R-7296 Addendum 1 with Drawings.pdf
PDF 22 MB Posted
- Attached to
- R-7296 REBID TID Radio & Asset Services Building
- Solicitation number
- PW-26-754
- Issued by
- Los Angeles County, California
About this file
This is Bid Addendum No. 1 issued by the City of Long Beach Department of Public Works for Plans and Specifications No. R-7296 concerning the TID Radio & Asset Services Building. The addendum, dated July 6, 2026, replaces all previously posted drawings in their entirety with an updated set titled "B-4854 TID Bldg. 100% Drawings 7.6.26." The project involves office and warehouse improvements to a 10,772 square-foot, one-story facility classified as Business (B) and Storage (S-1) occupancy. The scope of work encompasses asbestos abatement, ADA-compliant restrooms, millwork, HVAC ductwork, new roof installation, electrical and lighting systems, plumbing, interior finishes, chain link enclosures, rollup door, electric vehicle charging infrastructure, parking stall improvements, and vehicle exhaust control systems. The updated drawings include 68 total sheets covering architectural, mechanical, and electrical specifications, including site plans, demolition plans, partition plans, roof plans, reflected ceiling plans, exterior elevations, building sections, finish plans, restroom details, and door schedules. A mandatory pre-bid conference was scheduled for July 9, 2026 at 11:00 a.m. via Microsoft Teams, with a mandatory job-site walkthrough from 1:00 p.m. to 2:30 p.m. at 2961 Redondo Avenue. Bids were due August 6, 2026 at 11:00 a.m., and work must be completed within 243 calendar days of notice to proceed.
The project is subject to Title 24, Part 2 of the California Code of Regulations regarding disabled access and adaptability requirements, as well as the 2022 California Building Code, California Energy Code, California Fire Code, and California Green Building Standards Code. The Long Beach Small Business Enterprise Program applies with a 10% combined goal for SBE/VSBE/LSBE participation. A Citywide Project Labor Agreement with the Los Angeles/Orange Counties Building and Construction Trades Council establishes prevailing wage requirements and local hiring goals of 40% calculated on total hours worked, plus a 10% goal for transitional workers and veterans. Bidders must hold a valid California Class B contractor license and be registered with the Department of Industrial Relations, with bid security of 10% required. Certified payroll records must be submitted electronically in compliance with prevailing wage rates determined by the California Department of Industrial Relations. Workers' compensation insurance, commercial general liability insurance with minimum limits, and pollution/environmental impairment liability coverage are required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/6/2026
July 6, 2026
BID ADDENDUM NO. 1
PLANS AND SPECIFICATIONS NO. R-7296
TID RADIO & ASSET SERVICES BUILDING
NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS
Please note the following changes, clarifications, and additions:
1. The drawings posted in LB Buys are replaced in their entirety with an updated set of drawings:
“B-4854 TID Bldg. 100% Drawings 7.6.26”
PREPARED BY: Nancy Villaseñor
ACKNOWLEDGED BY: ___________________________________________
Company Name
Print Name Title
Signature Date
Department of Public Works 411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
THIS PROJECT IS SUBJECT TO TITLE 24, PART 2, OF THE CALIFORNIA CODE
OF REGULATIONS, SECTIONS 1.8.2.1.2, 1.9.1 AND 1103B, THE STATE’S
DISABLED ACCESS AND ADAPTABILITY REQUIREMENTS. THE DESIGN
PROFESSIONAL OF RECORD SHALL SIGN A STATEMENT ON THE PLANS TO
THE EFFECT:
"I CERTIFY THAT THE PRIMARY PATH OF TRAVEL TO THE SPECIFIC AREA OF
ALTERATION, STRUCTURAL REPAIR OR ADDITION FROM THE PUBLIC WAY
OR ACCESSIBLE PARKING SPACE AS INDICATED ON THE PLANS DOES NOT
INCLUDE STEPS OR A SLOPE EXCEEDING 1:20 EXCEPT WHERE ACCESS IS
PROVIDED BY A RAMP WITH 1:12 MAXIMUM SLOPE, ACCESSIBLE ELEVATOR
OR OTHERWISE GRANTED BY AN UNREASONABLE HARDSHIP EXEMPTION. I
UNDERSTAND THAT IF THE PRIMARY PATH OF TRAVEL IS FOUND NOT TO
BE AS INDICATED, SIGNIFICANT DELAYS MAY RESULT.
FURTHERMORE, I CERTIFY THAT THESE PLANS WERE PREPARED UNDER MY
DIRECT SUPERVISION AND THAT THE AREA OF SPECIFIC ALTERATION,
STRUCTURAL REPAIR OR ADDITION, INCLUDING A PRIMARY ENTRANCE TO
THE EXISTING BUILDING AND, WHEN APPLICABLE, SANITATION FACILITIES,
DRINKING FOUNTAINS, SIGNS AND PUBLIC TELEPHONES SERVING THE
AREA COMPLIES WITH CURRENT CA TITLE 24 ACCESSIBILITY
REQUIREMENTS."
SIGNATURE TITLE
PRINT DATE
SHEET INDEX
A-0.00 COVER SHEET
GENERAL
SHEET DESCRIPTION IS
SU
E
FO
R
0%
A-0.11 GENERAL NOTES
A-0.12 GENERAL NOTES
A-0.13 GENERAL NOTES
A-0.14 2022 CBC CHAPTER 11B
A-0.21 2022 CALGREEN NON-RESIDENTIAL
A-0.22 2022 CALGREEN NON-RESIDENTIAL
A-0.23 2022 CALGREEN NON-RESIDENTIAL
A-0.24 2022 CALGREEN NON-RESIDENTIAL
A-0.61 EGRESS PLAN
AD-1.00 DEMOLITION SITE PLAN
ARCHITECTURAL DEMOLITION
AD-1.01 DEMOLITION PARTITION PLAN
AD-1.11 DEMOLITION ROOF PLAN
A-1.00 SITE PLAN
ARCHITECTURAL
A-1.01 PARTITION PLAN
A-1.11 ROOF PLAN
A-2.01 REFLECTED CEILING PLAN
A-3.01
EXTERIOR ELEVATIONSA-4.01
BUILDING SECTIONSA-5.01
FINISH PLAN - FLOOR
A-7.01 ENLARGED RESTROOM PLAN
D-1.01 DETAILS - WALL
D-8.01 DETAILS - DOOR
D-2.01 DETAILS - CEILING
A-8.01 DOOR SCHEDULE
AD-2.01 DEMOLITION REFLECTED CEILING PLAN
MECHANICAL
ELECTRICAL
TOTAL SHEETS: 68
M-0.01 GENERAL NOTES, LEGEND, CODES AND SHEET INDEX
M-0.02
MECHANICAL DEMO PLAN - LEVEL 1
MD-2.02 MECHANICAL DEMO PLAN - ROOF LEVEL
M-2.01 MECHANICAL PLAN - LEVEL 1
MD-2.01
MECHANICAL SCHEDULES
M-2.02 MECHANICAL PLAN - ROOF LEVEL
M-6.01 MECHANICAL DETAILS
E-0.01 ELECTRICAL GENERAL NOTES AND SHEET INDEX
E-0.02
ELECTRICAL SINGLE LINE DIAGRAM
ED-2.01 ELECTRICAL DEMOLITION POWER PLAN
ED-2.02 ELECTRICAL DEMOLITION LIGHTING PLAN
ELECTRICAL SYMBOLS LIST AND ABBREVIATIONS
E-1.01 ELECTRICAL SITE REMODEL POWER PLAN
E-2.01 ELECTRICAL REMODEL POWER PLAN
DETAILS - ROOFD-1.11
THE CONTRACTOR SHALL CONFORM TO ALL CODES, ORDINANCES, ETC.
WHICH HAVE JURISDICTION OVER THE WORK. THE CONTRACTOR SHALL
RETAIN RESPONSIBILITY FOR COMPLIANCE WITH LATEST REVISIONS OF ALL
OTHER APPLICABLE CODES AND ORDINANCES INCLUDING THE FOLLOWING:
CALIFORNIA CODE OF REGULATIONS:
TITLE 19 - CALIFORNIA CODE OF REGULATIONS
TITLE 24 - BUILDING STANDARDS CODE:
2022 CALIFORNIA ADMINISTRATIVE CODE
2022 CALIFORNIA ENERGY CODE - TITLE 24
2022 CALIFORNIA EXISTING BUILDING CODE
2022 CALIFORNIA BUILDING CODE (CBC)
2022 CALIFORNIA ELECTRICAL CODE (CEC)
2022 CALIFORNIA MECHANICAL CODE (CMC)
2022 CALIFORNIA PLUMBING CODE (CPC)
2022 CALIFORNIA FIRE CODE (CFC)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC)
LONG BEACH MUNICIPAL CODE:
TITLE 18 - LONG BEACH BUILDING STANDARDS CODE
TITLE 21 - ZONING
OWNER
CITY OF LONG BEACH
411 W. OCEAN BLVD
LONG BEACH, CA 90802
CONTACT: NANCY VILLASENOR
PHONE: 562.570.4634
EMAIL: NANCY.VILLASENOR@LONGBEACH.GOV
ARCHITECT
KARDENT
11 GOLDEN SHORE, SUITE 540
LONG BEACH, CA 90802
CONTACT: ERICA BOARD
PHONE: 562-436-9900
EMAIL: EBOARD@KARDENTDESIGN.COM
(E) EXISTING
(N) NEW
L ANGLE
& AND
@ AT
# POUND OR NUMBER
CL CENTERLINE
DIA DIAMETER OR ROUND
ACOUS. ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
A.D. AREA DRAIN
ARCH. ARCHITECTURAL
AES.ST. AESTHETIC STEEL
AGG. AGGREGATE
ALUM. ALUMINUM
ANO. ANODIZED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
ASPH. ASPHALT
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BEAM
BOT. BOTTOM
CAB. CABINET
C.B. CATCH BASIN
CEM. CEMENT
CER. CERAMIC
C.G. CORNER GUARD
C.I. CAST IRON
CLG. CEILING
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CNTR. CENTER
C.O. CASED OPENING
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONSTR. CONSTRUCTION
CONT. CONTINUOUS
CORR. CORRIDOR
CP COMMON PATH
CTSK. COUNTERSUNK
CTR. COUNTER
DBL. DOUBLE
DEPT. DEPARTMENT
DET. DETAIL
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIM. DIMENSION
DISP. DISPENSER
DN. DOWN
D.O. DOOR OPENING
DR. DOOR
D.S. DOWNSPOUT
D.S.P. DRY STANDPIPE
DWG. DRAWING
DWR. DRAWER
E EXISTING
EA. EACH
E.D.F. ELECTRICAL DRINKING FOUNTAIN
E.J. EXPANSION JOINT
EL. ELEVATION
ELEC. ELECTRICAL
ELEV. ELEVATOR
EMER. EMERGENCY
ENCL. ENCLOSURE
E.P. ELECTRICAL PANEL BOARD
EQ. EQUAL
EQPT. EQUIPMENT
E.W.C. ELECTRICAL WATER COOLER
EXST. EXISTING
EXP. EXPANSION
EXPO. EXPOSED
EXT. EXTERIOR
F.A. FIRE ALARM
F.B. FLAT BAR
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.A. FIRE EXTINGUISHER
F.A.C. FIRE EXTINGUISHER CABINET
F.B. FINISH FLOOR
FE FIRE EXTINGUISHER
F.H.C. FIRE HOSE CABINET
FIN. FINISH
FL. FLOOR
FLASH. FLASHING
FLUOR. FLUORESCENT
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF MASONRY
F.O.S. FACE OF STUD
FP FIRE ALARM PULL
FPRF. FIREPROOF
F.R. FIRE-RATED
F.S. FULL SIZE
FT. FOOT OR FEET
FTG. FOOTING
FURR. FURRING
FUT. FUTURE
GA. GAUGE
GALV. GALVANIZED
G.B. GRAB BAR
G.C. GENERAL CONTRACTOR
GFA GROSS FLOOR AREA
G.I.S.M GALVANIZED IRON SHEET METAL
GL. GLASS
GND. GROUND
GR. GRADE
GYP. GYPSUM
H.B. HOSE BIB
H.C. HOLLOW CORE
HDWD. HARDWOOD
HDWE. HARDWARE
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HR. HOUR
H. HEIGHT
ID. INSIDE DIAMETER
IN. INCH OR INCHES
INSUL. INSULATION
INT. INTERIOR
JAN. JANITOR
JT. JOINT
KIT. KITCHEN
LAB. LABORATORY
LAM. LAMINATE
LAV. LAVATORY
LKR. LOCKER
LT. LIGHT
MAX. MAXIMUM
M.D. MEDICINE CABINET
MECH. MECHANICAL
MEMB. MEMBRANE
MET. METAL
MFR. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM OR MINUTES
MIR. MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTD MOUNTED
MTL MATERIAL
MUL. MULLION
N NEW
NA NOT APPLICABLE
N.I.C. NOT IN CONTRACT
NO. NUMBER
NOM. NOMINAL
N.R. NOT RATED
N.T.S. NOT TO SCALE
O.A. OVERALL
OBS. OBSCURE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OFF. OFFICE
OPNG. OPENING
OPP. OPPOSITE
O.L.F. OCCUPANT LOAD FACTOR
P.F. PRE-FINISHED
P.LAM. PLASTIC LAMINATE
P.T.D. PAPER TOWEL DISPENSER
COMBINATION
P.T.D./R PAPER TOWEL DISPENSER
& RECEPTACLE
PL. PLATE
PLAS. PLASTER
PLYWD. PLYWOOD
PR. PAIR
PRCST. PRE-CAST
PT. POINT OR PAINTED
Q.T. QUARRY TILE
R. RISER
RAD. RADIUS
RCP REFLECTED CEILING PLAN
R.D. ROOF DRAIN
REF. REFERENCE
REFR. REFRIGERATOR
RGTR. REGISTER
REINF. REINFORCED
REQ. REQUIRED
RESIL. RESILIENT
RM. ROOM
R.O. ROUGH OPENING
RWD. REDWOOD
R.W.L. RAIN WATER LEADER
S.C. SOLID CORE
S.C.D. SEAT COVER DISPENSER
SCHED. SCHEDULE
S.A. SOAP DISPENSER
SECT. SECTION
SH. SHELL
SHR. SHOWER
SHT. SHEET
SIM. SIMILAR
S.N.D. SANITARY NAPKIN DISPENSER
S.N.R. SANITARY NAPKIN RECEPTACLE
SPEC. SPECIFICATION
SQ. FT. SQUARE FEET
S.ST. STAINLESS STEEL
S.SK. SERVICE SINK
ST. STAINED
STA. STATION
STD. STANDARD
STL. STEEL
STOR. STORAGE
STRL. STRUCTURAL
SUSP. SUSPENDED
SYM. SYMMETRICAL
T. TEMPERED
TD TRAVEL DISTANCE
TRD. THREAD
T.B. TOWEL BAR
T.C. TOP OF CURB
TEL. TELEPHONE
TER. TERRAZZO
T.&G. TONGUE AND GROOVE
THK. THICK
T.O.C. TOP OF CANOPY
T.O.M.S. TOP OF MECHANICAL SCREEN
T.O.P. TOP OF PARAPET
T.O.S. TOP OF SURFACE
T.O.W. TOP OF WALL
T.P. TOP OF PAVEMENT
T.P.D. TOILET PAPER DISPENSER
T.V. TELEVISION
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
V.P. VISION PANEL
VERT. VERTICAL
VEST. VESTIBULE
W/ WITH
W.C. WATER CLOSET
WD. WOOD
W/O WITHOUT
W.P. WATERPROOF
WT. WEIGHT
MEP ENGINEER
STRUCTURAL ENGINEER
PBS ENGINEERS
279 E ARROW HIGHWAY, SUITE 201
SAN DIMAS, CA 91773
CONTACT: LOUIS (LOU) R. PEREZ
PHONE: 626.691.3090
EMAIL: LPEREZ@PBSENGINEERS.COM
INSIGHT STRUCTURAL ENGINEERS
855 NORTH DOUGLAS ST, FIRST FLOOR
EL SEGUNDO, CA 90245
CONTACT: VANESSA L. CHOW
PHONE: 310.640.0123 X103
EMAIL: VCHOW@INSIGHT-SE.COM
PROJECT TEAM
ABBREVIATIONS SCOPE OF WORK
USE OF BUILDING: B; S-1 - EXISTING NO CHANGE
TYPE OF CONSTRUCTION: III-B
NUMBER OF STORIES: 1 STORY - EXISTING NO CHANGE
SQUARE FOOTAGE: 10,772 - EXISTING NO CHANGE
FULLY FIRE SPRINKLERED: YES - EXISTING
FIRE ALARM SYSTEM: YES - EXISTING
OCCUPANCY GROUP: B- BUSINESS (OFFICE USE); S-1 - EXISTING, NO CHANGE
OCCUPANCY LOAD: 80 OCCUPANTS
EXITS REQUIRED: 2
EXITS PROVIDED: 4
TRAVEL DISTANCE: 176'-5"<300' MAX FULLY SPRINKLERED
COMMON PATH OF TRAVEL: 57'-10"<100' MAX FULLY SPRINKLERED
ZONING CLASSIFICATION: SP-3-IG
PARKING CALCULATION:
WAREHOUSE 1 PER 1,000 GFA (OFFICE AREA GREATER THAN 25% IS CALCULATED
SEPARATELY)
B 4,474 GFA = 5 SPACES
S-1 6,298 GFA = 7 SPACES
TOTAL 12 SPACES
TOTAL PARKING PROVIDED = 19 SPACES
ACCESSIBLE VAN PARKING = 1
ACCESSIBLE PARKING = 1
STANDARD PARKING = 15
EV FLEET PARKING = 2
CODE COMPLIANCE
SEPARATE SUBMITTALS
MECHANICAL, ELECTRICAL, PLUMBING
BMEC323524 BELE323525 BPLM323527
UNDER SEPARATE REVIEW & PERMIT
PRIVATE OFFICE IMPROVEMENTS:
NEW COPY AREA MILLWORK, PARTITION TO SPLIT CONFERENCE 115, ASSOCIATED
MECHANICAL, ELECTRICAL, LIGHTING, & PATCH/REPAIR FINISHES
ACCESSIBLE RESTROOM IMPROVEMENTS:
ENLARGING MEN & WOMEN, ADJUSTING FIXTURE LOCATIONS, ADDING WATER CLOSET,
CONVERTING EXISTING RESTROOM TO ACCESSIBLE SINGLE OCCUPANCY; ASSOCIATED
MECHANICAL, ELECTRICAL, LIGHTING, & FINISHES
WAREHOUSE IMPROVEMENTS:
NEW WORK ROOM, FINISHES, NEW MILLWORK, NEW CHAINLINK ENCLOSURE WITH
ROLLING GATE AND TWO MAN GATE OPENINGS, STRUCTURAL SUPPORTS TO ENLARGE
ROLL UP DOOR OPENING AT EXTERIOR WALL, NEW ROLL UP DOOR; ASSOCIATED
MECHANICAL, ELECTRICAL, LIGHTING, ETC.
ROOF IMPROVEMENTS:
NEW ROOF HATCH, ROOF RESTORATION
SITE IMPROVEMENTS:
NEW EV PARKING, NEW PARKING STRIPING, ADDING ENLARGED ROLLING GATE OPENING
AT EXISTING FENCING, ACCESSIBLE PARKING SIGNAGE, NEW 400A PANEL
BUILDING INFORMATION
TI
D
R A
D
IO
A
SS
ET
S
ER
VI
C
ES
W
. O C
EA
N
B
LV
D
LO
N
G B
EA
C
H
C A
C
IT
Y
O F
LO
N
G B
EA
C
H
D
EP
A R
TM
EN
T O
F
PU
B
LI
C W
O R
K S
PL
O
T D
A
TE
M ay . 4
, 2
SA
V
ED
P
A
TH
P:
\k ar de nt d es ig n\
PR
O
JE
C
TS
\1
.1 ti d ra di o a ss et s er vi ce s bu ild in g\ dr aw in g fil es
\0 4_ co nd oc s
LA
ST
S A
V
ED
B Y:
e bo ar d
PROJECT SITE:
2961 REDONDO AVE
SCALE: NONE
VICINITY MAP
CITY OF
LONG BEACH
R
ED
O N
D O
A
VE
, L O
N G
B
EA
C H
, C A
City of Long Beach, California 2025.
