R7296 REBID TID Radio and Asset Services Building Specs.pdf
PDF 40 MB Posted
- Attached to
- R-7296 REBID TID Radio & Asset Services Building
- Solicitation number
- PW-26-754
- Issued by
- Los Angeles County, California
About this file
This is a rebid specification and bid document package from the City of Long Beach Department of Public Works for the TID Radio & Asset Services Building renovation project. The work consists primarily of office and warehouse improvements including asbestos abatement, ADA restrooms, millwork, HVAC ductwork and new roof, electrical, lighting, plumbing, interior finishes, chain link enclosures, rollup door, EV charger and parking stalls, and vehicle exhaust control system. The project includes 32 line items covering mobilization/demobilization, selective demolition, concrete work, masonry, metals, HVAC, fencing, framing, drywall, painting, flooring, ceiling work, restroom partitions, signage, fire protection, casework, plumbing, electrical systems, EV charging stations, windows, doors, window shades, kitchen equipment, parking lot improvements, vehicle exhaust systems, roofing, and hazardous materials removal. A mandatory pre-bid conference is scheduled for July 9, 2026, at 11:00 a.m. via Microsoft Teams, and a mandatory job-site walkthrough is scheduled for the same date from 1:00 p.m. to 2:30 p.m. at 2961 Redondo Avenue. Bids are due electronically by 11:00 a.m. on August 6, 2026, through the City's online portal at https://longbeachbuys.buyspeed.com/. Work must be completed within 243 calendar days after the notice to proceed is issued. The project is identified as Specification R-7296, Project Number 3005010200, with Drawing B-4854.
The bid includes a 10% bid security requirement and is subject to the City's Long Beach Small Business Enterprise (LBSBE) Program with a 10% combined goal for SBE/VSBE/LSBE participation. The project is covered by a Citywide Project Labor Agreement (PLA) with the Los Angeles/Orange Counties Building and Construction Trades Council and signatory craft unions, establishing prevailing wage requirements and local hiring goals of 40% calculated on total hours worked, with an additional 10% goal for transitional workers and veterans. Contractors must possess a valid California Class B contractor license and be registered with the Department of Industrial Relations. The contractor is required to submit certified payroll records electronically and comply with prevailing wage rates as determined by the California Department of Industrial Relations for 2026-1. All work is subject to federal Labor Code sections 1720 et seq., with requirements for workers' compensation insurance, commercial general liability insurance with minimum limits, and pollution/environmental impairment liability coverage. The contract includes liquidated damages provisions, retention withholding provisions in accordance with Public Contract Code Section 22300, and compliance requirements with the Equal Benefits Ordinance and Iran Contracting Act of 2010 for contracts estimated at $1,000,000 or more.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Long Beach Working Together to Serve
Department of Public Works
PW-26-754
REBID TID Radio & Asset Services Building
Contract Documents Plans and Specifications
Project Number 3005010200
Specification R-7296
Drawing B-4854
Project Management Bureau Long Beach, California
For Bidding Purposes Only Mandatory Pre-bid Conference On July 9, 2026 At 11:00 a.m.
and Mandatory Job Site Walkthrough On July 9, 2026 drop-in between 1:00 p.m. and 2:30 p.m.
REBID TID RADIO & ASSET SERVICES BUILDING
Department of Public Works Page i R-7296
City of Long Beach Table of Contents
CONTRACT DOCUMENTS
TABLE OF CONTENTS
DIVISION A – NOTICE INVITING BIDS
Notice Inviting Bids
DIVISION B – INSTRUCTION TO BIDDERS
Instructions to Bidders
DIVISION C – BID DOCUMENTS
Bid Form Bidder Information / Signature Form List of Subcontractors Bidder’s Bond Non-Collusion Declaration Workers Compensation Certification Certification of Site Examination Debarment, Suspension, Ineligibility Certification Information To Comply with Labor Code Section 2810 LBSBE Acknowledgement Form - Attachment A LBSCE Program Awardee Commitment Plan - Attachment B LBSCE Good Faith Effort - Attachment C Certification of Compliance with The Equal Benefits Ordinance Equal Benefits Ordinance Disclosure Form Iran Contracting Act of 2010 Compliance Affidavit
DIVISION D – POST-BID DOCUMENTS
Specimen Contract Bond for Faithful Performance Labor and Materials Bond Insurance Requirements/Sample Forms/Endorsement Forms Bid Protest Procedures Contract Change Order Form Contract Change Order Supporting Documentation Form
DIVISION E – FEDERAL, STATE AND LOCAL REQUIREMENTS
Federal: Not Used State: Not Used Local: Project Labor Agreement Local: Equal Benefits Ordinance Statement Local: Orion Construction Management Software Web Based Local: Construction and Demolition Ordinance Requirement Local: Small Business Enterprise (SBE) Guidelines Local: SBE Monthly Utilization Report Local: City of Long Beach Standard Plans – Available at http://www.longbeach.gov/pw/resources/standard-plans/
Department of Public Works Page ii R-7296
DIVISION F – PERMITS AND ATTACHMENTS
Hazardous Building Materials Survey Hazardous Materials Specifications Tremco Roof Analysis
DIVISION G – BEST MANAGEMENT PRACTICES (BMP)
BMP Template
Note: Divisions H and I include only sections of the Standard Specifications that have been modified. See the Standard Specifications for sections not included here.
DIVISION H – GENERAL REQUIREMENTS
Standard Specifications ............................................................................................... H-1
PART 1 – GENERAL PROVISIONS
Section 1 – General ..................................................................................................... H-2 1-2 Terms and Definitions ................................................................................. H-2 1-3 Abbreviations .............................................................................................. H-3 1-3.2 Common Usage ........................................................................... H-3 1-4 Units of Measure ......................................................................................... H-5 1-4.1 General ........................................................................................ H-5 1-7 Award and Execution of the Contract .......................................................... H-5 1-7.2 Contract Bonds .............................................................................. H-5 Section 2 – Scope and Control of the Work ................................................................. H-5 2-3 Subcontracts ............................................................................................... H-5 2-3.1 General ......................................................................................... H-5 2-3.2 Self Performance ........................................................................... H-5 2-5 Plans and Specifications ............................................................................. H-6 2-5.3 Submittals ..................................................................................... H-6 2-5.3.1 General ...................................................................................... H-7 2-5.4 Record Drawings ........................................................................... H-7 2-9 Surveying .................................................................................................... H-7 2-9.1 Permanent Survey Markers ........................................................... H-7 2-9.2 Survey Service .............................................................................. H-8 2-10 Authority of Board and Engineer ............................................................... H-9 Section 3 – Changes in Work ...................................................................................... H-9 3-2 Changes Initiated by the Agency ................................................................ H-9 3-2.2 Contract Unit Prices ...................................................................... H-9 3-2.2.1 General ...................................................................................... H-9 3-2.2.2 Increases of More Than 25% ..................................................... H-9 3-2.2.3 Decreases of More Than 25% .................................................... H-9 3-3 Extra Work ................................................................................................ H-10 3-3.2 Payment ...................................................................................... H-10 3-3.2.3 Markup ..................................................................................... H-10 3-3.2.3.1 Work by Contractor ............................................................... H-10 3-3.2.3.2 Work by Subcontractor .......................................................... H-10 Section 4 – Control of Materials ................................................................................. H-10
Department of Public Works Page iii R-7296
4-1 Materials and Workmanship ...................................................................... H-10 4-1.2 Protection of Work and Materials ............................................... H-10 4-1.4 Test of Materials .......................................................................... H-10 4-1.6 Trade Names or Equals ............................................................. H-11 Section 5 – Utilities .................................................................................................... H-11 5-1 Location .................................................................................................... H-11 5-3 Removals .................................................................................................. H-11 5-4 Relocation ................................................................................................. H-11 5-4.1 Resetting Vaults and Other Appurtenances ................................ H-11 5-7 Unknown Facilities .................................................................................... H-12 5-8 Facilities Requiring Special Precautions ................................................... H-12
5-9 General Requirements When Working Around Long Beach Energy Resources (LBER) Facilities ........................................................................... H-12
Section 6 – Prosecution, Progress, and Acceptance of the Work .............................. H-13 6-1 Construction Schedule and Commencement of Work............................... H-13 6-1.1 Construction Schedule ................................................................ H-13 6-1.1.1 Terms and Definitions ............................................................. H-13 6-1.1.2 General ................................................................................... H-14 6-1.1.3 Submittals................................................................................. H-16 6-1.1.4 Payment ................................................................................... H-17 6-1.2 Commencement of Work ............................................................. H-17 6-1.3 Preconstruction Conference ........................................................ H-17 6-1.4 Notices ....................................................................................... H-17 6-1.5 Construction Update Meetings .................................................... H-19 6-2 Prosecution of the Work ............................................................................ H-19 6-2.3 Sequence of Work ....................................................................... H-19
6-6 Delays and Extensions of Time ................................................................. H-19 6-6.5 Weather Delays ........................................................................... H-19
6-7 Time of Completion ................................................................................... H-20 6-7.4 Additional Requirements ............................................................. H-20 6-8 Completion, Acceptance, and Warranty .................................................... H-20 6-9 Liquidated Damages ................................................................................. H-21 6-11 Claims Resolution ................................................................................... H-21 6-11.1 Compliance with Mandatory Procedures ................................... H-21 6-11.2 Public Contract Code Section 9204 ........................................... H-21 Section 7 – Responsibilities of the Contractor ........................................................... H-25 7-1 The Contractor’s Equipment and Facilities ................................................ H-25 7-1.1 General ....................................................................................... H-25 7-1.2 Temporary Utility Services........................................................... H-25 7-2 Labor ......................................................................................................... H-25 7-2.2 Prevailing Wages ........................................................................ H-25 7-3 Liability and Workers’ Compensation Insurance ....................................... H-28 7-3.1 Minimum Insurance Requirements .............................................. H-28 7-3.1.1 Commercial General Liability Insurance ................................... H-28 7-3.1.2 Commercial Automobile Liability Insurance .............................. H-28 7-3.1.3 Workers’ Compensation Insurance .......................................... H-28 7-3.1.4 Pollution/Environmental Impairment Liability Coverage ........... H-28 7-3.1.4.1 Limits of Insurance ................................................................ H-28
Department of Public Works Page iv R-7296
7-3.1.4.2 Claims Made Coverage ......................................................... H-28 7-3.1.4.3 Additional Insured .................................................................. H-28 7-3.1.4.4 Pollution/Environmental Impairment Coverage ..................... H-28 7-3.2 Acceptability of Insurers .............................................................. H-29 7-3.2.1 Non-admitted in California ........................................................ H-29 7-3.2.2 Admitted (licensed) in the State of California............................ H-29 7-3.2.3 For Worker’s Compensation Only ............................................ H-29 7-3.3 Verification of Coverage .............................................................. H-29 7-3.4 Documentation Required ............................................................. H-30 7-3.4.1 Certificates of Insurance ........................................................... H-30 7-3.4.2 General Liability Insurance Endorsements ............................... H-30 7-3.4.3 Automobile Liability Insurance Endorsements .......................... H-30
7-3.4.4 Workers’ Compensation and Employer’s Liability Insurance Endorsements ..................................................................... H-31 7-3.4.5 Pollution/Environmental Impairment Liability Insurance Endorsements ..................................................................... H-31
7-3.5 Self-insured Programs, Self-Insured Retentions, Deductibles ..... H-31 7-3.5.1 Approval ................................................................................... H-31 7-3.5.2 Legal Defense .......................................................................... H-31 7-3.5.3 Certification .............................................................................. H-31 7-3.6 Subcontractors ............................................................................ H-31 7-5 Permits ...................................................................................................... H-32 7-5.1 City Building and Fire Prevention Permits ................................... H-32 7-8 Work Site Maintenance ............................................................................. H-32 7-8.1 Cleanup and Dust Control ........................................................... H-32 7-8.3 Noise Control............................................................................... H-32 7-8.6 Water Pollution Control ............................................................... H-32 7-8.6.3 SWPPP .................................................................................... H-33 7-8.8 Vermin Control ............................................................................ H-34 7-8.9 Graffiti Removal ........................................................................... H-34 7-9 Protection and Restoration of Existing Improvements .............................. H-34 7-10.3 Haul Routes H-34# 7-10 Safety ...................................................................................................... H-35 7-10.3 Haul Routes H-34# 7-10.3 Haul Routes............................................................................... H-35 7-10.4 Safety ........................................................................................ H-35 7-10.6 Construction Area Information Sign and Community Outreach ............................................................................................... H-35 7-10.6.1 Temporary Security/Construction Fence ................................ H-36
7-10.6.2 Graphic Fence Wrap for Temporary Security/Construction Fence ............................................................... H-37
7-15 Taxes ...................................................................................................... H-38 7-16 Indemnification ........................................................................................ H-39 7-16.1 General ..................................................................................... H-39 7-16.2 Defense of Claims, Enforcement and Restrictions .................... H-40 7-16.3 No Limitations ............................................................................ H-41 Section 8 – Facilities for Agency Personnel ............................................................... H-41 Section 9 – Measurement and Payment .................................................................... H-41 9-3 Payment .................................................................................................... H-41 9-3.1 General ....................................................................................... H-41
Department of Public Works Page v R-7296
9-3.2 Partial and Final Payment ........................................................... H-42
DIVISION I – TECHNICAL REQUIREMENTS
Not Used
DIVISION J – CSI TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 20 00 PRICE AND PAYMENT PROCEDURES
01 25 00 SUBSTITUTION PROCEDURES
01 26 13 REQUESTS FOR INTERPRETATION
01 30 00 SUBMITTAL REQUIREMENTS
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
02 41 20 SELECTIVE BUILDING DEMOLITION
DIVISION 03 – CONCRETE
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 10 CONCRETE FLATWORK FINISHING AND CURING
03 54 16 HYDRAULIC CEMENT UNDERLAYMENT
DIVISION 05 – METALS
05 05 14 SHOP-APPLIED STEEL PRIMER
05 12 00 STRUCTURAL STEEL
05 40 00 COLD FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 10 53 MISCELLANEOUS ROUGH CARPENTRY
06 41 19 PLASTIC LAMINATE-CLAD WOOD CASEWORK
Department of Public Works Page vi R-7296
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 01 50 PREPARATION FOR RE-ROOFING
07 21 50 BUILDING ENCLOSURE INSULATION
07 54 16 KETONE ETHYLENE ESTER ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 65 26 SASM FLASHING
07 72 33 ROOF HATCHES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 12 13 STANDARD HOLLOW METAL FRAMES
08 12 15 SPECIALTY METAL FRAMES
08 13 13 STANDARD HOLLOW METAL DOORS
08 14 16 FLUSH WOOD DOORS
08 31 16 ACCESS PANELS
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 81 10 INTERIOR GLASS GLAZING
08 83 13 MIRRORED GLASS
08 87 13 SOLAR CONTROL GLAZING FILM
DIVISION 09 – FINISHES
09 01 90 EXISTING PAINTED METAL REFINISHING
09 05 16 PREPARATION OF CONCRETE SUBSTRATES FOR FINISH
FLOORING
09 22 16 LIGHTGAGE METAL FRAMING
09 22 26 METAL SUSPENSION SYSTEMS
09 28 15 GMF GYPSUM TILE BACKING BOARD
09 29 00 GYPSUM BOARD
09 51 13 ACOUSTICAL PANEL CEILINGS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 16 RESILIENT SHEET FLOORING
09 65 19 RESILIENT TILE FLOORING
09 65 23 RESILIENT PLANK FLOORING
09 77 33 FRP WALL PANELS
09 81 33 ACOUSTICAL INSULATION, SEALANTS, AND ACCESSORIES
09 91 00 PAINTING
09 98 23 PENETRATING CONCRETE FLOOR SEALER
Department of Public Works Page vii R-7296
DIVISION 10 – SPECIALTIES
10 14 13 REGULATORY SIGNAGE
10 12 13 TOILET COMPARTMENTS
10 28 13 COMMERCIAL TOILET ACCESSORIES
10 44 00 FIRE PROTECTION SPECIALTIES
DIVISION 11 – EQUIPMENT
11 11 33 ELECTRIC VEHICLE CHARGING STATIONS
11 12 33 PARKING GATES
DIVISION 12 – FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS
12 36 64 QUARTZ AGGLOMERATE COUNTERTOPS
DIVISION 21 – FIRE SUPRESSION
21 13 19 PRE-ACTION FIRE SPRINKLER SYSTEM
DIVISION 22 – PLUMBING
22 01 30 COMMON WORK RESULTS FOR PLUMBING
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION
22 10 05 PLUMBING PIPING
22 10 06 PLUMBING PIPING SPECIALTIES
22 40 00 PLUMBING FIXTURES
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 01 30 COMMON WORK RESULTS FOR HVAC
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 48 VIBRATION & SEISMIC CONTROLS FOR HVAC PIPING & EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13 DUCT INSULATION
23 07 19 HVAC PIPING INSULATION
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 23 00 REFRIGERANT PIPING
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
Department of Public Works Page viii R-7296
23 35 24 VEHICLE SQUARE RAIL WITH EXTERNAL TROLLEY (VSRX) VEHICLE
EXHAUST REMOVAL SYSTEM MAGNETIC GRABBER®
23 36 00 AIR TERMINAL UNITS
23 37 00 AIR OUTLETS AND INLETS
23 81 27 SMALL SPLIT-SYSTEM HEATING AND COOLING
DIVISION 26 – ELECTRICAL
26 05 00 GENERAL ELECTRICAL REQUIREMENTS
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 34 CONDUIT
26 05 37 BOXES
26 05 48 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 16 ELECTRIC CONTROLS AND RELAYS
26 09 23 LIGHTING CONTROL DEVICES
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 16 ELECTRICAL CABINETS AND ENCLOSURES
26 27 17 EQUIPMENT WIRING
26 27 26 WIRING DEVICES
26 28 18 ENCLOSED SWITCHES
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 FIRE DETECTION AND ALARM SYSTEM (EXISTING)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 17 19 PAVEMENT MARKINGS AND WHEEL STOPS
32 31 13 CHAIN LINK FENCES AND GATES
32 31 22 MANUFACTURED DECORATIVE METAL FENCES AND GATES
32 31 23 SECURITY FENCES AND GATES
32 31 43 AUTOMATIC GATE OPERATORS
DIVISION A
NOTICE INVITING BIDS
Department of Public Works A-1 Specification R-7296
City of Long Beach Division A – Notice Inviting Bids
DIVISION A
NOTICE INVITING BIDS
FOR
RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the work, until 11:00 a.m. on August 6, 2026, for TID Radio & Asset Services Building, via the City’s online portal https://longbeachbuys.buyspeed.com/ keyword Project R-7296.
MANDATORY PRE-BID CONFERENCE AND JOB-SITE WALK-THROUGH: The City will conduct a mandatory pre-bid conference to review bidding processes, Project Labor Agreement (PLA), and Long Beach Small Business Enterprise (LBSBE) requirements on July 9, 2026, at 11:00 a.m. Prospective Bidders must attend this meeting. Failure to attend the pre-bid conference and follow procedures to confirm your attendance shall be cause for rejection of the bid.
The pre-bid conference will be conducted via Microsoft Teams. The meeting can be accessed online via the following link:
https://teams.microsoft.com/meet/281698371385950?p=vvaKrR5MggpFfivKL7
Meeting ID: 281 698 371 385 950 Passcode: Bb3uq3rE
Dial in by phone: +1 213-279-1690,,33970977# United States, Los Angeles
The City will also conduct a mandatory Job-Site Walk-Through meeting at the location below.
2961 Redondo Ave.
Time: 1:00 p.m. to 2:30 p.m. (drop-in hours)
Date: July 9, 2026
DESCRIPTION OF WORK: The work to be done consists primarily of office and warehouse improvements including asbestos abatement, ADA restrooms, millwork, HVAC ductwork and new roof, electrical, lighting, plumbing, interior finishes, chain link enclosure, rollup door, EV charger and parking stalls, and vehicle exhaust control system.
Used furniture has been acquired and is stored at the site. The Contractor is required to protect and move disassembled furniture as needed to complete construction activities.
Furniture assembly is by others. Bids are required for the entire Work.
LONG BEACH SMALL BUSINESS ENTERPRISE (SBE) PROGRAM: Bidders are advised that this project is subject to the City’s SBE (SBE), Very Small Business (VSB) and Local Small Business (LSBE) Enterprise Program (LBSBE Program) established by City Ordinance No. Ord 11-0010. See Divisions C and E of the Specifications. This project is subject to a LBSBE goal of 10%.
https://longbeachbuys.buyspeed.com/ https://teams.microsoft.com/meet/281698371385950?p=vvaKrR5MggpFfivKL7 tel:+12132791690,,33970977
Department of Public Works A-2 Specification R-7296
PROJECT LABOR AGREEMENT (PLA): This work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the work and for the craft persons employed by the Contractor or subcontractor while engaged in the work. See Division E of the Specifications for the applicable PLA.
CONTRACTOR'S LICENSE: The Contractor shall possess a valid California Class B contractor license at the time of bid. The City may deem any Bidder who fails to possess the required license to be non-responsive.
PLANS AND SPECIFICATIONS: Plans and specifications are posted on the City’s website at the URL http://www.longbeach.gov/finance/business-info/purchasing-division/ on the “Bids/RFPs” tab and available for free download, however, you must be registered (registration is free and may be accomplished at the same URL) and logged in to view or download the documents.
BID SECURITY: Bidders must scan and upload with their bid documents, a certified check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the bid. The original of the above instrument shall be submitted to the City Clerk in a sealed envelope and must be received and time/date stamped by the City Clerk’s Office no later than the time and date stated for receipt of bids. The outside of the envelope shall clearly state “Bid Security for Specification R-7296 Project TID Radio & Asset Services Building. DO NOT OPEN WITH REGULAR MAIL.” The City Clerk’s Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach, CA 90802. The bid security may be submitted through certified mail or in-person. Bidders may proceed directly to Window 12 without pulling a service ticket.
The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will execute, and deliver to the City, no later than fifteen (15) calendar days after the date shown on the “Notice of Award,” the following items:
1. The Contract for doing the work, and
2. A corporate surety bond in favor of the City of Long Beach in an amount not less than 100 percent of the Contract price for the faithful performance of the Contract, and
3. A corporate surety bond in an amount not less than 100 percent of the Contract price for the payment of all labor and material claims, and
4. Evidence of required insurance coverage as written in Division H of the Bid Specifications.
Failure to submit the items noted above when specified may result in the City, in its sole discretion, declaring the bid security forfeited and depositing the same into the City Treasury.
http://www.longbeach.gov/finance/business-info/purchasing-division/
Department of Public Works A-3 Specification R-7296
The City will retain the bid security accompanying all bids until it awards the Contract.
The City will retain the bid security submitted with the bid of the Bidder to whom an award of Contract is made, and the bid security of the next higher bid, until the Contract between the Bidder to whom award of the Contract is made and the City has been executed.
RETENTION: In the event the contract to be awarded hereunder, including Bid Specifications and other documents incorporated therein by reference, provides for the withholding of monies by the City to ensure performance of such contract, the Contractor may: a) deposit with the City as a substitute for said monies, securities listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit, or both, equivalent to the amount withheld; or, b) request payment of retentions earned directly to the escrow agent at the expense of the Contractor, provided Contractor requests, in writing, to make such substitution within five (5) days of the date of the Notice of Award of the Contract and bears all expenses in connection therewith. Either option shall be in accordance with Public Contract Code Section 22300.
CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the work.
Copies of the prevailing rate of per diem wages are on file in the office of the City Engineer, 5th Floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802.
The Contractor to whom the Contract is awarded, and its subcontractors, shall pay to all workers in the performance of the work not less than the prevailing rate of wages needed to execute the contract. Copies of schedules of prevailing wage rates may be obtained on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr.
This project will be subject to the 2026-1 prevailing wage rate, as determined by the Director of the Department of Industrial Relations for the State of California. Bidders are directed to Section 7-2, “Labor,” of the Standard Specifications, and to Division H, Subsection 7-2.2, “Prevailing Wages,” for requirements concerning payment of prevailing wages, payroll records, and hours of labor.
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is subject to the following: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations.
http://www.dir.ca.gov/dlsr
Department of Public Works A-4 Specification R-7296
CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the provisions of Labor Code Section 1776, Contractor shall keep and shall cause each subcontractor performing any portion of the work under this Contract to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by
Contractor or subcontractor in connection with the work. Such payroll records for
Contractor and all subcontractors shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor pursuant to the provisions of
Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or
City’s authorized Labor Compliance representative in the manner provided herein for notices shall entitle City to withhold the penalty prescribed by law from progress payments due to Contractor.
Each contractor and every subcontractor and supplier shall be required to submit certified payrolls and labor compliance documentation electronically at the discretion of and the manner specified by the City of Long Beach. Electronic submittal will be a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subcontractor will be given a Log On identification and password to access the City of
Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other requirements or obligations established and imposed by any department of the City with regard to submission and retention of certified payroll records for Contractor and subcontractors.
APPRENTICESHIP EMPLOYMENT (CONTRACTS OVER $30,000 ONLY): The
Contractor shall comply with Section 1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall so comply. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
PENALTIES: Contractor and subcontractors are subject to penalties, including, but not limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with
Labor Code § 1720 et seq. The Awarded Consultant expressly agrees to comply with the penalty provisions of California Labor Code section 1776.
(SEAL) /s/ MONIQUE DE LA GARZA
CITY CLERK, CITY OF LONG BEACH, CALIFORNIA
_____________ /s/ THOMAS B. MODICA
DATE CITY MANAGER
Department of Public Works A-5 Specification R-7296
End of Division A – Notice Inviting Bids
DIVISION B
INSTRUCTIONS TO BIDDERS
Department of Public Works B-1 Specification R-7296
City of Long Beach Division B – Instruction to Bidders
DIVISION B
INSTRUCTIONS TO BIDDERS
Please read these instructions carefully. If you do not submit a complete bid, the City may determine that your bid is non-responsive, in which case the City will reject your bid.
ATTENDANCE AT MANDATORY PRE-BID CONFERENCE: Entry of bid amounts will be accomplished electronically. Bid prices submitted on a paper bid form will not be accepted. Bidders are strongly encouraged to send an individual who is responsible for the bid, and not a runner. Bid submission processes and how to access the bidding system will be discussed at the pre-bid conference. Attendance at the pre-bid conference is mandatory. Failure to attend the pre-bid conference and follow procedures to confirm attendance shall be cause for rejection of the bid. See Division A of the Specifications for the date and time of the Pre-Bid Conference.
SUBMISSION OF BID: The bid shall be submitted online at https://longbeachbuys.buyspeed.com/bso/ keyword R-7296. Bidders must be registered on the City’s portal to access the bidding page and to download the plans and specifications. All documents to be submitted with the bid are contained in Division C of this Specification and the issued Addenda found under the online bid portal. These documents shall be scanned and uploaded with the bid. The originals of the Bidder’s Bond, and any other document which may require notarization, must be placed in a sealed envelope, clearly marked on the outside with Specification R-7296 TID Radio & Asset Services Building, DO NOT OPEN WITH REGULAR MAIL,” and these originals must be received by the City Clerk at the address shown in the Notice Inviting Bids by the time and date stated therein. These originals may be mailed or sent via package delivery service to City of Long Beach, 411 W. Ocean Blvd, Attn: City Clerk, Long Beach, CA 90802, but the City is not responsible for lost or misdirected mail. The City Clerk’s time-stamp clock is the official time for receipt of documents.
PROJECT LABOR AGREEMENT: This work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the Work and for the craft persons employed by the Contractor or subcontractor while engaged in the Work.
The work covered by this Agreement shall be limited to any and all demolition, construction and rehabilitation work pursuant to prime multi-trade and specialty contracts and all subcontracts, of whatever tier, entered into by the City that exceed $750,000 for non-street/right of way projects and $1,000,000 for street/right of way projects.
The goal of the PLA is to provide that the Work bring full employment and economic benefit to the City and its residents. With the PLA, the parties have established a framework for fair wages, hours and working conditions through which these goals may be achieved, and which will permit the utilization of the most modern, efficient and https://longbeachbuys.buyspeed.com/bso/
Department of Public Works B-2 Specification R-7296 effective procedures for construction, assure a sufficient supply of skilled craft persons, and reduce or eliminate the causes of disruptions or interference with the Work.
The PLA contains a local hiring goal of 40%, calculated based on total hours worked. The local hire provision requires best efforts to utilize qualified workers residing in first tier zip codes (which include all of the City of Long Beach), then in second tier zip codes (which reflect the Gateway Cities), and finally in Los Angeles and Orange Counties.
In addition, there is a provision with a goal of 10% to hire Transitional Workers and Veterans. The term Local Resident, as used herein, shall mean an individual whose primary place of residence is within the Counties of Los Angeles or Orange. The City of Long Beach will utilize a PLA Administrator who will work with the contractors, residents, Long Beach City College, Long Beach Workforce Innovation Network (LBWIN), and the Trades to oversee the provisions of the Agreement.
Furthermore, the general contractor will be required to hire a "Jobs Coordinator" to provide additional outreach efforts connecting Long Beach residents to job opportunities.
The term Jobs Coordinator means an independent third-party individual, entity, or employee with whom the prime contractor enters into a contract or employs to facilitate implementation of the targeted hiring requirements of the PLA.
This work will provide many opportunities for local residents and local small business enterprises to participate. It is the City’s policy that contractors will cooperate with all efforts of the City, the PLA Administrator, the Jobs Coordinator (if applicable), and other organizations retained by the City to encourage and assist in the participation of local residents and local small businesses in the Work.
Contractor and all its subs will be required to sign a Letter of Assent to acknowledge and agree to comply with all provisions of the PLA. Refer to Division E of the Specifications for the applicable PLA and Letter of Assent.
EXAMINATION OF SITE AND WORK: Each Bidder must fully inform itself of the conditions relating to the work and the employment of labor for the work. A Contractor’s failure to do so will not relieve it of the obligation to furnish all material and labor necessary to complete the Work.
TIME FOR COMPLETION: The Work must be completed within 243 calendar days after the commencement date stated in the Notice to Proceed.
CONTACT: Before the bid opening, prospective Bidders shall direct any communications regarding this Work to:
City of Long Beach, Department of Public Works Project Management Bureau 5h Floor, City Hall 411 W. Ocean Boulevard Long Beach, CA 90802 Attention: Nancy Villaseñor E-mail: Nancy.Villasenor@longbeach.gov
Department of Public Works B-3 Specification R-7296
Communications may be written or oral, but the City is not bound by any oral interpretation of the Contract Documents made by any City employee, nor does the City guarantee the accurate transcription of oral questions.
PROPRIETARY INFORMATION: Responses to the Notice Inviting Bids become the exclusive property of the City of Long Beach. All bids submitted in response to the Notice Inviting Bids are a matter of public record and shall be regarded as public records.
Exceptions will be those elements in each bid that are defined by the Bidder as business or trade secrets and are marked as “Trade Secrets,” “Confidential,” or “Proprietary.”
The City shall not be liable or responsible in any way for disclosure of any records not marked as “Trade Secrets,” “Confidential,” or “Proprietary.” The City shall not be liable or responsible in any way for disclosure of any records so marked if disclosure is deemed to be required by law or by a court order.
BIDS SHALL REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for 120 calendar days after the bid opening.
INTERPRETATION AND MISUNDERSTANDINGS OF PLANS AND DOCUMENTS:
Bidders may submit to the Project Manager written requests for interpretation or correction of the Plans, Specifications, or other Contract Documents. Bidders shall not make such requests later than fourteen (14) calendar days prior to the date of bid opening. Bidders submitting such requests are responsible for their timely delivery. The City will interpret or correct the Contract Documents only by a written Addendum, and such Addenda will be posted to the web address noted in Division A. The City is not bound by any oral interpretation of the Contract Documents made by any City employee.
If Bidder fails to raise any issue regarding such interpretation or correction or if the City fails to respond to a request, Bidder will be deemed to have accepted all risks associated with that issue. Bidder specifically waives the right to request a Change Order, equitable adjustment, or to request additional time, or to seek recovery in quantum meruit in conjunction with any such issue. Bidder further waives the right to assert arguments of estoppel or implied or express warranty of design with regard to any such issue.
ITEM EQUIVALENCY: Any Bidder desiring to bid an "approved equal" item shall submit a request to do so to the City in writing no later than fourteen (14) calendar days prior to the date of the bid opening. The request shall include all data necessary to substantiate that the item is equal. The City will notify the Bidder, in writing, of approval or disapproval of the proposed item no later than five (5) calendar days prior to the date of the bid opening. Submit written approvals with your bid.
EQUAL EMPLOYMENT OPPORTUNITY: The City of Long Beach is an equal opportunity employer and requires all Bidders to comply with policies and regulations concerning equal employment opportunity.
IRAN CONTRACTING ACT: In accordance with California Public Contracting Code Section 2200-2208, all Bidders submitting proposals for, entering into, or renewing contracts with the City and estimated at $1,000,000 or more are required to complete, Department of Public Works B-4 Specification R-7296 sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit” contained in Division C.
TAXES: Bidders shall not mention Sales Tax, Use Tax, or any other tax in their bids. All bid amounts will be deemed to include such taxes.
BID PREPARATION: The Bid Form included in Division C is provided to assist Bidders in the preparation of their bid, but bids shall be entered electronically as directed above and in Division A. Bidders shall complete all items of the Bid. Selection of “NO BID” for any bid item will render the bid non-responsive (the “NO BID” box is checked off by default, be sure to uncheck it). Submission of 0.00 as the value for any bid item will also render the bid non-responsive. The Unit Price shall control, regardless of the extended total for that item. If the unit price is less than one cent, Bidders shall include the proper number of zeros.
Bidders shall not modify the bid in any way. The City will not consider substitutions except as described in “Item Equivalency”.
Bidders shall provide a bid for the base Bid and, as directed by instructions on the bid Document, a separate bid for each of the alternates.
The electronic bidding system will total the amount bid. The TOTAL AMOUNT BID may be used by the City for comparison in determining the apparent low bid at the time of bid opening. The sum of the mathematically correct extended totals for each item under the ITEM TOTAL column shall be deemed the Bidder’s intended bid. Any errors shall, at the option of the City, constitute grounds for the City’s rejection of the bid.
Bidders are cautioned that the electronic bidding system will cease allowing entry at the time stated for bid opening, regardless of when entry was begun. Bidders are reminded to begin bid submission with sufficient time to complete the entries.
The City will not consider oral, telephonic, fax, or paper bids.
Bidders shall sign the Bidder Information / Signature Form properly, in longhand.
The City will not consider any bid that does not meet these requirements.
LISTING SUBCONTRACTORS: Bidders must submit the list of subcontractors on this Project that is required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et. seq.). Failure to list a subcontractor for an item of work at time of bid is an acknowledgement that the Bidder will perform such work with its own forces.
ADDENDA ACKNOWLEDGEMENT: All Addenda issued before the time Bids are due shall form a part of the Contract Documents. It is the Bidders’ responsibility to determine what Addenda are issued. Bidders may do so by accessing the website shown in Division A. The City may deem any bid that fails to acknowledge all Addenda to be non-responsive. Bidders should acknowledge each Addenda by signing the signature block found in each Addenda and uploading with Division C bid documents.
