Revised_Attachment_A_-_Drawings.pdf

PDF 826 KB Posted

Attached to
HVAC Replacement at Port St. John Community Center
Solicitation number
B-2-26-34
Issued by
Brevard County, Florida

About this file

Revised Attachment A - Drawings Summary

This is a mechanical drawings document prepared by TLC Engineering Solutions for the Brevard County Public Works Department on behalf of the State of Florida for HVAC replacement services at the Port St. John Community Center located at 6650 Corto Road, Cocoa, Florida 32927. The project requires demolition of four existing condensing units (CU-5, CU-6, CU-7, CU-8) and four air handling units (AHU-5, AHU-6, AHU-7, AHU-8), with installation of two new Direct Expansion split HVAC systems. The new systems include AHU-6 (1,640 CFM total with 350 CFM outside air) paired with CU-6 (5-ton cooling capacity at 60 MBH), and AHU-7 (825 CFM total with 160 CFM outside air) paired with CU-7 (3-ton cooling capacity at 36 MBH). Both systems utilize R-454B refrigerant with Trane equipment as the basis of design. The contract specifies acceptable alternatives from Carrier and Daikin, with a Pelican RT2-DC thermostat or approved alternatives for multi-room temperature averaging control. Bid questions were due by April 16, 2026, with sealed bids due by April 28, 2026 at 10:00 AM. Substantial completion is required within 240 calendar days from Notice to Proceed, with final completion within an additional 30 calendar days.

The drawings include comprehensive mechanical specifications, floor plans, enlarged details, and demolition plans prepared at scales ranging from 1/8" = 1'-0" to 1/2" = 1'-0". All pricing shall be firm and include FOB destination delivery with packing, handling, shipping, and fuel surcharges included in the bid. Standard working hours are 9:00 AM to 6:00 PM Monday through Friday, with no work permitted on County-observed holidays. Required insurance includes general liability ($1,000,000 combined single limits), auto liability ($1,000,000 limits), workers' compensation, and builders risk or installation floater insurance equal to project value. A bid bond of five percent of the proposed bid price and a public construction bond equal to 100 percent of the contract price (required for contracts exceeding $200,000) are mandated. Contractors must hold a valid Florida Class A or Class B Air Conditioning or Mechanical Contractor license and comply with the 2023 Florida Building Code. Testing and balancing must be performed by an AABC or NEBB-certified contractor within ten percent of design specifications, and temporary cooling must be provided during unit downtime.

View the file

Other files

File Type Posted
ITB_Notice_of_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Addendum_2.pdf PDF
Addendum_1.pdf PDF
Attachment_C_-_Substitution_Request_Form.pdf PDF
Attachment_B_-_General_Conditions.pdf PDF
Attachment_A_-_Drawings.pdf PDF
INV_&_SPECS_B22634.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BD

P

M

TS

SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION

-HYDRONIC REHEAT COIL

-ELECTRIC DUCT HEATER

(W/ PANEL CLEARANCE)

-FLEXIBLE CONNECTION

-ACCESS DOORS, VERTICAL OR HORIZONTAL

-INLINE CENTRIFUGAL FAN

-DOOR GRILLE

-UNDERCUT DOOR

-SPIN-IN TAKE-OFF-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE

-RECTANGLE-TO-ROUND TAKE-OFF

DNUP

-TRANSITION, SQUARE TO ROUND

UP W/IN FLOORDOWN

-CEILING EXHAUST

-CEILING RETURN

24x12

-STANDARD BRANCH TAKE-OFF

-RADIUS ELBOW

-TRANSITION, ECCENTRIC

-FLEXIBLE DUCT

-CHANGE OF ELEVATION

-DUCT ELBOW, NEGATIVE PRESSURE, RETURN

-DUCT ELBOW, EXHAUST

DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING

-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST

-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN

-TRANSITION, CONCENTRIC

-SQUARE THROAT ELBOW

W/TURNING VANES

-RECTANGULAR/ROUND BRANCH TAKE-OFF

OR ROUND/ROUND BRANCH TAKE-OFF

-SQUARE THROAT TEE

-RADIUS TEE

-SUPPLY REGISTER OR GRILLE

-RETURN/EXHAUST REGISTER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

(VERTICAL MOUNT, SIDEWALL)

-EXISTING DUCTWORK TO REMAIN

-EXISTING DUCTWORK TO BE REMOVED

(CEILING DIFFUSERS ARE 4-WAY THROW UNO)

-CEILING DIFFUSER, ROUND NECK

-CEILING DIFFUSER, RECTANGULAR OR

SQUARE NECK (CEILING DIFFUSERS

ARE 4-WAY THROW UNO)

M-1

-TEMPERATURE SENSOR

-MOTORIZED CONTROL DAMPER

-HUMIDISTAT/HUMIDITY SENSOR

-THERMOSTAT/TEMPERATURE SENSOR

-REVISION REFERENCE

-DETAIL REFERENCE: TOP-DETAIL#,

BOTTOM-DRAWING# SHOWN ON

-PRESSURE SENSOR

-DUCT SMOKE DETECTOR

-CONNECT TO EXISTING

-DEMOLISH TO POINT INDICATED

FF -FINAL FILTERS

DDC -DIRECT DIGITAL CONTROLS

PRS -PRESSURE REDUCING STATION

SP -STATIC PRESSURE

-CFM (CUBIC FEET PER MINUTE)

P -CHANGE IN PRESSURE

CV -CONSTANT AIR VOLUME

-ROOFTOP AIR HANDLING UNITRTU

RS/L -REFRIGERANT SUCTION & LIQUID LINES

CL

-OUTSIDE AIR LOUVEROAL

-VARIABLE AIR VOLUMEVAV

-SUPPLY AIRSA

-ROOFTOP HEAT PUMPRHP

-REHEAT COILRHC

-REVOLUTIONS PER MINUTERPM

-RETURN AIRRA

-POLYVINYL CHLORIDE PIPEPVC

-PSI GAUGEPSIG

-POUNDS PER SQUARE INCHPSI

-PRESSURE REDUCING VALVEPRV

-OUTSIDE AIROA

-NOT TO SCALENTS

-NORMALLY OPENNO

-NORMALLY CLOSEDNC

-LINEAR DIFFUSERLD

-LEAVING WATER TEMPERATURELWT

-LEAVING AIR TEMPERATURELAT

-GALLONS PER MINUTEGPM

-FEET PER MINUTE

-FIRE DAMPER

-FAN COIL UNIT

-ENTERING WATER TEMPERATURE

-ENTERING AIR TEMPERATURE

-DOWN

-CONDENSING UNIT

-CUBIC FEET PER MINUTE

-CHANGE IN TEMPERATURE

-COOLING TOWER

-CEILING DIFFUSER

-CENTER LINE

-BRITISH THERMAL UNIT

-BRAKE HORSEPOWER

-BOTTOM OF PIPE

-ACCESS PANEL

-ABOVE FINISHED FLOOR

FPM

FD

FCU

EWT

EAT

DN

CU

CFM

T

CT

CD

BTU

BOP

BHP

AP

AFF

-AIR HANDLING UNITAHU

MBH -THOUSAND BTUs PER HOUR

AFD -ADJUSTABLE FREQUENCY DRIVE

ESP -EXTERNAL STATIC PRESSURE

KW -KILOWATT

MCA -MINIMUM CIRCUIT AMPS

MOCP -MAXIMUM OVER CURRENT PROTECTION

UNO

TSP -TOTAL STATIC PRESSURE

-VOLTS/PHASEV/PH

VFD -VARIABLE FREQUENCY DRIVE

-UNLESS NOTED OTHERWISE

FLA -FULL LOAD AMPS-BACKDRAFT DAMPER

MOD -MOTOR OPERATED CONTROL DAMPER (MOD)

-PACKAGED TERMINAL AIR CONDITIONERPTAC

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-EXHAUST DUCT UP THROUGH SLAB W/

-EXHAUST FAN ON ROOF W/ DUCT DOWN

THROUGH ROOF

-CEILING MOUNTED ACCESS DOOR

-RECTANGULAR DUCT SECTION UP, EXHAUST

-RECTANGULAR DUCT SECTION UP,

-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,

-ROUND DUCT SECTION UP

SUPPLY OR OUTSIDE AIR

NEGATIVE PRESSURE, RETURN

FAN ON ROOF ABOVE

-ABOVE FINISHED ROOFAFR

-TERMINAL UNIT, VARIABLE/CONSTANT AIR

VOLUME WITH ELECTRIC HEAT

HVAC GENERAL NOTESHVAC ABBREVIATIONSHVAC SYMBOL LEGEND

HVAC EQUIPMENT TAGS

8"10x8

24x12

12x81

H

1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT

SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT.

3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION

STANDARD.

4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.

5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.

6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.

7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF

ALL TRADES.

8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.

9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS

REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK.

12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT

EQUIPMENT FURNISHED.

14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR

MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED

REQUIREMENTS.

17. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL

UNITS.

18. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.

19. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE

THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.

20. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS

DIRECTED BY OWNER.

21. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND

FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

22. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE

LOCATIONS.

23. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

24. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST

PLUMBING DRAIN.

25. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS

IN CHILLED WATER AND HOT WATER PIPING.

26. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.

T

UC

CFMM

FM

-MANUAL BALANCING DAMPER

-AIR FLOW MEASURING STATION

-MOTOR OPERATED CONTROL DAMPER (MOD)

-COMBINATION FIRE & SMOKE DAMPER (WITH ACCESS PANEL)

-FIRE DAMPER (WITH ACCESS PANEL)

-SMOKE DAMPER (WITH ACCESS PANEL)

200A

AHU-G-1

VTU-1-1

CTU - CONSTANT TERMINAL UNIT

VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS

VTU - VARIABLE TERMINAL UNIT

PTU - PARALLEL TERMINAL UNIT

STU - SERIES TERMINAL UNIT

-AIR HANDLING UNIT

-AIR DISTRIBUTION DEVICE

TAG

CFM

AHU NUMBER

AHU NUMBER

TERMINAL NUMBER

TERMINAL UNIT TYPE

BUILDING NUMBER

MARK

CFM

NECK SIZE DESCRIPTION

MIN MAX

FACE SIZE

LENGTH

AIR DISTRIBUTION SCHEDULE

X2

X3

EXISTING SIDEWALL SUPPLY GRILLE

EXISTING EXHAUST GRILLEX4

EXISTING RETURN GRILLE

X1 EXISTING SUPPLY DIFFUSER

B

A 1300

270135

10x8

6x6

24x24 RETURN GRILLE (BASIS OF DESIGN: TITUS 50F)

SIDEWALL SUPPLY GRILLE (BASIS OF DESIGN: TITUS 300FL)

NOTES:

1. GRILLES WERE SIZED @ NC < 20

7370 Cabot Court, Ste. 103 Melbourne, FL 32940

P 321.636.0274 www.tlc-engineers.com

© Copyright 2025 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

525109

THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF

NTS

/2

/2

:0 :3

P

M C

R e v it

L o c a ls \5

M E

P

C o rt o R o a d

C o m m u n it y C e n te r_

R jim .m u lle n K

E

D

.r v t

C O

R T

O R

O A

D C

O M

M U

N

IT

Y C

E N

T E

R B

ID

S

E T

C O

R T

O R

O A

D C

O C

O A

F

L

525109

04/20/2026

WCP

JMW

MECHANICAL

LEGEND,

ABBREVIATIONS AND

NOTES

M001

BID SET

D/X SPLIT SYSTEM INDOOR UNIT SCHEDULE

Mark MANUFACTURER MODEL

AIRFLOWS SUPPLY AIR FAN

ELECTRIC

HEATING COIL ELECTRICAL

TOT. CFM

OA

CFM

MOTOR

(HP) ESP

KW

(@208V) STAGES

VOLT /

PHASE MCA MOCP

AHU-6 TRANE 5TAMXD05AV41DA 1640 350 1 0.6 7.2 1 208/1 48 50

AHU-7 TRANE 5TAMXC03AV31DA 825 160 1/2 0.6 5.76 1 208/1 39 40

NOTES:

1. PROVIDE WITH 1" PLEATED MERV 8 FILTER.

2. PROVIDE WITH SINGLE-POINT POWER CONNECTION.

3. COORDINATE UNIT DOOR, COIL, DUCT AND DRAIN CONNECTIONS WITH EXISTING CONDITIONS AND PLANS.

4. PROVIDE PELICAN RT2-DC THERMOSTAT.

5. ACCEPTABLE ALTERNATIVES TO TRANE INCLUDE CARRIER AND DIAKIN.

6. PROVIDE VARIABLE SPEED AIR HANDLERS WITH EPOXY COATED COIL.

D/X SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT SCHEDULE

Mark MANUFACTURER MODEL

REFRIG.

TYPE

COOLING ELECTRICAL

TONS

TOT.

MBH

SENS.

MBH

AMB.

TEMP (°F)

SEER2

(MIN.)

VOLT /

PHASE

NO.

FANS

FAN FLA

(EA)

NO.

COMP.

COMP.

RLA (EA) MCA MOCP

CU-6 TRANE 5TWV0X60A R-454B 5 60 48 95 14 230/1 1 2.80 1 22.3 33 50

CU-7 TRANE 5TWV0X60A R-454B 3 36 30 95 14 208/1 1 0.64 1 14.1 19 30

NOTES:

1. PROVIDE WITH SEACOAST PROTECTIVE COATING ON CONDENSER COILS.

2. PROVIDE WITH CONDENSER COIL GUARDS.

3. PROVIDE WITH SINGLE-POINT POWER CONNECTION.

4. SIZE REFRIGERANT LINES PER MANUFACTUER'S RECOMMENDATIONS.

5. ACCEPTABLE ALTERNATIVES TO TRANE INCLUDE CARRIER AND DIAKIN.

6. PROVIDE A VARIABLE SPEED HEAT PUMP WITH WEATHERGUARD.

D/X SPLIT SYSTEM INDOOR UNIT ALTERNATE SCHEDULE

Mark MANUFACTURER MODEL

AIRFLOWS SUPPLY AIR FAN

ELECTRIC

HEATING COIL ELECTRICAL

TOT. CFM

OA

CFM

MOTOR

(HP) ESP

KW

(@208V) STAGES

VOLT /

PHASE MCA MOCP

D/X SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT ALTERNATE SCHEDULE

Mark MANUFACTURER MODEL

REFRIG.

TYPE

COOLING ELECTRICAL

TONS

TOT.

MBH

SENS.

MBH

AMB.

TEMP (°F)

SEER2

(MIN.)

VOLT /

PHASE

NO.

FANS

FAN FLA

(EA)

NO.

COMP.

COMP.

RLA (EA) MCA MOCP

CU-6 DAIKIN DC4SEA6010A R-32 5 60 48 95 14.0 208/1 1 2.60

0.95

23.9

13.4 17.8

32.4

208/1 1R-32 3 36 30 95 14.5CU-7 DAIKIN DC4SEA3610A

2.60 1 25.8 34.9 60208/1 1R-32 5 60 48 95 17.5CU-6 CARRIER 27TPA60

2.60 1 18.5 25.7 40208/1 1R-32 3 36 30 95 15.2CU-7 CARRIER 27TPA36

AHU-6 DAIKIN AMST60DU1300A

AHU-7 DAIKIN AMST36CU1300A

AHU-6 CARRIER

AHU-7 CARRIER FT5A36

3/4

1/2

1/2

7.50

6.00

208/1

208/1

52.0

43.0

3/4 0.60 7.50 2 208/1 51.6 60FT5A60

1/2 0.60 6.0 2 208/1 40.6 45

NOTES: EQUIPMENT SHOWN REPRESENTS ACCEPTABLE CARRIER AND DAIKIN ALTERNATES. SEE DX SPLIT SYSTEM OUTDOOR HEAT PUMP SCHEDULE FOR NOTES.

NOTES: EQUIPMENT SHOWN REPRESENTS ACCEPTABLE CARRIER AND DAIKIN ALTERNATES. SEE DX SPLIT SYSTEM INDOOR UNIT SCHEDULE FOR NOTES.

No. Date Description

2 2026-04-20 ADDENDUM#1

REFERENCED NOTES

DEMOLISH CU-5, 6, 7, AND 8 AND ALL ASSOCIATED REFRIGERANT PIPING AND SUPPORTS.

DEMOLISH THE EQUIPMENT PADS UNDER EACH CU UNLESS REPURPOSING FOR NEW UNITS.

EXISTING PADS MAY BE REUSED IF THEY SATISFY DETAIL M200-5 WITH NEW UNITS.

DEMOLISH AHU-5, 6, 7, AND 8 AND ALL ASSOCIATED REFRIGERANT PIPING AND CONDENSATE

PIPING. REUSE EQUIPMENT PADS AS NEEDED FOR NEW EQUIPMENT AND DEMOLISH THE REMAINING

EQUIPMENT PADS UNDER EACH AHU.

DEMOLISH THE DUCTWORK UP TO POINTS OF DEMOLITION. DEMOLISH ALL ASSOCIATED

DUCT HANGERS.

EXISTING 40X30 LOUVER AND RECTANGULAR TRANSITION TO REMAIN.

DEMOLISH EXISTING DIFFUSER. CAP DUCT BACK TO CORRIDOR-SIDE OF WALL.

1.

2.

3.

4.

5.

7370 Cabot Court, Ste. 103 Melbourne, FL 32940

P 321.636.0274 www.tlc-engineers.com

© Copyright 2025 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

525109

THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF

1/8" = 1'-0"

/2

/2

:0 :3

P

M C

R e v it

L o c a ls \5

M E

P

C o rt o R o a d

C o m m u n it y C e n te r_

R jim .m u lle n K

E

D

.r v t

C O

R T

O R

O A

D C

O M

M U

N

IT

Y C

E N

T E

R B

ID

S

E T

C O

R T

O R

O A

D C

O C

O A

F

L

525109

04/20/2026

LWA

JCM

MECHANICAL

DEMOLITION PLAN

MD101

BID SET

1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN

No. Date Description

2 2026-04-20 ADDENDUM#1

James.Monarchy Rectangle

James.Monarchy Rectangle

James.Monarchy Rectangle

PRESTAGE #2

MECH/ELECT.

STORAGE

KITCHEN

MECH/ELECT.

STORAGE

STORAGE

MECH/ELECT.

MEN

WOMEN

C O R R

ID

O R

#3 MULTIPURPOSE ROOM #3

OFFICE

MULTIPURPOSE ROOM #2

C O R R

ID

O R

WOMEN

C O

R R

ID

O

R

PREFUNCTION

LOBBY/LOUNGE

GAME ROOM

RECEPTION

STORAGE

MECH/ELECT.

PRESTAGE #1

PLATFORM STAGE

COVERED ENTRY

OFFICE

MEN

J.C.

TLT.

M

T

T

M

T T

CU-6

CU-7

AHU-6

AHU-7

X3 295

X1 140

X3 305

X3 270

X1 135

X1 135

X1 475

X1 475

X1 490

X1 135

X1 135

X1 50

X1 20

X1 65

X1 25 X1 65

X3 690

X1 130

X4 100

X4 20

X4 50

X4 100

M102

REFERENCED NOTES

ROUTE REFRIGERANT TO/FROM CU'S TO AHU'S THROUGH EXISTING WALL OPENING. SEAL OPENING

AFTER INSTALLATION, WATER TIGHT.

CONNECT TO EXISTING 40X30 OA LOUVER VIA EXISTING RECTANGULAR TRANSITION.

EXISTING 12X10 UP TO EXISTING EF-2, BALANCE EACH EXHAUST GRILL TO AIR FLOW SHOWN ON

PLANS.

EXISTING 16X18 UP TO EXISTING EF-3, BALANCE EACH EXHAUST GRILL TO AIR FLOW SHOWN ON

PLANS.

PROVIDE NEW THERMOSTAT MULTI ROOM TEMPERATURE AVERAGING CONTROL, BASIS OF DESIGN

PELICAN RT2-DC - ANY ALTERNATES MUST BE SUBMITTED TO PURCHASING FOR APPROVAL PRIOR

TO BID SUBMISSION

A PELICAN GATEWAY MUST BE USED WITH THIS REMOTE THERMOSTAT. THE

THERMOSTAT CANNOT BE CONFIGURED OR MANAGED WITHOUT THE GATEWAY. INSTALL THE

GATEWAY PRIOR TO INSTALLING THIS THERMOSTAT. PROVIDE POWER (2 AMPS, 115V/1PH).

ACCEPTABLE ALTERNATES INCLUDE: CARRIER - ECOBEE, HONEYWELL - RTH9585WF1004.

THERMOSTAT IS THE MASTER FOR THE CORRESPONDING AHU.

ROUTE CONDENSATE TO NEWLY CONSTRUCTED DRYWELL FROM AHU'S THROUGH EXISTING WALL

OPENING. SEE M200-4 FOR DETAILS.

TRANSFER GRILLE TO REMAIN.

1.

2.

3.

4.

5.

6.

7.

8.

9.

GENERAL NOTES

PROVIDE NEW AHU-6 AND 7 AND CU-6 AND 7. BALANCE AIR FLOWS TO EACH DEVICE CONNECTED

TO UNITS TO CFM'S SHOWN ON PLANS. EQUIPMENT PADS ARE TO BE INSTALLED UNDER EACH

AHU AND CU UNLESS REPURPOSING EXISTING PADS. EXISTING PADS MAY BE REPURPOSED IF

THEY PROVIDE A MINIMUM OF 4 INCHES BETWEEN THE EDGE OF NEW EQUIPMENT AND THE EDGE

OF PAD ON EACH SIDE.

1.

X4 150

X4 150

X4 100

X4 100

AHU-7

AHU-7

AHU-6

1 A 40

X3 50

B 255 10x8 RA

7370 Cabot Court, Ste. 103 Melbourne, FL 32940

P 321.636.0274 www.tlc-engineers.com

© Copyright 2025 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

525109

THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF

1/8" = 1'-0"

/2

/2

:0 :4

P

M C

R e v it

L o c a ls \5

M E

P

C o rt o R o a d

C o m m u n it y C e n te r_

R jim .m u lle n K

E

D

.r v t

C O

R T

O R

O A

D C

O M

M U

N

IT

Y C

E N

T E

R B

ID

S

E T

C O

R T

O R

O A

D C

O C

O A

F

L

525109

04/20/2026

LWA

JCM

MECHANICAL FLOOR

PLAN

M101

BID SET

1/8" = 1'-0"

MECHANICAL FLOOR PLAN

No. Date Description

CU-6

CU-7

AHU-6

AHU-7

10x14 RA10x16 SA

X1 50

M

CONNECT TO EXISTING 40X30 OA LOUVER

VIA EXISTING RECTANGULAR TRANSITION

M102 3

M102 x1

2 S A x1

2 S A x1

6 O A

10x4 OA

ROUTE REFRIGERANT TO/FROM CU'S TO AHU'S

THROUGH EXISTING WALL OPENING

M x1

4 R A

14x12 SA x1

0 R A

14x10 OA

12x14 RA x4

O A

PELICAN GATEWAY

ROUTE CONDENSATE TO NEWLY CONSTRUCTED DRYWELL FROM AHU'S

THROUGH EXISTING WALL OPENING. SEE M200-4 FOR DETAILS.

14x10 RA

A 40

TRANSFER GRILLE TO REMAIN

TRANSFER GRILLE TO REMAIN

x1

2 R A

B 255

X3 50

10x8 RA

AHU-6

x1

SA

x1

R

A x1

O

A x1

SA

AHU-7

PLENUM

x1

R

A

4x10 OA

7370 Cabot Court, Ste. 103 Melbourne, FL 32940

P 321.636.0274 www.tlc-engineers.com

© Copyright 2025 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

525109

THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF

As indicated

/2

/2

:0 :4

P

M C

R e v it

L o c a ls \5

M E

P

C o rt o R o a d

C o m m u n it y C e n te r_

R jim .m u lle n K

E

D

.r v t

C O

R T

O R

O A

D C

O M

M U

N

IT

Y C

E N

T E

R B

ID

S

E T

C O

R T

O R

O A

D C

O C

O A

F

L

525109

04/20/2026

LWA

JCM

MECHANICAL

ENLARGED FLOOR

PLAN

M102

BID SET

1/2" = 1'-0"1

MECHANICAL ENLARGED FLOOR PLAN

1/2" = 1'-0"2

AHU-6 DIAGRAM

3/4" = 1'-0"3

AHU-7 DIAGRAM

No. Date Description

GALVANIZED

STRAP

5 8

H.I.T. OR CADDY BEAM CLIP FOR APPROPRIATE

BEAM THICKNESS

PHILLIPS JS14C (BSA APPROVAL NO. 39058 SM)

OR EQUAL, OR FORCED ENTRY FASTENERS

BAND IRON HANGER PER CODE OR SMACNA

TURN UNDER WHEN DUCT IS OVER 47" WIDE

PHILLIPS J38C OR EQUAL

THREADED ROD COUPLING

THREADED ROD (SIZE AS REQUIRED, 3/8" MIN.)

SCISSOR CLAMP ON REINFORCED ROD

G.A.T. CHANNEL CLAMP SLAB FASTENER

STEEL ROD (3/8" MIN.)10

WIRE

BEYOND

METAL DECK

NOTE: PERMISSIBLE

TO ROUTE UP TO 3

LINESETS IN CONDUIT.

TO AHU COOLING COIL

CONDENSING UNIT ON CONCRETE PAD

14 GAUGE GALVANIZED STEEL ANGLE,

1" WIDE MIN., TWO MIN. PER 4'-0".

SECURE TO CONRETE PAD AND UNIT

WITH 1/4" x 1-1/2" STAINLESS STEEL

CONCRETE SCREWS OR ANCHORS.

SEAL AT WALL WITH UL LISTED EXTERIOR

GRADE HVAC SEALANT CAULK.

TEMPERATURE RANGE: 0-140 °F.

ENCLOSE REFRIGERANT LINE SET IN

LINE SET COVER, BASIS OF DESIGN:

DIVERSITECH SPEEDICHANNEL

SYSTEM. PAINT TO MATCH EXTERIOR.

INSULATION (SUCTION LINE ONLY)

FLOOR SLAB

SUPPLY DUCT

DISCONNECT

AIR HANDLING UNIT

SET UNIT ON NON-

COMBUSTIBLE PLENUM

HINGED LATCHING AHU

ACCESS DOOR

OMITTED FOR CLARITY

INSULATE REFRIGERATE

AND CONDENSATE LINES

WITH NON-COMBUSTIBLE

INSULATION

NON-COMBUSTIBLE

LINED DUCT PLENUM

PROVIDE A WATER LEVEL DEVICE TO

SHUT DOWN UNIT UPON HIGH LEVEL OF

CONDENSATE DUE TO PRIMARY DRAIN

BLOCKAGE

FILTER RACK

M OA DUCT WITH

MOTORIZED DAMPER

RA DUCT (BOTH

SIDES) WITH VOLUME

DAMPER

MOUNT REFRIGERATE

AND CONDENSATE LINES

TO FLOOR AND WALL AS

REQUIRED WITH UNISTRUT

INTERLOCK MOTORIZED DAMPER TO

OPEN WHEN CONDENSER IS

ENERGIZED ON AND CLOSE WHEN

CONDENSER IS ENERGIZED OFF

CONCRETE PAD

FINISHED GRADE

3'

0"

LARGE

GRAVEL

FILL

6" M

IN

1'

0"

CUT PIPE AT

45 DEGREES

CONDENSATE DRAIN PIPE

(MINIMUM SLOPE OF 1/4" PER FOOT)

SLIP-ON END CAP

MIN. 15" DIAMETER

CORRUGATED HDPE PIPE

1/4" Ø TAPCON

2" HURRICANE

STRAP MIN. 1 EACH

CORNER OF

CONDENSER

#12 GALVANIZED

SHEET METAL SCREW

CONDENSING

UNIT

CONDENSING UNIT PAD

NOTE: PROVIDE HURRICANE TIE DOWN STRAPS, 2" WIDE 20

GAUGE GALVANIZED (TYP OF 2). FASTEN AND ANCHOR STRAPS

TO CONCRETE PAD, USE #12 X 2" CORROSION RESISTANT

SCREWS WITH NEOPRENE WASHERS.

SIZE REFRIGERANT PIPING PER MANUFACTURER'S

INSTRUCTIONS BASED ON ACTUAL ROUTING AND # OF ELBOWS.

4" THICK CONDENSING UNIT PAD.

EXTEND 6" BEYOND FOOTPRINT

OF CONDENSING UNIT. PROVIDE #

4 REBAR 12" O.C. IN EITHER

DIRECTION.

7370 Cabot Court, Ste. 103 Melbourne, FL 32940

P 321.636.0274 www.tlc-engineers.com

© Copyright 2025 TLC Engineering Solutions, Inc.

TLC Project No.:

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

525109

THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF

As indicated

/2

/2

:0 :4

P

M C

R e v it

L o c a ls \5

M E

P

C o rt o R o a d

C o m m u n it y C e n te r_

R jim .m u lle n K

E

D

.r v t

C O

R T

O R

O A

D C

O M

M U

N

IT

Y C

E N

T E

R B

ID

S

E T

C O

R T

O R

O A

D C

O C

O A

F

L

525109

04/20/2026

WCP

JMW

MECHANICAL

DETAILS

M200

BID SET

NOT TO SCALE

METHOD OF HANGING DUCTWORK

1 NOT TO SCALE

REFRIGERANT PIPING DIAGRAM

2 NOT TO SCALE

AHU FLOOR MOUNT

NOT TO SCALE

DRYWELL DETAIL

No. Date Description

2 2026-04-20 ADDENDUM#1

1 1/2" = 1'-0"

CU PAD INSTALLATION

Sheets
M001 - MECHANICAL LEGEND, ABBREVIATIONS AND NOTES
M002 - MECHANICAL SPECIFICATIONS
M003 - MECHANICAL SPECIFICATIONS
M101 - MECHANICAL FLOOR PLAN
M102 - MECHANICAL ENLARGED FLOOR PLAN
M200 - MECHANICAL DETAILS
MD101 - MECHANICAL DEMOLITION PLAN