CONTRACT_CHANGE_REQUEST.pdf
PDF 32 KB Posted
- Solicitation number
- 22-ENG-05
- Issued by
- Hamilton County, Indiana
About this file
This document is a Contract Change Request form issued by the City of Carmel for the 99th Street Path Construction project between Westfield Boulevard and Haverstick Road. The form is a standardized template designed to document and request modifications to an existing contract, with sections for describing the scope of work changes, reasons for the change, cost implications, potential timeline extensions, and personnel requirements. The form provides space for detailing the proposed contract modification, including approximate cost changes, additional contract time needed, and any impacts on project personnel.
The form does not contain specific details about the current contract modification, as all fields are blank. It serves as a structured mechanism for the City of Carmel to formally propose and track changes to the 99th Street Path Construction project contract. The document includes sections for identification of attachments, dates, preparer and reviewer signatures, and a space for comments and recommendations from the reviewing engineer. The blank form indicates that no specific contract change has been implemented at this time, but the template is ready to be used when modifications to the original contract become necessary.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation: