Exhibit VII Menu of Services

266 KB Posted

Attached to
On-Call Geotechnical Drilling Services
Solicitation number
RFQ-484-08152022
Issued by
Georgia

About this file

This document is a cost proposal and menu of services for on-call geotechnical and environmental drilling services solicited by the Georgia Department of Transportation (GDOT). The scope includes bridge foundation drilling and sampling, soil survey drilling and sampling, wall foundation drilling and sampling, and environmental drilling and sampling services. The contract will be established as an open agency agreement to be utilized for up to five years as jobs and needs are identified by the Department. The menu of services includes numerous drilling activities such as auger borings, standard penetration test (SPT) borings at various depths, rock coring, piezometer installation, and monitoring well work. Laboratory services requested encompass USCS tests, triaxial shear testing, consolidation testing, natural moisture content analysis, organic content analysis, and corrosivity series testing. Additional services include site restoration, traffic control, erosion control, water hauling, and specialized drilling equipment rental. Miscellaneous services such as travel, dozer work, equipment rental, and per diem are also specified.

The cost proposal document presents pricing schedules showing detailed unit rates and extended costs for a five-year period, with example calculations demonstrating total costs of approximately $10.9 million. Bidders are required to provide unit rates for all line items in the menu of services, with the instruction that leaving line items blank or at $0.00 may result in bid rejection. The contract includes provisions for price increases and decreases at specified intervals during the five-year term. Mobilization costs are addressed separately, with standard mobilization for a 50-mile radius or less listed as "TBD" (to be determined) and billed at actual costs when individual projects are identified. The solicitation emphasizes that all respondents must thoroughly review the entire solicitation and follow instructions carefully, with GDOT reserving the right to reject any or all proposals and waive technicalities at its discretion.

Text of this file

BFI-1

Georgia Department of Transportation
COST PROPOSAL - Detailed GeotechnicalDO NOT print to the right of Column L for submittals to GDOT
Final BFI - Other Direct Costs
ITEMUNITNO OF UNITSUNIT RATECOST
DrillingTotal Drilling Costs$16,472
MOBILIZATION, PER RIGeach1$1,000.00$1,000
ADDITIONAL MOBE OVER 50 MILE RADIUSper mile284$3.00$852
DRILL CREW PER DIEM, THREE MAN CREWday17$300.00$5,100
DRILL CREW PER DIEM, (ADDITIONAL PERSONS)day17$100.00
AUGER BORINGS (CULVERT W/SPT)foot45$8.50
SOIL SURVEY AUGER BORINGSfoot825
BRIDGE SPT BORINGS per ASTM D-1586 (0-50 FEET)foot150$10.00$1,500
BRIDGE SPT BORINGS per ASTM D-1586 (51-100 FEET)foot150$12.00$1,800
BRIDGE SPT BORING per ASTM D-1586 (101-150 FEET)foot75
BRIDGE SPT BORING per ASTM D-1586 (151-200 FEET)foot
