Resturant_Renovations_Addendum__2.pdf
PDF 65 KB Posted
- Solicitation number
- Event 32701-13834
- Issued by
- Carter County, Tennessee
About this file
This is Addendum #2 to the scope of work for restaurant building renovations at Roan Mountain State Park issued by the Tennessee Department of Environment and Conservation. The addendum modifies specific work requirements across multiple building systems and components. Key changes include removal of the existing ADA ramp and installation of a 4-foot wide set of steps with pressure-treated pine lumber to match existing cabin steps; removal of asphalt walkway and installation of a 5-foot wide concrete ADA ramp approximately 45 feet in length with minimum 5-inch thickness, 4,000 psi concrete, galvanized cattle panels, 12-inch turndown with two ½-inch rebar, and 5-foot saw crack joints; installation of a 42-inch high steel ADA railing with handrail meeting all ADA requirements; installation of 6-inch guttering with aluminum leaf guards; removal of the screened rear entrance wall without replacement; installation of new LED exterior lights; installation of a new HVAC split system with minimum SEER 15 rating and two thermostats; installation of new drop ceiling grid and rear restroom drop ceiling; installation of new exit lights at all exits; and installation of ⅝-inch plywood on the closet ceiling with primer and two-coat paint application. The addendum also clarifies that references to HVAC vents in the gathering room should be disregarded, with only non-HVAC connected vents removed, and specifies that flashing around the raised roof vent area shall match the siding color.
The addendum does not address pricing, bonding, insurance requirements, or bid response deadlines, as these are covered in the primary solicitation documents. The modifications represent significant changes to structural elements, accessibility compliance features, mechanical systems, and interior finishing work that contractors must incorporate into their project estimates and schedules. All work remains subject to the general specifications outlined in the primary scope of work, including material brand requirements, contractor licensing verification, workmanship warranty of not less than one year, and project completion within 90 days of contract receipt.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
** ADDENDUM HIGHLIGHTED **
OLD RESTURANT BUILDING RENOVATIONS ADDENDUM #2
ROAN MOUNTAIN STATE PARK
1015 HIGHWAY 143
ROAN MOUNTAIN, TN 37687
GENERAL SCOPE OF WORK
6. RAISED ROOF VENT AREA
D. The Contractor shall remove the existing siding on the front side of the vents.
If the vent louvers are in good condition, it shall be the same as 6.- A., B., and C. If vent louvers are bad then the Contractor shall install siding, the same as #3-Siding and Paint.
7. STEPS, PORCH DECKING, ADA RAMP AND RAILINGS
F. Will change to--The Contractor shall remove the existing ADA ramp and install a 4-feet wide set of steps to match the existing steps on the cabins with pressure treated pine lumber.
K. The Contractor shall remove the existing asphalt walkway on the right side of the porch, from the porch to the existing parking area for an ADA ramp. The Contractor shall saw the asphalt at a designated point on the walkway before removing the existing asphalt.
L. The Contractor shall form and pour a 5-feet wide concrete ADA ramp where the asphalt was removed from the parking area to the front porch (approximately 45-foot in length). The concrete shall be a minimum of 5-inches thick and 4,000 psi. The Contractor shall install galvanized cattle panels in the concrete walkway from end to end. The turn down on the front side of the walkway shall be a minimum of 12 -inches thick at the bottom with two 1/2-inch rebar. The rebar shall run horizontally with one
3-inches from the bottom and one between the bottom rebar and the top of the walkway. The Contractor shall saw crack joints 5-feet on centers.
M. The Contractor shall install a steel ADA railing 42-inches high with an ADA handrail (ADA railing and handrail shall meet all ADA requirements). The handrail shall be installed in the concrete with epoxy. The Contractor shall apply one coat of metal primer and two coats of paint to match the new siding with the same specifications.
9. ROOF SHINGLE REPLACEMENT
J. The Contractor shall install flashing around the bottom of the raised roof vent area and the color shall match the siding color.
20. DROP CEILINGS, LIGHTS AND HVAC VENTS
F. The Contractor shall disregard any references to HVAC vents but remove existing vents in the gathering room not connected with HVAC.
G. The Contractor shall remove the existing gathering room drop ceiling grid and install a new drop ceiling grid the same as existing.
H. The Contractor shall install a new drop ceiling in the rear restrooms the same as the other rooms.
24. GUTTERING AND DOWN SPOUTS
A. The Contractor shall install 6-inch guttering, down spouts and leaf guards around all fascia boards on the bottom area but does not include the raised roof vent area.
The leaf guards shall be aluminum with holes.
25. EXTERIOR LIGHTS
A. The Contractor shall remove all existing exterior lights and install new LED exterior lights the same as existing.
26. REAR SCREEN AREA
A. The Contractor shall remove the screened wall at the rear entrance door before installing siding, and do not replace.
27. HVAC
A. The Contractor shall install a new HVAC split system. (It is possible it could take two separate systems.)
B. The HVAC system shall be sized as necessary by an HVAC company and shall have a minimum seer of 15.
C. The Contractor shall install two thermostats, one in the gathering room and one in the kitchen area.
D. The HVAC vents shall be installed in the drop ceilings as necessary in all rooms.
28. KITCHEN AREA CLOSET
A. The Contractor shall install BC ½-inch plywood on the ceiling in the newly framed closet.
B. The Contractor shall apply one coat of bonding primer-sealer and two coats of paint. The Contractor shall caulk as necessary before painting.
29. EXIT LIGHTS
A. The Contractor shall install new exit lights at all exits.
| ** ADDENDUM HIGHLIGHTED ** |
| OLD RESTURANT BUILDING RENOVATIONS ADDENDUM #2 |