This addendum is issued by Brevard County Public Works Department, Purchasing Services, for the HVAC Replacement project at Port St. John Community Center (Bid B-2-26-34), dated May 1, 2026. Addendum 2 clarifies design specifications and technical requirements in response to bidder questions and provides revised drawing sheets. Key clarifications include confirmation that no new exhaust fans will be provided by the contractor; existing ductwork will be rebalanced to CFM values per plan specifications. The storage room ceiling is confirmed as 2' x 2' lay-in acoustic ceiling tile. Equipment pads are required under each air handling unit (AHU) and condensing unit (CU), with options to repurpose existing pads if they meet minimum clearance of 4 inches on each side and satisfy detail M200-5 requirements. The fire alarm system is monitored by World Electronics, and the contractor shall adhere to all applicable regulations. Revised drawing sheets dated April 20, 2026 are incorporated (M001, MD101, M101, M102, M200), and the basis of design for HVAC controls is specified as Pelican RT2-DC. Bidders are required to acknowledge receipt of this addendum with their bid submission.

The contractor is responsible for paying the Application Processing Fee required for permitting with Brevard County. All other terms and conditions from the original bid package remain unchanged. No specific pricing terms, set-asides, incumbent information, or funding sources are detailed in this addendum document, as it serves primarily to clarify technical specifications and incorporate revised design drawings for prospective bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchasing Services 2725 Judge Fran Jamieson Way

Building C, Room 303 Viera, Florida 32940

HVAC Replacement at Port St. John Community Center

B-2-26-34 May 1, 2026

ADDENDUM 2

TO ALL PROSPECTIVE BIDDERS

This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 2 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.

1. CLARIFICATION TO QUESTIONS RECEIVED:

Question 1: M101, Reference Notes 3 & 4 mention new exhaust fans. Are these fans that are to be provided by the contractor and are to be installed as part of the scope, or already existing fans and the note is simply for T&B to be done on these fans?

Answer 1: There will not be new exhaust fans. The existing ductwork running to each existing exhaust fan will need to be rebalanced to the CFM values shown on the plans on detail 1/M102 on Revised Drawing Sheet M101.

Question 2: Is the ceiling in the storage room adjacent to the mechanical room lay-in or hard ceiling?

Answer 2: The ceiling is a 2’ x 2’ lay-in Acoustic Ceiling Tile.

Question 3: M101, General Note 1 states that, “Equipment pads to be installed under each AHU and CU.” M200, Detail 3 does not show an equipment pad under the AHU. Please confirm whether or not equipment pads are to be installed for the AHUs.

Answer 3: Please see Revised Attachment A - Drawings. Equipment pads are to be installed under each AHU and CU unless repurposing existing pads. Existing pads may be repurposed if they provide a minimum of 4 inches between the edge of new equipment and the edge of pad on each side and meet the requirements of detail M200-5.

Question 4: M200, Detail 2 shows the CUs sitting on a reinforced concrete pad, “Basis of Design:

Hurricane Pad.” M002, Section W. Concrete Pads describe poured concrete being used for the pads, rather than prefabricated hurricane pads. Please confirm whether prefabricated or poured concrete pads should be used for the CUs.

Answer 4: Please see response to Question 3.

Question 5: What is the existing Fire Alarm system for this building? Is there a preferred Fire Alarm vendor? If so, what is their contact information?

Answer 5: The fire alarm is monitored by World Electronics. Paul Chinaris paulchinaris@gmail.com The scope of work is not anticipated to require modifications to the fire alarm system; however, the Contractor is to adhere to all local, state, and federal regulations.

2. Added Revised Drawing Sheets, dated April 20, 2026, as follows:

• M001

• MD101

• M101

• M102

• M200

3. Additional information - The X4 is the existing exhaust grill. X1 is the existing supply diffuser.

*** Please Note: The Basis of Design for the HVAC controls is Pelican RT2-DC.

The Contractor shall pay the Application Processing Fee required for permitting with Brevard County.

***All other terms and conditions remain unchanged.