Metrics Reporting Template for Energy Resilience Construction Grants
This is an instructional metrics reporting template developed by the Connecticut Department of Energy and Environmental Protection (DEEP) for grant applicants submitting proposals to the Energy Resilience Construction Grants program. The template requires applicants to populate comprehensive reporting data across three primary project types: Grid Infrastructure, Distributed Energy Resources, and Microgrids. Applicants must complete the Towns tab to identify all benefited municipalities and classify whether communities qualify as vulnerable under state and federal definitions. For each project type, applicants must provide General Information (project organization, title, and utility status), Resilience Metrics (outage types, coverage areas, and performance indices such as SAIDI, CAIDI, and SAIFI), Climate Policy Goal Metrics (emissions reductions for CO2, NOx, SO2, and PM 2.5), Community Benefits Metrics, Workforce Development Metrics, Cost-Effectiveness Metrics, and Project-Specific Reporting detailing major components, critical facilities served, and component lifespans. The template includes predefined drop-down menus, manual input fields, and cells that automatically populate from other entries, with specific instructions provided for utility and non-utility applicants.
The template accommodates up to four project components per submission, though applicants may duplicate rows for additional components. Applicants must provide baseline performance data from 2020 through 2024 with annual averages for relevant metrics, propose performance targets following project implementation, and document methodologies for all calculations. For Distributed Energy Resources and Microgrid projects, applicants must specify nameplate ratings, peak generation and savings capacity, annual energy generation and savings, and participation in Forward Capacity Markets. For Microgrid projects specifically, applicants must detail grid parallel operations (average and peak loads, annual generation and export), islanded operations (load-shedding technologies, critical load percentages, and maximum outage duration the system can withstand), and islanding response time in seconds. All cost-effectiveness data must align with the project budget submission, and community benefits data must correspond to vulnerable community identifications in the Towns tab.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| DRAFT - 9/22/25 |
| Attachment A: Metrics Reporting Template - Instructions tab |
| Introduction |
| Grant applicants should populate this Metrics Reporting Template with details regarding their proposed projects. |
| This template incorporates and aligns with the federal grant program reporting requirements and also includes state specific reporting requirements. |
| Inputs are on the Towns, 1-GridInfrastructure, 2-DistributedEnergyResources, and 3-Microgrid tabs. Grant applicants should populate all inputs that are relevant |
| to their project. |
| The 1-GridInfrastructure, 2-DistributedEnergyResources, and 3-Microgrid tabs are subdivided into sections as follows: | ||
| General Information (Applicable to All Project Types) | ||
| Reporting Applicable to All Project Types | ||
| Resilience Metrics | ||
| Climate Policy Goal Metrics | ||
| Community Benefits Metrics | ||
| Workforce Development Metrics | ||
| Cost-Effectiveness Metrics | ||
| Project-Specific Reporting for Grid Infrastructure, Distributed Energy Resources, or Microgrid (depending on the tab) |
Instructions specific to each tab and section are provided below.
This document contains drop-down menus and unchanging elements. The cells on the each tab of this workbook are color coded as follows:
| Manual Input (type in new information or data each year) |
| Drop Down Input (select an option from a list) |
| Populated from entry in another cell |
| No entry required |
| Towns tab |
| Select all towns benefited by the proposed project and identify whether the community benefited by the project is considered a vulnerable community. |
| Please explain how and why that community meets the definition of a vulnerable community. |
| 1-GridInfrastructure, 2-DistributedEnergyResources, and 3-Microgrid tabs |
| General Information (Applicable to All Project Types) |
| Grant applicants are responsible for populating: |
| - Project Organization or Subawardee | Name of recipent performing the project work. | |||
| - Project Title | Descriptive name of project work being done. | |||
| - Utillity or Non-Utility Grant Applicant | Indicates if the grant applicant is a utility or not. Should align with the Resilience Metrics populated by the applicant. | |||
| Reporting Applicable to All Project Types | ||||
| Resilience Metrics | ||||
| The selections for each of these fields should be consistent throughout the reporting in this section. | ||||
| Please note that these fields apply to a subset of the fields in this section and are not relevant to any other section in this report. | ||||
| - Outage Type | Specifies the cause(s) of all outages the impact metrics are associated with, including: all causes, vegetation, animals, | |||
| vehicles, tornados, thunderstorms, hurricanes, derecho, flooding, wildfire, earthquake, ice/snow storm, operator error, | ||||
| equipment failure, extreme heat, extreme cold, and other. | ||||
| - Outage Type | ||||
| (If 'Other', char lim: 100) | Specifies the cause(s) of all outages the impact metrics are associated with, using less than 100 characters. | |||
| (To be populated only if Outage Type is identified as 'Other'.) | ||||
| - Coverage | Specifies which part of the electric grid the impact metric is associated with. | |||
| - Coverage Type (If 'Other', char lim: 100) | Specifies an area of the system the impact metric is associated with, using less than 100 characters. | |||
| (To be populated only if Coverage is identified as 'Other'.) |
| Grant applicants should assume the following when developing values for the proposal, and baseline sections: | ||
| - Does Outage Data include Major | Includes all days, including MED as defined by IEEE 1366-2001 2.5 Beta Methodology. | |
| Event Days (MED)? | (see more detail on Definitions tab) |
| This section of the report is designed to record the proposed resilience performance of the funded project, and enable comparisons to the baseline. | ||
| Please use the notes column all the way to the right on each tab to provide any additional useful context or informations about the data provided. | ||
| Proposed Performance: | Grant applicants should include the average annual proposed performance of the project. | |
| Baseline Performance: | Only relevant to a subset of metrics in this section. Applicants should provide annual data for each of the past | |
| five years and calculate an annual average across those five years. | ||
| Climate Policy Goal Metrics | ||
| These metrics may not be relevant to some types of projects. Please populate all of the relevant metrics for your measures and project types | ||
| and insert n/a for those that are not relevant. Grant applicants should provide documentation of the methodology and inputs for calculating these metrics. | ||
| Community Benefits Metrics | ||
| The data in this section should align with the vulnerable community reporting in the Towns tab. | ||
| Workforce Development Metrics | ||
| The data in this section should align with the vulnerable community reporting in the Towns tab. | ||
| Cost-Effectiveness Metrics | ||
| The data in this section should align with the proposed budget in Attachment D: Budget. | ||
| Project-Specific Reporting | ||
| The table below maps the Eligible Projects eligible measures to the project types. Proposals that include more than one project type must clearly specify the project | ||
| types included in their proposal and submit Project-Specific Metrics for all included project types. |
| Project Type | Eligible Projects |
| Grid Infrastructure | Fire-resistant technologies and fire prevention systems |
| Monitoring and control technologies | |
| The undergrounding of electrical equipment | |
| Utility pole management | |
| The relocation of power lines or the reconductoring of power lines with low-sag, advanced conductors | |
| Adaptive protection technologies | |
| Advanced modeling technologies | |
| Hardening of power lines, facilities, substations, of other systems | |
| The replacement of old overhead conductors and underground cables | |
| Distributed Energy Resources (not part of a Microgrid) | Weatherization technologies and equipment |
| Fuel-load management | |
| The use or construction of distributed energy resources for enhancing system adaptive capacity during disruptive events, |
| including stand alone energy storage subcomponents | |
| Microgrids | The use or construction of distributed energy resources for enhancing system adaptive capacity during disruptive events, |
including microgrids and energy storage subcomponents associated with a microgrid
| Grid Infrastructure Metrics |
| Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different |
| project components. If the project consists of more than four different project components, please copy and paste additional rows into the table. |
| The life of each project component should include replacement, if the costs of replacement are included in the total costs. |
| The life of each project is assumed to be the minimum of life of all of the project components. |
| The miles of lines impacted by the project may or may not be relevant, depending on the Eligible Projects. |
| Distributed Energy Resources Metrics |
| Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different |
| project components. If the project consists of more than four different project components, please copy and paste additional rows into the table. |
| The life of each project component should include replacement, if the costs of replacement are included in the total costs. |
| The life of each project is assumed to be the minimum of life of all of the project components. |
| Microgrid Metrics |
| Please describe the project components using the Eligible Projects descriptions from the table above. The reporting template provides space for up to four different |
| project components. If the project consists of more than four different project components, please copy and paste additional rows into the table. |
| The life of each project component should include replacement, if the costs of replacement are included in the total costs. |
| The life of each project is assumed to be the minimum of life of all of the project components. |
Towns
| DRAFT - 9/22/25 |
| Attachment A: Metrics Reporting Template - Towns tab |
| Towns | Utility Service Territory | Towns Benefited by the Project | Vulnerable Community | Explain how/why the community meets the definition of a vulnerable community | Source: | |
| A | https://www.eversource.com/content/residential/services/communities-we-serve | |||||
| Andover | Eversource | FALSE | FALSE | ANDOVER | Eversource | |
| Ansonia | UI | FALSE | FALSE | ASHFORD | Eversource | |
| Ashford | Eversource | FALSE | FALSE | AVON | Eversource | |
| Avon | Eversource | FALSE | FALSE | BARKHAMSTED | Eversource | |
| B | BEACON FALLS | Eversource | ||||
| Barkhamsted | Eversource | FALSE | FALSE | BERLIN | Eversource | |
| Beacon Falls | Eversource | FALSE | FALSE | BETHANY | Eversource | |
| Berlin | Eversource | FALSE | FALSE | BETHEL | Eversource | |
| Bethany | Eversource | FALSE | FALSE | BETHLEHEM | Eversource | |
| Bethel | Eversource | FALSE | FALSE | BLOOMFIELD | Eversource | |
| Bethlehem | Eversource | FALSE | FALSE | BOLTON | Eversource | |
| Bloomfield | Eversource | FALSE | FALSE | BRANFORD | Eversource | |
| Bolton | Eversource | FALSE | FALSE | BRIDGEWATER | Eversource | |
| Bozrah | Municipal | FALSE | FALSE | BRISTOL | Eversource | |
| Branford | Eversource | FALSE | FALSE | BROOKFIELD | Eversource | |
| Bridgeport | UI | FALSE | FALSE | BROOKLYN | Eversource | |
| Bridgewater | Eversource | FALSE | FALSE | BURLINGTON | Eversource | |
| Bristol | Eversource | FALSE | FALSE | CANAAN | Eversource | |
| Brookfield | Eversource | FALSE | FALSE | CANTERBURY | Eversource | |
| Brooklyn | Eversource | FALSE | FALSE | CANTON | Eversource | |
| Burlington | Eversource | FALSE | FALSE | CHAPLIN | Eversource | |
| C | CHESHIRE | Eversource | ||||
| Canaan | Eversource | FALSE | FALSE | CHESTER | Eversource | |
| Canterbury | Eversource | FALSE | FALSE | CLINTON | Eversource | |
| Canton | Eversource | FALSE | FALSE | COLCHESTER | Eversource | |
| Chaplin | Eversource | FALSE | FALSE | COLEBROOK | Eversource | |
| Cheshire | Eversource | FALSE | FALSE | COLUMBIA | Eversource | |
| Chester | Eversource | FALSE | FALSE | CORNWALL | Eversource | |
| Clinton | Eversource | FALSE | FALSE | COVENTRY | Eversource | |
| Colchester | Eversource | FALSE | FALSE | CROMWELL | Eversource | |
| Colebrook | Eversource | FALSE | FALSE | DANBURY | Eversource | |
| Columbia | Eversource | FALSE | FALSE | DARIEN | Eversource | |
| Cornwall | Eversource | FALSE | FALSE | DEEP RIVER | Eversource | |
| Coventry | Eversource | FALSE | FALSE | DURHAM | Eversource | |
| Cromwell | Eversource | FALSE | FALSE | EAST GRANBY | Eversource | |
| D | EAST HADAAM | Eversource | ||||
| Danbury | Eversource | FALSE | FALSE | EAST HAMPTON | Eversource | |
| Darien | Eversource | FALSE | FALSE | EAST HARTFORD | Eversource | |
| Deep River | Eversource | FALSE | FALSE | EAST LYME | Eversource | |
| Derby | UI | FALSE | FALSE | EAST WINDSOR | Eversource | |
| Durham | Eversource | FALSE | FALSE | EASTFORD | Eversource | |
| E | EASTON | Eversource | ||||
| East Granby | Eversource | FALSE | FALSE | ELLINGTON | Eversource | |
| East Haddam | UI | FALSE | FALSE | ENFIELD | Eversource | |
| East Hampton | Eversource | FALSE | FALSE | ESSEX | Eversource | |
| East Hartford | Eversource | FALSE | FALSE | FAIRFIELD | Eversource | |
| East Haven | UI | FALSE | FALSE | FARMINGTON | Eversource | |
| East Lyme | Eversource | FALSE | FALSE | FRANKLIN | Eversource | |
| East Windsor | Eversource | FALSE | FALSE | GLASTONBURY | Eversource | |
| Eastford | Eversource | FALSE | FALSE | GOSHEN | Eversource | |
| Easton | Eversource/UI | FALSE | FALSE | GRANBY | Eversource | |
| Ellington | Eversource | FALSE | FALSE | GREENWICH | Eversource | |
| Enfield | Eversource | FALSE | FALSE | GRISWOLD | Eversource | |
| Essex | Eversource | FALSE | FALSE | GROTON | Eversource | |
| F | GUILFORD | Eversource | ||||
| Fairfield | Eversource/UI | FALSE | FALSE | HADDAM | Eversource | |
| Farmington | Eversource | FALSE | FALSE | HAMDEN | Eversource | |
| Franklin | Eversource | FALSE | FALSE | HAMPTON | Eversource | |
| G | HARTFORD | Eversource | ||||
| Glastonbury | Eversource | FALSE | FALSE | HARTLAND | Eversource | |
| Goshen | Eversource | FALSE | FALSE | HARWINTON | Eversource | |
| Granby | Eversource | FALSE | FALSE | HEBRON | Eversource | |
| Greenwich | Eversource | FALSE | FALSE | KENT | Eversource | |
| Griswold | Eversource | FALSE | FALSE | KILLINGLY | Eversource | |
| Groton | Municipal | FALSE | FALSE | KILLINGWORTH | Eversource | |
| Guilford | Eversource | FALSE | FALSE | LEBANON | Eversource | |
| H | LEDYARD | Eversource | ||||
| Haddam | Eversource | FALSE | FALSE | LISBON | Eversource | |
| Hamden | Eversource/UI | FALSE | FALSE | LITCHFIELD | Eversource | |
| Hampton | Eversource | FALSE | FALSE | LYME | Eversource | |
| Hartford | Eversource | FALSE | FALSE | MADISON | Eversource | |
| Hartland | Eversource | FALSE | FALSE | MANCHESTER | Eversource | |
| Harwinton | Eversource | FALSE | FALSE | MANSFIELD | Eversource | |
| Hebron | Eversource | FALSE | FALSE | MARLBOROUGH | Eversource | |
| J | MERIDEN | Eversource | ||||
| Jewett | Municipal | FALSE | FALSE | MIDDLEBURY | Eversource | |
| K | MERIDEN | Eversource | ||||
| Kent | Eversource | FALSE | FALSE | MIDDLEBURY | Eversource | |
| Killingly | Eversource | FALSE | FALSE | MIDDLEFIELD | Eversource | |
| Killingworth | Eversource | FALSE | FALSE | MIDDLETOWN | Eversource | |
| L | MONROE | Eversource | ||||
| Lebanon | Eversource | FALSE | FALSE | MONTVILLE | Eversource | |
| Ledyard | Eversource | FALSE | FALSE | MORRIS | Eversource | |
| Lisbon | Eversource | FALSE | FALSE | NAUGATUCK | Eversource | |
| Litchfield | Eversource | FALSE | FALSE | NEW BRITAIN | Eversource | |
| Lyme | Eversource | FALSE | FALSE | NEW CANAAN | Eversource | |
| M | NEW FAIRFIELD | Eversource | ||||
| Madison | Eversource | FALSE | FALSE | NEW HARTFORD | Eversource | |
| Manchester | Eversource | FALSE | FALSE | NEW LONDON | Eversource | |
| Mansfield | Eversource | FALSE | FALSE | NEW MILFORD | Eversource | |
| Marlborough | Eversource | FALSE | FALSE | NEWINGTON | Eversource | |
| Meriden | Eversource | FALSE | FALSE | NEWTOWN | Eversource | |
| Middlebury | Eversource | FALSE | FALSE | NORFOLK | Eversource | |
| Middlefield | Eversource | FALSE | FALSE | NORTH BRANFORD | Eversource | |
| Middletown | Eversource | FALSE | FALSE | NORTH CANAAN | Eversource | |
| Milford | UI | FALSE | FALSE | NORTH STONINGTON | Eversource | |
| Monroe | Eversource | FALSE | FALSE | NORWALK | Eversource | |
| Montville | Eversource | FALSE | FALSE | NORWICH | Eversource | |
| Morris | Eversource | FALSE | FALSE | OLD LYME | Eversource | |
| N | OLD SAYBROOK | Eversource | ||||
| Naugatuck | Eversource | FALSE | FALSE | OXFORD | Eversource | |
| Newington | Eversource | FALSE | FALSE | PLAINFIELD | Eversource | |
| Newtown | Eversource | FALSE | FALSE | PLAINVILLE | Eversource | |
| New Britain | Eversource | FALSE | FALSE | PLYMOUTH | Eversource | |
| New Canaan | Eversource | FALSE | FALSE | POMFRET | Eversource | |
| New Fairfield | Eversource | FALSE | FALSE | PORTLAND | Eversource | |
| New Hartford | Eversource | FALSE | FALSE | PRESTON | Eversource | |
| New Haven | UI | FALSE | FALSE | PROSPECT | Eversource | |
| New London | Eversource | FALSE | FALSE | PUTNAM | Eversource | |
| New Milford | Eversource | FALSE | FALSE | REDDING | Eversource | |
| Norfolk | Eversource | FALSE | FALSE | RIDGEFIELD | Eversource | |
| North Branford | Eversource/UI | FALSE | FALSE | ROCKY HILL | Eversource | |
| North Canaan | Eversource | FALSE | FALSE | ROXBURY | Eversource | |
| North Haven | UI | FALSE | FALSE | SALEM | Eversource | |
| North Stonington | Eversource | FALSE | FALSE | SALISBURY | Eversource | |
| Norwalk | Eversource/Municipal | FALSE | FALSE | SCOTLAND | Eversource | |
| Norwich | Eversource/Municipal | FALSE | FALSE | SEYMOUR | Eversource | |
| O | SHARON | Eversource | ||||
| Old Lyme | Eversource | FALSE | FALSE | SHELTON | Eversource | |
| Old Saybrook | Eversource | FALSE | FALSE | SHERMAN | Eversource | |
| Orange | UI | FALSE | FALSE | SIMSBURY | Eversource | |
| Oxford | Eversource | FALSE | FALSE | SOMERS | Eversource | |
| P | SOUTH WINDSOR | Eversource | ||||
| Plainfield | Eversource | FALSE | FALSE | SOUTHBURY | Eversource | |
| Plainville | Eversource | FALSE | FALSE | SOUTHINGTON | Eversource | |
| Plymouth | Eversource | FALSE | FALSE | SPRAGUE | Eversource | |
| Pomfret | Eversource | FALSE | FALSE | STAFFORD | Eversource | |
| Portland | Eversource | FALSE | FALSE | STAMFORD | Eversource | |
| Preston | Eversource | FALSE | FALSE | STERLING | Eversource | |
| Prospect | Eversource | FALSE | FALSE | STONINGTON | Eversource | |
| Putnam | Eversource | FALSE | FALSE | SUFFIELD | Eversource | |
| R | THOMASTON | Eversource | ||||
| Redding | Eversource | FALSE | FALSE | THOMPSON | Eversource | |
| Ridgefield | Eversource | FALSE | FALSE | TOLLAND | Eversource | |
| Rocky Hill | Eversource | FALSE | FALSE | TORRINGTON | Eversource | |
| Roxbury | Eversource | FALSE | FALSE | UNION | Eversource | |
| S | VERNON | Eversource | ||||
| Salem | Eversource | FALSE | FALSE | VOLUNTOWN | Eversource | |
| Salisbury | Eversource | FALSE | FALSE | WALLINGFORD | Eversource | |
| Scotland | Eversource | FALSE | FALSE | WARREN | Eversource | |
| Seymour | Eversource | FALSE | FALSE | WASHINGTON | Eversource | |
| Sharon | Eversource | FALSE | FALSE | WATERBURY | Eversource | |
| Shelton | Eversource/UI | FALSE | FALSE | WATERFORD | Eversource | |
| Sherman | Eversource | FALSE | FALSE | WATERTOWN | Eversource | |
| Simsbury | Eversource | FALSE | FALSE | WEST HARTFORD | Eversource | |
| Somers | Eversource | FALSE | FALSE | WESTBROOK | Eversource | |
| South Norwalk | Municipal | FALSE | FALSE | WESTBROOK | Eversource | |
| South Windsor | Eversource | FALSE | FALSE | WESTON | Eversource | |
| Southbury | Eversource | FALSE | FALSE | WESTPORT | Eversource | |
| Southington | Eversource | FALSE | FALSE | WETHERSFIELD | Eversource | |
| Sprague | Eversource | FALSE | FALSE | WILLINGTON | Eversource | |
| Stafford | Eversource | FALSE | FALSE | WILTON | Eversource | |
| Stamford | Eversource | FALSE | FALSE | WINCHESTER | Eversource | |
| Sterling | Eversource | FALSE | FALSE | WINDHAM | Eversource | |
| Stonington | Eversource | FALSE | FALSE | WINDSOR | Eversource | |
| Stratford | UI | FALSE | FALSE | WINDSOR LOCKS | Eversource | |
| Suffield | Eversource | FALSE | FALSE | WOLCOTT | Eversource | |
| T | WOODBRIDGE | Eversource | ||||
| Thomaston | Eversource | FALSE | FALSE | WOODBURY | Eversource | |
| Thompson | Eversource | FALSE | FALSE | WOODSTOCK | Eversource | |
| Tolland | Eversource | FALSE | FALSE | |||
| Torrington | Eversource | FALSE | FALSE | |||
| Trumbull | UI | FALSE | FALSE | |||
| U | ||||||
| Union | Eversource | FALSE | FALSE | |||
| Ucasville (Mohegan) | Municipal | FALSE | FALSE | |||
| V | ||||||
| Vernon | Eversource | FALSE | FALSE | |||
| Voluntown | Eversource | FALSE | FALSE | |||
| W | ||||||
| Wallingford | Eversource/Municipal | FALSE | FALSE | |||
| Warren | Eversource | FALSE | FALSE | |||
