About this file
Revised Attachment A - Drawings Summary
This is a mechanical drawings document prepared by TLC Engineering Solutions for the Brevard County Public Works Department on behalf of the State of Florida for HVAC replacement services at the Port St. John Community Center located at 6650 Corto Road, Cocoa, Florida 32927. The project requires demolition of four existing condensing units (CU-5, CU-6, CU-7, CU-8) and four air handling units (AHU-5, AHU-6, AHU-7, AHU-8), with installation of two new Direct Expansion split HVAC systems. The new systems include AHU-6 (1,640 CFM total with 350 CFM outside air) paired with CU-6 (5-ton cooling capacity at 60 MBH), and AHU-7 (825 CFM total with 160 CFM outside air) paired with CU-7 (3-ton cooling capacity at 36 MBH). Both systems utilize R-454B refrigerant with Trane equipment as the basis of design. The contract specifies acceptable alternatives from Carrier and Daikin, with a Pelican RT2-DC thermostat or approved alternatives for multi-room temperature averaging control. Bid questions were due by April 16, 2026, with sealed bids due by April 28, 2026 at 10:00 AM. Substantial completion is required within 240 calendar days from Notice to Proceed, with final completion within an additional 30 calendar days.
The drawings include comprehensive mechanical specifications, floor plans, enlarged details, and demolition plans prepared at scales ranging from 1/8" = 1'-0" to 1/2" = 1'-0". All pricing shall be firm and include FOB destination delivery with packing, handling, shipping, and fuel surcharges included in the bid. Standard working hours are 9:00 AM to 6:00 PM Monday through Friday, with no work permitted on County-observed holidays. Required insurance includes general liability ($1,000,000 combined single limits), auto liability ($1,000,000 limits), workers' compensation, and builders risk or installation floater insurance equal to project value. A bid bond of five percent of the proposed bid price and a public construction bond equal to 100 percent of the contract price (required for contracts exceeding $200,000) are mandated. Contractors must hold a valid Florida Class A or Class B Air Conditioning or Mechanical Contractor license and comply with the 2023 Florida Building Code. Testing and balancing must be performed by an AABC or NEBB-certified contractor within ten percent of design specifications, and temporary cooling must be provided during unit downtime.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BD
P
M
TS
SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
-HYDRONIC REHEAT COIL
-ELECTRIC DUCT HEATER
(W/ PANEL CLEARANCE)
-FLEXIBLE CONNECTION
-ACCESS DOORS, VERTICAL OR HORIZONTAL
-INLINE CENTRIFUGAL FAN
-DOOR GRILLE
-UNDERCUT DOOR
-SPIN-IN TAKE-OFF-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE
-RECTANGLE-TO-ROUND TAKE-OFF
DNUP
-TRANSITION, SQUARE TO ROUND
UP W/IN FLOORDOWN
-CEILING EXHAUST
-CEILING RETURN
24x12
-STANDARD BRANCH TAKE-OFF
-RADIUS ELBOW
-TRANSITION, ECCENTRIC
-FLEXIBLE DUCT
-CHANGE OF ELEVATION
-DUCT ELBOW, NEGATIVE PRESSURE, RETURN
-DUCT ELBOW, EXHAUST
DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING
-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN
-TRANSITION, CONCENTRIC
-SQUARE THROAT ELBOW
W/TURNING VANES
-RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
-SQUARE THROAT TEE
-RADIUS TEE
-SUPPLY REGISTER OR GRILLE
-RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
(VERTICAL MOUNT, SIDEWALL)
-EXISTING DUCTWORK TO REMAIN
-EXISTING DUCTWORK TO BE REMOVED
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
-CEILING DIFFUSER, ROUND NECK
-CEILING DIFFUSER, RECTANGULAR OR
SQUARE NECK (CEILING DIFFUSERS
ARE 4-WAY THROW UNO)
M-1
-TEMPERATURE SENSOR
-MOTORIZED CONTROL DAMPER
-HUMIDISTAT/HUMIDITY SENSOR
-THERMOSTAT/TEMPERATURE SENSOR
-REVISION REFERENCE
-DETAIL REFERENCE: TOP-DETAIL#,
BOTTOM-DRAWING# SHOWN ON
-PRESSURE SENSOR
-DUCT SMOKE DETECTOR
-CONNECT TO EXISTING
-DEMOLISH TO POINT INDICATED
FF -FINAL FILTERS
DDC -DIRECT DIGITAL CONTROLS
PRS -PRESSURE REDUCING STATION
SP -STATIC PRESSURE
-CFM (CUBIC FEET PER MINUTE)
P -CHANGE IN PRESSURE
CV -CONSTANT AIR VOLUME
-ROOFTOP AIR HANDLING UNITRTU
RS/L -REFRIGERANT SUCTION & LIQUID LINES
CL
-OUTSIDE AIR LOUVEROAL
-VARIABLE AIR VOLUMEVAV
-SUPPLY AIRSA
-ROOFTOP HEAT PUMPRHP
-REHEAT COILRHC
-REVOLUTIONS PER MINUTERPM
-RETURN AIRRA
-POLYVINYL CHLORIDE PIPEPVC
-PSI GAUGEPSIG
-POUNDS PER SQUARE INCHPSI
-PRESSURE REDUCING VALVEPRV
-OUTSIDE AIROA
-NOT TO SCALENTS
-NORMALLY OPENNO
-NORMALLY CLOSEDNC
-LINEAR DIFFUSERLD
-LEAVING WATER TEMPERATURELWT
-LEAVING AIR TEMPERATURELAT
-GALLONS PER MINUTEGPM
-FEET PER MINUTE
-FIRE DAMPER
-FAN COIL UNIT
-ENTERING WATER TEMPERATURE
-ENTERING AIR TEMPERATURE
-DOWN
-CONDENSING UNIT
-CUBIC FEET PER MINUTE
-CHANGE IN TEMPERATURE
-COOLING TOWER
-CEILING DIFFUSER
-CENTER LINE
-BRITISH THERMAL UNIT
-BRAKE HORSEPOWER
-BOTTOM OF PIPE
-ACCESS PANEL
-ABOVE FINISHED FLOOR
FPM
FD
FCU
EWT
EAT
DN
CU
CFM
T
CT
CD
BTU
BOP
BHP
AP
AFF
-AIR HANDLING UNITAHU
MBH -THOUSAND BTUs PER HOUR
AFD -ADJUSTABLE FREQUENCY DRIVE
ESP -EXTERNAL STATIC PRESSURE
KW -KILOWATT
MCA -MINIMUM CIRCUIT AMPS
MOCP -MAXIMUM OVER CURRENT PROTECTION
UNO
TSP -TOTAL STATIC PRESSURE
-VOLTS/PHASEV/PH
VFD -VARIABLE FREQUENCY DRIVE
-UNLESS NOTED OTHERWISE
FLA -FULL LOAD AMPS-BACKDRAFT DAMPER
MOD -MOTOR OPERATED CONTROL DAMPER (MOD)
-PACKAGED TERMINAL AIR CONDITIONERPTAC
-SHEET NOTE CALLOUT
-SHEET NOTE CALLOUT
-SHEET NOTE CALLOUT
-EXHAUST DUCT UP THROUGH SLAB W/
-EXHAUST FAN ON ROOF W/ DUCT DOWN
THROUGH ROOF
-CEILING MOUNTED ACCESS DOOR
-RECTANGULAR DUCT SECTION UP, EXHAUST
-RECTANGULAR DUCT SECTION UP,
-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,
-ROUND DUCT SECTION UP
SUPPLY OR OUTSIDE AIR
NEGATIVE PRESSURE, RETURN
FAN ON ROOF ABOVE
-ABOVE FINISHED ROOFAFR
-TERMINAL UNIT, VARIABLE/CONSTANT AIR
VOLUME WITH ELECTRIC HEAT
HVAC GENERAL NOTESHVAC ABBREVIATIONSHVAC SYMBOL LEGEND
HVAC EQUIPMENT TAGS
8"10x8
24x12
12x81
H
1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT
SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT.
3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION
STANDARD.
4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.
5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.
7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF
ALL TRADES.
8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.
9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS
REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK.
12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT
EQUIPMENT FURNISHED.
14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR
MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED
REQUIREMENTS.
17. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL
UNITS.
18. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.
19. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE
THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.
20. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS
DIRECTED BY OWNER.
21. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND
FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
22. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE
LOCATIONS.
23. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.
24. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST
PLUMBING DRAIN.
25. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS
IN CHILLED WATER AND HOT WATER PIPING.
26. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.
T
UC
CFMM
FM
-MANUAL BALANCING DAMPER
-AIR FLOW MEASURING STATION
-MOTOR OPERATED CONTROL DAMPER (MOD)
-COMBINATION FIRE & SMOKE DAMPER (WITH ACCESS PANEL)
-FIRE DAMPER (WITH ACCESS PANEL)
-SMOKE DAMPER (WITH ACCESS PANEL)
200A
AHU-G-1
VTU-1-1
CTU - CONSTANT TERMINAL UNIT
VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS
VTU - VARIABLE TERMINAL UNIT
PTU - PARALLEL TERMINAL UNIT
STU - SERIES TERMINAL UNIT
-AIR HANDLING UNIT
-AIR DISTRIBUTION DEVICE
TAG
CFM
AHU NUMBER
AHU NUMBER
TERMINAL NUMBER
TERMINAL UNIT TYPE
BUILDING NUMBER
MARK
CFM
NECK SIZE DESCRIPTION
MIN MAX
FACE SIZE
LENGTH
AIR DISTRIBUTION SCHEDULE
X2
X3
EXISTING SIDEWALL SUPPLY GRILLE
EXISTING EXHAUST GRILLEX4
EXISTING RETURN GRILLE
X1 EXISTING SUPPLY DIFFUSER
B
A 1300
270135
10x8
6x6
24x24 RETURN GRILLE (BASIS OF DESIGN: TITUS 50F)
SIDEWALL SUPPLY GRILLE (BASIS OF DESIGN: TITUS 300FL)
NOTES:
1. GRILLES WERE SIZED @ NC < 20
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
525109
THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF
NTS
/2
/2
:0 :3
P
M C
R e v it
L o c a ls \5
M E
P
C o rt o R o a d
C o m m u n it y C e n te r_
R jim .m u lle n K
E
D
.r v t
C O
R T
O R
O A
D C
O M
M U
N
IT
Y C
E N
T E
R B
ID
S
E T
C O
R T
O R
O A
D C
O C
O A
F
L
525109
04/20/2026
WCP
JMW
MECHANICAL
LEGEND,
ABBREVIATIONS AND
NOTES
M001
BID SET
D/X SPLIT SYSTEM INDOOR UNIT SCHEDULE
Mark MANUFACTURER MODEL
AIRFLOWS SUPPLY AIR FAN
ELECTRIC
HEATING COIL ELECTRICAL
TOT. CFM
OA
CFM
MOTOR
(HP) ESP
KW
(@208V) STAGES
VOLT /
PHASE MCA MOCP
AHU-6 TRANE 5TAMXD05AV41DA 1640 350 1 0.6 7.2 1 208/1 48 50
AHU-7 TRANE 5TAMXC03AV31DA 825 160 1/2 0.6 5.76 1 208/1 39 40
NOTES:
1. PROVIDE WITH 1" PLEATED MERV 8 FILTER.
2. PROVIDE WITH SINGLE-POINT POWER CONNECTION.
3. COORDINATE UNIT DOOR, COIL, DUCT AND DRAIN CONNECTIONS WITH EXISTING CONDITIONS AND PLANS.
4. PROVIDE PELICAN RT2-DC THERMOSTAT.
5. ACCEPTABLE ALTERNATIVES TO TRANE INCLUDE CARRIER AND DIAKIN.
6. PROVIDE VARIABLE SPEED AIR HANDLERS WITH EPOXY COATED COIL.
D/X SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT SCHEDULE
Mark MANUFACTURER MODEL
REFRIG.
TYPE
COOLING ELECTRICAL
TONS
TOT.
MBH
SENS.
MBH
AMB.
TEMP (°F)
SEER2
(MIN.)
VOLT /
PHASE
NO.
FANS
FAN FLA
(EA)
NO.
COMP.
COMP.
RLA (EA) MCA MOCP
CU-6 TRANE 5TWV0X60A R-454B 5 60 48 95 14 230/1 1 2.80 1 22.3 33 50
CU-7 TRANE 5TWV0X60A R-454B 3 36 30 95 14 208/1 1 0.64 1 14.1 19 30
NOTES:
1. PROVIDE WITH SEACOAST PROTECTIVE COATING ON CONDENSER COILS.
2. PROVIDE WITH CONDENSER COIL GUARDS.
3. PROVIDE WITH SINGLE-POINT POWER CONNECTION.
4. SIZE REFRIGERANT LINES PER MANUFACTUER'S RECOMMENDATIONS.
5. ACCEPTABLE ALTERNATIVES TO TRANE INCLUDE CARRIER AND DIAKIN.
6. PROVIDE A VARIABLE SPEED HEAT PUMP WITH WEATHERGUARD.
D/X SPLIT SYSTEM INDOOR UNIT ALTERNATE SCHEDULE
Mark MANUFACTURER MODEL
AIRFLOWS SUPPLY AIR FAN
ELECTRIC
HEATING COIL ELECTRICAL
TOT. CFM
OA
CFM
MOTOR
(HP) ESP
KW
(@208V) STAGES
VOLT /
PHASE MCA MOCP
D/X SPLIT SYSTEM OUTDOOR HEAT PUMP UNIT ALTERNATE SCHEDULE
Mark MANUFACTURER MODEL
REFRIG.
TYPE
COOLING ELECTRICAL
TONS
TOT.
MBH
SENS.
MBH
AMB.
TEMP (°F)
SEER2
(MIN.)
VOLT /
PHASE
NO.
FANS
FAN FLA
(EA)
NO.
COMP.
COMP.
RLA (EA) MCA MOCP
CU-6 DAIKIN DC4SEA6010A R-32 5 60 48 95 14.0 208/1 1 2.60
0.95
23.9
13.4 17.8
32.4
208/1 1R-32 3 36 30 95 14.5CU-7 DAIKIN DC4SEA3610A
2.60 1 25.8 34.9 60208/1 1R-32 5 60 48 95 17.5CU-6 CARRIER 27TPA60
2.60 1 18.5 25.7 40208/1 1R-32 3 36 30 95 15.2CU-7 CARRIER 27TPA36
AHU-6 DAIKIN AMST60DU1300A
AHU-7 DAIKIN AMST36CU1300A
AHU-6 CARRIER
AHU-7 CARRIER FT5A36
3/4
1/2
1/2
7.50
6.00
208/1
208/1
52.0
43.0
3/4 0.60 7.50 2 208/1 51.6 60FT5A60
1/2 0.60 6.0 2 208/1 40.6 45
NOTES: EQUIPMENT SHOWN REPRESENTS ACCEPTABLE CARRIER AND DAIKIN ALTERNATES. SEE DX SPLIT SYSTEM OUTDOOR HEAT PUMP SCHEDULE FOR NOTES.
NOTES: EQUIPMENT SHOWN REPRESENTS ACCEPTABLE CARRIER AND DAIKIN ALTERNATES. SEE DX SPLIT SYSTEM INDOOR UNIT SCHEDULE FOR NOTES.
No. Date Description
2 2026-04-20 ADDENDUM#1
REFERENCED NOTES
DEMOLISH CU-5, 6, 7, AND 8 AND ALL ASSOCIATED REFRIGERANT PIPING AND SUPPORTS.
DEMOLISH THE EQUIPMENT PADS UNDER EACH CU UNLESS REPURPOSING FOR NEW UNITS.
EXISTING PADS MAY BE REUSED IF THEY SATISFY DETAIL M200-5 WITH NEW UNITS.
DEMOLISH AHU-5, 6, 7, AND 8 AND ALL ASSOCIATED REFRIGERANT PIPING AND CONDENSATE
PIPING. REUSE EQUIPMENT PADS AS NEEDED FOR NEW EQUIPMENT AND DEMOLISH THE REMAINING
EQUIPMENT PADS UNDER EACH AHU.
DEMOLISH THE DUCTWORK UP TO POINTS OF DEMOLITION. DEMOLISH ALL ASSOCIATED
DUCT HANGERS.
EXISTING 40X30 LOUVER AND RECTANGULAR TRANSITION TO REMAIN.
DEMOLISH EXISTING DIFFUSER. CAP DUCT BACK TO CORRIDOR-SIDE OF WALL.
1.
2.
3.
4.
5.
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
525109
THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF
1/8" = 1'-0"
/2
/2
:0 :3
P
M C
R e v it
L o c a ls \5
M E
P
C o rt o R o a d
C o m m u n it y C e n te r_
R jim .m u lle n K
E
D
.r v t
C O
R T
O R
O A
D C
O M
M U
N
IT
Y C
E N
T E
R B
ID
S
E T
C O
R T
O R
O A
D C
O C
O A
F
L
525109
04/20/2026
LWA
JCM
MECHANICAL
DEMOLITION PLAN
MD101
BID SET
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN
No. Date Description
2 2026-04-20 ADDENDUM#1
James.Monarchy Rectangle
James.Monarchy Rectangle
James.Monarchy Rectangle
PRESTAGE #2
MECH/ELECT.
STORAGE
KITCHEN
MECH/ELECT.
STORAGE
STORAGE
MECH/ELECT.
MEN
WOMEN
C O R R
ID
O R
#3 MULTIPURPOSE ROOM #3
OFFICE
MULTIPURPOSE ROOM #2
C O R R
ID
O R
WOMEN
C O
R R
ID
O
R
PREFUNCTION
LOBBY/LOUNGE
GAME ROOM
RECEPTION
STORAGE
MECH/ELECT.
PRESTAGE #1
PLATFORM STAGE
COVERED ENTRY
OFFICE
MEN
J.C.
TLT.
M
T
T
M
T T
CU-6
CU-7
AHU-6
AHU-7
X3 295
X1 140
X3 305
X3 270
X1 135
X1 135
X1 475
X1 475
X1 490
X1 135
X1 135
X1 50
X1 20
X1 65
X1 25 X1 65
X3 690
X1 130
X4 100
X4 20
X4 50
X4 100
M102
REFERENCED NOTES
ROUTE REFRIGERANT TO/FROM CU'S TO AHU'S THROUGH EXISTING WALL OPENING. SEAL OPENING
AFTER INSTALLATION, WATER TIGHT.
CONNECT TO EXISTING 40X30 OA LOUVER VIA EXISTING RECTANGULAR TRANSITION.
EXISTING 12X10 UP TO EXISTING EF-2, BALANCE EACH EXHAUST GRILL TO AIR FLOW SHOWN ON
PLANS.
EXISTING 16X18 UP TO EXISTING EF-3, BALANCE EACH EXHAUST GRILL TO AIR FLOW SHOWN ON
PLANS.
PROVIDE NEW THERMOSTAT MULTI ROOM TEMPERATURE AVERAGING CONTROL, BASIS OF DESIGN
PELICAN RT2-DC - ANY ALTERNATES MUST BE SUBMITTED TO PURCHASING FOR APPROVAL PRIOR
TO BID SUBMISSION
A PELICAN GATEWAY MUST BE USED WITH THIS REMOTE THERMOSTAT. THE
THERMOSTAT CANNOT BE CONFIGURED OR MANAGED WITHOUT THE GATEWAY. INSTALL THE
GATEWAY PRIOR TO INSTALLING THIS THERMOSTAT. PROVIDE POWER (2 AMPS, 115V/1PH).
ACCEPTABLE ALTERNATES INCLUDE: CARRIER - ECOBEE, HONEYWELL - RTH9585WF1004.
THERMOSTAT IS THE MASTER FOR THE CORRESPONDING AHU.
ROUTE CONDENSATE TO NEWLY CONSTRUCTED DRYWELL FROM AHU'S THROUGH EXISTING WALL
OPENING. SEE M200-4 FOR DETAILS.
TRANSFER GRILLE TO REMAIN.
1.
2.
3.
4.
5.
6.
7.
8.
9.
GENERAL NOTES
PROVIDE NEW AHU-6 AND 7 AND CU-6 AND 7. BALANCE AIR FLOWS TO EACH DEVICE CONNECTED
TO UNITS TO CFM'S SHOWN ON PLANS. EQUIPMENT PADS ARE TO BE INSTALLED UNDER EACH
AHU AND CU UNLESS REPURPOSING EXISTING PADS. EXISTING PADS MAY BE REPURPOSED IF
THEY PROVIDE A MINIMUM OF 4 INCHES BETWEEN THE EDGE OF NEW EQUIPMENT AND THE EDGE
OF PAD ON EACH SIDE.
1.
X4 150
X4 150
X4 100
X4 100
AHU-7
AHU-7
AHU-6
1 A 40
X3 50
B 255 10x8 RA
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
525109
THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF
1/8" = 1'-0"
/2
/2
:0 :4
P
M C
R e v it
L o c a ls \5
M E
P
C o rt o R o a d
C o m m u n it y C e n te r_
R jim .m u lle n K
E
D
.r v t
C O
R T
O R
O A
D C
O M
M U
N
IT
Y C
E N
T E
R B
ID
S
E T
C O
R T
O R
O A
D C
O C
O A
F
L
525109
04/20/2026
LWA
JCM
MECHANICAL FLOOR
PLAN
M101
BID SET
1/8" = 1'-0"
MECHANICAL FLOOR PLAN
No. Date Description
CU-6
CU-7
AHU-6
AHU-7
10x14 RA10x16 SA
X1 50
M
CONNECT TO EXISTING 40X30 OA LOUVER
VIA EXISTING RECTANGULAR TRANSITION
M102 3
M102 x1
2 S A x1
2 S A x1
6 O A
10x4 OA
ROUTE REFRIGERANT TO/FROM CU'S TO AHU'S
THROUGH EXISTING WALL OPENING
M x1
4 R A
14x12 SA x1
0 R A
14x10 OA
12x14 RA x4
O A
PELICAN GATEWAY
ROUTE CONDENSATE TO NEWLY CONSTRUCTED DRYWELL FROM AHU'S
THROUGH EXISTING WALL OPENING. SEE M200-4 FOR DETAILS.
14x10 RA
A 40
TRANSFER GRILLE TO REMAIN
TRANSFER GRILLE TO REMAIN
x1
2 R A
B 255
X3 50
10x8 RA
AHU-6
x1
SA
x1
R
A x1
O
A x1
SA
AHU-7
PLENUM
x1
R
A
4x10 OA
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
525109
THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF
As indicated
/2
/2
:0 :4
P
M C
R e v it
L o c a ls \5
M E
P
C o rt o R o a d
C o m m u n it y C e n te r_
R jim .m u lle n K
E
D
.r v t
C O
R T
O R
O A
D C
O M
M U
N
IT
Y C
E N
T E
R B
ID
S
E T
C O
R T
O R
O A
D C
O C
O A
F
L
525109
04/20/2026
LWA
JCM
MECHANICAL
ENLARGED FLOOR
PLAN
M102
BID SET
1/2" = 1'-0"1
MECHANICAL ENLARGED FLOOR PLAN
1/2" = 1'-0"2
AHU-6 DIAGRAM
3/4" = 1'-0"3
AHU-7 DIAGRAM
No. Date Description
GALVANIZED
STRAP
5 8
H.I.T. OR CADDY BEAM CLIP FOR APPROPRIATE
BEAM THICKNESS
PHILLIPS JS14C (BSA APPROVAL NO. 39058 SM)
OR EQUAL, OR FORCED ENTRY FASTENERS
BAND IRON HANGER PER CODE OR SMACNA
TURN UNDER WHEN DUCT IS OVER 47" WIDE
PHILLIPS J38C OR EQUAL
THREADED ROD COUPLING
THREADED ROD (SIZE AS REQUIRED, 3/8" MIN.)
SCISSOR CLAMP ON REINFORCED ROD
G.A.T. CHANNEL CLAMP SLAB FASTENER
STEEL ROD (3/8" MIN.)10
WIRE
BEYOND
METAL DECK
NOTE: PERMISSIBLE
TO ROUTE UP TO 3
LINESETS IN CONDUIT.
TO AHU COOLING COIL
CONDENSING UNIT ON CONCRETE PAD
14 GAUGE GALVANIZED STEEL ANGLE,
1" WIDE MIN., TWO MIN. PER 4'-0".
SECURE TO CONRETE PAD AND UNIT
WITH 1/4" x 1-1/2" STAINLESS STEEL
CONCRETE SCREWS OR ANCHORS.
SEAL AT WALL WITH UL LISTED EXTERIOR
GRADE HVAC SEALANT CAULK.
TEMPERATURE RANGE: 0-140 °F.
ENCLOSE REFRIGERANT LINE SET IN
LINE SET COVER, BASIS OF DESIGN:
DIVERSITECH SPEEDICHANNEL
SYSTEM. PAINT TO MATCH EXTERIOR.
INSULATION (SUCTION LINE ONLY)
FLOOR SLAB
SUPPLY DUCT
DISCONNECT
AIR HANDLING UNIT
SET UNIT ON NON-
COMBUSTIBLE PLENUM
HINGED LATCHING AHU
ACCESS DOOR
OMITTED FOR CLARITY
INSULATE REFRIGERATE
AND CONDENSATE LINES
WITH NON-COMBUSTIBLE
INSULATION
NON-COMBUSTIBLE
LINED DUCT PLENUM
PROVIDE A WATER LEVEL DEVICE TO
SHUT DOWN UNIT UPON HIGH LEVEL OF
CONDENSATE DUE TO PRIMARY DRAIN
BLOCKAGE
FILTER RACK
M OA DUCT WITH
MOTORIZED DAMPER
RA DUCT (BOTH
SIDES) WITH VOLUME
DAMPER
MOUNT REFRIGERATE
AND CONDENSATE LINES
TO FLOOR AND WALL AS
REQUIRED WITH UNISTRUT
INTERLOCK MOTORIZED DAMPER TO
OPEN WHEN CONDENSER IS
ENERGIZED ON AND CLOSE WHEN
CONDENSER IS ENERGIZED OFF
CONCRETE PAD
FINISHED GRADE
3'
0"
LARGE
GRAVEL
FILL
6" M
IN
1'
0"
CUT PIPE AT
45 DEGREES
CONDENSATE DRAIN PIPE
(MINIMUM SLOPE OF 1/4" PER FOOT)
SLIP-ON END CAP
MIN. 15" DIAMETER
CORRUGATED HDPE PIPE
1/4" Ø TAPCON
2" HURRICANE
STRAP MIN. 1 EACH
CORNER OF
CONDENSER
#12 GALVANIZED
SHEET METAL SCREW
CONDENSING
UNIT
CONDENSING UNIT PAD
NOTE: PROVIDE HURRICANE TIE DOWN STRAPS, 2" WIDE 20
GAUGE GALVANIZED (TYP OF 2). FASTEN AND ANCHOR STRAPS
TO CONCRETE PAD, USE #12 X 2" CORROSION RESISTANT
SCREWS WITH NEOPRENE WASHERS.
SIZE REFRIGERANT PIPING PER MANUFACTURER'S
INSTRUCTIONS BASED ON ACTUAL ROUTING AND # OF ELBOWS.
4" THICK CONDENSING UNIT PAD.
EXTEND 6" BEYOND FOOTPRINT
OF CONDENSING UNIT. PROVIDE #
4 REBAR 12" O.C. IN EITHER
DIRECTION.
7370 Cabot Court, Ste. 103 Melbourne, FL 32940
P 321.636.0274 www.tlc-engineers.com
© Copyright 2025 TLC Engineering Solutions, Inc.
TLC Project No.:
COA 15
Seal
Drawing No.:
Scale:
Revisions:
Drawing Title:
Approved By:
Issue Date:
Project No.:
Drawn By:
Consultants:
525109
THIS DRAWING IS BEING RELEASED FOR THE PURPOSE OF
As indicated
/2
/2
:0 :4
P
M C
R e v it
L o c a ls \5
M E
P
C o rt o R o a d
C o m m u n it y C e n te r_
R jim .m u lle n K
E
D
.r v t
C O
R T
O R
O A
D C
O M
M U
N
IT
Y C
E N
T E
R B
ID
S
E T
C O
R T
O R
O A
D C
O C
O A
F
L
525109
04/20/2026
WCP
JMW
MECHANICAL
DETAILS
M200
BID SET
NOT TO SCALE
METHOD OF HANGING DUCTWORK
1 NOT TO SCALE
REFRIGERANT PIPING DIAGRAM
2 NOT TO SCALE
AHU FLOOR MOUNT
NOT TO SCALE
DRYWELL DETAIL
No. Date Description
2 2026-04-20 ADDENDUM#1
1 1/2" = 1'-0"
CU PAD INSTALLATION
| Sheets |
| M001 - MECHANICAL LEGEND, ABBREVIATIONS AND NOTES |
| M002 - MECHANICAL SPECIFICATIONS |
| M003 - MECHANICAL SPECIFICATIONS |
| M101 - MECHANICAL FLOOR PLAN |
| M102 - MECHANICAL ENLARGED FLOOR PLAN |
| M200 - MECHANICAL DETAILS |
| MD101 - MECHANICAL DEMOLITION PLAN |