KARDENT
A R C H I T E C T U R E D E S I G N
11 Golden Shore, Suite 540 | Long Beach | CA 90802 | 562.436.9900 c
EB
JLJL
EB
B-4854
TID RADIO & ASSET SERVICES BUILDING
2961 REDONDO AVE, LONG BEACH, CA, 90806
March 31, 2027
G E N L I
L I C
ENSED ARCH I TECT
STATE OF CAL I FORN IA
C-39258
RENEWAL
DATE
/2
6/
PL
A N
C H
EC
K
R
ES
U B
M
IT
TA
L
B R
M D
/1
0/
PL
A N
C H
EC
K
S U
B M
IT
TA
L
/0
9/
PL
A N
C H
EC
K
R
ES
U B
M
IT
TA
L
/0
3/
IS
SU
E
FO
R
C O
N
SR
U C
TI
O
N
A-0.00
COVER SHEET
IS
SU
E
FO
R
0%
IS
SU
E
FO
R
0%
A-1.02 POWER SIGNAL PLAN
INTERIOR & MILLWORK ELEVATIONS
FINISH PLAN - WALL
A-6.01
DETAILS - MILLWORKD-3.01
A-6.02
ARCHITECTURAL DETAILS
M-6.02 MECHANICAL DETAILS
M-6.03 MECHANICAL DETAILS
E-2.02 ELECTRICAL REMODEL LIGHTING PLAN
PLUMBING
P-0.01 GENERAL NOTES, LEGEND, SCHEDULES & SHEET INDEX
P-2.01
PLUMBING REMODEL PLAN
P-3.01 PLUMBING ENLARGED PLAN
P-2.02
PLUMBING DEMOLITION PLAN
STRUCTURAL
S-0.1 GENERAL STRUCTURAL NOTES & DRAWING INDEX
S-0.2 GENERAL STRUCTURAL NOTES CONT.
S-0.3 SYMBOLS AND ABBREVIATIONS
S-2.01 FIRST FLOOR PLAN
S-2.02 ROOF FRAMING PLAN
S-3.01 SECTIONS AND DETAILS
DEFERRED SUBMITTALS
FIRE SPRINKLER, FIRE ALARM,
PALLET RACKS, WIRE RACKS
UNDER SEPARATE REVIEW & PERMIT
E-0.04 INDOOR T-24 COMPLIANCE FORMS
E-0.05 OUTDOOR T-24 COMPLIANCE FORMS
E-0.06 NORMAL PHOTOMETRIC CALCULATIONS
E-0.07
E-6.01 ELECTRICAL DETAILS
M-0.03 T-24 COMPLIANCE FORMS
M-0.04 T-24 COMPLIANCE FORMS
M-0.05 T-24 COMPLIANCE FORMS
E-3.01 ELECTRICAL PLAN ROOF LEVEL
PLUMBING ROOF PLANP-2.03
M-6.04 MECHANICAL DETAILS
A-3.02 INTERIOR ELEVATIONS
FOR BIDDING PURPOSES ONLY
# OF
FEMALE WATERCLOSETS
MALE FEMALE
OCCUPANCY TYPE: B / OFFICE
11 1
2022 CPC
TABLE 4-1
OCC.
LOAD
FACTOR
3,046/150 =21
# OF
MALE
URINALS
MALE FEMALE
BATHTUBS
OR
SHOWERS
DRINKING
FOUNTAINS
# OF
FEMALE
OCCUPANCY TYPE: S-1
2022 CPC
TABLE 4-1
OCC.
LOAD
FACTOR
6,247/4000 =2
1 PER 250
# OF
MALE
NA 1
LAVATORIES
REQUIRED
PROVIDED
REQUIRED
PROVIDED
SERVICE
SINK
1 1 1
MALE 1 PER 150
WATERCLOSETS URINALS
BATHTUBS
OR
SHOWERS
DRINKING
FOUNTAINS
LAVATORIES SERVICE
SINK
MALE FEMALE MALE FEMALEMALE
NANA1 1 1 1 1 1
1 3 2 02 2 00
1 0 0 101
PLUMBING FIXTURE CALCULATION
TABLE 422.1 MIN PLUMBING FACILITIES
TABLE 422.1 MIN PLUMBING FACILITIES
EXISTING
EXISTING
1 2 2 02 2 00
1 0 1 03 0 10
PL
A
N C
H
EC
K R
E-
SU
B M
IT
TA
L
1 68
R E-
SU
B
M
IT
TA
L navilla Text Box
FOR BIDDING PURPOSES ONLY
1. CONSTRUCTION WASTE MATERIALS ARE TO BE RECYCLED, CONTRACTOR TO
FOLLOW THE REQUIREMENTS OF THE LOCAL JURISDICTION. CONTRACTOR TO
SUBMIT WASTE MANAGEMENT FORMS AND DEPOSIT PRIOR TO PULLING PERMITS.
G.C. CONSTRUCTION WASTE NOTES
G.C. DEMOLITION NOTES
1. REVIEW CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS PRIOR TO
COMMENCING WITH DEMOLITION AND IMMEDIATELY REPORT DISCREPANCIES TO
KARDENT FOR DIRECTION ON HOW TO PROCEED
2. UPON DISCOVERY OF CONCEALED OR UNANTICIPATED ITEMS (ASBESTOS, PLUMBING,
DUCTWORK, ETC.) CONTACT KARDENT PRIOR TO REMOVAL OF THESE ITEMS
3. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN, BUT IS TO INCLUDE
WHAT IS NECESSARY TO COMPLETE THE WORK IN ACCORDANCE WITH FULL SCOPE OF
THESE DOCUMENTS
4. COORDINATE DEMOLITION PLAN WITH PARTITION PLAN INCLUDING ALL GENERAL
NOTES AND PLAN INFORMATION
5. DEMOLITION DRAWINGS PREPARED BY KARDENT ARE FOR A GENERAL DESCRIPTION
OF EXISTING BUILDING COMPONENTS, ASSEMBLIES AND MATERIALS TO BE REMOVED.
VERIFY ALL EXISTING CONDITION AND QUANTITIES
6. PROTECT EXISTING CONSTRUCTION PRIOR TO AND DURING DEMOLITION PHASE.
PROTECTION TO BE MAINTAINED UNTIL COMPLETION OF DEMOLITION AND
CONSTRUCTION. ANY DAMAGE TO NEW AND EXISTING CONSTRUCTION STRUCTURE
OR EQUIPMENT SHALL BE CONTRACTOR'S RESPONSIBILITY AND SHALL BE
IMMEDIATELY REPAIRED OR REPLACED TO THE SATISFACTION OF THE CLIENT AT THE
EXPENSE OF THE GENERAL CONTRACTOR
7. FURNISH ALL LABOR, MATERIALS & EQUIPMENT AS REQUIRED TO COMPLETE
DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED OR DIRECTED BY KARDENT
8. COORDINATE WITH CLIENT REPRESENTATIVE ALL ASPECTS OF THE DEMOLITION AND
CONSTRUCTION WORK. EXECUTE ALL WORK WITHIN THE REGULATIONS OF PROPERTY
CLIENT FOR DEMOLITION & REMOVAL OF DEBRIS, INCLUDING AFTER HOUR WORK, AS
REQUIRED
9. COORDINATE WITH CLIENT REPRESENTATIVE REGARDING SCHEDULING OF
CUTTING/CORING OF SLAB, SHOOTING OF TRACK, PLUMBING AND OTHER
NOISE-RELATED CONSTRUCTION ACTIVITIES.
10. REMOVAL OF ANY EQUIPMENT, CABLING, SWITCHES AND CONDUIT PERTAINING TO
DATA, COMMUNICATIONS AND TELEPHONES SHALL BE VERIFIED WITH CLIENT
REPRESENTATIVE AS REQUIRED TO PREVENT CONSTRUCTION DELAYS
11. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS IN A MANNER COMPLIANT TO
FEDERAL, STATE AND LOCAL MUNICIPAL REQUIREMENTS AND GUIDELINES
12. REFERENCE PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS FOR
ADDITIONAL COORDINATION OF ITEMS TO BE REMOVED OR PROTECTED IN PLACE
13. WHERE CONSTRUCTION TO BE REMOVED INTERSECTS CONSTRUCTION TO REMAIN,
WORK SHALL INCLUDE OF ALL ATTACHMENT DEVICES (SHOT PINS, ANCHORS, LAG
BOLTS, NAILS, NAILERS, SHIMS, ETC.)
14. COORDINATE THE STORAGE OF SALVAGED MATERIALS: DOORS, FRAMES, HARDWARE,
HVAC EQUIPMENT, LIGHT FIXTURES, MILLWORK AND FURNITURE WITH THE CLIENT
REPRESENTATIVE
15. FURNISH THE CLIENT REPRESENTATIVE WITH A COMPLETE INVENTORY LIST OF ALL
ITEMS THAT CAN BE REUSED AND/OR STORED IN BUILDING ATTIC STOCK, AND OBTAIN
DIRECTIVE REGARDING THEIR DISPOSITION
16. ALL DEMOLISHED MATERIAL OTHER THAN ITEMS TO BE SALVAGED, REUSED OR
RETURNED TO THE CLIENT SHALL BECOME CONTRACTORS PROPERTY UNO, AND
SHALL BE REMOVED FROM THE PREMISES. CLEAN UP AND DISPOSE OF DEBRIS
PROMPTLY AND CONTINUOUSLY AS THE WORK PROGRESSES. SECURE AND PAY FOR
REQUIRED HAULING PERMITS, PAY DUMPING FEES AND CHARGES.
17. REMOVE FROM PREMISES ALL CONDUITS, BOXES, PLATES, BRIDGES, OR ANY OTHER
TELEPHONE AND/OR ELECTRICAL WIRING & EQUIPMENT LEFT AFTER WALL
DEMOLITION
18. REMOVE ALL UNUSED DATA/TELE CABLING IN CEILING BACK TO SOURCE UNO
19. REMOVE EXISTING CEILING FINISHES (ACOUSTICAL TILE) AND SUBSTRATE (GYPSUM
BOARD, PLASTER) AND RELATED SUSPENSION SYSTEMS WHERE NOTED ON DRAWINGS
IN ALL ROOMS DESIGNATED TO RECEIVE NEW CEILING FINISHES (AND SUSPENSION
SYSTEMS) PER REFLECTED CEILING PLAN
20. REMOVE EXISTING WALL FINISHES (CERAMIC TILE, VINYL WALL COVERING, PLYWOOD,
GYPSUM BOARD SUBSTRATES, PLASTER, ETC.) IN ALL ROOMS DESIGNATED TO RECEIVE
NEW WALL FINISHES PER INTERIOR FINISH SCHEDULE
21. REMOVE EXISTING FLOORING & BASE (CERAMIC TILE, CARPET, PADDING AND
ACCESSORIES) IN ALL ROOMS DESIGNATED TO RECEIVE NEW FLOORING AND BASE PER
INTERIOR FINISH PLANS
22. PROVIDE ALL FLOOR CUT-OUTS AND PATCHING REQUIRED FOR THE INSTALLATION OF
ALL WORK
23. VERIFY NECESSITY OF SLAB X-RAYING PRIOR TO COMMENCEMENT OF CORING OR
CUTTING OF SLAB, REFERENCE ELECTRICAL PLANS. NOTIFY KARDENT OF ANY
STRUCTURAL OR EQUIPMENT CONFLICTS PRIOR TO CORING OR CUTTING OF SLAB
24. PATCH ALL CRACKS, HOLES OR OTHER IMPERFECTIONS (PROJECTIONS SHALL BE
REMOVED AND PATCHED) TO PROVIDE A CONTINUOUS SMOOTH FLOOR SURFACE
25. PREPARE UNEVEN AND OR DAMAGED SUB-FLOOR (WHERE EXISTS) AS NEEDED FOR
SMOOTH AND LEVEL FLOORING. NOTIFY KARDENT AFTER FLOOR PATCHING IS DONE
TO RECEIVE APPROVAL PRIOR TO INSTALLATION OF FINISHED FLOORING
26. REMOVE ALL EXISTING IRREGULAR MATERIALS WHICH MIGHT CAUSE RISE IN FLOORING
SURFACE; SUCH AS: FASTENERS, OUTLETS, FLASH PATCH, CONCRETE FILL, ETC. UNO
27. DOWEL/FILL/PATCH SLAB AFTER SAWCUTTING TO ENSURE SLAB STRUCTURAL
INTEGRITY
28. PATCH ALL SCARS, BLEMISHES AND RELATED DUE TO DEMOLITION. PREPARE
DEMOLISHED AREA FOR NEW WORK.