| Washington | Eversource | FALSE | FALSE | |||
| Waterbury | Eversource | FALSE | FALSE | |||
| Waterford | Eversource | FALSE | FALSE | |||
| Watertown | Eversource | FALSE | FALSE | |||
| West Hartford | Eversource | FALSE | FALSE | |||
| West Haven | UI | FALSE | FALSE | |||
| Westbrook | Eversource | FALSE | FALSE | |||
| Weston | Eversource | FALSE | FALSE | |||
| Westport | Eversource | FALSE | FALSE | |||
| Wethersfield | Eversource | FALSE | FALSE | |||
| Willington | Eversource | FALSE | FALSE | |||
| Wilton | Eversource | FALSE | FALSE | |||
| Winchester | Eversource | FALSE | FALSE | |||
| Windham | Eversource | FALSE | FALSE | |||
| Windsor | Eversource | FALSE | FALSE | |||
| Windsor Locks | Eversource | FALSE | FALSE | |||
| Wolcott | Eversource | FALSE | FALSE | |||
| Woodbridge | UI | FALSE | FALSE | |||
| Woodbury | Eversource | FALSE | FALSE | |||
| Woodstock | Eversource | FALSE | FALSE |
https://www.eversource.com/content/residential/services/communities-we-serve 1-GridInfrastructure
| DRAFT - 9/22/25 |
| Metrics for Grid Infrastructure Projects |
| General Information (Applicable to All Project Types) | |
| Project Type | Grid Infrastructure |
| Project Organization or Subawardee | |
| Project Title | |
| Utility or Non-Utility Applicant | select from list |
| Reporting Applicable to All Project Types | |||||||||||||
| Resilience Metrics | |||||||||||||
| Impact Metric | Units | Proposed Performance | Notes | ||||||||||
| Towns Benefited by the Project | Number of towns | ||||||||||||
| Number of Residential Customers Benefited | Number of customers | ||||||||||||
| Number of Commercial Customers Benefited | Number of customers | ||||||||||||
| Number of Industrial Customers Benefited | Number of customers | ||||||||||||
| Planned Maintenance | Number of occurrences | ||||||||||||
| Planned Maintenance | Number of hours across all occurrences | ||||||||||||
| Unplanned Maintenance | Number of occurrences | ||||||||||||
| Unplanned Maintenance | Number of hours across all occurrences | ||||||||||||
| Uptime | Number of hours | ||||||||||||
| Utility Applicant | Units | Outage Type | Outage Type | ||||||||||
| (If 'Other', char lim: 100) | Coverage | Coverage Type | |||||||||||
| (If 'Other', char lim: 100) | Proposed Performance | Baseline Performance (Before Project Implementation) | |||||||||||
| 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| System Average Interruption Duration Index (SAIDI) | Number | select from list | select from list | ||||
| Customer Average Interruption Duration Index (CAIDI) | Number | ||||||
| System Average Interruption Frequency Index (SAIFI) | Number | ||||||
| Total Number of Residential Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Commercial Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Industrial Customers in the Coverage Area | Number of customers | ||||||
| Non-Utility Applicant | Units | Outage Type (select from list) | Outage Type | ||||
| (If 'Other', char lim: 100) | Coverage | ||||||
| (select from list) | Coverage Type | ||||||
| (If 'Other', char lim: 100) | Proposed Performance | 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| Outages | Number of outages | select from list | select from list |
| Hours of Unmet Load | Number of hours across all outages |
| Climate Policy Goal Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| CO2 Equivalent Emissions Reductions | Metric tons | ||
| NOx Emissions Reductions | Metric tons | ||
| SO2 Emissions Reductions | Metric tons | ||
| PM 2.5 Emissions Reductions | Metric tons |
| Community Benefits Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Vulnerable Communities Benefited | Number of communities | ||
| Number of Residential Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Commercial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Industrial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Total Project Costs associated with Vulnerable Communities that Benefit | Nominal 2026 $ |
| Workforce Development Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Full Time Employees (FTEs) In-State | Number of FTEs | ||
| FTEs in Vulnerable Communities | Number of FTEs | ||
| Businesses In-State | Number of businesses | ||
| Businesses in Vulnerable Communities | Number of businesses | ||
| Apprenticeships and Trainings In-State | Number of apprenticeships and trainings | ||
| Apprenticeships and Trainings in Vulnerable Communities | Number of apprenticeships and trainings |
| Cost-Effectiveness Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Total Project Costs | Nominal 2026 $ | ||
| Funding Requested | Nominal 2026 $ | ||
| Ratepayer Funds | Nominal 2026 $ | ||
| Other Funding (excluding Ratepayer Funds) | Nominal 2026 $ |
Project Specific Reporting for Grid Infrastructure
| Serves Facilities providing Critical Services | Select from list |
| Critical Facilities Served | Number and description of facilities |
| Major Project Components | Description of components |
| Impact Metric | Units | Proposed Performance | Notes |
| Component 1: [insert description] | Number of measures | ||
| Life of Project Component 1 | Years | ||
| Component 2: [insert description] | Number of measures | ||
| Life of Project Component 2 | Years | ||
| Component 3: [insert description] | Number of measures | ||
| Life of Project Component 3 | Years | ||
| Component 4: [insert description] | Number of measures | ||
| Life of Project Component 4 | Years | ||
| Life of Project | Years | ||
