NHGS Groundwater Level Monitoring Network - 2026 Bedrock Monitoring Well Installation Project
Solicitation number
RFB DES 2026-20
Issued by
Grafton County, New Hampshire

About this file

Summary

This is a Contractor's Bid Schedule and Signature Pages document issued by the New Hampshire Department of Environmental Services, New Hampshire Geological Survey, for the 2026 Bedrock Monitoring Well Installation Project. The procurement seeks contractors to install eight bedrock monitoring wells at designated locations in Bath, Concord, Errol, Exeter, Franklin, Lebanon, Lyndeborough, and Walpole. Contractors must submit sealed bids with unit prices for all specified line items and must bid on a minimum of four of the eight sites to be considered for award. Proposals are due by 2:30 PM on May 7, 2026, with public bid opening the same day. The contract completion deadline is September 30, 2027. Work is expected to commence upon issuance of a Notice to Proceed. The bid schedule includes 18 pay items comprising pre-job virtual meetings, mobilization and demobilization to each site, site preparation and restoration (both standard and hourly-based), overburden drilling, bedrock socket drilling, bedrock drilling at varying borehole diameters, steel casing installation, cement grouting, locking caps, and drilling spoil haulage. Site-specific scopes of work outline varying quantities for each pay item based on anticipated drilling depths and site conditions, with total drilling depths ranging from approximately 500 to 600 feet across the eight locations.

Bidders must provide unit prices in dollars for all line items, which will be multiplied by the quantities specified for each site to calculate total bid amounts. The document requires contractor certification regarding non-debarment status and compliance with federal competitive bidding requirements under Title 23 USC, Section 112(c). Contractors must also certify that no collusion or restraint of competitive bidding has occurred. The bid schedule requires signatures from the bidder and identification of firm principals, officers, or organizational members. Qualified contractors must hold a current water well contractor license from the New Hampshire Water Well Board and perform at least 75 percent of work with their own forces, with subcontracting limited to 25 percent. Additional bid requirements include certificates of insurance for Commercial Liability (minimum $1,000,000 per occurrence and $2,000,000 aggregate) and Workers' Compensation, a notarized Certificate of Authority, and a current Certificate of Good Standing from the New Hampshire Secretary of State. Awards will be made to the lowest responsive and responsible bidder(s) within 30 calendar days of bid opening, subject to Governor and Executive Council approval.

View the file

Other files

File Type Posted
rfb-des-2026-20-attachment-1.pdf PDF
rfb-des-2026-20.pdf PDF
rfb-des-2026-20-attachment-2.pdf PDF
rfb-des-2026-20-attachment-3.pdf PDF
rfb-des-2026-20-addendum-1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

STATE OF NEW HAMPSHIRE

DEPARTMENT OF ENVIRONMENTAL SERVICES

NEW HAMPSHIRE GEOLOGICAL SURVEY

Groundwater Level Monitoring Network 2026 Bedrock Well Installation Project

Attachment 1 (Amended) - CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES

CONTRACTOR NAME

CONTRACTOR

ADDRESS

SIGNATURE OF

BIDDER

TITLE

Please indicate by marking with an “x” in the circle next to the locations for which of the eight (8) Bedrock Well Installations your firm is providing a bid.

Minimum of 4 sites required for bid consideration

1. Bath ⃝

2. Concord ⃝

3. Errol ⃝

4. Exeter ⃝

5. Franklin ⃝

6. Lebanon ⃝

7. Lyndeborough ⃝

8. Walpole ⃝

The CONTRACTOR’s unit prices, provided on pages 2 and 3 of this document, will be multiplied by the quantities specified in the Example Scopes of Work for each BEDROCK WELL INSTALLATION Site, specified on pages 4, 5, and 6 of this document, to calculate the CONTRACTOR’s total bid amount for each site.

Groundwater Level Monitoring Network 2026 Bedrock Monitoring Well Installation Project

