This document is a Request for Proposal (RFP) Change form issued by the City of Carmel, designed to facilitate modifications to an existing contract. The form provides a structured template for proposing changes to a contract's price and/or timeline, requiring the contractor to submit a detailed proposal within fifteen (15) calendar days of the request date. The proposal must include four (4) copies of a comprehensive breakdown showing quantities, material costs, equipment expenses, labor costs, overhead, profit, and any basis for additional time requirements.
The form emphasizes that submission of this request does not authorize the contractor to proceed with the proposed work or interrupt previously scheduled work. Upon approval, a Contract Change Order and a Notice to Proceed will be issued. The contractor must also specify the potential impact of the proposed changes on the project's Substantial Completion and Final Completion dates. The document is intentionally left with blank spaces to be filled in with specific project details, project number, specification references, and drawing information, indicating its flexible nature as a standardized change request template for municipal contract modifications.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: REQUEST FOR PROPOSAL NO
DATE:
PROJECT NAME:
PROJECT NO.:
Specification Reference:
Drawing Reference: _____________ Drawing Date:____________
Identification of Attachments:
Please submit within fifteen (15) calendar days of this request date a proposal showing increase, decrease or no change in Contract Price and/or Contract Time. Proposal shall be accompanied by four (4) copies of breakdown showing quantities, cost of material, equipment, labor, overhead, profit and basis for the additional time if any.
DESCRIPTION OF PROPOSED CHANGE COVERED BY THIS REQUEST:
REASON FOR CHANGE:
SPECIAL INSTRUCTIONS:
THIS REQUEST DOES NOT AUTHORIZE YOU TO PROCEED WITH THE ABOVE WORK
NOR STOP PREVIOUSLY SCHEDULED WORK. Upon approval a Contract Change Order and a Notice To Proceed will be issued.
Please state in your proposal the effect the acceptance of this Request will have on the Project’s Substantial Completion and Final Completion, if accepted within ___ days of proposal due date.
YOUR PROPOSAL DUE DATE: _____________________________________
By: _____________________________________ _________________ Engineer Date
Approved By: _________________________________ Owners Representative