| Miles of Lines Impacted by Project | Number of miles |
2-DistributedEnergyResources
| DRAFT - 9/22/25 |
| Metrics for Distributed Energy Resources Projects |
| General Information (Applicable to All Project Types) | |
| Project Type | Distributed Energy Resources |
| Project Organization or Subawardee | |
| Project Title | |
| Utility or Non-Utility Applicant | select from list |
| Reporting Applicable to All Project Types | |||||||||||||
| Resilience Metrics | |||||||||||||
| Impact Metric | Units | Proposed Performance | Notes | ||||||||||
| Towns Benefited by the Project | Number of towns | ||||||||||||
| Number of Residential Customers Benefited | Number of customers | ||||||||||||
| Number of Commercial Customers Benefited | Number of customers | ||||||||||||
| Number of Industrial Customers Benefited | Number of customers | ||||||||||||
| Planned Maintenance | Number of occurrences | ||||||||||||
| Planned Maintenance | Number of hours across all occurrences | ||||||||||||
| Unplanned Maintenance | Number of occurrences | ||||||||||||
| Unplanned Maintenance | Number of hours across all occurrences | ||||||||||||
| Uptime | Number of hours | ||||||||||||
| Utility Applicant | Units | Outage Type | Outage Type | ||||||||||
| (If 'Other', char lim: 100) | Coverage | Coverage Type | |||||||||||
| (If 'Other', char lim: 100) | Proposed Performance | Baseline Performance (Before Project Implementation) | |||||||||||
| 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| System Average Interruption Duration Index (SAIDI) | Number | select from list | select from list | ||||
| Customer Average Interruption Duration Index (CAIDI) | Number | ||||||
| System Average Interruption Frequency Index (SAIFI) | Number | ||||||
| Total Number of Residential Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Commercial Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Industrial Customers in the Coverage Area | Number of customers | ||||||
| Non-Utility Applicant | Units | Outage Type | Outage Type | ||||
| (If 'Other', char lim: 100) | Coverage | Coverage Type | |||||
| (If 'Other', char lim: 100) | Proposed Performance | 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| Outages | Number of outages | select from list | select from list |
| Hours of Unmet Load | Number of hours across all outages |
| Climate Policy Goal Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| CO2 Equivalent Emissions Reductions | Metric tons | ||
| NOx Emissions Reductions | Metric tons | ||
| SO2 Emissions Reductions | Metric tons | ||
| PM 2.5 Emissions Reductions | Metric tons |
| Community Benefits Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Vulnerable Communities Benefited | Number of communities | ||
| Number of Residential Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Commercial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Industrial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Total Project Costs associated with Vulnerable Communities that Benefit | Nominal 2026 $ |
| Workforce Development Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Full Time Employees (FTEs) In-State | Number of FTEs | ||
| FTEs in Vulnerable Communities | Number of FTEs | ||
| Businesses In-State | Number of businesses | ||
| Businesses in Vulnerable Communities | Number of businesses | ||
| Apprenticeships and Trainings In-State | Number of apprenticeships and trainings | ||
| Apprenticeships and Trainings in Vulnerable Communities | Number of apprenticeships and trainings |
| Cost-Effectiveness Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Total Project Costs | Nominal 2026 $ | ||
| Funding Requested | Nominal 2026 $ | ||
| Ratepayer Funds | Nominal 2026 $ | ||
| Other Funding (excluding Ratepayer Funds) | Nominal 2026 $ |
Project Specific Reporting for Distributed Energy Resources
| Serves Facilities providing Critical Services | Select from list |
| Critical Facilities Served | Number and description of facilities |
| Major Project Components | Description of components |
| Impact Metric | Units | Proposed Performance | Notes |
| Component 1: [insert description] | Number of measures | ||
| Nameplate Rating for Component 1 | Select unit | ||
| Life of Project Component 1 | Years | ||
| Component 2: [insert description] | Number of measures | ||
| Nameplate Rating for Component 2 | Select unit | ||
| Life of Project Component 2 | Years | ||
| Component 3: [insert description] | Number of measures | ||
| Nameplate Rating for Component 3 | Select unit | ||
| Life of Project Component 3 | Years | ||
| Component 4: [insert description] | Number of measures | ||
| Nameplate Rating for Component 4 | Select unit | ||
| Life of Project Component 4 | Years | ||
| Life of Project | Years | ||
| Peak Generation | kW | ||
| Peak Savings | kW | ||
| Annual Energy Generation | kWh | ||
| Annual Energy Savings | kWh | ||
| Forward Capacity Market (FCM) Participation | Select from list | ||
| On-Site Fossil Fuel Replacement | Select from list | ||
| Annual Natural Gas Savings | Therms | ||
| Annual Oil Savings | Gallons | ||
| Annual Gasoline Savings | Gallons | ||
| Annual Diesel Savings | Gallons |
3-Microgrid
| DRAFT - 9/22/25 |
| Metrics for Microgrid Projects |
| General Information (Applicable to All Project Types) | |
| Project Type | Microgrid |
| Project Organization or Subawardee | |
| Project Title | |
| Utility or Non-Utility Applicant | select from list |
| Reporting Applicable to All Project Types | |||||||||||||
| Resilience Metrics | |||||||||||||
| Impact Metric | Units | Proposed Performance | Notes | ||||||||||
| Towns Benefited by the Project | Number of towns | ||||||||||||
| Number of Residential Customers Benefited | Number of customers | ||||||||||||
| Number of Commercial Customers Benefited | Number of customers | ||||||||||||
| Number of Industrial Customers Benefited | Number of customers | ||||||||||||
| Planned Maintenance | Number of occurrences | ||||||||||||
| Planned Maintenance | Number of hours across all occurrences | ||||||||||||
| Unplanned Maintenance | Number of occurrences | ||||||||||||
| Unplanned Maintenance | Number of hours across all occurrences | ||||||||||||
| Uptime | Number of hours | ||||||||||||
| Utility Applicant | Units | Outage Type | Outage Type | ||||||||||
| (If 'Other', char lim: 100) | Coverage | Coverage Type | |||||||||||
| (If 'Other', char lim: 100) | Proposed Performance | Baseline Performance (Before Project Implementation) | |||||||||||
| 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| System Average Interruption Duration Index (SAIDI) | Number | select from list | select from list | ||||
| Customer Average Interruption Duration Index (CAIDI) | Number | ||||||
| System Average Interruption Frequency Index (SAIFI) | Number | ||||||
| Total Number of Residential Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Commercial Customers in the Coverage Area | Number of customers | ||||||
| Total Number of Industrial Customers in the Coverage Area | Number of customers | ||||||
| Non-Utility Applicant | Units | Outage Type | Outage Type | ||||
| (If 'Other', char lim: 100) | Coverage | Coverage Type | |||||
| (If 'Other', char lim: 100) | Proposed Performance | 2020 | 2021 | 2022 | 2023 | 2024 | Annual |
Average
| Outages | Number of outages | select from list | select from list |
| Hours of Unmet Load | Number of hours across all outages |
| Climate Policy Goal Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| CO2 Equivalent Emissions Reductions | Metric tons | ||
| NOx Emissions Reductions | Metric tons | ||
| SO2 Emissions Reductions | Metric tons | ||
| PM 2.5 Emissions Reductions | Metric tons |
| Community Benefits Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Vulnerable Communities Benefited | Number of communities | ||
| Number of Residential Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Commercial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Number of Industrial Customers Benefited in Vulnerable Communities | Number of customers | ||
| Total Project Costs associated with Vulnerable Communities that Benefit | Nominal 2026 $ |
| Workforce Development Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Full Time Employees (FTEs) In-State | Number of FTEs | ||
| FTEs in Vulnerable Communities | Number of FTEs | ||
| Businesses In-State | Number of businesses | ||
| Businesses in Vulnerable Communities | Number of businesses | ||
| Apprenticeships and Trainings In-State | Number of apprenticeships and trainings | ||
| Apprenticeships and Trainings in Vulnerable Communities | Number of apprenticeships and trainings |
| Cost-Effectiveness Metrics | |||
| Impact Metric | Units | Proposed Performance | Notes |
| Total Project Costs | Nominal 2026 $ | ||
| Funding Requested | Nominal 2026 $ | ||
| Ratepayer Funds | Nominal 2026 $ | ||
| Other Funding (excluding Ratepayer Funds) | Nominal 2026 $ |
Project Specific Reporting for Microgrids
| Serves Facilities providing Critical Services | Select from list |
| Critical Facilities Served | Number and description of facilities |
| Major Project Components | Description of components |
| Impact Metric | Units | Proposed Performance | Notes |
| Component 1: [insert description] | Number of measures | ||
| Nameplate Rating for Component 1 | Select unit | ||
| Life of Project Component 1 | Years | ||
| Component 2: [insert description] | Number of measures | ||
| Nameplate Rating for Component 2 | Select unit | ||
| Life of Project Component 2 | Years | ||
| Component 3: [insert description] | Number of measures | ||
| Nameplate Rating for Component 3 | Select unit | ||
| Life of Project Component 3 | Years | ||
| Component 4: [insert description] | Number of measures | ||
| Nameplate Rating for Component 4 | Select unit | ||
| Life of Project Component 4 | Years | ||
| Life of Project | Years | ||
| Grid Parallel Operation | Units | Proposed Performance | Notes |
| Average Load of Facilities Served by Microgrid | kW | ||
| Peak Load of Facilities Served by Microgrid | kW | ||
| Annual Generation During Normal Operation: | |||
| Annual On-Site Usage | kWh | ||
| Annual Export to Grid | kWh | ||
| Peak Reduction | kW | ||
| Islanded Operation | Units | Proposed Performance | Notes |
| Does the microgrid employ load shed technologies? | Select from list | ||
| Percentage of Normal Operation Load Served by Microgrid | % | ||
| Percentage of Load Served by Microgrid that is Considered Critical | % | ||
| Average Critical Loads Served by Microgrid | Select unit | ||
| Peak Critical Loads Served by Microgrid | Select unit | ||
| Annual Critical Load | kWh | ||
| Annual Critical Load Served by Microgrid | kWh | ||
| Maximum Outage Duration that Microgrid is Designed to Ride-Through | Hours | ||
| Islanding Response Time | Seconds |
Definitions
| DRAFT - 9/22/25 | |
| Attachment A: Metrics Reporting Template - Definitions tab | |
| Term | Resilience Metrics Definitions |
