This is a Request for Proposal (RFP) issued by the New Jersey Department of Environmental Protection (NJDEP) on behalf of the New Jersey Department of the Treasury Cooperative Purchasing Program. The purpose is to solicit proposals from qualified vendors to provide statewide waterway debris assessment services for the State of New Jersey and Cooperative Purchasing Partners in the event of a disaster, whether federally declared, state declared, county declared, or municipally declared.

The RFP outlines the scope of work, which includes ongoing pre-event planning, conducting waterway debris assessments using various methods and technologies, worker safety requirements, reporting and deliverable specifications, and the process for activating and engaging vendors. Up to three master blanket purchase orders may be awarded for a term to be determined. Vendors must have the capability to work simultaneously on at least two engagements in each of the five identified regions. Pricing will not be tied to the regional designations. Payment for services rendered is the responsibility of the using agencies, and vendors will be required to assist in obtaining maximum reimbursement from available funding sources.

View the file

Other files

File Type Posted
Attachment 1 Tidal Regions T3004.pdf PDF
Bid Amendment 9 T3004 Waterway Debris Assess 101317~2.docx DOCX document
RFP T3004 Waterway Debris Assess 100416~1.docx DOCX document
Bid Amendment 5 T3004 Waterway Debris Assess 060217~1.docx DOCX document
REVISED RFP T3004 Waterway Debris Assess 122916.docx DOCX document
Vendor Checklist T3004.pdf PDF
REVISED RFP T3004 Waterway Debris Assess 092217.docx DOCX document
Attachment 3 T3004 Statement of Assurances.docx DOCX document
Bid Amendment 4 T3004 Waterway Debris Assess 042017.pdf PDF
Price Schedule T3004 100416~1.xlsx XLSX spreadsheet
Attachment 2 Non-Tidal Regions T3004 .pdf PDF
Cooperative Purchasing Form T3004.pdf PDF
Bid Amendment 8T3004 Waterway Debris Assess 092217.docx DOCX document
Subcontractor Utilization Plan T3004.pdf PDF
Bid Amendment 1T3004 Waterway Debris Assess 122916.docx DOCX document
Bid Amendment 6 T3004 Waterway Debris Assess 080217.docx DOCX document
Bid Amendment 3 T3004 Waterway Debris Assess 032917.pdf PDF
Bid Amendment 7 T3004 Waterway Debris Assess 090717.docx DOCX document
REVISED Price Schedule T3004 122916.xlsx XLSX spreadsheet
Bid Amendment 2 T3004 Waterway Debris Assess 012717.docx DOCX document
Offer and Acceptance Page T3004.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Solicitation/Request for Proposal

Bid #17DPP00058
For:
T3004 Waterway Debris Assessment Services for Disasters
Event
Date
Time

Vendor’s {Bidder’s} Electronic Question Due Date (Refer to Bid Solicitation {RFP} Section 1.3.1 for more information.)

10/04/2017
2:00 PM

Mandatory/Optional Pre-Quote {Proposal} Submission Conference (Refer to Bid Solicitation {RFP} Section 1.3.6 for more information.)

Not Applicable

Mandatory/Optional Site Visit (Refer to Bid Solicitation {RFP} Section 1.3.5 for more information.)

Not Applicable

Quote {Proposal} Submission Date (Refer to Bid Solicitation {RFP} Section 1.3.2 for more information.)

11/08/2017
2:00 PM

Dates are subject to change. All times contained in the Bid Solicitation {RFP} refer to Eastern Time. All changes will be reflected in Bid Amendments {Addenda} to the Bid Solicitation {RFP} posted on the Division of Purchase and Property website and on www.njstart.gov.

Small Business Set-Aside Status |_| Not Applicable

|_| Entire Blanket P.O. {Contract}

|_| Partial Blanket P.O. {Contract}

|X| Subcontracting Only Category

|X| I |_| IV

|X| II |_| V

|X| III |_| VI

Bid Solicitation {RFP} Issued By Using Agency

State of New JerseyDepartment of Environmental Protection
Department of the TreasuryCooperative Purchasing Program Participants

Division of Purchase and Property Trenton, New Jersey 086250230

Date: October 13September 22, 2017

Table of Contents

1.0INFORMATION FOR VENDORS {BIDDERS}6
1.1PURPOSE AND INTENT6
1.2BACKGROUND7
1.2.1FEDERALLY-DECLARED DISASTERS8
1.2.2STATE DECLARED DISASTERS8
1.2.3COUNTY DECLARED DISASTERS8
1.2.4MUNICIPAL DECLARED DISASTERS8
1.3KEY EVENTS8
1.3.1ELECTRONIC QUESTION AND ANSWER PERIOD8
1.3.2SUBMISSION OF QUOTES {PROPOSALS}9
1.3.3NJSTART10
1.3.4ELECTRONIC SIGNATURES10
1.3.5MANDATORY/OPTIONAL SITE VISIT10
1.3.6MANDATORY/OPTIONAL PRE-QUOTE {PROPOSAL} CONFERENCE10
1.3.7PRE-QUOTE {PROPOSAL} DOCUMENT REVIEW10
1.4ADDITIONAL INFORMATION10
1.4.1BID AMENDMENTS {ADDENDA}: Revisions to this BID SOLICITATION {RFP}10
1.4.2VENDOR {BIDDER} Responsibility11
1.4.3COST LIABILITY11
1.4.4CONTENTS OF QUOTE {PROPOSAL}11
1.4.5ANNOUNCEMENT OF QUOTE {PROPOSAL} INFORMATION12
1.4.6PRICE ALTERATION IN HARD COPY QUOTES {PROPOSALS}12
1.4.7QUOTE {PROPOSAL} ERRORS12
1.4.8JOINT VENTURE13
1.4.9RECIPROCITY FOR JURISDICTIONAL VENDOR {BIDDER} PREFERENCE13
1.4.10QUOTE {PROPOSAL} ACCEPTANCES AND REJECTIONS14
2.0DEFINITIONS15
2.1CROSSWALK15
2.2GENERAL DEFINITIONS15
2.3BLANKET P.O. {CONTRACT}-SPECIFIC DEFINITIONS/ACRONYMS18
3.0SCOPE OF WORK23
3.1ONGOING PRE-EVENT PLANNING23
3.2GENERAL REQUIREMENTS23
3.2.1APPEAL SUPPORT24
3.3COMPLIANCE WITH ALL APPLICABLE LAWS, RULES, POLICIES24
3.4METHOD OF ENGAGEMENT25
3.5PRE-EVENT ALERT, PREPARATION, AND COMMUNICATION25
3.5.1DISASTER ALERT25
3.5.2PROJECT MEETINGS26
3.5.3ADDITIONAL MEETINGS26
3.5.4ENGAGEMENT PERFORMANCE SECURITY26
3.5.5TASK ORDERS AND Blanket P.O. {Contract} ACTIVATION26
3.5.6PROJECT WORK PLAN26
3.5.7MOBILIZATION27
3.6OPERATIONS MANAGERs27
3.6.1REGION OPERATIONS MANAGER (ROM)28
3.6.2ZONE OPERATIONS MANAGER (ZOM)28
3.6.3REGION HEALTH SAFETY OFFICER (HSO)28
3.7LICENSES AND PERMITS29
3.8WATERWAY DEBRIS ASSESSMENT methods and technologies30
3.8.1AERIAL SURVEYS30
3.8.2VISUAL INSPECTION30
3.8.3GEOACOUSTICAL AND MAGNETOMETER SURVEY SPECIFICATIONS31
3.8.4HYDROGRAPHIC SURVEY SERVICES32
3.9WORKER SAFETY AND HEALTH PROTECTION32
3.10WORK PROGRESS MEETINGS AND ONGOING REPORTING33
3.10.1MEETINGS33
3.10.2ONGOING REPORTING33
3.11ASSESSMENT REPORTING AND DELIVERABLES34
3.11.1REPORTS AND DELIVERABLES34
3.12ASSESSMENT TO VERIFY DEBRIS HAS BEEN REMOVED35
3.12.1ASSESSMENT TO VERIFY DEBRIS HAS BEEN REMOVED REPORTING AND DELIVERABLES35
3.12.2REPORTS AND DELIVERABLES35
3.13GEOGRAPHIC INFORMATION SYSTEMS (GIS)36
3.14EQUIPMENT SIGNAGE36
3.15BRIDGE TO BRIDGE COMMUNICATION37
3.16CONTAMINATION37
3.17HUMAN REMAINS37
3.18REPORTABLE ACCIDENTS37
3.19PRIVATE PROPERTY ACCESS37
3.20MISPLACED MATERIAL37
3.21PROPERTY DAMAGE38
3.22CONTRACTOR LIABILITY FOR VIOLATIONS And responsibility for damage38
3.23FEMA REIMBURSEMENT REQUirements38
3.24EQUIPMENT, LABOR, AND MATERIALS REQUIREMENTS38
3.25WORK HOURS39
3.26COMPENSATION, PAYMENT AND invoices39
3.26.1PAYMENT39
3.26.2INVOICES39
3.26.3WITHHOLDING OF PAYMENT40
3.26.4VENDOR’S {CONTRACTOR’S} RELEASE41
4.0QUOTE {PROPOSAL} PREPARATION AND SUBMISSION42
4.1GENERAL42
4.2QUOTE {PROPOSAL} DELIVERY AND IDENTIFICATION42
4.3NJSTART ELECTRONIC SUBMISSION VS. HARD COPY SUBMISSION INSTRUCTION43
4.3.1NJSTART SUBMISSION OF QUOTE {PROPOSAL}43
4.3.2HARD COPY SUBMISSION43
4.4QUOTE {PROPOSAL} CONTENT44
4.4.1FORMS, REGISTRATIONS AND CERTIFICATIONS REQUIRED WITH QUOTE {PROPOSAL}44
4.4.2FORMS, REGISTRATIONS AND CERTIFICATIONS REQUIRED BEFORE BLANKET P.O. {CONTRACT} AWARD AND THAT SHOULD BE SUBMITTED WITH THE QUOTE {PROPOSAL}50
4.4.3TECHNICAL QUOTE {PROPOSAL}51
4.4.4ORGANIZATIONAL SUPPORT AND EXPERIENCE53
4.4.5PRICE SCHEDULE/SHEET55
4.4.6COOPERATIVE PURCHASING PROGRAM57
5.0SPECIAL CONTRACTUAL TERMS AND CONDITIONS APPLICABLE TO THE BLANKET P.O. {CONTRACT}58
5.1PRECEDENCE OF SPECIAL CONTRACTUAL TERMS AND CONDITIONS58
5.2BLANKET P.O. {CONTRACT} TERM AND EXTENSION OPTION58
5.3BLANKET P.O. {CONTRACT} TRANSITION58
5.4CHANGE ORDER {Contract AMENDMENT}59
5.5VENDOR {CONTRACTOR} RESPONSIBILITIES59
5.6SUBSTITUTION OF STAFF59
5.7SUBSTITUTION OR ADDITION OF SUBCONTRACTOR(S)59
5.8OWNERSHIP OF MATERIAL60
5.9SECURITY AND CONFIDENTIALITY60
5.9.1DATA CONFIDENTIALITY60
5.9.2DATA SECURITY STANDARDS61
5.9.3TAX RETURN DATA SECURITY61
5.9.4SECURITY PLAN61
5.10NEWS RELEASES61
5.11ADVERTISING62
5.12LICENSES AND PERMITS62
5.13CLAIMS AND REMEDIES62
5.13.1CLAIMS62
5.13.2REMEDIES62
5.13.3REMEDIES FOR FAILURE TO COMPLY WITH MATERIAL BLANKET P.O. {CONTRACT} REQUIREMENTS62
5.14LIQUIDATED DAMAGES62
5.15RETAINAGE62
5.16ADDITIONAL WORK AND/OR SPECIAL PROJECTS62
5.17MODIFICATIONS AND CHANGES TO THE State of NJ STANDARD TERMS AND CONDITIONS (SSTC)63
5.17.1INDEMNIFICATION63
5.17.2INSURANCE - PROFESSIONAL LIABILITY INSURANCE64
5.17.3PERFORMANCE GUARANTEE OF VENDOR {CONTRACTOR}64
5.18ACCESSIBILITY COMPLIANCE64
5.19BLANKET P.O. {CONTRACT} ACTIVITY REPORT64
5.20ELECTRONIC PAYMENTS65
5.21PROGRAM EFFICIENCY ASSESSMENT FOR STATE USING AGENCIES65
6.0QUOTE {PROPOSAL} EVALUATION66
6.1RIGHT TO WAIVE66
6.2DIRECTOR’S RIGHT OF FINAL Quote {Proposal} ACCEPTANCE66
6.3STATE'S RIGHT TO INSPECT VENDOR (BIDDER) FACILITIES66
6.4STATE'S RIGHT TO REQUEST FURTHER INFORMATION66
6.5QUOTE {PROPOSAL} EVALUATION COMMITTEE66
6.6ORAL PRESENTATION AND/OR CLARIFICATION OF QUOTE {PROPOSAL}66
6.7EVALUATION CRITERIA67
6.7.1TECHNICAL EVALUATION CRITERIA67
6.7.2VENDOR’S {BIDDER’S} PRICE SCHEDULE67
6.7.3QUOTE (PROPOSAL) DISCREPANCIES67
6.7.4EVALUATION OF THE QUOTES {PROPOSALS}67
6.8NEGOTIATION AND BEST AND FINAL OFFER (BAFO)68
6.9“REQUEST FOR REVISION” WITHIN NJSTART68
6.10POOR PERFORMANCE69
7.0BLANKET P.O. {CONTRACT} AWARD70
7.1DOCUMENTS REQUIRED BEFORE BLANKET P.O. {CONTRACT} AWARD70
7.1.1REQUIREMENTS OF PUBLIC LAW 2005, CHAPTER 51, N.J.S.A. 19:44A-20.13 - N.J.S.A. 19:44A-20.25 (FORMERLY EXECUTIVE ORDER NO. 134), EXECUTIVE ORDER NO. 117 (2008) AND N.J.A.C. 17:12-5 ET SEQ.70
7.1.2SOURCE DISCLOSURE REQUIREMENTS71
7.1.3AFFIRMATIVE ACTION71
7.1.4BUSINESS REGISTRATION72
7.2FINAL BLANKET P.O. {CONTRACT} AWARD72
7.3INSURANCE CERTIFICATES72
7.4PERFORMANCE SECURITY72
8.0BLANKET P.O. {CONTRACT} ADMINISTRATION74
8.1STATE CONTRACT MANAGER74
8.1.1STATE CONTRACT MANAGER RESPONSIBILITIES74
8.1.2COORDINATION WITH THE STATE CONTRACT MANAGER74
9.0STATE OF NEW JERSEY STANDARD TERMS AND CONDITIONS75

RFP-SPECIFIC ATTACHMENTS

ATTACHMENT #1 – NJDEP Waterway Map – Tidal ATTACHMENT #2 – NJDEP Waterway Map – Non-tidal ATTACHMENT #3 – Statement of Assurances

INFORMATION FOR VENDORS {BIDDERS}

NOTICE: This Bid Solicitation {Request for Proposal (RFP)} is part of the NJSTART Procurement Program. The Vendor {Bidder} is advised to thoroughly read all sections, as many have been revised, and follow all instructions contained in this Bid Solicitation {RFP}, including the instructions on the Bid Solicitation’s {RFP’s} Offer and Acceptance Page {Signatory Page} and read through all Quick Reference Guides (QRGs) located on the NJSTART Vendor Support Page (http://www.state.nj.us/treasury/purchase/njstart/vendor.shtml), in preparing and submitting its Quote {Proposal}.

Terminology is listed by new NJSTART term; {existing term} appears in braces.

PURPOSE AND INTENT

This Bid Solicitation {RFP} is issued by the Procurement Bureau, Division of Purchase and Property (Division), Department of the Treasury on behalf of New Jersey Department of Environmental Protection (NJDEP). The purpose of this Bid Solicitation {RFP} is to solicit Quotes {Proposals} from interested qualified Vendors {Bidders} and award up to twothree (23) Master Blanket Purchase Orders (Blanket P.O.s) {Contracts} to provide statewide waterway debris assessment services for State and Cooperative Purchasing Partners (CPP) as such needs may arise in their jurisdiction.

The intent of this Bid Solicitation {RFP} is to award up to threetwo (32) Master Blanket Purchase Orders (Blanket P.O.s) {Contracts} to those responsible Vendors {Bidders} whose Quotes {Proposals}, conforming to this Bid Solicitation {RFP} are most advantageous to the State, price and other factors considered. The State may award any and all price lines. The State, however, reserves the right to separately procure individual requirements that are the subject of the Blanket P.O. {Contract} during the Blanket P.O. {Contract} term, when deemed by the Director of the Division of Purchase and Property (Director) to be in the State’s best interest.

The Using Agency will select the Vendor(s) {Contractor(s)} that best meets its needs in the event of a Disaster pursuant to the Method of Engagement outlined in Section 3.4 of the scope of work.

In no event shall tThe same Vendor {Contractor} shall not be eligible to perform both the waterway debris assessment services identified in this Bid Solicitation {RFP}, and waterway debris removal services pursuant to the Blanket P.O. {Contract} T-3014 – Waterway Debris Assessment and Removal Services for Disasters or any other Waterway Debris Removal Blanket P.O.s {Contracts} for the same Engagementwithin the same waterway debris management region.

The State of NJ Standard Terms and Conditions (SSTC) accompanying this Bid Solicitation {RFP} will apply to all Blanket P.O.s {Contracts} made with the State of New Jersey. These terms are in addition to the terms and conditions set forth in this Bid Solicitation {RFP} and should be read in conjunction with them unless the Bid Solicitation {RFP} specifically indicates otherwise.

The State of New Jersey (State) intends to extend the Blanket P.O.s {Contracts} awarded to the Division's Cooperative Purchasing Program participants. These participants include quasi-State entities, counties, municipalities, school districts, volunteer fire departments, first aid squads, independent institutions of higher learning, County colleges, and State colleges. In order for the State Blanket P.O. {Contract} to be extended to Cooperative Purchasing Program participants, the Vendor {Bidder} must agree to the extension by executing the Cooperative Purchase Form. Also refer to Section 4.4.6 of this Bid Solicitation {RFP}. Although the State, with the consent of the Vendor(s) {Bidder(s)}, is making the use of any Blanket P.O. {Contract} resulting from this Bid Solicitation {RFP} available to non-State Agencies, the State makes no representation as to the acceptability of any State Bid Solicitation {RFP} terms and conditions under the Local Public Contracts Law or any other enabling statute or regulation.

BACKGROUND

The State is issuing this Bid Solicitation {RFP} as part of preparations for a Disaster that results in the generation of Disaster-related debris in New Jersey’s public tidal and non-tidal waterways.

The Blanket P.O.s {Contracts} are intended to be utilized in the event of 1) a Federally Declared Disaster, during which the Vendor {Contractor} shall comply with Federal Emergency Management Agency (FEMA) requirements, procedures, policies, documentation requirements, including FEMA reimbursement and funding requirements whether specifically identified herein or not, recordkeeping requirements, and the requirements of the executed Blanket P.O.s {Contracts}; 2) a State Declared Disaster Emergency pursuant to the Disaster Control Act at N.J.S.A. App. A:9-30 et seq. during which the Vendor {Contractor} need not comply with FEMA requirements unless directed by the Using Agency to do so, but must comply with applicable law and the requirements of any executed Blanket P.O.(s) {Contract(s)}; 3) a County Declared Disaster Emergency pursuant to the Disaster Control Act at N.J.S.A. App. A:9-30 et seq. and New Jersey Office of Emergency Management (NJOEM) Directive # 61 during which the Vendor {Contractor} must comply with applicable law and the requirements of the executed Blanket P.O.(s) {Contract(s)}; or 4) a Municipally Declared Disaster Emergency pursuant to the Disaster Control Act at N.J.S.A. App. A:9-30 et seq., during which the Vendor {Contractor} must comply with applicable law and the requirements of the executed Blanket P.O.(s) {Contract(s)}.

In the event of a Federally Declared Disaster, all actions performed under this Blanket P.O. {Contract}, and any records generated or maintained, must be done so in a manner allowing for full reimbursement by FEMA. The Vendor {Contractor} shall know and act according to FEMA guidelines, standards and requirements. Actions performed under this Blanket P.O. {Contract} that do not include eligible debris and are not authorized by the Using Agency will subject the Vendor {Contractor} to non-payment in each instance at the sole discretion of the Using Agency. Any debris assessed by the Vendor {Contractor} outside the scope of Task Orders, project parameters, or FEMA Eligibility requirements (in a Federally Declared Disaster), shall be at the Vendor’s {Contractor’s} expense unless otherwise previously agreed upon by the Using Agency.

Waterway debris assessment services consist of the assessment of all FEMA Eligible Debris and Eligible Debris, including sand and/or sediment, as directed in a non-Federally Declared Disaster located within and around the identified waterways as directed, including but not limited to bays, tidal rivers, and non-tidal waterways. Some Disaster events may begin as State or Municipally Declared Disasters and be designated Federally Declared Disasters after reaching federal threshold levels.

Payment for services rendered is strictly the responsibility of the Using Agencies.

For the purposes of this Bid Solicitation {RFP}, the Regions are identified herein as Tidal 1, Tidal 2, Tidal 3, Non-tidal 1 and Non-tidal 2 (reference Section 2.3 and Attachments 1 and 2 of the Bid Solicitation {RFP}). These Regions have been defined for technical purposes only as they correspond to waterway debris removal services under T-3014 – Waterway Debris Assessment and Removal Services for Disasters and subsequent services related to future Blanket P.O.s {Contracts} for Waterway Debris Removal Services for Disasters. These regions are not to be used to establish pricing under this Bid Solicitation {RFP}. The State or Using Agency may further define Regions into Zones to assign and prioritize areas for waterway debris assessment.

The services for Waterway Debris Assessment Services for Disasters were originally procured through Bid Solicitation {RFP} 15-X-23761 (Waterway Debris Assessment and Removal Disasters T-3014); however, the assessment portion was not awarded under that procurement.

1.1.1 FEDERALLY-DECLARED DISASTERS

1.1.1.1 FEMA REIMBURSEMENT PROGRAMS AND FUNDING

In a Federally Declared Disaster, the State and Using Agencies intend to seek qualification for any applicable FEMA funding, including any pilot program(s), other incentives, or beneficial programs so offered. The Vendor {Contractor} shall operate in a manner informed of and in compliance with such program(s) to the benefit of the Using Agency.

During a Federally Declared Disaster debris assessment effort, an effective coordinated operation under a unified command will be required between the Vendor {Contractor}, Using Agencies, and FEMA to ensure that debris assessment operations are efficient, effective, and comply with eligibility criteria in effect at the time of the declared event to provide for full FEMA reimbursement and funding.

1.1.2 STATE DECLARED DISASTERS

During a State Declared Disaster debris assessment effort, an effective coordinated operation under a unified command will be required between the Vendor {Contractor} and the Using Agencies to ensure that debris assessment operations are efficient, effective, and comply with eligibility criteria in effect at the time of the declared event.

1.1.3 COUNTY DECLARED DISASTERS

During a County Declared Disaster debris assessment effort, an effective coordinated operation under a unified command will be required between the Vendor {Contractor} and the Using Agency, to ensure that debris assessment operations are efficient, effective, and comply with eligibility criteria in effect at the time of the declared event.

1.1.4 MUNICIPAL DECLARED DISASTERS

During a Municipally Declared Disaster debris assessment effort, an effective coordinated operation under a unified command will be required between the Vendor {Contractor} and the Using Agency, to ensure that debris assessment operations are efficient, effective, and comply with eligibility criteria in effect at the time of the declared event.

KEY EVENTS

ELECTRONIC QUESTION AND ANSWER PERIOD

The Division will electronically accept questions and inquiries from all potential Vendors {Bidders} via the “Q&A” Tab of the Bid Solicitation {RFP} in NJSTART.

A. Questions should be directly tied to the Bid Solicitation {RFP} and asked in consecutive order, from beginning to end, following the organization of the Bid Solicitation {RFP}; and

B. Each question should begin by referencing the Bid Solicitation {RFP} page number and section number to which it relates.

Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instruction. QRGs are located on the NJSTART Vendor Support Page.

A Vendor {Bidder} must not contact the Using Agency and/or the Procurement Specialist directly, in person, by telephone or by e-mail, concerning this Bid Solicitation {RFP}.

The cut-off date for electronic questions and inquiries relating to this Bid Solicitation {RFP} is indicated on the Bid Solicitation {RFP} cover sheet. In the event that questions are posed by Vendors {Bidders}, answers to such questions will be issued by Bid Amendment {Addendum}. Any Bid Amendment {Addendum} to this Bid Solicitation {RFP} will become part of this Bid Solicitation {RFP} and part of any Blanket P.O. {Contract} awarded as a result of this Bid Solicitation {RFP}. Bid Amendments {Addenda} to this Bid Solicitation {RFP}, if any, will be posted as a File Attachment on the “Summary” page of the Bid Solicitation {RFP} in NJSTART after the cut-off date. (See Bid Solicitation {RFP} Section 1.4.1 for further information.)

EXCEPTIONS TO THE STATE OF NJ STANDARD TERMS AND CONDITIONS (SSTC)

Questions regarding the SSTC and exceptions to mandatory requirements must be posed during this Electronic Question and Answer period and shall contain the Vendor’s {Bidder’s} suggested changes and the reason(s) for the suggested changes.

SUBMISSION OF QUOTES {PROPOSALS}

In order to be considered for award, the Quote {Proposal} must be received by the Procurement Bureau of the Division at the appropriate location by the required time.

Vendors {Bidders} shall submit a Quote {Proposal} either electronically through NJSTART or via hard copy.

Hard copy Quote {Proposal} must be submitted to the physical location noted below:

PROPOSAL RECEIVING ROOM – 9TH FLOOR

DIVISION OF PURCHASE AND PROPERTY

DEPARTMENT OF THE TREASURY

33 WEST STATE STREET, P.O. BOX 230

TRENTON, NJ 08625-0230

Directions to the Division are available on the web at http://www.state.nj.us/treasury/purchase/directions.shtml.

QUOTES {PROPOSALS} NOT RECEIVED PRIOR TO THE QUOTE {PROPOSAL} OPENING DEADLINE SHALL BE REJECTED. THE DATE AND TIME OF THE QUOTE {PROPOSAL} OPENING ARE INDICATED ON THE BID SOLICITATION {RFP} COVER SHEET AND IN THE “SUMMARY” TAB OF THE BID SOLICITATION WEBPAGE WITHIN NJSTART.

