About this file

This is a Schedule of Bid Prices for the Elk Creek Marsh Improvements project issued by the Kansas Department of Wildlife and Parks for the Clinton Wildlife Area wetland construction and restoration initiative in Lecompton, Kansas. The project encompasses site grading and embankment construction (932 cubic yards), constructed topography (31,182 cubic yards), installation of three water control structures with 12-inch Spears BF valves, 612 linear feet of 24-inch aluminum corrugated metal pipe culverts, 4,140 linear feet of 12-inch Schedule 40 PVC pipe with fittings and saddles, and seeding and mulch work across 1.6 acres of disturbed land and 53.5 acres of borrow and fill areas. The procurement is structured as a single lump sum contract award covering all labor, materials, contractor overhead, and profit, with an optional pre-proposal conference scheduled for May 12, 2026, at 10:00 AM, written questions due by May 19, 2026, and bids due May 26, 2026, at 2:00 PM CDT. The project must be completed within 90 calendar days from the Notice to Proceed, with a one-year warranty period from final completion.

The bid pricing structure requires contractors to submit unit cost rates for each line item (mobilization/demobilization, site preparation, general conditions, embankment construction, topography, water control structures, culverts, piping, seeding, and mulching) that collectively constitute the lump sum price. Two optional alternates are included: a 5% allowance of the base bid and transport of materials from the Clinton Wildlife Area office to the project site. Water control structures, piping, valves, and fittings have been procured and are stored at the Clinton Wildlife Area office, reducing contractor procurement responsibility. Contractors must provide evidence of five consecutive years in business and five comparable completed projects, submit a current Kansas tax clearance certificate, maintain Workers' Compensation and liability insurance, and provide a 5% bid guarantee at submission, with a Performance Bond of 100% of the bid price and a Public Works Bond of 100% of the contract price required if awarded. Liquidated damages of $500 per day apply for project delays, and 10% retainage is held on each payment request and released within 30 days after project completion on undisputed amounts.

View the file

Other files for this state and local contract opportunity

Other files attached to Elk Creek Wetlands - Phase 2, newest first.
File Type Posted
Amendment_1_-_Bid_Extended.docx DOCX document
Amendment_2_-_Q-A.pdf PDF
Amendment_A_-_Plans.pdf PDF
Elk_Creek_Wetlands_-_Phase_2.pdf PDF
EVT0010817_-_Elk_Creek_Wetlands_-_RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELK CREEK MARSH IMPROVEMENTS

CLINTON WILDLIFE AREA

SCHEDULE OF BID PRICES

A single contract will be awarded for the “Project as a Whole”. The scope includes overall site grading to support wetland improvements and construction of a fill supply pipeline, as outlined in the construction documents prepared by the Engineer and Project Manager for a total lump sum price.

DESCRIPTION: BASE BID LUMP SUM PRICE

Elk Creek Marsh - Wetland Improvement

Each Bid Unit Cost includes an amount considered by Bidder to be adequate to cover all labor, materials, Contractor’s overhead, and profit for each separately identified item.

Estimated plan quantities are not guaranteed. The Contractor is responsible for understanding site conditions and verifying all quantities.

All water control structures, piping, valves, and fittings have been procured and are stored at Clinton Wildlife Area office.

BASE BID-UNIT COST RATES (included in the Lump Sum Price)

Item DESCRIPTION: EST.

QTY UNIT UNIT

PRICE

TOTAL

PRICE

1 Mobilization/Demobilization 1 L.S.

2 Site Preparation 1 L.S.

3 General Conditions (Bonding, ect.) 1 L.S.

4 Embankment Construction (Plan Line Items - Pink) 932 C.Y.

5 Constructed Topography 31,182 C.Y.

6 Water Control Structure (12" Spea12" Spears BF Valve) 3 EA.

7 Culverts - 24"Ø 14 Gauge Aluminum CMP 612 L.F.

8 Pipe - 12"Ø Schedule 40 PVC 4140 L.F.

9 Pipe - 12"Ø Fittings and Saddles 1 L.S.

10 Seeding & Mulch 1.6 Acres 11 Seeding for Borrow and Fill (Japanese Millet seed mix) 53.5 Acres Subtotal Base Bid (Items #1-11)

ADD ALTERNATE - UNIT COST RATES

Item DESCRIPTION: EST.

QTY UNIT LUMP SUM PRICE

1 Allowance - 5% of Base Bid 1 L.S.

2 Transport material from Clinton Wildlife Area office to site 1 L.S.

ELK CREEK MARSH IMPROVEMENTS
CLINTON WILDLIFE AREA
SCHEDULE OF BID PRICES