BRIDGE SPT BORING per ASTM D-1586 (> 200 FEET)foot
WALL SPT BORINGS per ASTM D-1586 (0 - 50 FEET)foot120
WALL SPT BORINGS per ASTM D-1586 (51 -100 FEET)foot25
WALL SPT BORINGS per ASTM D-1586 (> 100 FEET))foot
INCREASE FOR SPT BORINGS > 50 BLOWS/FT.foot30$10.00$300
PIEZOMETER/MONITORING WELLfoot45$0
CORE OR ROTARY DRILLING SETUPeach6$150.00$900
NQ ROCK CORINGfoot60$45.00$2,700
TEMPORARY CASINGfoot50$7.00$350
SOIL SUPPORT SAMPESeach20
810.2 SERIES SAMPLESeach95
SPT SAMPLES ( SOILE SURVEY CUT SECTIONS IN CONJUCTION W/AUGER BORINGS)each7
BRIDGE/WALL SPT SAMPLESeach114
UNDISTURBED SHELBY TUBE SAMPLESeach4$80.00$320
DRILL CREW STANDBY/DELAY/SITE REHABhour6$150.00$900
SITE RESTORATIONhour6$0
WATER HAULINGhour15$120.00
DRILLING THROUGH CONCRETE, PER COREeach3$100.00$300
PATCHING PAVEMENT AT GRADEeach2$25.00$50
PATCHING CONCRETE BRIDGE DECKeach1$100.00$100
UNSUITABLE MATERIALS INVESTIGATIONfoot30$10.00$300
WATER SAMPLES FOR CORROSIVITYeach5$0
$0
$0
$0
ITEMUNITNO OF UNITSUNIT RATECOST
LaboratoryTotal Laboratory Costs$0
USCS TESTSeach$160.00$0
TRIAXIAL SHEAR (CU/PP)each$700.00$0
CONSOLIDATIONeach$300.00$0
NATURAL MOISTURE CONTENTeach$12.00$0
ORGANIC CONTENTeach$0
CORROSIVITY SERIESeach$0
$0
$0
ITEMUNITUNIT RATECOST
Miscellaneous Other Direct CostsTotal Misc. Other Direct Costs$29,695
TRAVELmile670$0.500$335
DOZER FOR CLEARING TO BORING LOCATIONShour8$120.00$960
EROSION CONTROL (Materials & Trenching Equipment)lineal foot600$7.00$4,200
LIMITED SITE RESTORATION in CLEARED/DISTURBED AREASactual costs3$500.00$1,500
TRAFFIC CONTROLeach15$1,400.00$21,000
GENERATOR & CORE MACHINE RENTALday2$0
PER DIEM (NON DRILL CREW PERSONNEL)day17$100.00$1,700
POSTAGElump1$0
$0
$0
$0
$0
$0
BFI (continued)
Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS
TOTAL SPECIALTY DRILLING ITEMS OTHER DIRECT COSTSERROR:#REF!
ITEMUNITNO OF UNITSUNIT RATECOSTCOMMENTS
Drilling (Specialty Drilling Items)Total Drilling Costs$0
Mobilization of Specialty Drill, Per Rigeach$25,000.00$0Specify rig type (ATV, Marsh Buggy, Low Headroom, etc.)
Mobilization of Specialty Support Equipmenteach$10,000.00$0Specify type of equipment
Time Rate Drilling & Setup for Confined Spaces, Over Water, Specialty In-Situ Fieldcrew hour$50.00$0Specify # in Crew
Barge (for drilling over water)days$1,500.00$0If Rental, list as direct expense
Work Boatdays$100.00$0If Rental, list as direct expense
Equipment Charge (Packers, Pressuremeter, Dilatometer, etc.)hour$0Specify Equipment (if rental, list as direct expense)
Soil Test Borings, Below 100 Feet in Depthfeet$0Specify depth range
HQ Rock Coringfeet$0
Grouting of Bore Holesfeet$10.00$0
Training of Field Personnel Due to Special Site Requirementshour$0Specify requirements and by who this is required
Casing Advancer (drilling thru debris, rubble fill or boulders)feet$25.00$0
Seismic Refraction Crew (Personnel only)crew hour$0
Time Rate Decon for Environmental Purposeshour$0
Ground Penetrating Radar (GPR)hour$0
Unsuitable Materials Investigationfeet$0
Water Truckdays$0
$0
$0
$0
$0
$0
$0
UNSUITABLE MATERIALS INVESTIGATIONhour$0
$46,167$5,078,370
$46167 * 11* 2*5

&"Arial,Italic"&8&D &T &F &A Page &P of &N

YR x 11 x 2

Georgia Department of Transportation
COST PROPOSAL - Detailed GeotechnicalDO NOT print to the right of Column L for submittals to GDOT
Final BFI - Other Direct Costs
ITEMUNITNO OF UNITSUNIT RATECOST
DrillingTotal Drilling Costs$966,204
MOBILIZATION, PER RIGeach22$1,000.00$22,000
ADDITIONAL MOBE OVER 50 MILE RADIUSper mile6,248$3.00$18,744
DRILL CREW PER DIEM, THREE MAN CREWday374$300.00$112,200
DRILL CREW PER DIEM, (ADDITIONAL PERSONS)day374$100.00$37,400
AUGER BORINGS (CULVERT W/SPT)foot990$13.50$13,365
SOIL SURVEY AUGER BORINGSfoot18,150$10.00$181,500
BRIDGE SPT BORINGS per ASTM D-1586 (0-50 FEET)foot3,300$10.00$33,000
BRIDGE SPT BORINGS per ASTM D-1586 (51-100 FEET)foot3,300$12.00$39,600
BRIDGE SPT BORING per ASTM D-1586 (101-150 FEET)foot1,650$13.50$22,275
BRIDGE SPT BORING per ASTM D-1586 (151-200 FEET)foot1,100$15.00$16,500
BRIDGE SPT BORING per ASTM D-1586 (> 200 FEET)foot500$16.50$8,250
WALL SPT BORINGS per ASTM D-1586 (0 - 50 FEET)foot2,640$10.00$26,400
WALL SPT BORINGS per ASTM D-1586 (51 -100 FEET)foot550$12.00$6,600
WALL SPT BORINGS per ASTM D-1586 (> 100 FEET))foot100$13.50$1,350
INCREASE FOR SPT BORINGS > 50 BLOWS/FT.foot660$10.00$6,600
PIEZOMETER/MONITORING WELLfoot2,695$10.00$26,950
CORE OR ROTARY DRILLING SETUPeach132$150.00$19,800
NQ ROCK CORINGfoot1,320$45.00$59,400
TEMPORARY CASINGfoot1,100$7.00$7,700
SOIL SUPPORT SAMPESeach440$85.00$37,400
810.2 SERIES SAMPLESeach2,090$65.00$135,850
SPT SAMPLES ( SOILE SURVEY CUT SECTIONS IN CONJUCTION W/AUGER BORINGS)each154$50.00$7,700
BRIDGE/WALL SPT SAMPLESeach2,508$10.00$25,080
UNDISTURBED SHELBY TUBE SAMPLESeach88$80.00$7,040
DRILL CREW STANDBY/DELAY/SITE REHABhour132$150.00$19,800
SITE RESTORATIONhour132$100.00$13,200
WATER HAULINGhour330$120.00$39,600
DRILLING THROUGH CONCRETE, PER COREeach66$100.00$6,600
PATCHING PAVEMENT AT GRADEeach44$25.00$1,100
PATCHING CONCRETE BRIDGE DECKeach44$100.00$4,400
UNSUITABLE MATERIALS INVESTIGATIONfoot660$10.00$6,600
WATER SAMPLES FOR CORROSIVITYeach110$20.00$2,200
$0
$0
$0
ITEMUNITNO OF UNITSUNIT RATECOST
LaboratoryTotal Laboratory Costs$391,750
USCS TESTSeach500$160.00$80,000
TRIAXIAL SHEAR (CU/PP)each250$700.00$175,000
CONSOLIDATIONeach250$300.00$75,000
NATURAL MOISTURE CONTENTeach250$12.00$3,000
ORGANIC CONTENTeach250$150.00$37,500
CORROSIVITY SERIESeach250$85.00$21,250
$0
$0
ITEMUNITUNIT RATECOST
Miscellaneous Other Direct CostsTotal Misc. Other Direct Costs$723,190
TRAVELmile14,740$0.500$7,370
DOZER FOR CLEARING TO BORING LOCATIONShour176$120.00$21,120
EROSION CONTROL (Materials & Trenching Equipment)lineal foot13,200$7.00$92,400
LIMITED SITE RESTORATION in CLEARED/DISTURBED AREASactual costs253$500.00$126,500
TRAFFIC CONTROLeach330$1,400.00$462,000
GENERATOR & CORE MACHINE RENTALday44$150.00$6,600
PER DIEM (NON DRILL CREW PERSONNEL)day17$100.00$1,700
POSTAGElump22$250.00$5,500
$0
$0
$0
$0
$0
BFI (continued)
Final BFI - Other Direct Costs (continued) - SPECIALTY DRILLING ITEMS
TOTAL SPECIALTY DRILLING ITEMS OTHER DIRECT COSTSERROR:#REF!
ITEMUNITNO OF UNITSUNIT RATECOSTCOMMENTS
Drilling (Specialty Drilling Items)Total Drilling Costs$100,400
Mobilization of Specialty Drill, Per Rigeach2$25,000.00$50,000Specify rig type (ATV, Marsh Buggy, Low Headroom, etc.)
Mobilization of Specialty Support Equipmenteach1$10,000.00$10,000Specify type of equipment
Time Rate Drilling & Setup for Confined Spaces, Over Water, Specialty In-Situ Fieldcrew hour30$50.00$1,500Specify # in Crew
Barge (for drilling over water)days14$1,500.00$21,000If Rental, list as direct expense
Work Boatdays14$100.00$1,400If Rental, list as direct expense
Equipment Charge (Packers, Pressuremeter, Dilatometer, etc.)hour$0Specify Equipment (if rental, list as direct expense)
Soil Test Borings, Below 100 Feet in Depthfeet$0Specify depth range
HQ Rock Coringfeet$0
Grouting of Bore Holesfeet$0
Training of Field Personnel Due to Special Site Requirementshour$0Specify requirements and by who this is required
Casing Advancer (drilling thru debris, rubble fill or boulders)feet660$25.00$16,500
Seismic Refraction Crew (Personnel only)crew hour$0
Time Rate Decon for Environmental Purposeshour$0
Ground Penetrating Radar (GPR)hour$0
Unsuitable Materials Investigationfeet$0
Water Truckdays$0
$0
$0
$0
$0
$0
$0
UNSUITABLE MATERIALS INVESTIGATIONhour$0

$2,181,544 $10,907,720

&"Arial,Italic"&8&D &T &F &A Page &P of &N

5 yr Qty.

EXHIBIT VII MENU OF SERVICES

PLEASE PROVIDE THE UNIT RATE FOR ALL LINE ITEMS. LEAVING LINE ITEM(S) BLANK OR AT $0.00 MAY RESULT IN REJECTION OF BID.

Firm Name:
ITEMUNITUNIT RATESERVICES TO BE PROVIDED BYCOMMENTS
Drilling
ADDITIONAL MOBILIZATION OVER 50 MILE RADIUSper mile3,000$
DRILL CREW PER DIEM, THREE MAN CREWday250$
DRILL CREW PER DIEM, (ADDITIONAL PERSONS)day250$
AUGER BORINGS (CULVERT W/SPT)foot500$
SOIL SURVEY AUGER BORINGSfoot15,000$
BRIDGE SPT BORINGS per ASTM D-1586 (0-50 FEET)foot3,000$
BRIDGE SPT BORINGS per ASTM D-1586 (51-100 FEET)foot2,000$
BRIDGE SPT BORING per ASTM D-1586 (101-150 FEET)foot800$
BRIDGE SPT BORING per ASTM D-1586 (151-200 FEET)foot500$
BRIDGE SPT BORING per ASTM D-1586 (> 200 FEET)foot250$
BRIDGE CPT SOUNDING per ASTM D-5778-07day$
WALL SPT BORINGS per ASTM D-1586 (0 - 50 FEET)foot2,000$
WALL SPT BORINGS per ASTM D-1586 (51 -100 FEET)foot100$
WALL SPT BORINGS per ASTM D-1586 (> 100 FEET))foot25$
WALL CPT SOUNDING per ASTM D-5778-07day$
INCREASE FOR SPT BORINGS > 50 BLOWS/FT.foot600$
DIRECT PUSH BORINGSfoot$
PIEZOMETERfoot1,500$
TEMPORARY MONITORING WELLfoot$
HOLLOW STEM AUGER DRILLING SETUPeach$
MUD ROTARY DRILLING SETUPeach$
ROCK CORING SETUPeach150$
NQ ROCK CORINGfoot1,000$
TEMPORARY CASINGfoot550$
SOIL SUPPORT SAMPLESeach275$
810.2 SERIES SAMPLESeach2,000$
SPT SAMPLES (by Auger Boring)each150$
SPT SAMPLES (by Mud Rotary Drilling)each2,500$
UNDISTURBED SHELBY TUBE SAMPLESeach45$
GROUNDWATER SAMPLES (UST/HW)each$
SOIL SAMPLES (UST/HW)each$
DRILL CREW STANDBY/DELAY/SITE REHAB/BORING BACKFILLhour50$
BORING GROUND ELEVATION AND GPS COORDINATEShour$
SOIL LOGGING/CLASSIFICATION/SUPERVISIONhour$
GROUNDWATER ELEVATION READINGShour$
SITE RESTORATIONhour50$
WATER HAULINGhour150$
DRILLING THROUGH CONCRETE, PER COREeach65$
PATCHING PAVEMENT AT GRADEeach40$
PATCHING CONCRETE BRIDGE DECKeach65$
SOIL SURVEY VISUAL ASSESSMENTday$
UNSUITABLE MATERIALS INVESTIGATIONfoot100$
WATER SAMPLES FOR CORROSIVITYeach100$
ITEMUNITUNIT RATE
Laboratory
USCS TESTSeach250$
TRIAXIAL SHEAR (CU/PP)each100$
CONSOLIDATIONeach100$
NATURAL MOISTURE CONTENTeach100$
ORGANIC CONTENTeach100$
CORROSIVITY SERIESeach100$
ITEMUNITUNIT RATE
Miscellaneous Other Direct Costs
TRAVELmile10,000$
DOZER FOR CLEARING TO BORING LOCATIONShour100$
EROSION CONTROL (Materials & Trenching Equipment)lineal foot10,000$
INSTALLATION OF EROSION CONTROLhour$
ITEMUNITUNIT RATE
INTERFACE PROBE AND PHOTO-IONIZATION DETECTORday$
LIMITED SITE RESTORATION in CLEARED/DISTURBED AREASactual costs100TBD
TRAFFIC CONTROLeach300$
GENERATOR & CORE MACHINE RENTALday30$
PER DIEM (NON DRILL CREW PERSONNEL)day60$
POSTAGElump sum22TBD
*MOBILIZATION FOR 50 MILE RADIUS OR LESSactual costsTBD
*Mobilization includes preparatory work and operations, including but not limited to, moving personnel, equipment, supplies, and incidentals to the Project site. Mobilization also includes all other work and operations that shall be performed or costs incurred before beginning work on the various Items on the Project site. Mobilization cost will be requested at the time the individual projects are identified.

Other files

File Type Posted
Responses to Questions —
RFQ —
Exhibit V Non Collusion —
Award Information —
Notice of Award —
Exhibit II Wall Foundation —
Exhibit VI Tax Compliance Form —
Exhibit II Environmental Drill —
Exhibit VIII Contractor Wksht —
Exhibit II Bridge Foundation D —
Exhibit II Soil Survey —
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .