This is a Responses to Questions document issued by the Georgia Department of Transportation (GDOT) for RFQ-484-08152022, an on-call geotechnical drilling services solicitation. The solicitation seeks qualified firms to provide geotechnical and environmental drilling services including bridge foundation drilling and sampling, soil survey drilling and sampling, wall foundation drilling and sampling, and environmental drilling and sampling. GDOT will establish open agency contracts with awarded vendors to be utilized as jobs and needs are identified by the Department. The awarded contracts shall be effective for up to five years and will include options for price increases and/or decreases at specified intervals. A virtual optional pre-bid meeting was held on July 28, 2022 at 10:00 AM. The RFX was initially posted to the internet on July 15, 2022, with the issuing officer identified as Trina E. Williams of GDOT.
The document addresses four key supplier questions regarding prequalification requirements, deliverables, surveying standards, and billing procedures. Respondents must include team members prequalified in both Foundation Drilling and Environmental Drilling Geotechnical Services Classes, though unqualified subcontractors may work under a prequalified prime contractor's supervision with the prime held fully accountable for work product. Typed boring logs are required deliverables. Surveyed elevations must follow GDOT's Foundation Drilling and Sampling Guidelines, which may require engagement of a Georgia registered land surveyor if no benchmark is available. Private utility locate services must be added as a separate line item in the mobilization and traffic control section of the bid menu. A restriction of communication is in effect from the advertisement date until a successful respondent is selected, prohibiting respondents from communicating with GDOT staff except for submitting questions as instructed.
Text of this file
Revised 02/11/11 SPD-SPR004
Supplier Q & A Template
RFX Number: RFQ-484-08152022 RFX Title: On-Call Geotechnical Drilling
Requesting State Entity: Ga. Dept. of Transportation
Date: April 25, 2022
Issuing Officer: Trina E. Williams RFX Initially Posted to Internet: July 15, eMail Address: TrWilliams@dot.ga.gov Telephone: 404.631.1301
The purpose of this document is to provide answers to supplier questions.
Please see Questions and Answers included herein.
Note: This document is intended for informational purposes only. Any changes to the RFX must occur through a published addendum (or through publication of a new version of the RFX in Team Georgia Marketplace™). If multiple Q & A documents are posted, the most recent Q & A shall govern in the event of a conflict.
QUESTIONS AND ANSWERS
# Questions Referenced RFX Section
Answers
1.
Exhibit I, Section II (Required
Prequalification Service Classes), indicates the Team is comprised of the Prime Contractor and their Sub-contractor(s) and that either the
Prime or Sub-contractor must include team members which are prequalified in both Foundation
Drilling and Environmental Drilling
Geotechnical Services Classes.
However, a little further down in
Exhibit I in paragraph B, #9, it says we are to furnish qualified drillers.
Can you clarify what a “qualified driller” is and provide clarification if a sub-contracted driller can perform their work under the Service Class pre-qualification of the Prime?
Exhibit I, Section II
(Required
Prequalification
Service Classes), The requirements for pre-qualified firms for foundation drilling services and environmental drilling are defined in GDOT’s geotechnical specialty services prequalification application which can be found at:
https://www.dot.ga.gov/PartnerSmart/
Business/Prequalification/Documents/
SpecialityServices/GeotechApp.pdf
Yes, an unqualified subcontractor can work under the prequalification of the prime if the prequalified prime provides the appropriate supervision while the unqualified subcontractor is performing the work. The prime will be held accountable for the work product and will be required to facilitate any required corrections as a result of any errors/omissions/mistakes by the unqualified subcontractor without any
Revised 02/11/11 SPD-SPR004
# Questions Referenced RFX Section
Answers additional compensation from the
Department.
2.
Are typed boring logs required as part of the deliverables (when drilling or hand augers are performed)?
Yes, typed boring logs will be required.
3.
The RFQ notes that “accurate surveyed elevations” are required. What is the required accuracy of surveyed locations for boring elevation and location? Is a survey of boring locations (SPT or hand augers) required by a Registered Land Surveyor?
Refer to the language shown in
GDOT’s Foundation Drilling and
Sampling Guidelines which state:
“Obtain the ground elevations at each boring by using the benchmark shown on the preliminary layout. If there is no benchmark shown, obtain a survey control package from the GDOT
Statewide Location Bureau in the
Office of Design Policy and Support.
If that is not available, have a Georgia registered land surveyor create a benchmark from which you can determine ground elevations at each boring.”
4. Will private utility locate services be added to the menu of services/costs or will that cost be considered during the mobilization and traffic control portions of the bid?
The drilling firm needs to add this as a separate line item in the mobilization and traffic control section of the menu of services at the time of the bid.
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .