Replace Bldg 7 Master Control Panel QA-Butler response editded for resubmission.docx
DOCX document 57 KB Posted
- Attached to
- Z1DA-- 529-22-101 Replace Bldg. #7 Master Control Panel Federal contract opportunity
- Solicitation number
- 36C24424R0075
About this file
This document is a Request for Proposals (RFP) for the Replace Bldg. #7 Master Control Panel project (Project 529-22-101) issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 4.
The RFP seeks proposals from contractors to provide professional construction services in accordance with the Statement of Work, drawings, and specifications. The solicitation will use a Best Value Lowest Price Technically Acceptable (LPTA) source selection approach. Award will be made to the lowest-priced responsible offeror whose proposal conforms to the solicitation requirements and is technically acceptable. The evaluation criteria assess the offeror's experience with industrial construction related to boiler and process plant equipment and controls, project phasing and coordination requirements, mobilization and management of crews across multiple shifts, and working in mission critical facilities. Offerors must submit proposals electronically by the due date, and the government will not accept late submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Drawings - Combined 2024-1101.pdf | ||
| Replace Bldg 7 Master Control Panel QA-Butler response editded for resubmission REVISED.docx | DOCX document | |
| 36C24424R0075 0004.docx | DOCX document | |
| Site Visit Sign In Boiler Plant 10-17.pdf | ||
| 36C24424R0075 0003.docx | DOCX document | |
| 36C24424R0075 0002.docx | DOCX document | |
| 36C24424R0075 0001.docx | DOCX document | |
| Boiler plant site visit 9-26.pdf | ||
| Wage Determination PA20240079 rev.7.19.24.pdf | ||
| Attachment 04 Butler VA HCS MCP.pdf | ||
| J and A Simplex redacted.pdf | ||
| Statement of Work - Project No. 529-22-101.pdf | ||
| Attachment 03 - Sensitive Infrastructure Data Classification.pdf | ||
| Attachment 02 - Specifications 9.12.24.pdf | ||
| VHA PCRA Boiler Plant.pdf | ||
| Attachment 01 - Drawings 7.12.24.pdf | ||
| 36C24424R0075_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24424R0016 529-22-101 Replace Bldg. #7 Master Control Panel Questions & Answers Answers provided in red text.
1. Part of the project is to replace the “soft start” contactor for the Weisnaupt boiler motors with VFD drives. Will the existing Weishaupt motors except, electrically, the new VFD drives? If so, will the motor need larger cables from VFD? Would the motor taps need rewired? Please advised. (see attached pic)
2. On drawing ED101 note 8 shows us removing power panel BP and replacing it with new panel BP on drawing EP201 note 6. The arc flash study on this existing panel dictates a 42” limited boundary. This can’t be achieved because of the master control panel in front of it. The master panel is approximately 38” from the front of panel BP. If the limited boundary does not exist, is it still in compliance for new panel BP to be in same location? (See attached photos) Please advise.
3. On drawing(s) ED101, EP201, MH703 they show us replacing Triguard system with new CO2 and hazardous gas detection systems. Who is supplying the equipment for this system? This equipment shall be supplied by the contractor who is awarded the project. Also note that this is not CO2 but CO.
4. In SOW 3. There were a couple of questions to come out of this statement. Does this SOW 3 statement apply to our project? If so, on page 13 new work electrical, they state ;
‘Survey the building for electrical code violations and damaged electrical equipment and devices. Catalog these items and provide repair directions in the project drawings.”
“Verify electrical capacity of the existing service and electrical panels. Upgrade service and feeders if found to be insufficient. Survey panelboards for age and end of life replacement.”
“Install new LED light fixtures as needed.” (all light fixtures in boiler plant seem to be florescent or metal-halide but working).
“Short circuit calculations will be performed for new equipment to assure it is adequately rated.”
“Arc flash calculations will be performed for new equipment along with provision of the proper labeling.”
“Voltage drop calculations will be performed.”
“Lighting level calculations will be performed to ensure VA minimum levels are achieved.”
“Seismic design considerations will be included in the scope of work.”
Will these items need to be included in our scope? The majority of these items are items covered in the design team SOW, however All NEC required items are still required of the electrical contractor.
5. On drawing E600 it shows VFD’S being supplied by division 26(electrical). Will these drives for all mechanical be supplied by others? This decision can be left up to the awarded general contractor.
6. On drawing MHOO1 general notes #12 shows “all abandoned extraneous (not relevant to project) controls, raceway, etc to be removed.” Will we carry this scope of work in our bid? YES!
7. Certain equipment in project will need a Building Automation system to report points back to workstations. Including but not limited to exhaust fans, supply fans, make-up units, etc… Who will be our controls systems integrator? VA Butler does not currently have a Master System Integrator, this position will need to be a part of the project team.
8. A note on plumbing drawing 201, it states in note 1 to reference RMF consultants’ drawings for continuation of piping, however we cannot locate these drawings. Please provide Drawings. All drawings are provided in SOW attachment 1
9. Per the below highlighted comment sheet included at the end of spec section 23 09 11, please provide the PLC I/O list in excel format? Will do
10. Refer to EP201. There are several symbols on drawing EP201 that are unclear. Please clarify scope for the following.
· “CC” in an oval- CCTV. This symbol appears next to stairs at entrance to Boiler 102 and in hallway south of corridor 100.
Per the walk thru, there is an existing CCTV camera located next to stairs in 102. Not sure if one in hallway is existing.
Confirm our scope, are these cameras existing to remain? Is there an existing one in the hallway? Do we need to replace the existing? Are they meant to be new Cameras? If we furnish and install new cameras, please provide spec.
· “CO” in a circle – Carbon Monoxide detector. Symbol appears in locker 105, Boiler 102 adjacent to B#1 and adjacent to B#2, Summer boiler 103A and in control office 102A.
Please clarify.
-Are these meant to be new CO detectors as part of the fire alarm system? If yes, mounted at ceiling?
- Please provide manufacturer and type of existing fire alarm system.
-Per walk thru, there are existing gas detection devices (TRUGUARD) located at the locations in 102 and 103A. Do the symbols indicate that they existing as part of the gas detection system? Are we to replace existing?
- “H” in a circle- What is this symbol? Note Fire alarm Heat detector on the legend is an “H” in a hexagon. Symbol appears twice on east wall of 103A, twice on south wall of 102, and once on north wall of 102 behind control office.
Please clarify scope.
- Is this symbol a fire alarm heat detector? If yes, please provide mounting height and spec for device required.
- If no, what is it and is it in our scope?
11. Refer to Notes #4, #5, & #9 on EP201
- Note #4 Gas Detection System.
- Please confirm scope. Who supplies this system? Who installs? Can you confirm that we own power connection only?
- Note #5 Provide UPS and connect to EM outlet.
- please confirm scope. Do we furnish this item? If yes, please provide spec for required UPS.
- Note #9 Connect Gas system output to Fire Alarm control panel input.
- Please clarify, where is main fire alarm control panel?
12. Who’s responsible for Pressure Vessel Permitting and Inspection ?
13. Who is responsible for the 3rd party commissioning? Typically, this is handled by the A&E?
14. Which company(ies) are contracted for the BAS Maintenance Agreements? What is their contact information? N/A
15. Is the existing Roof under warranty? If so, with whom? When does it expire? Will we be required to maintain that warranty with manufacturer’s inspection? No
16. Existing burners on boilers 1, 3, & 4 are Weishaupt brand burners, that are pressure atomizing on fuel oil firing. Specification 23 52 39, section 2.3 item G specifies Low pressure Air Atomizing system trim on the burner.
a. Question: is the intent of project to supply Weishaupt burner for boiler #2 to match similar equipment to existing, and take exception to atomizing media section of specification?
17. Existing boiler steam flow meters are orifice plate style with differential pressure transmitters. Specification 23 09 11, section 2.7 specifies Vortex shedding flow meters.
a. Question: Are these flow meters included in the schedule to be replaced with specified technology even though they appear to be properly functioning?
18. Statement of work Page 10, New Work / Flowmeters specifies Vortex shedding flow meters are to be utilized for Steam Flow, Feedwater Flow, and boiler natural gas flow, while turbine type meters are specified for Plant Natural gas flow. Specification 23 09 11, section2.7 “Flow Meters” subsection D, specifies Turbine type flow meters for natural gas flow. With Turbine type and vortex shedding type both being specified, there will be an inherent discrepancy between the readings due to accuracy differences between the two technologies.
a. Question: What technology is acceptable for all natural gas flow meters?
19. Specification SECTION 23 52 39, FIRE TUBE BOILERS § 1.7 PROJECT CONDITIONS, Paragraph E - Oil Atomizing Media, Paragraph E states: “Low-pressure air atomizing burners are required, and each boiler must include a dedicated air compressor system furnished by burner manufacturer.” Existing Weishaupt burners are High Pressure Atomized Fuel Oil system requiring fuel delivery pressure to the nozzle up to 400 psi with no atomizing air.
a. Question: If the intent of the project is to supply Weishaupt burner for boiler #2 to match existing equipment, is a deviation from this specification requirement allowed?
b. Question: if the deviation is allowed, Has the VHA Office of Healthcare Engineering (OHE) been made aware of the deviation from Master VA Specification SECTION 23 52 39, FIRE TUBE BOILERS and have they approved the deviation.
20. With Design alert 151 included in the project plans and specifications, shall the cast iron safety relief valves and other existing malleable fittings on the existing high pressure steam system to also be addressed and included in this project? Existing valves, fittings, and devices are outside the scope of this project unless they will be disturbed or directly impacted.
21. Will any/all deficiencies of the current VHA Safety Device testing manual requirements on the existing boilers/burner be included in this project? Unsure of true intent of this question as the VHA boiler and safety device testing manual is not part of the scope of this project.
22. The Project Specification Section 23 09 11, INSTRUMENTATION AND CONTROL FOR BOILER PLANT § 2.3 MAIN INSTRUMENTATION AND CONTROL PANEL calls for “Plant Master Panel”.
a. Question: Is the intent of re-using the existing cabinet to be re-tasked as the Plant Master Panel to include:
i. Master Steam Pressure Control Station
ii. Boiler/Burner Submaster Control Stations
iii. Recording Systems and Touch Screens
iv. Pressure Gauges for steam header pressure, boiler feed header pressure for each boiler, fuel header pressures.
v. Boiler Economizer Temperature Indicator Systems that include RTD measuring temperature for feedwater in and out, flue gas in and out, Modbus communication, Pressure gauges on feedwater, in and out. Thermometers measuring the feedwater temperature in and out, and flue gas in and out.
vi. Annunciator System with alarm lights, alarm bell, integral test and acknowledge push buttons, Modbus communications for monitoring alarms
vii. Condensate Storage Tank High and Low Water Level Alarms
viii. Feedwater Deaerator Tank High and Low Water Level Alarms
ix. High and Low Steam Header Pressure
x. Emergency Gas Valve Closed
xi. Oil Tanks – High and Low Level
xii. Low Excess Air – Boiler
xiii. High Natural Gas Header Pressure
xiv. LP Igniter (Pilot) Gas in
xv. Fuel Oil Temperature – High and Low (Heated Oil Only
xvi. Low feedwater pressure
xvii. Emergency Fuel Safety Shut-Off Valve Control
23. Who holds the warranty for the existing roof? There is not one
24. Will there be a designated area for office and storage trailers? This will be discussed during the NTP with the awarded firm, but there will be areas that can accommodate job trailers and storage.
25. Due to lead time of equipment is there a change to have liquidated damages removed from the project? Liquidated damages will remain, however, equipment lead time and the contractors efforts to mitigate their effects will be evaluated by the contract team during all contract actions including but not limited to CPARS, contract modifications, liquidated damages, and other actions.
image1.png