REQD SUBMITTAL INFO FOR ALL MANUFACTURERS.pdf
PDF 75 KB Posted
- Attached to
- RFP 24-005
- Solicitation number
- PE-77111-NONST-2024-000000004
- Issued by
- Jasper County, Georgia
About this file
This document outlines the Required Submittal Information for All Manufacturers (not pre-approved) for a state and local contract opportunity issued by the City of Commerce Recreation Department for the replacement of outdoor sports field lighting at the American Veterans Memorial Park in Jackson County, Georgia. The submittal requirements cover various aspects of the lighting design, including field and off-field lighting layouts, photometric reports, performance guarantees, structural calculations, control and monitoring systems, electrical distribution plans, warranties, project references, and product information. Manufacturers are required to provide a signed checklist and list any non-compliant items. The contract opportunity is described as RFP 24-005, with a focus on qualified vendors to replace the existing outdoor sports field lighting.
The document outlines detailed technical and operational requirements for the lighting system, including cost of ownership considerations and environmental light control design. Manufacturers must provide references of customers currently using the proposed system in Georgia and meet the specification requirements, or be responsible for any future costs to bring the equipment into compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_005 Bid Sign_in Sheet.pdf | ||
| RFP 24_005 ADDENDUM _3.pdf | ||
| RFP 24_005 ADDENDUM _1.pdf | ||
| RFP 24_005 Veterans Memorial Park Field Light.pdf | ||
| 20240425140013580.pdf | ||
| RFP 24_005 ADDENDUM 4.pdf | ||
| Scoring Sheet 24_005.pdf | ||
| 24_005 NOIA.pdf | ||
| Notice of Award.pdf | ||
| RFP 24_005 ADDENDA 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIRED SUBMITTAL INFORMATION FOR ALL MANUFACTURERS (NOT PRE-APPROVED) 10
DAYS PRIOR TO BID
All items listed below are mandatory, shall comply with the specification and be submitted according to pre-bid submittal requirements. Complete the Yes/No column to indicate compliance (Y) or noncompliance (N) for each item. Submit checklist below with submittal.
Yes/ No
Tab Item Description
A
Letter/ Checklist
Listing of all information being submitted must be included on the table of contents. List the name of the manufacturer’s local representative and his/her phone number. Signed submittal checklist to be included.
B
Equipment Layout
Drawing(s) showing field layouts with pole locations
C On Field Lighting Design
Lighting design drawing(s) showing:
a. Field Name, date, file number, prepared by
b. Outline of field(s) being lighted, as well as pole locations referenced to the center of the field (x & y), Illuminance levels at grid spacing specified
c. Pole height, number of fixtures per pole, horizontal and vertical aiming angles, as well as luminaire information including wattage, lumens and optics
d. Height of light test meter above field surface.
e. Summary table showing the number and spacing of grid points; average, minimum and maximum illuminance levels in foot candles (fc); uniformity including maximum to minimum ratio, coefficient of variance (CV), coefficient of utilization (CU) uniformity gradient; number of luminaries, total kilowatts, average tilt factor; light loss factor.
f. Technical document addressing the issue of lighting in the vertical plane above the playing surface for aerial sports while achieving the desired glare control requirements.
D Off Field Lighting Design
Lighting design drawing showing initial spill light levels along the boundary line (defined on bid drawings) in footcandles. Lighting design showing glare along the boundary line in candela. Light levels shall be taken at 30-foot intervals along the boundary line. Readings shall be taken with the meter orientation at both horizontal and aimed towards the most intense bank of lights.
E Photometric
Report
Provide first page of photometric report for all luminaire types being proposed showing candela tabulations as defined by IESNA Publication LM-35-02. Photometric data shall be certified by laboratory with current National Voluntary Laboratory Accreditation Program or an independent testing facility with over 5 years experience. No partial wattage fixture reports or ISO Polar curve reports are acceptable.
F Performance Guarantee
Provide performance guarantee including a written commitment to undertake all corrections required to meet the performance requirements noted in these specifications at no expense to the owner. Light levels must be guaranteed to not fall below target levels for warranty period.
G Structural
Calculations
Pole structural calculations and foundation design showing foundation shape, depth backfill requirements, rebar and anchor bolts (if required). Pole base reaction forces shall be shown on the foundation drawing along with soil bearing pressures. Design must be stamped by a structural engineer in the state of Georgia, if required by owner. (May be supplied upon award).
H Control & Monitoring
System
Manufacturer of the control and monitoring system shall provide written definition and schematics for automated control system. They will also provide ten (10) references of customers currently using proposed system in the state of Georgia.
I
Electrical Distribution
Plans
Manufacturer bidding an alternate product must include a revised electrical distribution plan including changes to service entrance, panels and wire sizing, signed by a licensed Electrical Engineer in the state of Georgia.
J Warranty
Provide written warranty information including all terms and conditions. Provide ten (10) references of customers currently under specified warranty in the state of Georgia.
K Project
References
Manufacturer to provide a list of 10 projects where the technology and specific fixture proposed for this project has been installed in the state of Georgia. Reference list will include project name, project city, installation date, and if requested, contact name and contact phone number.
L Product
Information
Complete bill of materials and current brochures/cut sheets for all products being provided.
Cut sheets shall be technical (and illustrative) and provide specific detail on fixtures, remote driver cabinets, drivers, surge protections, fusing, controls, poles and foundations. All certifications including UL and DLC shall be shown on the technical cut sheets.
M Delivery
Manufacturer shall supply an expected delivery timeframe from receipt of approved submittals and complete order information.
N
Non- Compliance
Manufacturer shall list all items that do not comply with the specifications. If in full compliance, tab may be omitted.
O
Cost of Ownership
Document cost of ownership as defined in the specification. Identify energy costs for operating the luminaires. Maintenance cost for the system must be included. All costs should be based on 10 Years
P Environmental Light Control
Design
Environmental glare impact scans must be submitted showing the maximum candela from the field edge on a map of the surrounding area.
The information supplied herein shall be used for the purpose of complying with the specifications for Veterans Memorial Park. By signing below, I agree that all requirements of the specifications have been met and that the manufacturer will be responsible for any future costs incurred to bring their equipment into compliance for all items not meeting specifications and not listed in the Non-Compliance section.
Manufacturer: ____________________________________ Signature: ______________________________
Contact Name: ____________________________________ Date: ______/______/_____
Contractor: ______________________________________ Signature:____________________________