Revised_Bid_Form-_ITB-34-2026-_FS#2_Reroof-_2523.addendum1.pdf
PDF 136 KB Posted
- Solicitation number
- ITB-34-2026
- Issued by
- Rutherford County, Tennessee
About this file
This is a revised bid form addendum for the City of Murfreesboro's reroofing project at Fire Rescue Station No. 2, prepared by Johnson + Bailey Architects P.C. under project number 2523. The City of Murfreesboro is soliciting sealed bids for complete reroofing services including removal of existing asphalt shingle roofing, gutters, and downspouts, with installation of new Class A fire-rated asphalt shingles, underlayment, flashing, metal gutters, downspouts, and repair of damaged roof sheathing up to 300 square feet. Additional work includes installation of new Carlisle EPDM flashing by a certified installer, new pipe vents with pre-molded seals, and restoration of construction-related damage to landscaping and building components. A mandatory pre-bid conference is scheduled for Thursday, April 9, 2026, at 10:00 AM at the fire station. Sealed electronic bids must be submitted through the City's OpenGov procurement portal by 2:00 PM CST on Thursday, April 23, 2026. Substantial completion is required within 30 calendar days of the written Notice to Proceed. Bidders must maintain their proposals for 45 consecutive calendar days from submission and execute the contract within 5 consecutive calendar days of written acceptance.
The contract will be awarded on a lump sum basis with unit price proposals required for replacement of damaged roof sheathing at a price per square foot. A 5% bid security must accompany all proposals. Bidders must be licensed general contractors in Tennessee and provide performance and payment bonds equal to 100% of the contract sum from a Tennessee-licensed bonding company. Comprehensive insurance coverage is required, including $2,000,000 combined general liability per occurrence, workers' compensation meeting Tennessee statutory requirements, $1,000,000 commercial auto liability, $1,000,000 pollution liability, $1,000,000 professional liability, and a $5,000,000 umbrella policy. All bids must include a $5,000 contingency allowance. Contractors and subcontractors employing five or more workers must submit executed Drug-Free Workplace Affidavits. All bidders must certify compliance with Tennessee's Iran Divestment Act and non-boycott of Israel requirements. Liquidated damages are assessed at $200 per calendar day for delays beyond the Contract Completion Date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Form-_ITB-34-_2026-_Station_No._2_Reroof.pdf | ||
| Station_No._2_Reroof_-_Drawings.pdf | ||
| Station_No._2_Reroof_-_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 12, 2026 8 2026 JOHNSON + BAILEY ARCHITECTS P.C. 2523 April 17, 2026 00 41 13 - 1
SECTION 00 41 13 BID FORM
Reroofing at Station No. 2
Murfreesboro Fire Rescue Department
Murfreesboro Tennessee
J+B No. 2523
DATE SUBMITTED: CONTRACTOR:
TO: City of Murfreesboro
111 West Vine Street Murfreesboro, Tennessee 37130
The undersigned, as Bidder, hereby declares that the only person, or persons interested in this Proposal as principal, or principals, is or are named herein and that this Proposal is in all respects fair and in good faith without collusion or fraud.
The Bidder further declares that they have examined the site of the Work and are informed fully in regard to all conditions thereon and has examined the Drawings, Specifications, and Contractual Documents for the Work and is satisfied relative to the Work to be performed.
Time being of the essence, the Bidder proposes and agrees to commence work with an adequate force and equipment, as will be specified in a written Order of the Architect, and to complete all work by the date set forth in Section 01 32 13 - Scheduling of Work.
It is understood that the Notice to Proceed with construction will not be issued until the following documents have been delivered to the Owner through the Architect for review and execution:
- Contractor executed Standard Form of Agreement Between Owner and Contractor, AIA Document, A101, 2017 Edition.
- Performance Bond, Material and Labor Payment Bond.
- Insurance Certificate
- List of Subcontractors
- Schedule of Values
- Builders Risk Insurance (purchased for Owner by Contractor)
Whereas the Owner will suffer loss of use if the project is not complete on or before the dates stated in Section 01 32 13 - Scheduling of Work, the Contractor and their Surety shall be liable for and shall pay to the Owner the sum of Two Hundred Dollars ($200.00) as fixed and agreed liquidated damages for each calendar day of delay (in excess of the Contract Completion Date established herein) until the work is substantially complete as defined in AIA Document A201, Subparagraph 9.8.1. Architect shall issue a Certificate of Substantial Completion (AIA Document G704) to verify date work is substantially complete.
The Bidder further agrees that they will not withdraw this Proposal within a period of forty-five (45) consecutive calendar days from and including the date of this Proposal and that, if this Proposal is accepted, they will execute a Contract within said forty-five (45) day period and within five (5) consecutive calendar days after date of written notice of such acceptance. In case of failure on the Bidder's part to perform as agreed above, the monies payable on the Bid Bond accompanying this Proposal shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the Bid Bond shall be returned to the Bidder.
The Bidder further proposes and agrees to contract with the Owner on the AIA Standard Form of Agreement between Owner and Contractor for a Lump Sum to furnish for the following sum all necessary materials, equipment, tools, apparatus, means of transportation and labor necessary to complete the construction of the Project in complete accordance with the shown, noted, described, and reasonable intended requirements of Drawings, Specifications, and Contract Documents with the definite understanding that no money will be allowed for extra work except as set forth in the Contractual Documents.
February 12, 2026 8 2026 JOHNSON + BAILEY ARCHITECTS P.C. 2523 April 17, 2026 00 41 13 - 2
The Bidder further agrees that they and each subcontractor employing no less than five (5) employees will execute and submit to the Owner the attached DRUG FREE WORKPLACE AFFIDAVIT. No Contractor or Subcontractor may perform work on this project unless this form is fully executed and submitted prior to the start of the project. The General Contractor shall submit a fully executed, notarized copy of this form with this bid.
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to T.C.A. '12-12-106 (The Iran Divestment Act - 2016).
By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each supplier is not boycotting Israel pursuant to T.C.A.
§ 12-4-119, and will not boycott Israel during the term of contract.
BID: DOLLARS ($ )
CONTINGENCY
ALLOWANCE: FIVE THOUSAND DOLLARS ($ 5,000.00)
TOTAL BID: DOLLARS ($ )*
*Bid + Contingency Allowance (Contingency to be used only at Owner’s Discretion and Approval)
UNIT PRICE PROPOSALS
The following unit price Proposals shall be utilized to compute additional compensation due the Contractor for additional work. Refer to Section 01 22 00 - UNIT PRICES, for definitions. Refer to Section 01 21 29, QUANTITY ALLOWANCES, for quantities to be included in base bid.
1. DOLLARS PER SQUARE FOOT ($ ).
For replacement of damaged existing ½” APA rated roof sheathing.
The undersigned states that he has received and taken into consideration.
Addenda No. Dated
EXECUTION OF AGREEMENT:
The undersigned agrees that if written notice of acceptance of this proposal is mailed, telegraphed, or delivered to them within forty-five (45) days after opening of proposals, they will promptly execute an
Agreement with the Owner in accordance with the Bid Documents.
COMPANY: DATE:
BY: TITLE:
File details come from the government source that posted it. Updated .