORIGINAL LOCATION UNLESS NOTED OTHERWISE.

2. INSTALL NEW DOOR NUMBER SIGNAGE ON FRAME.

3. ALL DOOR FRAMES TO BE PAINTED.

4. NEW DOOR HARDWARE TO MATCH EXISTING BRONZE FINISH.

NEW WORK TO BE COMPLETED

DOOR SCHEDULE NOTES

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

A-601

DOOR

SCHEDULES,

ROOM FINISH

SCHEDULES

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

DOOR SCHEDULE

No. ROOM

DOOR SIZE DOOR FRAME CARD

READER Existing NOTESWIDTH HEIGHT TYPE MAT FINISH GLAZE TYPE MAT FINISH GLAZE

H319-A OPEN OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H340 OPEN OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H342 OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H344 OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H346 OFFICE 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H348 ELEC 6'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H350 COMM 6'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H352 OPEN OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H352-A OPEN OFFICE 3'-0" 7'-0" F WD ST HM1 HM PT-3 No 2,3,4

H353 OPEN OFFICE 3'-0" 7'-0" N WD ST YES HM2 HM PT-3 YES Yes 1,3

H359 OPEN OFFICE 3'-0" 7'-0" F WD ST HM2 HM PT-3 YES Yes 1,3

H359-A OPEN OFFICE 4'-0" 7'-0" N WD ST YES HM2 HM PT-3 YES Yes 1,3

H360 OPEN OFFICE 3'-6" 7'-0" G WD ST YES HM1 HM PT-3 HALF GLASS CUTOUT Yes 1,3

H360-A OPEN OFFICE 3'-6" 7'-0" N WD ST YES HM1 HM PT-3 Yes 1,3

H361 ELEC 6'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H362 CONFERENCE ROOM 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H363 COMM 6'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H364 CONFERENCE ROOM 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H365 STOR 3'-0" 7'-0" F WD ST HM1 HM PT-3 Yes 1,3

H366 CONFERENCE ROOM 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H368 OFFICE 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H372 OFFICE 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

H374 CONFERENCE ROOM 3'-0" 7'-0" F WD ST HM3 HM PT-3 2'-0" SIDE LIGHT No 2,3,4

1/4" = 1'-0"

DOOR TYPES

1/4" = 1'-0"

FRAME TYPES

ROOM FINISH SCHEDULE

ROOM

FLOOR FINISH

BASE

FINISH

WALL

FINISH

SPECIALTY

WALL FINISH CEILING FINISH NOTESNo. NAME

H340 OPEN OFFICE CPT-1 / TILE-1 RB-1 PNT-1 PNT-2 - SEE B1/AF-103 EXISTING MTL PANEL (PNT-4) / PNT-1

GYP SOFFIT / EXISTING WOOD

CEILING

RES-1 IN KITCHENETTE AS

SHOWN ON AF-103

EXISTING WOOD CEILING

IN KITCHNETTE

H342 OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4) / PNT-1

GYP SOFFIT

H344 OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H346 OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H348 ELEC CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H350 COMM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H352 OPEN OFFICE CPT-1 RB-1 PNT-1 PNT-2 - SEE B1/AF-103 EXISTING MTL PANEL (PNT-4)

H353 CORRIDOR CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H354 OPEN OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H359 CORRIDOR CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H360 OPEN OFFICE CPT-1 RB-1 PNT-1 PNT-2 - SEE B1/AF-103 EXISTING MTL PANEL (PNT-4)

H361 ELEC CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H362 CONFERENCE ROOM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H363 COMM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H364 CONFERENCE ROOM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H365 STOR CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H366 CONFERENCE ROOM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H368 OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4)

H370 OPEN OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4) / PNT-1

GYP SOFFIT

H372 OFFICE CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4) / PNT-1

GYP SOFFIT

H374 CONFERENCE ROOM CPT-1 RB-1 PNT-1 EXISTING MTL PANEL (PNT-4) / PNT-1

GYP SOFFIT

* NEW SIGNAGE TO MATCH EXISTING (MATERIAL, SIZE,

FONT, ETC). SEE PHOTO ABOVE FOR REFERENCE.

* EXISTING DIRECTIONAL, INFORMATIONAL, AND ROOM

SIGNAGE TO BE REMOVED, SALVAGED, & REINSTALLED,

TYP. SEE PHOTO ABOVE FOR REFERENCE.

DOOR 360-A GLASS CUTOUT

FOR REFERENCE ONLY

TT

L

L LLL

L

L

L

L

5 6 7 8 10 11

B

C

2'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 2'-0"

A

12943

OFFICE

H372

CONFERENCE

ROOM

H374

OPEN OFFICE

H370

OFFICE

H368

OPEN OFFICE

H360

CONFERENCE

ROOM

H366

CONFERENCE

ROOM

H364

CONFERENCE

ROOM

H362

OPEN OFFICE

H352

OPEN OFFICE

H340

OFFICE

H346

OFFICE

H344

OFFICE

H342

ELEC

H348

COMM

H350

ELEC

H361

COMM

H363

STOR

H365

CORRIDORS H353 & H359 TO

RECIEVE NEW PAINT / WALL FINISH

E4

AF-103

INSTALL CARPET

BELOW

CASEWORK

PAINT SOFFIT

(PNT-1)

PAINT

SOFFIT

(PNT-1)

H 359-A

H

H

4H

H368 H372

H374

H

H

H

H

H366

H

H364

H362H352-A

H

H

H

0H

H -A

H340

H 360-A

E2

AF-103

E3

AF-103

E1

AF-103

OPEN OFFICE

H354

INSTALL RESILIENT

FLOORING UNDER

CASEWORK

ALIGN

09 6813; CARPET

TILE (CPT-1)

PNT-1

PNT-2

09 6500; RESILIENT

FLOORING (RES-1)

RES-1

LEVEL 3

28'-0"

09 6800; CARPET

09 6500;

RESILIENT

FLOORING

03 3000; CIP

CONC

(EXISTING TOPPING)

5 6 7 8 10 11

B

C

A

12943 2'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 35'-0" 2'-0"

OFFICE

H372

CONFERENCE

ROOM

H374OPEN OFFICE

H370

OFFICE

H368

OPEN OFFICE

H360

CONFERENCE

ROOM

H366

CONFERENCE

ROOM

H364

CONFERENCE

ROOM

H362

OPEN OFFICE

H352

OPEN OFFICE

H340

OFFICE

H346

OFFICE

H344

OFFICE

H342

ELEC

H348

COMM

H350

ELEC

H361

COMM

H363

STOR

H365

H 359-A

H 342 H

H

H368 H372

H374

H

H

H

H

H366

H

H364

H362H352-A

H

H

H

H -A

H340

H 360-A

H

OPEN OFFICE

H354

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

APPROX LOCATION OF

WALLS (80" AFF) PROVIDED

BY FURNITURE CONRACT -

SHOWN FOR REFERENCE,

LEVEL 3

28'-0"

09 6813; CARPET TILE (NEW)

EXISTING CARPET

EXISTING CONCRETE

TOPPING

09 6566;

TRANSITION STRIP

EXISTING WOOD DOOR

LEVEL 3

28'-0"

09 6813; CARPET TILE (NEW)

EXISTING CONCRETE

TOPPING

09 6566;

TRANSITION STRIP

LEVEL 3

28'-0"

EXISTING CONCRETE

TOPPING

09 6566;

TRANSITION STRIP

09 6500; RESILIENT

FLOORING

EXISTING RESILIENT

FLOORING

EXISTING WOOD DOOR

MATERIAL SPECIFICATIONS - BASIS OF DESIGN

Key Name Material Name Manufacturer Description Comments SSM-1 12 3600 - Solid Surface Corian Solid Surface Glacier White COUNTERTOPS / BACKSPLASH

PNT-1 09 9000 - Paint Sherwin Williams SW7641, Colonnade Gray WALL PAINT, COLUMNS

PNT-2 09 9000 - Paint Sherwin Williams SW6716, Dancing Green WALL ACCENT PAINT

PNT-3 09 9000 - Paint Sherwin Williams SW7642, Pavestone DOOR FRAMES

PNT-4 09 9000 - Paint Sherwin Williams Pro Industrial Waterborne Acrylic Drywall Flat (B42W02181 White) CEILING PAINT

CPT-1 09 6813 Carpet Tile Shaw Contract Group Collection: Diffuse + Disperse, Riverfront 75335, Installation:

Quarter Turn

RB-1 09 6513 Resilient Base Johnsonite Silver Gray 55

RES-1 09 6500 - Resilient Flooring Mohawk Group Large and Local Cloudland 958 KITCHENETTE

PLAM-1 06 4100 - Plastic Laminate Formica Dover White - Matte Finish CASEWORK

1/8" = 1'-0"

FINISH FLOOR LEGEND

SHEET NUMBER

SHEET NAME

PROJECT NO.

OWNER

PROJECT NAME

CONSULTANTS

© NEUMANN MONSON INC.

Unauthorized copying, disclosure or construction without written permission by Neumann Monson Inc. is prohibited.

ARCHITECT OF RECORD

Neumann Monson Architects

221 East College Street | Suite 303

Iowa City, Iowa 52240

319.338.7878

111 East Grand Avenue | Suite 105

Des Moines, Iowa 50309

515.339.7800

ISSUE

DATE DESCRIPTION

KCL Engineering

MEP

300 4th St.

West Des Moines, IA 50265

515.724.7938

T B

V e rs io n

.3

KEY PLAN

ALL ARCH SHEETS TO BE PRINTED IN COLOR

AF-103

THRID LEVEL

FLOOR FINISH

PLAN

24.048

STATE OF IOWA

RFB No. 918604-01

9186.04 - DHS CC

STRATEGIC

SPACE PLANNING

HOOVER 3RD

FLOOR DEPT OF

ADMIN SERVICES

DAS No. 9186.04

50% CONSTRUCTION DOCUMENTS07/17/2024

95% CONSTRUCTION DOCUMENTS08/09/2024

100% CONSTRUCTION DOCUMENTS08/22/2024

1/8" = 1'-0"B1

THIRD LEVEL FLOOR FINISH PLAN

3" = 1'-0"E4

TRANSITION DTL @ CRPT - RES

1/8" = 1'-0"A1

THIRD LEVEL FURNITURE PLAN (FOR REFERENCE)

3" = 1'-0"E3

TRANSITION DTL @ CRPT - CRPT

3" = 1'-0"E2

TRANSITION DTL @ CRPT - CONC

3" = 1'-0"E1

TRANSITION DTL - RES - RES

COMMUNICATIONS - TELECOM SYSTEMS:

O

FO

I

RACKS, FRAMES AND ENCLOSURES

PLYWOOD BACKBOARDS

COPPER BACKBONE CABLING

OPTICAL FIBER BACKBONE CABLING

COAXIAL BACKBONE CABLING

COPPER HORIZONTAL CABLING

OPTICAL FIBER HORIZONTAL CABLING

COAXIAL BACKBONE CABLING

DATA COMMUNICATIONS SWITCHES AND HUBS

DATA COMMUNICATIONS WIRELESS ACCESS POINTS

VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT

CABLE MANAGEMENT

UNINTERRUPTIBLE POWER SUPPLIES (RACK MOUNT)

COMMUNICATIONS - AUDIO-VISUAL SYSTEMS:

FLAT PANEL DISPLAY(S)

MULTI-TOUCH DISPLAY(S)

MEDIA PLAYER(S)

HEAD-END EQUIPMENT

PUBLIC ADDRESS SYSTEM

SOUND MASKING / SPEECH PRIVACY SYSTEM - ADD ALTERNATE #1

INTERCOMMUNICATIONS SYSTEM

WIRED / WIRELESS CLOCK SYSTEM

NURSE CALL / CODE BLUE SYSTEM

COMMUNICATIONS - DISTRIBUTED SYSTEMS:

DISTRIBUTED ANTENNA SYSTEM

MASTER ANTENNA / COMMUNITY ANTENNA TELEVISION DISTRIBUTION

SECURITY - ACCESS CONTROL:

SECURITY MANAGEMENT SYSTEM - HEAD END COMPONENTS

ROUGH-IN, PATHWAYS AND SLEEVES

DOOR STATION(S)

HEAD END EQUIPMENT AND COMPONENTS

SECURITY MANAGEMENT SYSTEM - FIELD DEVICES

SECURITY MANAGEMENT SYSTEM - ELECTRIFIED DOOR HARDWARE

ROUGH-IN, PATHWAYS AND SLEEVES

ROUGH-IN, PATHWAYS AND SLEEVES

DISPLAY TECHNOLOGY MOUNTING HARDWARE

ROUGH-IN, PATHWAYS AND SLEEVES

ROUGH-IN, PATHWAYS AND SLEEVES

SECURITY - VIDEO INTERCOM:

ROUGH-IN, PATHWAYS AND SLEEVES

SECURITY - VIDEO SURVEILLANCE:

CAMERA(S)

