Exhibit B_City of Manitou Springs_Dillon Interim Lot_Bid Tabulation_2025-01-10.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- RFB2025-001
- Issued by
- El Paso County, Manzanola Town, Colorado
About this file
The document is a Bid Tabulation Sheet (RFB 2025-001) for the City of Manitou Springs' Dillon Mobility Hub Phase 1 Lot Construction project in Colorado. The bid covers comprehensive site development including demolition, excavation, pavement and sidewalk installation, curb and gutter work, signage and striping, erosion control, and site amenities. The project involves clearing and grading approximately 1,722 square yards, installing concrete sidewalks and ADA parking, adding curbing, implementing pedestrian crossings, and incorporating infrastructure elements like bollards, lighting, and fencing. Key timeline requirements include project completion by May 30th, 2025, with insurance and bond proof due by March 12th, 2025, and contract signatures required by noon on March 12th, 2025.
The bid tabulation sheet presents a detailed breakdown of construction activities with zero-dollar placeholder unit costs, suggesting that actual pricing will be completed by bidders. The document includes provisions for additional costs such as a 5% and 10% construction contingency, materials testing, quality control, traffic control, and project management. The project appears to be a public infrastructure improvement initiative focused on creating a mobility hub with enhanced accessibility, parking, and community infrastructure. No specific funding sources or budget allocations are explicitly stated in the provided document, though the comprehensive scope suggests municipal or potentially state-level transportation infrastructure funding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Interim Lot
| BID TABULATION SHEET | ||
| RFB 2025-001: Dillon Mobility Hub Phase 1 Lot Construction | ||
| City of Manitou Springs | ||
| Instructions: | Complete the fields highlighted in Yellow | |
| Contractor Name: | ENTER BIDDER NAME | |
| Date Estimated: | ENTER DATE |
| ITEM NO. | DESCRIPTION | UNITS | QUANTITY | UNIT COST | COST | SUBTOTAL |
| BASE BID | ||||||
| Demolition & Excavation | ||||||
| 2025001-01 | Site Clearing & Grubbing | LS | 1 | $0.00 | ||
| 2025001-02 | Emankment | CY | 202 | $0.00 | ||
| 2025001-03 | Unclassified Excavation | CY | 96 | $0.00 | ||
| 2025001-04 | Removal of Existing Asphalt & Disposal | SY | 1,722 | $0.00 | ||
| 2025001-05 | Demolition of 4' Brick Wall Along Manitou Ave | LF | 60 | $0.00 | ||
| $0.00 | ||||||
| Pavements & Sidewalk | ||||||
| 2025001-06 | Millings Placement | CY | 530 | $0.00 | ||
| 2025001-07 | 4" Concrete Sidewalk | CY | 10 | $0.00 | ||
| 2025001-08 | 8" Concrete ADA Parking | CY | 39 | $0.00 | ||
| 2025001-09 | 4" Subbase Course | CY | 29 | $0.00 | ||
| $0.00 | ||||||
| Curb & Gutter | ||||||
| 2025001-10 | 6" Concrete Vertical Curb | LF | 50 | $0.00 | ||
| 2025001-11 | Traversable Sloped Concrete Curb | LF | 70 | $0.00 | ||
| $0.00 | ||||||
| Signage & Striping | ||||||
| 2025001-12 | White Pavement Stripes | LF | 124 | $0.00 | ||
| 2025001-13 | Embedded Detectable Warning Units | SY | 12 | $0.00 | ||
| 2025001-14 | Pedestrian Crossing Area White Striping | SY | 530 | $0.00 | ||
| 2025001-15 | ADA Parking Stall Sign (MUTCD R7-8) | EA | 4 | $0.00 | ||
| 2025001-16 | ADA Van Accessible Sign (MUTCD R7-8P) | EA | 1 | $0.00 | ||
| 2025001-17 | ADA Handicap Parking Symbol | EA | 4 | $0.00 | ||
| 2025001-18 | Sign Post | EA | 1 | $0.00 | ||
| $0.00 | ||||||
| Erosion & Sediment Control | ||||||
| 2025001-19 | Vehicle Tracking Control | LS | 1 | $0.00 | ||
| 2025001-20 | Silt Fence | LF | 1,600 | $0.00 | ||
| 2025001-21 | Concrete Washout | EA | 1 | $0.00 | ||
| 2025001-22 | Sediment Control Logs | LF | 45 | $0.00 | ||
| 2025001-23 | Check Dams | EA | 1 | $0.00 | ||
| 2025001-24 | Seeding & Mulching | SY | 450 | $0.00 | ||
| $0.00 | ||||||
| Site Programs | ||||||
| 2025001-25 | Split Wood Rail Fence | LF | 1,595 | $0.00 | ||
| 2025001-26 | Concrete Wheel Stops | EA | 115 | $0.00 | ||
| 2025001-27 | Bollards | EA | 7 | $0.00 | ||
| 2025001-28 | Ornamental Light Standards and Luminaries | EA | $0.00 | |||
| 2025001-29 | Rigid 3" Conduit | LF | $0.00 | |||
| 2025001-30 | Lighting Control Allowance | LS | 1 | $0.00 | ||
| $0.00 | ||||||
| General | ||||||
| 2025001-31 | Mobilization | LS | 1 | $0.00 | ||
| 2025001-32 | Construction Surveying | LS | 1 | $0.00 | ||
| 2025001-33 | Traffic Control Measures | LS | 1 | $0.00 | ||
| $0.00 |
TOTAL BASE BID COST $ - 0
| ADDITIONAL COSTS | LUMP SUM | Percent of Base Bid | TOTAL | |
| Construction Contingency (5% assumed if not provided) | 5.0% | $0.00 | ||
| Construction Contingency (10% assumed if not provided) | 10.0% | $0.00 | ||
| Construction Materials Testing (enter % or Lump Sum) | $0.00 | |||
| Quality Control and Testing | $0.00 | |||
| Traffic Control Measures | $0.00 | |||
| Project Management | $0.00 | |||
| [OTHER] | $0.00 | |||
| [OTHER] | $0.00 | |||
| [OTHER] | $0.00 | |||
| TOTAL Additional Costs | $0.00 | |||
| TOTAL BASE BID + Additional | $0.00 | |||
| TIMELINE REQUIREMENTS | Select Response | Comments | ||
| Are you able to complete the project by May 30th, 2025? | ||||
| Are you able to provide proof of required Certificate of Insurance and Bond requirements by March 12th, 2025 (noon)? | ||||
| Are you able obtain contract signatures and notarization by noon March 12th, 2025 (noon)? |
Sheet1
| Yes |
| No |