Note: A Vendor {Bidder} using U.S. Postal Service regular or express mail services should allow additional time since the U.S. Postal Service does not deliver directly to the Proposal Receiving Room. A Vendor {Bidder} should make every effort to submit its Quote {Proposal} well ahead of the Quote {Proposal} submission deadline to mitigate unforeseen delays or issues. The Vendor {Bidder} is solely responsible for the timely submission of its Quote {Proposal} in response to this Bid Solicitation {RFP}.

Procedural inquiries concerning this Bid Solicitation {RFP} may be directed to njstart@treas.nj.gov and/or (609) 341-3500.

The State will not respond to substantive questions related to the Bid Solicitation {RFP} or any other Blanket P.O. {Contract} via this e-mail address or phone number. For inquiries related to substantive questions refer to Section 1.3.1 (Electronic Question and Answer Period).

NJSTART

The Division is pleased to announce its new eProcurement solution “ .”

Vendor {Bidder} Support:

Vendors {Bidders} are strongly encouraged to visit the NJSTART Vendor Support Page, which contains Quick Reference Guides (QRGs), supporting videos, a glossary of NJSTART terms, and helpdesk contact information.

The Vendor {Bidder} should utilize the QRGs before attempting to submit its Quote {Proposal} using the NJSTART process. It is the Vendor’s {Bidder’s} responsibility to ensure that the NJSTART Quote {Proposal} and attachments have been properly submitted.

ELECTRONIC SIGNATURES

Vendors {Bidders} submitting Quotes {Proposals} through NJSTART may sign the forms listed in Section 4.4.1 (Forms, Registrations and Certifications Required with Quote {Proposal}) and Section 4.4.2 (Forms, Registrations and Certifications Required Before Blanket P.O. {Contract} Award and That Should Be Submitted with the Quote {Proposal}) of this Bid Solicitation {RFP} electronically by typing the name of the authorized signatory in the “Signature” block as an alternative to downloading, physically signing the form, scanning the form, and uploading the form to NJSTART.

Vendors {Bidders} submitting Quotes {Proposals} in hard copy format, must provide forms with original, physical signatures, otherwise its Quote {Proposal} may be deemed non-responsive.

MANDATORY/OPTIONAL SITE VISIT

Not applicable to this procurement.

MANDATORY/OPTIONAL PRE-QUOTE {PROPOSAL} CONFERENCE

Not applicable to this procurement.

PRE-QUOTE {PROPOSAL} DOCUMENT REVIEW

Not applicable to this procurement.

ADDITIONAL INFORMATION

BID AMENDMENTS {ADDENDA}: Revisions to this BID SOLICITATION {RFP}

In the event that it becomes necessary to clarify or revise this Bid Solicitation {RFP}, such clarification or revision will be by Bid Amendment {Addendum}. Any Bid Amendment {Addendum} to this Bid Solicitation {RFP} will become part of this Bid Solicitation {RFP} and part of any Blanket P.O. {Contract} awarded as a result of this Bid Solicitation {RFP}.

There are no designated dates for release of Bid Amendments {Addenda}. Those Vendors {Bidders} who are on the bidholder list either through commodity code registration in NJSTART or by acknowledging the bid in NJSTART should receive notification of any Bid Amendment(s) {Addenda}. If a Vendor {Bidder} is not on the bidholder list to receive notifications related to a Bid Solicitation {RFP}, Bid Amendments {Addenda} are still viewable on the “Summary” page of the Bid Solicitation {RFP} in NJSTART.

BID AMENDMENTS {ADDENDA} WILL BE ISSUED AS FILE ATTACHMENTS, AND ARE VIEWABLE ON THE “SUMMARY” PAGE OF THE BID SOLICITATION {RFP} IN NJSTART. Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instruction. QRGs are located on the NJSTART Vendor Support Page.

It is the sole responsibility of the Vendor {Bidder} to be knowledgeable of all Bid Amendments {Addenda} related to this procurement. An interested Vendor {Bidder} should check the NJSTART “Open Bids” Tab on a daily basis to ensure review of the most updated information.

VENDOR {BIDDER} Responsibility

The Vendor {Bidder} assumes sole responsibility for the complete effort required in submitting a Quote {Proposal} in response to this Bid Solicitation {RFP}. No special consideration will be given after Quotes {Proposals} are opened because of a Vendor’s {Bidder’s} failure to be knowledgeable as to all of the requirements of this Bid Solicitation {RFP}.

COST LIABILITY

The State assumes no responsibility and bears no liability for costs incurred by a Vendor {Bidder} in the preparation and submittal of a Quote {Proposal} in response to this Bid Solicitation {RFP}.

CONTENTS OF QUOTE {PROPOSAL}

Quotes {Proposals} can be released to the public pursuant to N.J.A.C. 17:12-1.2(b) and (c), or under the New Jersey Open Public Records Act (OPRA), N.J.S.A. 47:1A-1 et seq., or the common law right to know.

After the opening of sealed Quotes {Proposals}, including Quotes {Proposals} submitted through the NJSTART electronic process, all information submitted by a Vendor {Bidder} in response to a Bid Solicitation {RFP} is considered public information notwithstanding any disclaimers to the contrary submitted by a Vendor {Bidder}. Proprietary and confidential information may be exempted from public disclosure by OPRA and/or the common law. When the Bid Solicitation {RFP} contains a negotiation component, the Quote {Proposal} will not be subject to public disclosure until a notice of intent to award a Blanket P.O. {Contract} is announced.

As part of its Quote {Proposal}, a Vendor {Bidder} may designate any data or materials it asserts are exempt from public disclosure under OPRA and/or the common law, explaining the basis for such assertion. The location in the Quote {Proposal} of any such designation should be clearly stated in a cover letter. The State reserves the right to make the determination as to what is proprietary or confidential, and will advise the Vendor {Bidder} accordingly. Any proprietary and/or confidential information in a Quote {Proposal} will be redacted by the State. The State will not honor any attempt by a Vendor {Bidder} to designate its entire Quote {Proposal} and/or prices as proprietary, confidential and/or to claim copyright protection for its entire Quote {Proposal}. Copyright law does not prohibit access to a record which is otherwise available under OPRA. In the event of any challenge to the Vendor’s {Bidder’s} assertion of confidentiality with which the State does not concur, the Vendor {Bidder} shall be solely responsible for defending its designation, but in doing so, all costs and expenses associated therewith shall be the responsibility of the Vendor {Bidder}. The State assumes no such responsibility or liability.

A Vendor {Bidder} shall not designate any price lists and/or catalogs submitted as exempt from public disclosure as the same must be accessible to State Using Agencies and Cooperative Purchasing Program participants (if the Bid Solicitation {RFP} has been extended to these participants) and thus must be made public to allow all eligible purchasing entities access to the pricing information.

ANNOUNCEMENT OF QUOTE {PROPOSAL} INFORMATION

On the date and time Quotes {Proposals} are due under the Bid Solicitation {RFP}, all information concerning the Quotes {Proposals} submitted may be publicly announced and shall be available for inspection and copying except as noted below:

a. Information appropriately designated as proprietary and/or confidential shall not be available for inspection and copying; and

b. Where negotiation is contemplated, only the names and addresses of the Vendors {Bidders} submitting Quotes {Proposals} will be announced, and the contents of the Quotes {Proposals} shall not be available for inspection and copying until the Notice of Intent to Award is issued by the Director.

PRICE ALTERATION IN HARD COPY QUOTES {PROPOSALS}

Hard copy Quote {Proposal} prices must be typed or written in ink. Any price change (including "white-outs") must be initialed. Failure to initial price changes shall preclude a Blanket P.O. {Contract} award from being made to the Vendor {Bidder}.

QUOTE {PROPOSAL} ERRORS

In accordance with N.J.A.C. 17:12-2.11, “Proposal errors,” a Vendor {Bidder} may withdraw its Quote {Proposal} as described below.

QUOTE {PROPOSAL} WITHDRAWAL PRIOR TO QUOTE {PROPOSAL} OPENING

NJSTART: A Vendor {Bidder} may withdraw its Quote {Proposal} submission in NJSTART prior to the Quote {Proposal} opening; however, Vendors {Bidders} should note that while withdrawn NJSTART Quotes {Proposals} remain viewable by the Vendor {Bidder} on its Vendor Profile Homepage, they are removed from the Division’s view and cannot be considered for Blanket P.O. {Contract} award. The Vendor {Bidder} may submit a revised Quote {Proposal} as long as the Quote {Proposal} is received prior to the announced date and time for Quote {Proposal} submission. Vendors {Bidders} may refer to the QRG “Submit a Quote” for additional instruction. QRGs are located on the NJSTART Vendor Support Page.

Hard Copy: A Vendor {Bidder} may request that its hard copy Quote {Proposal} be withdrawn prior to the Quote {Proposal} opening. Such request must be made, in writing, to the Supervisor of the Proposal Review Unit at the address provided in Section 1.4.7.2 below. The Vendor {Bidder} may submit a revised Quote {Proposal} as long as the Quote {Proposal} is received prior to the announced date and time for Quote {Proposal} submission and at the place specified.

QUOTE {PROPOSAL} WITHDRAWAL AFTER QUOTE {PROPOSAL} OPENING, BUT PRIOR TO BLANKET P.O. {CONTRACT} AWARD

NJSTART and Hard Copy: If, after the Quote {Proposal} opening, but before Blanket P.O. {Contract} award, a Vendor {Bidder} discovers an error in its Quote {Proposal}, the Vendor {Bidder} may make a written request to the Supervisor of the Proposal Review Unit to withdraw its Quote {Proposal} from consideration for award. If the Vendor’s {Bidder’s} request to withdraw is made in good faith, and the State will not be significantly prejudiced by granting the withdrawal of the Quote {Proposal} beyond the loss of the benefit of the bargain to the State of the withdrawing Vendor’s {Bidder’s} offer, the request shall be granted. Evidence of the Vendor’s {Bidder’s} good faith in making this request can be demonstrated by one (1) or more of the following factors: A mistake is so significant that to enforce the Blanket P.O. {Contract} resulting from the Quote {Proposal} would be unconscionable; that the mistake relates to a material feature or term of the Blanket P.O. {Contract}; and that the mistake occurred notwithstanding the Vendor’s {Bidder’s} exercise of reasonable care. After Quote {Proposal} opening, while pursuant to the provisions of this section a Vendor {Bidder} may request to withdraw its Quote {Proposal} and the Director may in her discretion allow said Vendor {Bidder} to withdraw it, the Division also may take notice of repeated or unusual requests to withdraw by a Vendor {Bidder} and take those prior requests to withdraw into consideration when evaluating the Vendor’s {Bidder’s} future Quotes {Proposals}.

All Quote {Proposal} withdrawal requests must include the Bid Solicitation {RFP} identification number and the final Quote {Proposal} submission date and be sent to the following address:

Department of the Treasury Division of Purchase and Property PO Box 039 33 West State Street – 9th Floor Trenton, New Jersey 08625-0039 Attention: Supervisor, Proposal Review Unit

If during a Quote {Proposal} evaluation process, an obvious pricing error made by a potential Blanket P.O. {Contract} awardee is found, the Director or her designee shall issue written notice to the Vendor {Bidder}. The Vendor {Bidder} will have up to five (5) business days after receipt of the notice to confirm its pricing. If the Vendor {Bidder} fails to respond, its Quote {Proposal} shall be considered withdrawn, and no further consideration shall be given to it.

If it is discovered that there is an arithmetic disparity between the unit price and the total extended price, the unit price shall prevail. If there is any other ambiguity in the pricing, other than a disparity between the unit price and extended price and the Vendor’s {Bidder’s} intention is not readily discernible from other parts of the Quote {Proposal}, the Director may seek clarification from the Vendor {Bidder} to ascertain the true intent of the Quote {Proposal}. If the Vendor {Bidder} inadvertently completes the “Discount” field and the “Unit Cost” field, the Discounted Unit Cost will prevail.

JOINT VENTURE

If a Joint Venture is submitting a Quote {Proposal}, the agreement between the parties relating to such Joint Venture should be submitted with the Joint Venture’s Quote {Proposal}. Authorized signatories from each party comprising the Joint Venture must sign the Offer and Acceptance Page {Signatory Page}. Each party to the Joint Venture must individually comply with all the forms and certification requirements in Sections 4.4.1 and 4.4.2 of this Bid Solicitation {RFP}.

RECIPROCITY FOR JURISDICTIONAL VENDOR {BIDDER} PREFERENCE

In accordance with N.J.S.A. 52:32-1.4 and N.J.A.C. 17:12-2.13, the State of New Jersey will invoke reciprocal action against an out-of-State Vendor {Bidder} whose state or locality maintains a preference practice for its in-state Vendors {Bidders}. The State of New Jersey will use the annual surveys compiled by the Council of State Governments, National Association of State Procurement Officials, or the National Institute of Governmental Purchasing or a State’s statutes and regulations to identify States having preference laws, regulations, or practices and to invoke reciprocal actions. The State of New Jersey may obtain additional information as it deems appropriate to supplement the stated survey information.

A Vendor {Bidder} may submit information related to preference practices enacted for a State or Local entity outside the State of New Jersey. This information may be submitted in writing as part of the Quote {Proposal} response, including name of the locality having the preference practice, as well as identification of the county and state, and should include a copy of the appropriate documentation, i.e., resolution, regulation, law, notice to Vendor {Bidder}, etc. It is the responsibility of the Vendor {Bidder} to provide documentation with the Quote {Proposal} or submit it to the Director within five (5) business days after the deadline for Quote {Proposal} submission. Written evidence for a specific procurement that is not provided to the Director within five (5) business days of the public Quote {Proposal} submission date may not be considered in the evaluation of that procurement, but may be retained and considered in the evaluation of subsequent procurements.