HEAD END EQUIPMENT AND COMPONENTS

SECURITY - INTRUSION DETECTION:

ROUGH-IN, PATHWAYS AND SLEEVES

FIELD DEVICES (MOTION DETECTORS, GLASS BREAKS, DOOR SWITCHES)

HEAD END EQUIPMENT AND COMPONENTS

SAFETY - FIRE DETECTION AND ALARM:

ROUGH-IN, PATHWAYS AND SLEEVES

INITIATING FIELD DEVICES (SMOKE, MANUAL PULL, MONITOR MODULES)

NOTIFICATION APPLIANCES (HORNS, STROBES, SPEAKERS)

MISCELLANEOUS DEVICES (RELAYS, TEST STATION, ANNUNCIATOR)

TECHNOLOGY RESPONSIBILITY MATRIX

PROVISION RESPONSIBILITIES DEFINED

SECURITY MANAGEMENT SYSTEM - ALL CABLING

PROJECTOR(S)

OFOI

OFCI

CFCI

CFOI

OWNER FURNISHED & OWNER INSTALLED

OWNER FURNISHED & CONTRACTOR INSTALLED

CONTRACTOR FURNISHED & CONTRACTOR INSTALLED

CONTRACTOR FURNISHED & OWNER INSTALLED

GENERAL NOTE:

A. MATRIX IS NOT INTENDED TO BE EXHAUSTIVE TO COVER ALL MATERIALS NECESSARY FOR

SCOPE AND SHOULD ONLY BE USED TO QUICKLY IDENTIFY SYSTEMS AND RELATED

INFRASTRUCTURE INSIDE AND OUTSIDE THE BID OF THIS PROJECT. ANY ITEMS FURNISHED

OR INSTALLED BY THE BIDDING CONTRACTOR SHALL COVER ALL REQUIRED APPURTENANCES

NECESSARY FOR A COMPLETE SYSTEM. THIS SHALL INCLUDE BUT NOT BE LIMITED TO,

EQUIPMENT, ACCESSORIES, TERMINATIONS, TERMINATION COMPONENTS, ALL FINAL

CORDAGE CONNECTIVITY, SOFTWARE, PROGRAMMING, AND THE LABOR TO INSTALL.

O

FC

I

C

FC

I

C

FO

I

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

1. EXTEND THE EXISTING SIMPLEX 4100U FIRE DETECTION AND ALARM SYSTEM TO

LOCATIONS ILLUSTRATED ON THE DRAWINGS.

2. FIRE ALARM ITEMS AND DEVICES ARE SHOWN IN SUGGESTED LOCATIONS. FINAL

LAYOUTS, LOCATIONS, AND QUANTITIES SHALL BE IN ACCORDANCE WITH APPLICABLE

CODES, MANUFACTURER’S RECOMMENDATIONS, AND EQUIPMENT LISTINGS.

COORDINATE LOCATIONS WITH LIGHTING AND AIR HANDLING SYSTEMS.

3. ALL FIRE ALARM CIRCUITRY IN EXPOSED CEILING SPACES SHALL BE IN ¾” CONDUIT PER

SPECIFICATIONS. EXPOSED CABLING SHALL NOT BE ACCEPTED.

4. ALL CONCEALED, ACCESSIBLE CEILING TILE LOCATIONS SHALL BE ALLOWED TO HAVE

OPEN AIR CABLING INSTALLED. PROVIDE J-HOOKS, BRIDLE RINGS AND ASSOCIATED

CABLE SUPPORTS TO KEEP INFRASTRUCTURE MANAGED AND OFF OF THE CEILING TILE.

5. ELECTRICAL CONTRACTOR SHALL PROVIDE FIRESTOPPING AT ALL PENETRATIONS PER

SPECIFICATION.

FIRE DETECTION & ALARM NOTES

1. ALL EXISTING DEVICES AND DEVICE LOCATIONS WERE MADE BY CASUAL FIELD

OBSERVATION. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING SYSTEM

COMPONENTS AND DEVICE LOCATIONS.

2. PROVIDE LABOR AND MATERIALS TO REMOVE ELECTRICAL FACILITIES AND CLEAR THE

AREA TO RECEIVE THE NEW WORK TO BE PROVIDED UNDER THIS CONTRACT.

3. SYSTEMS SCHEDULED TO BE REMOVED SHALL BE DONE SO IN THEIR ENTIRETY.

ABAND…

This is the start of the file's text. The full file is on GovTribe.