Department of Public Works B-5 Specification R-7296
BID SECURITY: Bidders shall include with their bids in the manner described above in the Bid Security section shown in Division A - Notice Inviting Bids. The City will reject any bid not accompanied by such bid security.
DELIVERY OF BID: Bidders shall input their bids online via the City’s bidding portal. No paper bids will be accepted.
WITHDRAWAL OF BIDS: Bidders may withdraw their bids before the time set for the bid opening in the Notice Inviting Bids. Bidders may not withdraw their Bids after that time without forfeiture of the bid security. Withdrawal of the bid will not prejudice any Bidder’s right to submit a new bid, if there is time to do so.
LATE BIDS: The City will reject, and the bidding system will not allow, any bid received after the time set for the bid opening whether or not the bids are opened exactly at the time set in the Notice Inviting Bids.
TELEPHONES: The City does not provide telephones for use by Bidders.
BID ALTERNATES: Please see the bid form.
BID OPENING: All timely received bids will be subject to further evaluation with respect to:
• The responsiveness of the bid
• Determination that Bidder is responsible
AWARD OF CONTRACT AND OWNER’S RIGHTS RESERVED: If the City awards the Contract, it will award the Contract to the lowest responsible Bidder as determined solely by the City. The City reserves the right to reject any or all bids, and, to the extent not prohibited by law, to waive any minor irregularity or informality in any bid that does not give the Bidder a competitive advantage over other Bidders and to take the Bids under advisement for the bid guarantee period shown above, as may be necessary in the best interests of the City.
End of Division B - Instructions to Bidders
DIVISION C
BID DOCUMENTS
Department of Public Works C-1 R-7296
City of Long Beach Division C – Bid Documents
BIDDER'S NAME: ______________________
BID TO THE CITY OF LONG BEACH
In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be opened on August 6, 2026, at 11:00 a.m., we offer to furnish all necessary labor, tools, materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting Bids, in full compliance with Plans & Specifications No. R-7296 at the prices listed below.
We certify that we have examined the site and that the Bid is complete. By signing the Bid, we certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.
The base bid total shall be used for determining the lowest bidder.
BASE BID
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN
FIGURES)
1. Mobilization/Demobilization (5% of Total Bid Maximum/Bid Items 2-32)
1 LS
2. Selective Demolition 1 LS
3. Concrete (ADA Ramp, Cutting, Scanning & Creating New Opening for Rollup Door and Man Door, Concrete Patching – Restrooms and New Switchgear Pad)
1 LS
4. Masonry (Infill Around New Openings as Required)
5. Metals (Structural Steel, ADA Ramp Handrails, Bollards)
6. HVAC – Interior Revisions, Wall Units, Duct & Testing
7. Fencing – Interior and Exterior, Including Gates & Rollup Doors
8. Exterior & Interior Framing & Rough Carpentry
9. Drywall, Tape & Finishing 1 LS
10. Painting (Interior & Exterior Components)
Department of Public Works C-2 R-7296
City of Long Beach Division C – Bid Documents
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN
FIGURES)
11. Flooring (Including Patching)
12. Ceiling (ACT, Hard Lid, Patches & Repairs)
13. Restroom Partitions & All Restroom Accessories
14. Signage 1 LS
15. Fire Protection/Fire Sprinkler, Relocation & Testing
16. Fire Extinguishers & Cabinets
17. Casework (Including All Countertop & Shelving)
18. Plumbing (Including Fixtures & Camera Inspection of Existing Sewer Lateral to Street)
19. Building Electrical System & Utility Components
20. New Electrical Service & Switchgear
21. EV Charging Stations 1 LS
22. Window 1 LS
23. Doors (Including Framing and Hardware)
24. Window Shades – As Needed Repair & Replacement
25. Kitchen Equipment & Appliances
26. Parking Lot – Asphalt Resurfacing, Striping, Signage & Wheel Stops
27. Vehicle Exhaust System 1 LS
28. Roofing 1 LS
29. Hazardous Materials Removal/Abatement
30. Allowance for Replacing up 1 LS
Department of Public Works C-3 R-7296
City of Long Beach Division C – Bid Documents
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
(IN FIGURES)
ITEM TOTAL
(IN
FIGURES)
to 15% of Roof Decking
31. Allowance for repairing all dings/scratches at existing doors/frames
$1,000
$1,000
32. Allowance for new ceiling and grid in offices 5-10 (identified as rooms 105, 106, 107, 108, 109 & 110), vestibule 113 and corridor 119A
$20,000
$20,000
BASE BID TOTAL _______________________________________________
We understand that these quantities are estimates only and are given solely for the purpose of facilitating the comparison of Bids, and that the Contractor’s compensation will be computed on the basis of the actual quantities in the completed Work.
DO NOT SUBMIT THIS FORM AS YOUR BID. BIDS ARE TO BE SUBMITTED
ELECTRONICALLY AS DESCRIBED IN DIVISION B.
(Continued on Next Page)
Department of Public Works C-4 R-7296
City of Long Beach Division C – Bid Documents
BIDDER INFORMATION…