29. REPAIR ALL SURFACES DESIGNATED TO RECEIVE NEW FLOOR, WALL, AND CEILING
FINISHES AS REQUIRED TO PROVIDE A SOUND AND FLUSH SUBSTRATE
30. COMPLETE ALL CUTTING, FITTING AND PATCHING WORK THAT MAY BE REQUIRED TO
MAKE ALL PARTS COME TOGETHER PROPERLY, AND FIT TO RECEIVE OR BE RECEIVED BY
WORK OF OTHER CONTRACTS WHERE SHOWN, OR REASONABLY IMPLIED BY THE
DRAWINGS AND NOTES
31. ALL PROJECTING PLUMBING, FLOOR ELECTRICAL/TELEPHONE OUTLETS AND ALL
OTHER PROJECTING ITEMS WHICH ARE BEING ABANDONED TO BE CAPPED TO
PROVIDE FLUSH FINISHED SURFACES. PATCH PENETRATIONS IN FLOOR WHERE
PLUMBING OR ELECTRICAL HAVE BEEN REMOVED OR ABANDONED. FIRE RATING
(WHERE OCCURS) OF FLOOR SHALL BE MAINTAINED
32. SURVEY ALL EXISTING FINISHED SURFACES TO REMAIN FOR CHIPS, CRACKS, HOLES,
AND OTHER DAMAGES. THESE DEFECTIVE SURFACES SHALL BE REPAIRED, OF IF BEYOND
REPAIRING, THEN NOTIFY KARDENT OR CLIENT REPRESENTATIVE IMMEDIATELY FOR
FURTHER INSTRUCTIONS
33. INSPECT ALL EXISTING SURFACES TO REMAIN, AFTER DEMOLITION OF EXISTING
FINISHES (I.E. WALLCOVERING, WALL BASE, ETC.). IF SURFACE IS NOT SMOOTH AND
FLUSH TO RECEIVE NEW FINISH, SKIM COAT AND SAND SMOOTH
34. ALL EXISTING OR NEW CONSTRUCTION WORK SHOWN ON THE DRAWINGS THAT IS
DAMAGED AS A RESULT OF WORK FOR THIS PROJECT, SHALL BE PATCHED OR REPAIRED
TO MATCH IMMEDIATE EXISTING ADJACENT AREAS IN MATERIALS, FIRE RATING, FINISH,
AND COLOR UNO
35. ALL EXISTING ITEMS TO REMAIN SHALL BE REFURBISHED UNO. LOOSE ITEMS SHALL BE
TIGHTENED AND ANY MISSING OR BROKEN PARTS SHALL BE REPLACE BY THE
CONTRACTOR TO ACHIEVE A FINISHED "LIKE NEW" APPEARANCE. PATCH AND REPAIR
EXISTING DOORS, FRAMES AND HARDWARE AS NEEDED
36. UPON COMPLETION OF THE DEMOLITION WORK, ENSURE THAT ALL AREAS ARE LEFT IN
A CLEAN AND BROOM SWEPT CONDITION
G.C. GENERAL NOTES
1. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF
WORK. THIS INCLUDES: UTILITIES, ALL OTHER WORKS AND FACILITIES THAT AFFECT THIS
PROJECT. NO ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE OR EXTENSION OF
TIME DUE TO CONTRACTORS FAILURE OR NEGLECT OF COMPLETE EXAMINATION OF THE
JOB SITE
2. ANY DISCREPANCIES, CONFLICTS OR OMISSIONS ETC., SHALL BE NOTIFIED TO KARDENT
PRIOR TO PROCEEDING WITH THE WORK
3. SUBMIT TO THE CLIENT REPRESENTATIVE A DETAILED CONSTRUCTION SCHEDULE
INDICATING PHASING OF WORK FROM START TO FINISH OF PROJECT, INCLUDING A
CRITICAL PATH SCHEDULE
4. ENTERING INTO AN AGREEMENT WITH THE CLIENT INDICATES THAT THE CONTRACTOR(S)
HAVE VISITED THE JOB SITE, FAMILIARIZED THEMSELVES WITH EXISTING CONDITIONS
AND REVIEWED THE SAME WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS
5. PROVIDE NECESSARY PERMITS REQUIRED BY FEDERAL, STATE AND LOCAL MUNICIPAL
AGENCIES HAVING JURISDICTIONAL AUTHORITY. THE CONTRACTOR SHALL OBTAIN AND
PAY FOR THE BUILDING PERMIT. EACH SUBCONTRACTOR SHALL OBTAIN AND PAY FOR
SUCH PERMITS, LICENSES AND INSPECTIONS NECESSARY FOR PERFORMANCES OF HIS
WORK AND INCLUDE THOSE IN THE COST OF THE WORK TO THE CLIENT
6. PROVIDE THE MINIMUM INSURANCE REQUIREMENTS SET FORTH IN ARTICLE II A.I.A.
DOCUMENTS A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
7. MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DOCUMENTS ON THE
JOB SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES AND PROVIDE
ALL SUB CONTRACTORS WITH CURRENT CONSTRUCTION DOCUMENTS.
8. ANY AND ALL REVISIONS SHALL BE WRITTEN CHANGE ORDER FORM, APPROVED AND
AUTHORIZED BY KARDENT BEFORE BEGINNING WORK.
9. THE INTENT OF THE DRAWING IS TO SHOW EXISTING BUILDING CONDITIONS WITH
INFORMATION DEVELOPED FROM VISUAL OBSERVATION. UNIDENTIFIED ITEMS SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE CLIENT REPRESENTATIVE AND
KARDENT PRIOR TO REMOVAL
10. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN, UNLESS OTHERWISE NOTED. LARGE
SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS
11. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED
CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIR
EXACT MEANING, CLARIFICATION SHALL BE REQUESTED FROM KARDENT
12. INSURE THAT INSTALLATION METHODS CONFORM TO ALL BUILDING CODE
REQUIREMENTS. THE MATERIALS SPECIFIED ARE INTENDED TO MEET CODE
REQUIREMENTS. DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND CODE
REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF KARDENT IMMEDIATELY BY
THE CONTRACTOR PRIOR TO PROCEEDING WITH FURTHER WORK
13. IT SHALL BE UNDERSTOOD, UNO, THAT ALL MATERIALS AND WORKMANSHIP SHALL BE
GUARANTEED FOR A MINIMUM PERIOD OF ONE YEAR FROM THE ACCEPTANCE OF THE
PROJECT BY THE CLIENT.
14. NO SUBSTITUTIONS OF SPECIFIED MATERIALS SHALL BE PERMITTED WITHOUT FIRST
SUBMITTING SPECIFICATIONS, SAMPLES AND COST IMPACT FOR KARDENT'S REVIEW AND
APPROVAL
15. ANY REVISION OR ADDITIONAL WORK REQUIRED BY THE CLIENT, FIELD CONDITIONS OR
LOCAL GOVERNING AUTHORITIES SHALL BE BROUGHT TO THE ATTENTION OF THE
CLIENT OR KARDENT BEFORE PROCEEDING REGARDLESS OF COST, TIME OR MATERIAL
INCREASE
16. THE CONSTRUCTION DOCUMENTS ARE PROVIDED TO ILLUSTRATE THE DESIGN AND
GENERAL TYPE OF CONSTRUCTION DESIRED AND IMPLY THE FINEST QUALITY OF
CONSTRUCTION, MATERIALS AND WORKMANSHIP. THE GENERAL CONTRACTOR IN
ASSUMING RESPONSIBILITY FOR THE WORK INDICATED SHALL COMPLY WITH THE SPIRIT
AS WELL AS THE LETTER IN WHICH THEY WERE DRAWN.
17. PROTECT AREA AND NEW OR EXISTING MATERIALS AND FINISHES FROM DAMAGE WHICH
MAY OCCUR FROM CONSTRUCTION, DEMOLITION,DUST,WATER, ETC. AND PROVIDE
AND MAINTAIN TEMPORARY BARRICADES, CLOSURE WALLS,ETC. AS REQUIRED TO
PROTECT THE PUBLIC DURING CONSTRUCTION. DAMAGE TO NEW AND EXISTING
MATERIAL,FINISHES, STRUCTURE AND EQUIPMENT SHALL BE REPAIRED OR REPLACED TO
THE SATISFACTION OF THE CLIENT'S REPRESENTATIVE AT THE EXPENSE OF THE
CONTRACTOR
18. PROVIDE A VISQUEEN SEAL FROM FLOOR TO CEILING AT INTERFACES TO PROTECT
ADJACENT BUILDING SUITE/SPACE WHILE DEMOLITION AND CONSTRUCTION ARE IN
PROGRESS. THIS SEAL IS TO BE KEPT CLOSED AT ALL TIME
19. VERIFY REQUIRED LOCATIONS OF ALL NECESSARY ACCESS PANELS (IN PARTITIONS,
FLOORS OR CEILINGS) AND COORDINATE EXACT LOCATIONS WITH ALL TRADES AND
CONFIRM WITH KARDENT
20. LEAVE THE BUILDING IN A LOCKABLE CONDITION DURING THE PERIOD OF THIS WORK
WHEN CONTRACTOR'S AND SUBCONTRACTORS' WORKERS ARE NOT AT THE JOB SITE
21. DEACTIVATE ALL UTILITY LINES IN CONTRACT AREA BEFORE STARTING WORK AND SECURE
PERMISSION FROM CLIENT/PROPERTY MANAGEMENT PRIOR TO DEACTIVATION
22. PATCH, REPAIR, REPLACE AND/OR REFINISH ANY EXISTING CONSTRUCTION IN THE
CONTRACT AREA, UNO
23. PROVIDE ALL WORK SHOWN ON THE DRAWINGS UNLESS SPECIFICALLY NOTED AS NOT
IN CONTRACT. (N.I.C.)
24. THE BUILDING SHALL COMPLY WITH TITLE 24, CHAPTER 11B ACCESSIBILITY
REQUIREMENTS FROM THE PATH OF TRAVEL FROM THE PUBLIC WAY TO THE ACCESSIBLE
PARKING AND BUILDING ENTRANCE(S) TO THE AREA BEING REMODELED AND
RESTROOMS SERVING THE AREA.
25. ALL CONSTRUCTION WORK, STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL,
PLUMBING, ETC. SHALL CONFORM TO THE LATEST EDITION OF ALL GOVERNING CODES
AND REGULATIONS
26. ALL WORK LISTED, SHOWN OR IMPLIED ON ANY CONSTRUCTION DOCUMENT SHALL BE
SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR UNO. THE GENERAL
CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THAT OF OTHER
SUB-CONTRACTORS
27. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING,
HANGERS OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS
AND ALL OTHER ITEMS REQUIRING THE SAME.
28. CONFINE EQUIPMENT, DELIVERY AND STORAGE OF MATERIALS AND THE OPERATION OF
WORKMEN TO THE LIMITS DEFINED BY THE CLIENT REPRESENTATIVE
29. STORE OF ALL MATERIALS DURING CONSTRUCTION IN A MANNER THAT PREVENTS LIVE
LOADS FROM EXCEEDING THOSE ALLOWED IN THE BUILDINGS STRUCTURAL DESIGN
30. REMOVE ALL RUBBISH AND WASTE MATERIALS ON A REGULAR BASIS, OF ALL
SUB-CONTRACTORS AND TRADES. EXERCISE STRICT CONTROL OVER JOB CLEANING
THROUGHOUT CONSTRUCTION, INCLUDING FINAL CLEAN UP UPON COMPLETION OF
WORK.
31. BEFORE ACCEPTANCE BY THE GENERAL CONTRACTOR, THE COMPLETED CONSTRUCTION
SHALL BE CLEANED, LABELS REMOVED AND ALL OTHER TOUCH UP COMPLETED PRIOR TO
SCHEDULING A PUNCH WALK WITH KARDENT, CLIENT AND/OR BUILDING MANAGEMENT
32. AT THE TIME OF FINAL BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE KARDENT (IN
WRITING) OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER
UNAVAILABLE OR WILL CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE
33. BID PRICING SHALL BE ITEMIZED AS FOLLOWS: DEMOLITION, CONCRETE WORK,
MASONRY, STEEL/METALS, WOOD, MILLWORK, DOORS/FRAMES & HARDWARE,
GLASS/GLAZING, DRYWALL & ACOUSTICAL CEILINGS, FLOORING, PAINTING, PLUMBING,
ELECTRICAL, HVAC, AND ROOFING. CONTRACTOR SHALL ALSO INCLUDE: CLEANING
AND PROTECTION/DUMPSTERS, GENERAL CONDITIONS AND INSURANCE, AND
SUPERVISION FEES.
1. SUBMIT ALL REQUESTED FABRICATION SHOP DRAWINGS, SAMPLES AND FIXTURE CUT
SHEETS TO KARDENT FOR REVIEW, COMMENTS AND/OR APPROVAL. ALL SHOP
DRAWINGS AND CUT SHEETS SIGNED "APPROVED" SHALL SUPERSEDE ORIGINAL
DRAWINGS IN DESIGN APPEARANCE ONLY. SUBCONTRACTORS SHALL ASSUME
RESPONSIBILITY FOR ERRORS IN THEIR DRAWINGS.
2. REVIEW ALL SUBCONTRACTORS' SUBMITTED DRAWINGS AND CUT SHEETS, VERIFY FIELD
MEASUREMENTS AS REQUIRED AND SUBMIT TO KARDENT FOR REVIEW AND APPROVAL.
3. DISAPPROVE AND RETURN TO SUBCONTRACTOR ANY SUBMITTALS NOT MEETING THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS. GENERAL CONTRACTOR SHALL
MAINTAIN AN UP-TO-DATE SUBMITTAL LOG, DISTRIBUTE THE LOG WEEKLY AND A FINAL
LOG AT COMPLETION OF THE PROJECT.
4. KARDENT WILL REVIEW, AND EITHER ACCEPT OR REJECT, WITH REASONABLE
PROMPTNESS AND AS OUTLINED IN THE ACCEPTED SUBMITTAL SCHEDULE, DATA, AND
DRAWINGS SUBMITTED BY THE CONTRACTOR. THE ARCHITECT WILL REVIEW
SUBMITTALS FOR CONFORMANCE WITH THE INTENT OF THE DESIGN, AND FOR
COMPLIANCE WITH SPECIFIC AND RELEVANT REQUIREMENTS OF THE CONTRACT
DOCUMENTS.
5. KARDENT WILL REJECT AND RETURN TO THE CONTRACTOR, SHOP DRAWINGS AND
CUT SHEETS SUBMITTED WITHOUT THE CONTRACTOR'S REVIEW STAMP AND/OR NOT
THOROUGHLY REVIEWED BY CONTRACTOR PRIOR TO SUBMITTAL.
6. KARDENT IS NOT RESPONSIBLE FOR DELAYS CAUSED BY REJECTION OF SHOP
DRAWINGS SUBMITTED BY THE CONTRACTOR.
7. REVIEW WILL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS.
8. REVIEW OF SUBMITTALS BY KARDENT SHALL NOT BE CONSTRUED AS AUTHORIZING
CHANGES IN THE CONTRACT SUM OR CONTRACT, TIME NOR SHALL IT BE CONSTRUED
AS RELIEVING THE CONTRACTOR OF HIS RESPONSIBILITY FOR COORDINATION OF
WORK WITH OTHER TRADES, OR INTERPRETED AS APPROVING QUANTITIES AND
DIMENSIONS.
9. KARDENT'S REVIEW OF SUBMITTALS OR DATA SHALL NOT RELIEVE THE CONTRACTOR
FROM RESPONSIBILITY FOR DEVIATIONS FROM THE CONTRACT DRAWINGS OR
SPECIFICATIONS UNLESS THE CONTRACTOR HAS CALLED THE ARCHITECT'S AND
CLIENT'S ATTENTION TO DEVIATIONS AND SECURED WRITTEN ACCEPTANCE, NOR
SHALL IT RELIEVE HIM OF RESPONSIBILITY FOR ERRORS IN SHOP DRAWINGS OR OTHER
DATA.
G.C. SUBMITTAL PROCEDURES
G.C. STORM WATER PREVENTION NOTES
1. FUELS, OIL, SOLVENTS & OTHER TOXIC MATERIALS SHALL BE STORED IN
ACCORDANCE WITH THEIR LISTING & ARE NOT TO CONTAMINATE THE SOIL &
SURFACE WATERS. ALL APPROVED STORAGE CONTAINERS ARE TO BE PROTECTED
FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY & DISPOSED OF IN A
PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE DRAINAGE SYSTEM, NOR BE
ALLOWED TO SETTLE OR INFILTRATE INTO SOIL.
2. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY
OTHER DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE
WASTE ON SITE UNTIL THEY CAN BE DISPOSED OF AS SOLID WASTES.
3. TRASH & CONSTRUCTION SOLID WASTES SHALL BE DEPOSITED INTO A COVERED
RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER & DISPERSAL BY WIND.
4. SEDIMENTS & OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY
VEHICULAR TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE
STABILIZED SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE PUBLIC
WAY. ACCIDENTAL DEPOSITS SHALL BE SWEPT UP IMMEDIATELY & MAY NOT BE
WASHED DOWN BY RAIN OR OTHER MEANS.
5. ANY SLOPES WITH DISTURBED SOILS OR REMOVED VEGETATION SHALL BE STABILIZED
TO INHIBIT EROSION BY WIND & WATER.
6. STORM WATER POLLUTION PREVENTION DEVICES &/OR PRACTICES SHALL BE
MODIFIED AS NEEDED AS THE PROJECT PROGRESS TO ENSURE EFFECTIVENESS.
EB EB
PL
O
T D
A
TE
M ay . 4
, 2
SA
V
ED
P
A
TH
P:
\k ar de nt d es ig n\
PR
O
JE
C
TS
\1
.1 ti d ra di o a ss et s er vi ce s bu ild in g\ dr aw in g fil es
\0 4_ co nd oc s
LA
ST
S A
V
ED
B Y:
e bo ar d KARDENT
A R C H I T E C T U R E D E S I G N
11 Golden Shore, Suite 540 | Long Beach | CA 90802 | 562.436.9900
JL JL
TI
D
R A
D
IO
A
SS
ET
S
ER
VI
C
ES
R
ED
O
N D
O A
VE
, L
O N
G B
EA
C
H , C
A
B-4854
March 31, 2027
G E N L I
L I C
ENSED ARCH I TECT
STATE OF CAL I FORN IA
C-39258
RENEWAL
DATE
/2
6/
PL
A N
C H
EC
K
R
ES
U B
M
IT
TA
L
B R
M D
/1
0/
PL
A N
C H
EC
K
S U
B M
IT
TA
L
City of Long Beach, California 2025.c
/0
9/
PL
A N
C H
EC
K
R
ES
U B
M
IT
TA
L
/0
3/
IS
SU
E
FO
R
C O
N
ST
R U
C
TI
O N
A-0.11
GENERAL NOTES
1. NOTIFY THE MECHANICAL ENGINEER FOR REVIEW OF MECHANICAL WORK PRIOR TO
INSPECTION AND CLOSING-UP CEILING
2. HVAC SUBCONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SUPERVISION OF ALL
THEIR WORK DURING INSTALLATION AND SHALL INSPECT ALL SYSTEMS FOR PROPER
OPERATIONS AT COMPLETION OF JOB
3. SUBMIT SHOP DRAWINGS OF ALL HVAC EQUIPMENT, REGISTERS, INCLUDING ACCESS
PANELS IF REQUIRED TO KARDENT FOR REVIEW AND APPROVAL PRIOR TO
PROCEEDING WITH FABRICATION AND/OR INSTALLATION OR RELOCATION
4. COORDINATE INSTALLATION WITH ALL TRADES AS REQUIRED FOR PROPER ASSEMBLY.
CEILING DIFFUSERS TO BE RELOCATED TO ACCOMMODATE NEW LIGHT FIXTURE
PATTERNS INDICATED ON THE DRAWINGS. NOTIFY KARDENT IMMEDIATELY OF ANY
DISCREPANCIES FROM FIELD CONDITIONS
5. THE MECHANICAL ENGINEER SHALL PROVIDE NECESSARY ENGINEERING DRAWINGS
AND CALCULATIONS TO REWORK ALL EXISTING EQUIPMENT AND TO DETERMINE ALL
NEW EQUIPMENT TO MEET THE CLIENT'S REQUIREMENT
6. VERIFY HVAC CONDITIONS/ZONING WITH BUILDING ENGINEER TO ENSURE
ADEQUACY OF EXISTING UNITS. ANY ADDITIONS TO HVAC TO BE INCLUDED IN
SCOPE AND BID. G.C. TO VERIFY CAPACITY OF EXISTING ELECTRICAL PANEL/
TRANSFORMER IS ADEQUATE
7. PROTECT EXISTING T-STAT (WHERE OCCURS) DURING DEMOLITION UNO
1. PROVIDE AND INSTALL ALL PLUMBING ROUGH-INS, FINAL HOOK-UP, FIXTURES,
ALLIANCES AND ACCESSORIES AS SHOWN OR IMPLIED ON THE CONSTRUCTION
DOCUMENTS UNO, AND PER CODE
2. SUBMIT CUT SHEETS OF ALL NEW FIXTURES, FITTINGS AND ACCESSORIES TO KARDENT
FOR REVIEW AND APPROVAL PRIOR TO PLACING ORDER
3. COORDINATE WORK OF THE PLUMBING SUBCONTRACTOR WITH ALL OF THE OTHER
TRADES
4. FURNISH ALL VALVES AS INDICATED ON THE DRAWINGS, OR AS MAY BE REQUIRED
FOR THE PROPER CONTROL OF THE VARIOUS APPARATUS AND PIPELINES INSTALLED
UNDER THIS SECTION SO THAT ANY FIXTURE LINES OR PIECE OF APPARATUS MAY BE
CUT OFF FOR REPAIR WITHOUT INTERFERENCE OR INTERRUPTION OF THE SERVICE
TO THE REST OF THE BUILDING
5. PROVIDE & INSTALL FOAM OR FIBER INSULATION WITH PROTECTIVE OVERLAP ON
DRAIN, HOT WATER SUPPLY AND SHARP OBJECTS BELOW LAVATORY.
6. BEFORE BEING COVERED UP OR BUILT-IN, PIPING SHALL BE TESTED AS REQUIRED BY
THE AUTHORITIES HAVING JURISDICTION
7. PROVIDE ACCESS PANELS AT ALL CLEAN OUTS
1. GENERAL: CONSTRUCTION SHALL COMPLY WITH THE AIR LEAKAGE REQUIREMENTS
OF THE CALIFORNIA ENERGY CODE 140.3 FOR WINDOWS, DOORS, CAULKING AND
SEALING
2. WINDOWS: (UNDER SHELL BUILDING WORK) FIXED WINDOWS CONSTRUCTED
AND/OR ERECTED ON SITE SHALL BE SEALED TO LIMIT AIR INFILTRATION IN
ACCORDANCE WITH LOCAL CODE AND MANUFACTURER SPECIFICATIONS
3. DOORS: (UNDER SHELL BUILDING WORK) ALL EXTERIOR DOORS SHALL BE SO
DESIGNED TO LIMIT AIR LEAKAGE AROUND THE PERIMETER WHEN IN A CLOSED
POSITION
a. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL OR BAFFLE AT THE
HEAD AND SILL
b. DOORS REQUIRING VERTICAL TRACK OR GLIDES SHALL USE A CONTINUOUS
MOUNTING ANGLE AND SEALED IN ACCORDANCE WITH SECTION T120-1495 ( E)
AT EACH END
c. DOORS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR
BAFFLE AT EACH JAMB
d. DOUBLE DOORS SHALL BE PROVIDED WITH A WEATHER-TIGHT ASTRAGAL OR
CLOSURE AT THE CENTER JAMB.MANUFACTURED DOORS SHALL HAVE AIR
INFILTRATION RATES CERTIFIED BY THE MANUFACTURER AS NOT EXCEEDING .50
CFM/SQ.FT. OF DOOR AREA FOR SINGLE DOORS, AND 1.00 CFM/SQ.FT. OF DOOR
AREA FOR DOUBLE DOORS
4. CAULKING AND SEALING: OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR
FRAMES, BETWEEN WALL AND FOUNDATION, BETWEEN WALL AND ROOF, BETWEEN
WALL PANELS, AT PENETRATIONS OF UTILITY SERVICES THROUGH WALLS, FLOORS
AND ROOFS AND ALL OTHER OPENINGS IN THE EXTERIOR ENVELOPE SHALL BE
SEALED, CAULKED OR WEATHER-STRIPPED TO LIMIT AIR LEAKAGE
5. SITE-CONSTRUCTED DOORS AND WINDOWS, EXTERIOR JOINTS, AND OPENINGS IN
THE BUILDING ENVELOPE THAT ARE OBSERVABLE SOURCES OF AIR LEAKAGE SHALL BE
CAULKED, GASKETED, WEATHER-STRIPPED OR OTHERWISE SEALED
G.C. HVAC NOTES
1. SUBMIT 1 SET OF SHOP DRAWINGS AND THREE (3) SETS OF FINISH SAMPLES TO KARDENT
FOR REVIEW
2. REFERENCE FINISH PLANS AND DETAILS FOR MILLWORK FINISH AND MATERIAL QUALITY
SPECIFICATIONS TO MEET OR EXCEED AWI STANDARDS
3. CLOSELY COORDINATE WORK WITH THAT OF THE MILLWORK SUBCONTRACTOR
4. ALL "INSTALLED" CABINETRY SHALL COMPLY WITH APPLICABLE BUILDING CODES AND
ADA REQUIREMENTS
5. ALL "INSTALLED" CABINETS SHALL BE SCRIBED TO WALL OR CEILING, UNO
6. MILLWORK SUBCONTRACTOR SHALL CHECK AND FIELD VERIFY ALL DIMENSIONS AND
CONDITIONS AT THE JOB SITE. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES
7. ALL FINISHED WORK SHALL, AS FAR AS PRACTICAL, BE ASSEMBLED AND FINISHED IN THE
SHOP AND DELIVERED TO THE BUILDING READY TO INSTALL IN PLACE.
8. ALL THE WORK SHALL BE FABRICATED, ASSEMBLED, FINISHED AND INSTALLED TO MEET
WIC "STANDARD" GRADE FOR PLASTIC LAMINATE AND "PREMIUM" GRADE FOR ALL WOOD
9. WHERE FILE CABINETS ARE SHOWN AS BEING SET INTO CABINETWORK, THE MILLWORK
CONTRACTOR SHALL SET AND BOLT ALL FILE CABINETS TOGETHER, UNO
10. ALL MILLWORK SHOP DRAWINGS ARE TO CALL OUT ALL MATERIALS AND FINISHES. ALL
JOINTS, CORNERS, EDGES ARE TO BE DETAILED IN INDIVIDUAL DETAILS. ALL DIMENSIONS
CRITICAL OR OTHERWISE ARE TO BE CALLED OUT ON THE SHOP DRAWINGS. ARCHITECT
WILL NOT REVIEW DRAWINGS, WHICH ARE INCOMPLETE SHOWING MINIMAL REQUIRED
DETAILING AND INFORMATION
11. COORDINATE MILLWORK, STONE, AND/OR OTHER SPECIALTIES CONTRACTORS.
12. FULLY CONCEALED CABINET INTERIORS TO BE MELAMINE, COLOR: WHITE AT PLASTIC
LAMINATE AND COLOR: BLACK AT WOOD VENEER CABINETS, UNO
1. ALL DOOR GLAZING TO BE TEMPERED GLASS. ALL TEMPERED GLAZING SHALL BE
INDICATED AS SUCH BY A SYMBOL OR THE WORD TEMPERED GLASS ETCHED ONTO
THE GLASS
2. EACH PANE SHALL BEAR THE MANUFACTURER'S MARK DESIGNATING THE TYPE AND
THICKNESS OF THE GLASS OR GLAZING MATERIAL. THE IDENTIFICATION SHALL NOT
BE OMITTED UNLESS APPROVED AND AN AFFIDAVIT IS FURNISHED BY THE GLAZING
CONTRACTOR CERTIFYING THAT EACH LIGHT IS GLAZED IN ACCORDANCE WITH
APPROVED CONSTRUCTION DOCUMENTS THAT COMPLY WITH THE PROVISIONS OF
THIS CHAPTER. SAFETY GLAZING SHALL BE IDENTIFIED IN ACCORDANCE WITH
SECTION 2406.3
3. EACH PANE OF TEMPERED GLASS, EXCEPT TEMPERED SPANDREL GLASS, SHALL BE
PERMANENTLY IDENTIFIED BY THE MANUFACTURER. THE IDENTIFICATION MARK
SHALL BE ACID ETCHED, SAND BLASTED, CERAMIC FIRED, LASER ETCHED, EMBOSSED
OR OF A TYPE THAT, ONCE APPLIED, CANNOT BE REMOVED WITHOUT BEING
DESTROYED
4. FIRE-PROTECTION-RATED GLAZING. GLAZING IN FIRE WINDOW ASSEMBLIES SHALL BE
FIRE-PROTECTION RATED IN ACCORDANCE WITH THIS SECTION AND TABLE 716.6.
GLAZING IN FIRE DOOR ASSEMBLIES SHALL COMPLY WITH SECTION 716.5.8.
FIRE-PROTECTION-RATED GLAZING SHALL BE TESTED IN ACCORDANCE WITH AND
SHALL MEET THE ACCEPTANCE CRITERIA OF NFPA 257 OR UL 9.
FIRE-PROTECTION-RATED GLAZING SHALL ALSO COMPLY WITH NFPA 80. OPENINGS
IN NONFIRE-RESISTANCE-RATED EXTERIOR WALL ASSEMBLIES THAT REQUIRE
PROTECTION IN ACCORDANCE WITH SECTION 705.3, 705.8, 705.8.5 OR 705.8.6 SHALL
HAVE A FIRE-PROTECTION RATING OF NOT LESS THAN 3/4 HOUR.
FIRE-PROTECTION-RATED GLAZING IN 0.5-HOUR FIRE-RESISTANCE-RATED PARTITIONS
IS PERMITTED TO HAVE A 0.33-HOUR FIRE PROTECTION RATING. (CBC SEC 716.6)
G.C. MILLWORK NOTES
G.C. PLUMBING NOTES
G.C. ENERGY NOTES
G.C. GLAZING NOTES
2 68
1. FURNISH AND INSTALL ALL LIGHT FIXTURES AND ELECTRICAL WORK AS SHOWN OR
IMPLIED ON ALL DRAWINGS AND NOTES, UNO
2. INSTALL FIXTURES IN ACCORDANCE TO THE MANUFACTURER'S SPECIFICATIONS
3. THE WORK SHALL BE INSTALLED IN A STRICT ACCORDANCE WITH THE REQUIREMENTS OF
THE NATIONAL BOARD OF FIRE UNDERWRITERS, PUBLIC UTILITIES COMPANY, TELEPHONE
COMPANY, AND ALL OTHER AUTHORITIES HAVING JURISDICTION
4. ALL NEW MATERIALS REQUIRED SHALL CONFORM WITH THE STANDARDS OF THE
UNDERWRITERS LABORATORIES, INC., WHERE SUCH STANDARDS HAVE BEEN
ESTABLISHED FOR THE PARTICULAR TYPE OF MATERIAL OR FIXTURE IN QUESTION, UNO
5. PROPOSALS SHALL BE BASED UPON REMOVING AND/OR RE-INSTALLING EXISTING LIGHT
FIXTURES (INCLUDING NEW LAMPS), FURNISHING AND INSTALLING NEW LIGHT FIXTURES
OF TYPES AND MANUFACTURERS AS INDICATED ON PLANS
6. SUBMIT CUT SHEETS OF ALL FIXTURES AND CONTROLS TO KARDENT FOR REVIEW,
KARDENT TO APPROVE PRIOR TO INSTALL
7. ALL DOWNLIGHTS, WALL WASHERS, SPRINKLER HEADS, SPEAKERS, SENSORS, AND OTHER
CEILING-MOUNTED FIXTURES SHALL BE CENTERED ON THE 2'X2' OR 2'X4' MODULE
CREATED BY CEILING GRIDS AND CEILING TILE SCORE LINE, UNLESS OTHERWISE NOTED.
ARCHITECT SHALL BE NOTIFIED OF ANY CONFLICTS.
8. ALL LAMPS SHALL BE IDENTICAL FROM THE SAME MANUFACTURER. CONTRACTOR SHALL
REPLACE ALL NON-CONFORMING LAMPS. ALL LAMPS ARE TO BE SINGLE COLOR
TEMPERATURE UNO
9. ALL RECESSED FIXTURES SHALL BE SET FLUSH INTO CEILINGS
10. ALL DOWNLIGHTS, WALL WASHERS, SPRINKLER HEADS, ETC. SHALL ALIGN IN A STRAIGHT
LINE, UNO
11. ALL EMERGENCY LIGHTING TO BE UPGRADED TO MATCH BUILDING STANDARD/ TITLE 24
REQUIREMENTS, REFER TO ENGINEER DRAWINGS FOR EXACT LOCATIONS. REFER TO G.C.
FIRE DEPARTMENT NOTES FOR ADDITIONAL INFORMATION
12. ELECTRICAL SUBCONTRACTOR SHALL COORDINATE ANY ELECTRICAL OR LIGHTING
INSTALLATION INTO CABINETWORK (WHERE OCCURS) WITH CABINET SUBCONTRACTOR
AS REQUIRED
13. ELECTRICAL SUBCONTRACTOR SHALL COORDINATE ANY TELEPHONE/DATA/SECURITY
AND AUDIO-VISUAL REQUIREMENTS WITH THE CLIENT'S VENDORS AS REQUIRED
14. ELECTRICAL SUBCONTRACTOR SHALL PROVIDE ALL TEMPORARY LIGHTING AND
ELECTRICAL SERVICE FOR ALL TRADES AS REQUIRED THROUGHOUT DURATION OF
CONSTRUCTION
15. WHERE MORE THAN ONE SWITCH OCCURS IN THE SAME LOCATION, THEY SHALL BE
INSTALLED IN GANG TYPE BOX UNDER ONE COVER PLATE
16. ALL ELECTRICAL, DATA/TELEPHONE RECEPTACLES AND LIGHT FIXTURES SHALL BE
LOCATED WHERE DIMENSIONED ON PLANS. ALL FURNITURE FEEDS/J-BOXES TO BE
LOCATED PER DIMENSIONS PROVIDED BY CLIENT'S FURNITURE VENDOR OR KARDENT
17. ALL NEW OUTLETS ON COLUMNS (WHERE OCCURS) WILL BE CENTERED ON FACE, UNO
18. ALL ELECTRICAL, TELEPHONE/DATA RECEPTACLES SHALL BE INSTALLED VERTICALLY AT 18"
ABOVE FINISH FLOOR TO CENTER OF BOX. (MINIMUM 15" AFF TO BOTTOM OF BOX)
19. ALL THERMOSTATS AND CONTROL DEVICES SHALL BE A MAXIMUM OF 44" TO THE
CENTERLINE ABOVE FINISH FLOOR, UNLESS OTHERWISE NOTED. THERMOSTATS AND
LIGHTING CONTROLS OCCURRING WITHIN THE SAME ROOM SHALL BE LOCATED PER
TYPICAL INSTALLATION ELEVATION IN DRAWINGS.
20. ALL SIDE BY SIDE OUTLETS SHALL BE NO MORE THAN 6" ON CENTER, APART
21. PROVIDE NEW BLANK COVER PLATES FOR EXISTING RECEPTACLES NOT BEING USED WHEN
NOTED. COVER PLATES TO MATCH BUILDING STANDARD, AND/OR TO MATCHING
EXISTING, UNLESS OTHERWISE NOTED. CONFIRM WITH ARCHITECT PRIOR TO
INSTALLATION
22. RECEPTACLES AT BACK TO BACK LOCATIONS ARE TO BE STAGGERED
23. RECEPTACLES OCCURRING ON MILLWORK OR OTHER FINISH PANELS SHALL BE INSTALLED
FLUSH WITH FACE OF MILLWORK, OR FINISHED PANEL
24. TELEPHONE/DATA RECEPTACLES SHALL CONSIST OF A 2-GANG BOX WITH A PULL STRING
AND 3/4 " CONDUIT, STUBBED 6" ABOVE CEILING, UNO
25. ALL DIMENSIONS ON THE POWER AND SIGNAL PLAN ARE ON CENTER LINE AS INDICATED,
UNO
1. PROVIDE AND INSTALL NEW CEILING SYSTEM IN DESIGNATED AREAS AS SHOWN
ON THE REFLECTED CEILING PLAN
2. REVIEW ALL CEILING HEIGHTS AND CEILING PLENUM CONDITIONS WITH
SUBCONTRACTORS FOR CLEARANCE OF DUCTWORK, LIGHTING AND OTHER
OBSTRUCTIONS TO ASSURE THE FINISHED CEILING HEIGHT SHOWN ON
DRAWINGS IS ACHIEVABLE AND CONTINUOUS. ANY DISCREPANCIES SHALL BE
BROUGHT TO ARCHITECT'S ATTENTION PRIOR TO FINAL PRICING
3. CEILING HEIGHTS SHALL BE AS SHOWN ON DRAWINGS AND DETAILS. ANY
DEVIATION FROM HEIGHTS SHOWN BASED UPON EXISTING FIELD CONDITIONS
SHALL BE SUBMITTED TO ARCHITECT FOR REVIEW PRIOR TO START OF WORK IN
QUESTION, OR RELATED WORK
6. CLOSELY COORDINATE CEILING SUBCONTRACTOR'S WORK WITH OTHER
SUBCONTRACTORS AND CLIENT VENDORS WHEREVER THEIR RESPECTIVE WORK IS
CONTIGUOUS
7. PROVIDE AND INSTALL ALL CEILING ACCESS PANELS IN GYPSUM BOARD CEILINGS
AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING ACCESS PER LOCAL
CODES, WHETHER INDICATED ON DRAWINGS OR NOT. COORDINATE LOCATIONS
SIZE AND TYPE WITH KARDENT PRIOR TO INSTALLATION
8. PRIOR TO CLOSING UP ANY CEILING, ALL PLENUM SYSTEMS (HVAC, PLUMBING,
ELECTRICAL, ETC.) SHALL BE INSPECTED AND WHERE REQUIRED, TESTED BY
CONTRACTOR'S ENGINEERS, TO ENSURE THEIR PROPER INSTALLATION AND
FUNCTION
9. CEILINGS IN CLOSETS SHALL BE OF THE SAME HEIGHTS AND CONSTRUCTION AS
THAT OF ADJOINING SPACE, UNO
10. THE GENERAL CONTRACTOR SHALL PROVIDE CUT-OUTS AND OTHER SPECIAL
PROVISIONS IN ACOUSTICAL WORK AS REQUIRED FOR LIGHT FIXTURES, REGISTERS,
DIFFUSERS AND OTHER INSERTED ITEMS
11. SUSPENDED CEILINGS (WHERE OCCURS) SHALL BE INSTALLED OR CONSTRUCTED
IN ACCORDANCE WITH STATE AND LOCAL CODES AND ASCE 7-05
12. ALL FIRE SPRINKLERS (WHERE OCCURS) IN DRYWALL CEILING AREAS SHALL HAVE
CONCEALED HEAD ASSEMBLIES. COLOR OF TRIM SHALL MATCH ADJACENT CEILING
FINISH
13. CABLING TO BE PLENUM RATED AND SUSPENDED FROM THE STRUCTURE ABOVE.
CABLING MAY NOT REST ON CEILING GRID OR BE ATTACHED TO ANY OTHER
ELEMENTS ABOVE THE CEILING GRID. G.C. TO PROVIDE PULL STRING & OUTLET
14. FASCIAS OR ANY BREAK IN THE CEILING HEIGHTS SHALL BE AS SHOWN ON
DRAWINGS AND SHALL BE FORMED OF GYPSUM WALLBOARD ON METAL FRAMING
UNO
1. ALL EXISTING WINDOW COVERINGS SHALL BE INSPECTED BY THE CONTRACTOR AND
ALL INOPERABLE OR DAMAGED CONDITIONS SHALL BE REPAIRED OR REPLACED
2. ALL EXISTING WINDOW COVERINGS SHALL BE PROTECTED THROUGHOUT THE
DURATION OF DEMOLITION AND CONSTRUCTION
3. PRIOR TO INSTALLATION OF FLOORING AND WINDOW COVERINGS, GENERAL
CONTRACTOR SHALL MAINTAIN THE SPACE IN BROOM CLEAN CONDITION WHETHER
OR NOT INSTALLATION OF FLOORING AND WINDOW COVERING ARE THE
RESPONSIBILITY OF THE CONTRACTOR
4. PROVIDE NEW BUILDING STANDARD WINDOW COVERINGS AT ALL EXTERIOR
WINDOWS, UNO
1. SUBMIT THREE (3) SAMPLES OF EACH FINISH TO KARDENT FOR REVIEW INCLUDING
SEAMING/PATTERN LAYOUTS AS APPLICABLE PRIOR TO PURCHASE AND
INSTALLATION
2. ALL FINISHES SHALL BE BID AS SPECIFIED, ANY SUBSTITUTIONS MUST BE APPROVED
BY KARDENT PRIOR TO SUBMISSION OF BID
3. ALL INTERIOR FINISHES SHALL MEET LOCAL AND STATE CODES, THE CONTRACTOR
SHALL NOTIFY KARDENT IMMEDIATELY UPON DISCOVERY OF NON COMPLIANT
FINISHES
4. ALL FINISHES SHALL BE INSPECTED UPON ARRIVAL TO THE JOB SITE FOR DEFECTS
AND DYE LOT CONSISTENCY. NOTIFY KARDENT OF ANY DEFECT PRIOR TO
INSTALLATION
5. ALL FINISHES SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS
6. ALL SURFACES SHALL BE PREPARED APPROPRIATELY TO RECEIVE SPECIFIED FINISHES
7. ENSURE ALL HOLES, SCRAPES AND GOUGES HAVE BEEN PATCHED AND PREPARED TO
RECEIVE NEW FINISHES
8. PROTECT NEW INSTALLED FINISHES FROM DAMAGE THAT MAY OCCUR BY OTHER
TRADES DURING DEMOLITION OR CONSTRUCTION
9. EXAMINE ALL FINISH SURFACES AFTER COMPLETION OF WORK AND PROCEED WITH
TOUCH UP AS REQUIRED
10. ALL FINISHES SHALL BE LEFT IN "LIKE NEW" CONDITIONS
11. IN SOUND RATED ROOMS, ALL WALL AND FLOOR PENETRATIONS FOR PIPES DUCTS
AND OUTLETS SHALL BE SEALED WITH AN ACOUSTIC SEALANT, AND CONCEALED OR
RECESSED FIXTURES SHALL BE COVERED OR BACKED WITH A SOUND ATTENUATION
BLANKET.
12. REFER TO FIRE DEPARTMENT NOTES ON SHEET A-0.1 FOR ADDITIONAL
REQUIREMENTS
1. SUBMIT THREE (3) PAINT DRAW DOWN SAMPLES (8.5"X11") OF EACH FINISH FOR
KARDENT TO REVIEW PRIOR TO PURCHASE AND INSTALLATION. PROVIDE SEAMING
DIAGRAM AND/OR PATTERN LAYOUT (WHERE OCCURS).
2. WALLCOVERING SUBCONTRACTOR TO REVIEW PERTINENT WALL PATCHING NOTES
IN SECTION 3.01, PATCHING AND CUTTING ON THIS SHEET, AND ENSURE SURFACES
ARE PROPERLY PREPPED PRIOR TO INSTALLING OF NEW MATERIALS AND/OR FINISHES.
3. INSTALL WALLCOVERINGS AS PER MANUFACTURER'S INSTALLATION SPECIFICATIONS,
WHERE DESIGNATED. ALL WALLCOVERINGS SHALL BE SMOOTH, WITH NO WRINKLES,
BUBBLES OR LOOSE EDGES, ALL PASTE AND BRUSH MARKS SHALL BE THOROUGHLY
REMOVED. WALLCOVERING ADJOIN WOOD OR METAL TRIM SHALL BE CUT STRAIGHT
AND SQUARE.
4. WALLS SHALL INCLUDE SURFACES FROM FLOOR TO CEILING, INCLUDING PILASTERS,
FASCIAS, AND ALL VERTICAL SURFACES NOT INCLUDED IN CEILING, UNO.
5. ALL WALLS AND CEILINGS SHALL BE PROPERLY PREPARED, PATCHED, SANDED, ETC.
TO PROVIDE A LEVEL 4 FINISH. PROVIDE LEVEL 5 FINISH ONLY WHERE INDICATED ON
PLAN.
6. ALL OPEN PORES IN WOOD SHELVING AND PAINTED DOORS SHALL BE FILLED AND
SHALL RECEIVE PRIMING, SANDING AND TWO FULL FINISH COATS FREE OF BRUSH
MARKS, UNLESS OTHERWISE NOTED. GLOSS FINISH PER SCHEDULE.
7. REMOVE ALL ELECTRICAL SWITCH AND RECEPTACLE PLATES, SURFACE HARDWARE,
ETC., AND PROTECT EXPOSED AREAS PRIOR TO PAINTING. REINSTALL OR REPLACE
ANY DAMAGED PLATES OR HARDWARE WHEN PAINTING HAS BEEN COMPLETED.
CONTRACTOR SHALL REMOVE ALL PAINT FROM SURFACES WHERE SPILLS, SPLASHES
OR SPLATTERS HAVE OCCURRED, INCLUDING BUT NOT LIMITED TO LIGHT FIXTURES,
DIFFUSERS, REGISTERS, ETC.
8. USE A LATEX BASE PAINT IN COLORS AND FINISHES SELECTED BY ARCHITECT.
PROPERLY PREPARE ALL SURFACES TO RECEIVE ONE (1) PRIMER COAT AND TWO (2)
FINISH COATS OF PAINT IN COLOR SELECTED BY ARCHITECT. INCLUDE ADDITIONAL
FINISH COATS AS REQUIRED TO ACHIEVE COLOR TO MATCH CONTROL SAMPLE.
9. UNEVENNESS IN EXISTING PARTITIONS SHALL BE SANDED OR CHIPPED AWAY AND
SURFACE PATCHED TO INSURE A PERFECTLY EVEN SURFACE.
10. EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF WORK BY ALL
TRADES (INCLUDING TELEPHONE INSTALLATION, FLOORING, ETC.) AND COMPLETE
ALL NECESSARY "TOUCH-UP" PAINTING AND /OR PATCHING PRIOR TO SCHEDULING
A PUNCH WALK.
11. IT IS THE INTENT OF THE DRAWINGS THAT ALL EXPOSED SURFACES RECEIVE FINISHES
UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. ANY SURFACES
WHICH DO NOT HAVE A SPECIFIC FINISH NOTED, OR ARE NOTED TO REMAIN
UNFINISHED, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND
FINISHED PER ARCHITECT'S INSTRUCTIONS.
12. TREAT JOINTS AND FASTENERS IN GYPSUM BOARD IN ACCORDANCE WITH GYPSUM
ASSOCIATION GA-214
13. RE-PAINT ALL EXISTING METAL SURFACES, INCLUDING HOLLOW METAL DOOR FRAME,
FIRE EXTINGUISHER CABINETS, ACCESS PANELS, ETC.
14. WHEN PAINTING PUBLIC CORRIDORS, ELEVATOR LOBBIES, STAIRWAYS, COMMON
AREA RESTROOMS, ETC. CHECK WITH BUILDING MANAGEMENT FOR BUILDING
STANDARD FINISH SPECIFICATIONS AND IN-STOCK AVAILABILITY
15. CONTRACTOR TO PREPARE ALL WALLS (NEW & EXISTING) TAPED, SANDED AND
SMOOTH TO RECEIVE NEW APPROVED WALL FINISH
1. SUBMIT THREE (3) FULL SIZE SAMPLES AND A DIMENSIONED SEAMING DIAGRAM TO
KARDENT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION OF SPECIFIED FLOOR
COVERING AND BASIC MATERIALS
2. REVIEW PERTINENT FLOOR PATCHING & CUTTING NOTES ON THE DRAWINGS. ALL
SURFACES TO BE PREPPED PER MANUFACTURER'S INSTRUCTIONS AND
SPECIFICATIONS. ENSURE SURFACES ARE PROPERLY PREPPED PRIOR TO INSTALLING
NEW MATERIALS AND/OR FINISHES
3. ANY MAJOR AND MINOR FLOOR PREPARATION IS THE RESPONSIBILITY OF THE
CONTRACTOR. FILL, SAND, AND LEVEL AS REQUIRED PRIOR TO INSTALLATION FINISH
MATERIAL TO PROVIDE A FLUSH AND EVEN SUBSTRATE. ALL SELF LEVELING
COMPOUNDS USED SHALL BE CEMENTITIOUS. ALL IMPERFECTIONS AND SLIGHT
DEPRESSIONS IN THE FLOOR SURFACE SHALL BE SKIM COATED
4. ALL NEW FLOORING IS TO BE PROVIDED AND INSTALLED BY GENERAL
CONTRACTOR AND SHALL BE AS SPECIFIED ON THE DRAWINGS, UNO
5. FLOORING TILES SHALL BE LAID IN SQUARE PATTERN WITH COURSES, PARALLEL TO
WALLS, UNO
6. TILES SHALL BE SECURELY CEMENTED AND SHALL BE LAID WITH TIGHT JOINTS. THE
ADHESIVE USED FOR CEMENTING TILE SHALL BE APPLIED FAR ENOUGH IN ADVANCE
OF THE SETTING TO PERMIT THE ADHESIVE TO REACH ITS INITIAL SET, BUT NOT ITS
FINAL SET. ALL STONE AND TILE FLOORING SHALL BE INSTALLED OVER CRACKED
ISOLATION /WATERPROOFING MEMBRANE. CONTRACTOR TO TEST SLAB FOR
MOISTURE PRIOR TO INSTALLATION OF RESILIENT FLOORING, AND INSTALL PER
MANUFACTURER'S INSTRUCTIONS
7. AREAS BEING SURFACED SHALL BE CLOSED TO TRAFFIC AND OTHER WORK DURING
THE LAYING OF FLOORING. STONE FLOORS SHALL BE COVERED AFTER INSTALLATION
FOR PROTECTION
8. CLEAN, REMOVE ALL SPOTS OF ADHESIVE AND SURFACES STAINS AND SCRAPS;
CARTONS AND CONTAINERS SHALL BE REMOVED FROM THE BUILDING UPON
COMPLETION OF WORK
9. APPLY TWO APPLICATIONS OF AN APPROVED NON-SLIP WAX OVER RESILIENT TILE
FLOOR, WHICH IS TO BE THOROUGHLY MACHINE BUFFED AND LEFT IN A
CONDITION SATISFACTORY TO THE CLIENT REPRESENTATIVE
10. PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL FLOORING WORK FOR
THE DURATION OF THE CONTRACT AND REMOVE ALL PROTECTION PRIOR TO
PUNCHLIST. ONLY CLIENT APPROVED CARPET PROTECTION SHALL BE USED,
ENSURING NO RESIDUE WILL REMAIN UPON REMOVAL
11. COORDINATE ALL FLOORING SUBCONTRACTORS INVOLVED TO ENSURE FLUSH
INSTALLATION OF VARYING FLOOR MATERIALS SPECIFIED ON THE DRAWINGS. ALL
TRANSITION METHODS TO BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION
12. PROVIDE REDUCER STRIP OR METAL TRANSITION STRIP WHERE MATERIAL
TRANSITIONS OCCUR.
This is the start of the file's text. The full file is on GovTribe.