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

ITEM ITEM AND UNIT PRICES BID IN WORDS PAY UNIT UNIT PRICE

1.1 Pre-job virtual meeting

Each $

______________________________________DOLLARS

1.2.1 Mobilization to Bath, NH

Lump Sum $

______________________________________DOLLARS

1.2.2 Mobilization to Concord, NH

Lump Sum $

______________________________________DOLLARS

1.2.3 Mobilization to Errol, NH

Lump Sum $

______________________________________DOLLARS

1.2.4 Mobilization to Exeter, NH

Lump Sum $

______________________________________DOLLARS

1.2.5 Mobilization to Franklin, NH

Lump Sum $

______________________________________DOLLARS

1.2.6 Mobilization to Lebanon, NH

Lump Sum $

______________________________________DOLLARS

1.2.7 Mobilization to Lyndeborough, NH

Lump Sum $

______________________________________DOLLARS

1.2.8 Mobilization to Walpole, NH

Lump Sum $

______________________________________DOLLARS

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

ITEM ITEM AND UNIT PRICES BID IN WORDS PAY UNIT UNIT PRICE

1.3.1 Standard Site Preparation and Restoration

Lump Sum $

______________________________________DOLLARS

1.3.2

Hourly Rate for Additional Site Preparation and Restoration Per Hour $

______________________________________DOLLARS

2.1 Overburden Drilling Rate, nominal 8-inch borehole

Per Foot $

______________________________________DOLLARS

2.2 Bedrock Socket Drilling Rate, nominal 8-inch borehole

Per Foot $

______________________________________DOLLARS

2.3 Bedrock Drilling Rate, nominal 6-inch borehole

Per Foot $

______________________________________DOLLARS

2.4 Steel Casing, 6-inch diameter, Schedule 40

Per Foot $

______________________________________DOLLARS

2.5 Cement Grout Casing

Lump Sum $

______________________________________DOLLARS

2.6 Locking Cap

Each $

______________________________________DOLLARS

2.7 Haulage of Drilling Spoils

Per Cubic Yard $

______________________________________DOLLARS

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

Example Scopes of Work for Bedrock Well Installation Site 1 - Bath

Item Nos. Item Description Quantity Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.1 Mobilization to Bath, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 20 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 460 Item No. 2.4 Steel Casing, per foot 43 Item No. 2.5 Cement Grout Casing, lump sum 1 Item No. 2.6 Locking Cap, each 1

Site 2 - Concord

Item Nos. Item Description Quantity Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.2 Mobilization to Concord, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 8 Item No. 2.1 Overburden Drilling Rate, per foot 160 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate, per foot 320 Item No. 2.4 Steel Casing, per foot 183 Item No. 2.5 Cement Grout Casing, lump sum 1

Item No. 2.7 Haulage of Drilling Spoils, per cubic yard 8

Site 3 - Errol

Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.3 Mobilization to Errol, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 120 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 360 Item No. 2.4 Steel Casing, per foot 143

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

Example Scopes of Work for Bedrock Well Installation, continued Site 4 - Exeter

Item Nos. Item Description Quantity Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.4 Mobilization to Exeter, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 60 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 420 Item No. 2.4 Steel Casing, per foot 83

Site 5 - Franklin

Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.5 Mobilization to Franklin, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 140 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 340 Item No. 2.4 Steel Casing, per foot 163

Site 6 - Lebanon

Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.6 Mobilization to Lebanon, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 20 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 460 Item No. 2.4 Steel Casing, per foot 43

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

Example Scopes of Work for Bedrock Well Installation, continued Site 7 - Lyndeborough

Item Nos. Item Description Quantity Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.7 Mobilization to Lyndeborough, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 8 Item No. 2.1 Overburden Drilling Rate, per foot 25 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 15 Item No. 2.3 Bedrock Drilling Rate , per foot 460 Item No. 2.4 Steel Casing, per foot 43

Site 8 - Walpole

Item No. 1.1 Pre-job virtual meeting, lump sum 1 Item No. 1.2.8 Mobilization to Walpole, NH, lump sum 1 Item No. 1.3.1 Standard Site Preparation and Restoration, lump sum 1 Item No. 1.3.2 Hourly Rate for Additional Site Preparation and Restoration 4 Item No. 2.1 Overburden Drilling Rate, per foot 150 Item No. 2.2 Bedrock Socket Drilling Rate, per foot 20 Item No. 2.3 Bedrock Drilling Rate , per foot 330 Item No. 2.4 Steel Casing, per foot 173

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

It is proposed:

To execute the Contract and begin work on the date specified in the “Notice to Proceed” and to prosecute said work so as to complete the BEDROCK WELL INSTALLATION and its appurtenances on or before September 30, 2027.

To guarantee all work performed under this Contract to be done in accordance with the Specifications and in good and workmanlike manner, and to renew or repair any work that may be rejected, because of defective materials or workmanship, prior to final completion and acceptance of the project.

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS.

PRIMARY COVERED TRANSACTIONS.

(1) The prospective primary participant certifies to the best of its knowledge and belief, that it and all its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1) (b) of this certification and (d) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. (2) Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

CONTRACT AFFIDAVIT

I/We declare under penalty of perjury under the laws of the United States and the State of New Hampshire that, in accordance with the provisions of Title 23 USC, Section 112(c), have not either directly or indirectly entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this Proposal.

Attachment 1 (Amended) – CONTRACTOR'S BID SCHEDULE and SIGNATURE PAGES continued

New Hampshire Geological Survey Groundwater Level Monitoring Network Contractor Initials ________ 2026 Bedrock Monitoring Well Installation Project Date ________

Dated: ______________________________ (If a firm or individual)

Signature of Bidder ________________________________

By ________________________________

Address of Bidder ________________________________

Names and addresses of members of the Firm or Organization:

(If a Corporation)

Signature of Bidder ________________________________

Title ________________________________

By ________________________________

Business Address ________________________________

Incorporated under the laws of the State of _______________________________________

Names of Officers:

President: ________________________________________________________ Name Address

Secretary: ________________________________________________________ Name Address

Treasurer: ________________________________________________________ Name Address