REVISED- Exhibit B_City of Manitou Springs_Dillon Interim Lot_Bid Tabulation_2025-02-11.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- RFB2025-001
- Issued by
- El Paso County, Manzanola Town, Colorado
About this file
This is a bid tabulation document for the City of Manitou Springs, Colorado, detailing the Dillon Interim Lot Mobility Hub Construction project (RFB2025-001). The project encompasses comprehensive site improvements, including demolition, excavation, pavement and sidewalk installation, curb and gutter work, signage and striping, erosion control, and site programming. The bid itemizes 34 separate line items across categories such as site clearing, concrete work, ADA parking features, signage, erosion control, and general construction activities. Key quantities include 700 cubic yards of embankment, 1,722 square yards of asphalt removal, 530 square yards of pedestrian crossing areas, and installation of 4 ADA parking stall signs and 1 van accessible sign.
The bid tabulation shows a total base bid cost of $0, with additional cost provisions including a 5% construction contingency and a recommended 10% contingency. The project appears to be a mobility hub phase 1 lot construction aimed at improving community parking and accessibility infrastructure. While specific budget details are not fully populated in the document, the bid includes provisions for construction materials testing, quality control, and project management. The comprehensive scope suggests a significant infrastructure improvement project for the City of Manitou Springs, with detailed specifications for site preparation, accessibility features, and sustainable construction practices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit B_City of Manitou Springs_Dillon Interim Lot_Bid Tabulation_2025-01-10.xlsx | XLSX spreadsheet | |
| RFB 2025-001 Addendum 3.pdf | ||
| 250213_RFB Addendum 2025-001.pdf | ||
| 2025-001 RFB Dillon Phase 1 Lot Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interim Lot
| Dillon Mobility Hub Interim Lot Construction | ENTER BIDDER NAME |
| City of Manitou Springs, CO | ENTER DATE |
| ITEM NO. | DESCRIPTION | UNITS | QUANTITY | UNIT COST | COST | SUBTOTAL |
| BASE BID | ||||||
| Demolition & Excavation | ||||||
| 2025001-01 | Site Clearing & Grubbing | LS | 1 | $0.00 | ||
| 2025001-02 | Emankment | CY | 700 | $0.00 | ||
| 2025001-03 | Unclassified Excavation | CY | 96 | $0.00 | ||
| 2025001-04 | Removal of Existing Asphalt & Disposal | SY | 1,722 | $0.00 | ||
| 2025001-05 | Demolition of 4' Brick Wall Along Manitou Ave | LF | 60 | $0.00 | ||
| 2025001-06 | Demolition of Existing Wood Fence | LF | 47 | $0.00 | ||
| $0.00 | ||||||
| Pavements & Sidewalk | ||||||
| 2025001-07 | Millings Placement | CY | 530 | $0.00 | ||
| 2025001-08 | 4" Concrete Sidewalk | CY | 10 | $0.00 | ||
| 2025001-09 | 8" Concrete ADA Parking | CY | 39 | $0.00 | ||
| 2025001-10 | 4" Subbase Course | CY | 29 | $0.00 | ||
| $0.00 | ||||||
| Curb & Gutter | ||||||
| 2025001-11 | 6" Concrete Vertical Curb | LF | 50 | $0.00 | ||
| 2025001-12 | Traversable Sloped Concrete Curb | LF | 70 | $0.00 | ||
| $0.00 | ||||||
| Signage & Striping | ||||||
| 2025001-13 | White Pavement Stripes | LF | 124 | $0.00 | ||
| 2025001-14 | Embedded Detectable Warning Units | SY | 12 | $0.00 | ||
| 2025001-15 | Pedestrian Crossing Area White Striping | SY | 530 | $0.00 | ||
| 2025001-16 | ADA Parking Stall Sign (MUTCD R7-8) | EA | 4 | $0.00 | ||
| 2025001-17 | ADA Van Accessible Sign (MUTCD R7-8P) | EA | 1 | $0.00 | ||
| 2025001-18 | ADA Handicap Parking Symbol | EA | 4 | $0.00 | ||
| 2025001-19 | Sign Post | EA | 1 | $0.00 | ||
| $0.00 | ||||||
| Erosion & Sediment Control | ||||||
| 2025001-20 | Vehicle Tracking Control | LS | 1 | $0.00 | ||
| 2025001-21 | Silt Fence | LF | 500 | $0.00 | ||
| 2025001-22 | Concrete Washout | EA | 1 | $0.00 | ||
| 2025001-23 | Sediment Control Logs | LF | 45 | $0.00 | ||
| 2025001-24 | Check Dams | EA | 1 | $0.00 | ||
| 2025001-25 | Seeding & Mulching | SY | 450 | $0.00 | ||
| $0.00 | ||||||
| Site Programs | ||||||
| 2025001-26 | Split Wood Rail Fence | LF | 1,595 | $0.00 | ||
| 2025001-27 | Concrete Wheel Stops | EA | 115 | $0.00 | ||
| 2025001-28 | Bollards | EA | 7 | $0.00 | ||
| 2025001-29 | Ornamental Light Standards and Luminaries | EA | $0.00 | |||
| 2025001-30 | Rigid 3" Conduit | LF | $0.00 | |||
| 2025001-31 | Lighting Control Allowance | LS | 1 | $0.00 | ||
| $0.00 | ||||||
| General | ||||||
| 2025001-32 | Mobilization | LS | 1 | $0.00 | ||
| 2025001-33 | Construction Surveying | LS | 1 | $0.00 | ||
| 2025001-34 | Traffic Control Measures | LS | 1 | $0.00 | ||
| $0.00 |
| TOTAL BASE BID COST | $ - 0 | |
| 03 3000 |
| ADDITIONAL COSTS (Provided by the City of Manitou Springs) | |
| Construction Contingency (5%) - Assumed | $0.00 |
| Construction Contingency (10%) - (recommended, but excluded from total) | $0.00 |
| Construction Materials Testing | |
| Quality Control and Testing | |
| Project Management |
TOTAL BASE BID + Additional Cost
32 1816.13