| Major Event Day | Days where the system operational and/or design limits exceed a threshold established by: |
| 1. Collecting values for five sequential years ending on the last day of the last complete reporting period. | |
| If fewer than five years of historical data are available, use all available historical data. | |
| 2. Excluding any day in the data set has a value of zero. | |
| 3. Taking the natural logarithm (ln) of each daily value in the data set. | |
| 4. Finding α (Alpha), the average of the logarithms (also known as the log-average) of the data set. | |
| 5. Finding β (Beta), the standard deviation of the logarithms (also known as the log-standard deviation) of the data set. | |
| 6. Computing the major event day threshold, TMED, using the equation: ( ) α+2.5β T = e MED | |
| 7. Classifying any day with daily value greater than the threshold value TMED that occurs during the subsequent reporting period is classified as a major event day. | |
| Outage Type | Specifies the cause(s) of all outages the impact metrics are associated with. |
| Coverage | Specifies the part(s) of the electric grid the impact metrics are associated with. |
| Critical Facilities | Any hospital, police station, fire station, water treatment plant, sewage treatment plant, public shelter, correctional facility or production and transmission facility of a television or radio station, whether broadcast, cable or satellite, licensed by the Federal Communications Commission, any commercial area of a municipality, a municipal center, as identified by the chief elected official of any municipality, or any other facility or area identified by the Department of Energy and Environmental Protection as critical. |
| Critical Services | Essential public safety, health, and disaster recovery services, including: emergency medical services (hospitals, clinics), public safety (fire stations, police departments), essential infrastructure (water treatment, power utilities), and government functions (town halls, emergency operations centers) or any other services identified as critical by the Department of Energy and Environmental Protection. |
| SAIDI | The average length of time customers experience a power outage over a specific period, calculated as the total duration of all customer interruptions within the year divided by the total number of customers served during the year. |
| CAIDI | How long, on average, a customer is without power after an outage occurs, calculated as the total duration of all customer interruptions divided by the total number of customer interruptions. |
| SAIFI | The average number of sustained interruptions (typically lasting more than 5 minutes) that a customer experiences over a year or other given time frame, calculated as the total number of customers served divided by the total number of sustained customer service interruptions during that period. |
| Residential Customers | Customers who would be served by one of the utilities' Residential rate classes. |
| Commercial Customers | Customers who would be served by one of the utilities' Commercial rate classes. Includes municipal government buildings. |
| Industrial Customers | Customers who would be served by one of the utilities' Industrial rate classes. |
| Project Types | Including Grid Infrastructure, Distributed Energy Resources, and Microgrids. |
| Project Components | Components of the Grid Infrastructure, Distributed Energy Resources, and Microgrids project types, as shown in the table on the Instructions tab. |
| Uptime | The number of hours the equipment is operational, excluding planned and unplanned maintenance. |
| Term | Community Definitions |
| Vulnerable Community | Populations that may be disproportionately impacted by the effects of climate change, including, but not limited to, low and moderate income communities, |
| environmental justice communities pursuant to section 22a-20a (https://www.cga.ct.gov/current/pub/chap_439.htm#sec_22a-20a), communities eligible | |
| for community reinvestment pursuant to section 36a-30 (https://www.cga.ct.gov/current/pub/chap_664a.htm#sec_36a-30) and the Community Reinvestment | |
| Act of 1977, 12 USC 2901 et seq., as amended from time to time, populations with increased risk and limited means to adapt to the effects of climate change, | |
| or as further defined by the Department of Energy and Environmental Protection in consultation with community representatives. | |
| Environmental Justice | Environmental justice communities pursuant to section 22a-20a (“Environmental justice community” means (A) a United States census block group, |
| (EJ) Community | as determined in accordance with the most recent United States census, for which thirty per cent or more of the population consists of low income persons |
| who are not institutionalized and have an income below two hundred per cent of the federal poverty level; or (B) a distressed municipality, as defined in subsection (b) | |
| of section 32-9p (https://www.cga.ct.gov/current/pub/chap_578.htm#sec_32-9p), communities eligible for community reinvestment pursuant to section 36a-30 | |
| (https://www.cga.ct.gov/current/pub/chap_664a.htm#sec_36a-30) and the Community Reinvestment Act of 1977, 12 USC 2901 et seq. as amended from time | |
| to time, populations with increased risk and limited means to adapt to the effects of climate change. |
File details come from the government source that posted it. Updated .