QUOTE {PROPOSAL} ACCEPTANCES AND REJECTIONS

N.J.A.C. 17:12-2.7(d), the Director’s right to waive minor irregularities or omissions in a Quote {Proposal} and N.J.A.C. 17:12-2.2 which defines causes for Quote {Proposal} rejection, apply to all Quotes {Proposals}. In addition, pursuant to N.J.S.A. 52:34-12, the Director retains the right to reject all Quotes {Proposals} if it is in the public interest.

DEFINITIONS

CROSSWALK

NJSTART Term
Equivalent Existing New Jersey Term
Bid/Bid Solicitation
RFP/Solicitation
Bid Amendment
Addendum
Change Order
Contract Amendment
Master Blanket Purchase Order (Blanket P.O.)
Contract
Offer and Acceptance Page
Signatory Page
Quote
Proposal
Vendor
Bidder/Contractor

GENERAL DEFINITIONS

The following definitions will be part of any Blanket P.O. {Contract} awarded or order placed as a result of this Bid Solicitation {RFP}.

Definitions are listed by new NJSTART terminology; {existing terminology} appears in braces.

All-Inclusive Hourly Rate – An hourly rate comprised of all direct and indirect costs including, but not limited to: labor costs, overhead, fee or profit, clerical support, travel expenses, per diem, safety equipment, materials, supplies, managerial support and all documents, forms, and reproductions thereof. This rate also includes portal-to-portal expenses as well as per diem expenses such as food.

Best and Final Offer or BAFO – Pricing timely submitted by a Vendor {Bidder} upon invitation by the Bureau after Quote {Proposal} opening, with or without prior discussion or negotiation.

Bid or Bid Solicitation {RFP or Solicitation} – This series of documents, which establish the bidding and Blanket P.O. {Contract} requirements and solicits Quotes {Proposals} to meet the needs of the Using Agencies as identified herein, and includes the Bid Solicitation {RFP}, State of NJ Standard Terms and Conditions (SSTC), price schedule, attachments, and Bid Amendments {Addenda}.

Bid Amendment {Addendum} – Written clarification or revision to this Bid Solicitation {RFP} issued by the Bureau. Bid Amendments {Addenda}, if any, will be issued prior to Quote {Proposal} opening.

Business Day - Any weekday, excluding Saturdays, Sundays, State legal holidays, and State-mandated closings unless otherwise indicated.

Calendar Day – Any day, including Saturdays, Sundays, State legal holidays, and State-mandated closings unless otherwise indicated.

Change Order {Contract Amendment} – An alteration or modification of the terms of a Blanket P.O. {Contract} between the State and the Vendor(s) {Contractor(s)}. A Change Order {Contract Amendment} is not effective until it is signed and approved in writing by the Director or Deputy Director, Division of Purchase and Property.

Cooperative Purchasing Program – The Division’s intrastate program that provides procurement-related assistance to New Jersey local governmental entities and boards of education, State and county colleges and other public entities having statutory authority to utilize select State Blanket P.O.s {Contracts} issued by the Division, pursuant to the provisions of N.J.S.A. 52:25-16.1 et seq.

Days After Receipt of Order (ARO) - Means the number of calendar days ‘After Receipt of Order’ in which the Using Agency will receive the ordered materials and/or services.

Director – Director, Division of Purchase and Property, Department of the Treasury, who by statutory authority is the Chief Contracting Officer for the State of New Jersey.

Discount - Means the standard discount applied by the Vendor {Bidder} to all items.

Discounted Unit Cost – Means “Unit Cost” field multiplied by (100 percent minus the “Discount” field percentage).

Division – The Division of Purchase and Property.

Evaluation Committee – A committee established or Division staff member assigned by the Director to review and evaluate Quotes {Proposals} submitted in response to this Bid Solicitation {RFP} and recommend a Blanket P.O. {Contract} award to the Director.

Firm Fixed Price – A price that is all-inclusive of direct cost and indirect costs, including, but not limited to, direct labor costs, overhead, fee or profit, clerical support, equipment, materials, supplies, managerial (administrative) support, all documents, reports, forms, travel, reproduction and any other costs.

Freight - Means Freight on Board (FOB) Destination.

Joint Venture – A business undertaking by two (2) or more entities to share risk and responsibility for a specific project.

Master Blanket Purchase Order (“Blanket P.O.”) {Contract} – The Blanket P.O. {Contract} consists of the State of NJ Standard Terms and Conditions (SSTC), the Bid Solicitation {RFP}, the responsive Quote {Proposal} submitted by a responsible Vendor {Bidder} as accepted by the State, the notice of award, any Best and Final Offer, any subsequent written document memorializing the agreement, any modifications to any of these documents approved by the State and any attachments, Bid Amendment {Addenda} or other supporting documents, or post-award documents including Change Orders {Contract Amendments} agreed to by the State and the Vendor {Contractor}, in writing.

May – Denotes that which is permissible or recommended, not mandatory.

No Bid – The Vendor {Bidder} is not submitting a price Quote {Proposal} for an item on a price line.

No Charge – The Vendor {Bidder} will supply an item on a price line free of charge.

Ownership Disclosure Form – Refers to the Statement of Bidder/Vendor Ownership as utilized in NJSTART.

Primary Form – An electronic form contained within a Vendor’s {Bidder’s} NJSTART profile designated by the Vendor {Bidder} as the primary or principal version of the required form.

Procurement Bureau (Bureau) - The Division unit responsible for the preparation, advertisement, and issuance of Bid Solicitations {RFPs}, for the tabulation of Quotes {Proposals} and for recommending award(s) of Blanket P.O.(s) {Contract(s)} to the Director and the Deputy Director.

Project – The undertakings or services that are the subject of this Bid Solicitation {RFP}.

QRGs – Quick Reference Guides.

Quote {Proposal} – Vendor’s {Bidder’s} timely response to the Bid Solicitation {RFP} including, but not limited to, technical Quote {Proposal}, price Quote {Proposal}, and any licenses, forms, certifications, or other documentation required by the Bid Solicitation {RFP}.

Retainage - The amount withheld from the Vendor {Contractor} payment that is retained and subsequently released upon satisfactory completion of performance milestones by the Vendor {Contractor}.

Revision – A response to a BAFO request or a requested clarification of the Vendors {Bidders} Quote {Proposal}.

Shall or Must – Denotes that which is a mandatory requirement. Failure to meet a mandatory material requirement will result in the rejection of a Quote {Proposal} as non-responsive.

Should – Denotes that which is permissible or recommended, not mandatory.

Small Business – Pursuant to N.J.A.C. 17:13-1.2, “small business” means a business that meets the requirements and definitions of “small business” and has applied for and been approved by the New Jersey Division of Revenue and Enterprise Services, Small Business Registration and M/WBE Certification Services Unit as (i) independently owned and operated, (ii) incorporated or registered in and has its principal place of business in the State of New Jersey; (iii) has 100 or fewer full-time employees; and has gross revenues falling in one (1) of the three (3) following categories: For goods and services - (A) 0 to $500,000 (Category I); (B) $500,001 to $5,000,000 (Category II); and (C) $5,000,001 to $12,000,000, or the applicable federal revenue standards established at 13 CFR 121.201, whichever is higher (Category III); For construction services: (A) 0 to $3,000,000 (Category IV); (B) gross revenues that do not exceed 50 percent of the applicable annual revenue standards established at 13 CFR 121.201 (Category V); and (C) gross revenues that do not exceed the applicable annual revenue standards established at CFR 121.201, (Category VI).

State – The State of New Jersey.

State Contract Manager or SCM – The individual, as set forth in Section 8.0, responsible for the approval of all deliverables, i.e., tasks, sub-tasks or other work elements in the Scope of Work. The SCM cannot direct or approve a Change Order {Contract Amendment}.

Subtasks – Detailed activities that comprise the actual performance of a task.

Subcontractor – An entity having an arrangement with a Vendor {Contractor}, whereby the Vendor {Contractor} uses the products and/or services of that entity to fulfill some of its obligations under its State Blanket P.O. {Contract}, while retaining full responsibility for the performance of all [the Vendor’s {Contractor's}] obligations under the Blanket P.O. {Contract}, including payment to the Subcontractor. The Subcontractor has no legal relationship with the State, only with the Vendor {Contractor}.

Task – A discrete unit of work to be performed.

Unit Cost – All-inclusive, firm fixed price charged by the Vendor {Bidder} for a single unit identified on a price line.

Using Agency[ies] – A State department or agency, a quasi-State governmental entity, or a Cooperative Purchasing Program participant, authorized to purchase products and/or services under a Blanket P.O. {Contract} procured by the Division. This Blanket P.O. {Contract} may be used by the Using Agencies or quasi-governmental agencies specifically identified in the Bid Solicitation {RFP}. In addition, with the approval of the Director of the Division of Purchase and Property and the agreement of the Vendor {Contractor}, the Blanket P.O. {Contract} may be used by any Using Agency or quasi-State governmental entity.

Vendor {Bidder} – An entity offering a Quote {Proposal} in response to the Division’s Bid Solicitation {RFP}.

Vendor {Contractor} – The Vendor {Bidder} awarded a Blanket P.O. {Contract} resulting from this Bid Solicitation {RFP}.

BLANKET P.O. {CONTRACT}-SPECIFIC DEFINITIONS/ACRONYMS

Activation – The act of the SCM formally notifying the Vendor {Contractor} (in accordance with Section 3.4 Method of Engagement), by issuance of the initial Task Order, that the Vendor {Contractor} shall initiate the Services identified in the Blanket P.O. {Contract} pursuant to the direction contained in the Task Order itself.

Alert – An official notification to the Vendor {Contractor} made by the SCM via telephone or email prior to an anticipated Disaster, or immediately following a Disaster, but prior to issuance of the first Task Order.

Construction and Demolition Waste (C&D) – Waste building material and rubble resulting from construction, remodeling, repair, and demolition operations on houses, commercial buildings, pavements and other structures.

County Declared Disaster – Pursuant to the NJ Disaster Control Act, N.J.S.A. Appendix A: 9-30 et seq., and New Jersey Office of Emergency Management (NJOEM) Directive # 61, any unusual incident resulting from natural or unnatural causes which endangers the health, safety or resources of the residents of one (1) or more municipalities of the State which, in the determination by the County Emergency Coordinator, is or may become too large in scope or unusual in type to be handled in its entirety by regular county operating services.

Debris – Items and materials broken, destroyed, or displaced by a natural or man-made Disaster. Examples of debris include, but are not limited to, trees, construction and demolition material, displaced sand and/or sediment, and personal property that are not part of normal generation of solid waste, which encompasses both FEMA Eligible and/or Eligible Debris as the context warrants.

Department of Labor and Workforce Development – The State agency in New Jersey responsible for employment, wages, benefits, training, social security, and workforce development within New Jersey.

Department of Transportation – The State agency in New Jersey responsible for transportation issues and policy in the State such as maintaining and operating the State's highway and public road system, planning and developing transportation policy and assisting with rail, freight and intermodal transportation issues.

Disaster – A disaster declared by the President of the United States pursuant to the Stafford Act, 42 U.S.C. Sec. 5121 et seq. or declared by the Governor of the State pursuant to the Disaster Control Act, N.J.S.A. App. 9-30 et seq. as further described in NJOEM Directive # 61.

Eligible Debris – Debris generated as a result of a State, County or (Locally) Municipal Declared Disaster that is required to be assessed. Eligible Debris may become FEMA Eligible Debris upon federal declaration of Disaster, which may happen after a storm occurs.

Engagement – A site-specific project performed by a Vendor {Contractor}.

Environmental Response Management Application (ERMA) – An online mapping tool that integrates both static and real-time data, such as Environmental Sensitivity Index (ESI) maps, ship locations, weather, and ocean currents, in a centralized, easy-to-use format for environmental responders and decision makers.

Federal Aviation Administration (FAA) – A Division of the United States Department of Transportation that inspects and rates civilian aircraft and pilots, enforces the rules of air safety, and installs and maintains air-navigation and traffic-control facilities.

Federal Communications Commission (FCC) – A United States government agency that regulates interstate and international communications by radio, television, wire, satellite and cable in all 50 states, the District of Columbia and U.S. territories.

Federally Declared Disaster – Pursuant to the Stafford Act 42 U.S.C. 5121 et seq. (as amended) any natural catastrophe including any hurricane, storm, high water, wind-driven water, snowstorm, which in the determination of the President causes damage of sufficient severity and magnitude to warrant major disaster assistance to supplement the efforts and available resources of States, local governments, and disaster relief organizations in alleviating the damage, loss, hardship, or suffering caused thereby. A Federally Declared Disaster brings with it the involvement and assistance of FEMA.

Federal Emergency Management Agency (FEMA) – Administers Public Assistance grant funding for eligible expenditures pursuant to 41 U.S.C. §5121, et seq., 44 C.F.R., Parts 13 and 206 and other published guidance.

FEMA Eligible Debris – Debris generated as a result of a Federally Declared Disaster, and that meets FEMA eligibility requirements set forth at 44 C.F.R. 206.224 and applicable FEMA policy documents set forth at http://www.fema.gov/9500-series-policy-publications and limited to only that debris that FEMA determines eligible for the Disaster event and is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .