_R_Technical_Specifications_-_Hazardous_Materials_-_Distribution.pdf
PDF 48 MB Posted
- Attached to
- Job Order Contract for Asbestos Abatement w/ Hazardous Materials (JOC 2619 and JOC 2621)
- Solicitation number
- 2026-RFP-00104
- Issued by
- San Mateo County, California
About this file
The document is a comprehensive technical specification for a Job Order Contract for Hazardous Materials Management issued by the County of San Mateo, California, specifically the Department of Public Works. The specification provides detailed technical requirements for asbestos abatement and hazardous materials handling across multiple construction and renovation scenarios. The County intends to contract up to three contractors with an aggregate fiscal obligation not exceeding $3,000,000 per agreement, with a maximum individual contract term of one year. The technical specification covers an extensive range of construction and environmental remediation processes, including detailed instructions for handling hazardous materials like asbestos, lead, PCBs, mold, and other contaminants across various structural and environmental settings.
The contract opportunity is structured to allow flexible deployment of hazardous materials remediation services across County facilities, with the potential for work at multiple locations under the County's jurisdiction. The apparent lowest, responsive, and responsible bidder will be selected for each Job Order Contract, with contractors being excluded from successive contract considerations. The specification includes extremely granular technical requirements spanning CSI Divisions 01-33, covering everything from general requirements and demolition to concrete work, masonry, metals, thermal and moisture protection, and utility systems. The technical depth suggests a comprehensive approach to managing hazardous materials removal and environmental remediation, with precise standards for material handling, safety protocols, and technical execution across diverse potential project scenarios.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Job Order Contract Technical Specifications CSI Divisions 01-33 October 2025
County of San Mateo, Hazardous Materials
This Page Intentionally Left Blank
Table of Contents
October 2025 County of San Mateo, Hazardous Materials TOC - 1
01 General Requirements
01 00 00 00 General Requirements 01 10 00 00 Summary 01 11 13 00 Work Covered by Contract Documents 01 22 00 00 No Specification Required 01 22 00 00a Unit Prices 01 31 00 00 Project Management and Coordination 01 40 00 00 Quality Requirements 01 42 00 00 References 01 50 00 00 Temporary Facilities and Controls 01 51 13 00 Temporary Electricity 01 54 23 00 Temporary Scaffolding and Platforms 01 56 39 00 Temporary Tree and Plant Protection 01 57 23 00 Temporary Storm Water Pollution Control 01 60 00 00 Product Requirements 01 74 19 00 Construction Waste Management and Disposal
02 Existing Conditions
02 41 16 00 Structure Demolition 02 41 16 13 Building Demolition 02 41 19 00 Selective Demolition 02 41 19 13 Cutting and Patching 02 58 13 00 Snow Fencing 02 61 00 00 Removal and Disposal of Contaminated Soils 02 82 16 00 Engineering Control of Asbestos Containing Materials 02 82 33 00 Removal Of Friable Asbestos-Containing Materials 02 82 33 00a Removal Of Nonfriable Asbestos-Containing Materials 02 83 00 00 Lead Remediation 02 83 19 00 Lead-Based Paint Remediation 02 83 19 00a XRF Testing For Lead-Based Paint 02 83 19 00b Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 84 16 00 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury 02 87 13 00 Mold Remediation 02 87 16 13 Bird Excrement Removal
03 Concrete
03 01 30 00 Maintenance of Cast-in-Place Concrete 03 01 30 71 Self-Adhering Sheet Waterproofing 03 10 00 00 Concrete Forming and Accessories 03 11 16 00 Architectural Concrete 03 20 00 00 Concrete Reinforcing 03 30 00 00 Cast-In-Place Concrete 03 35 43 00 Polished Concrete Finishing 03 37 13 00 Shotcrete 03 37 13 00a Glass-Fiber-Reinforced Concrete (GFRC) 03 41 00 00 Precast Structural Concrete 03 41 26 00 Unbonded Post-Tensioned Concrete 03 51 13 00 Cementitious Wood Fiber Decks 03 53 00 00 Concrete Topping 03 54 00 00 Gypsum Cement Underlayment 03 54 16 00 Hydraulic Cement Underlayment
04 Masonry
04 01 20 51 Brick Masonry Repair 04 01 20 52 Masonry Cleaning 04 01 20 91 Brick Masonry Repointing
TOC - 2 County of San Mateo, Hazardous Materials
04 20 00 00 Unit Masonry 04 20 00 00a Masonry Veneer 04 22 00 00 Concrete Unit Masonry 04 23 00 00 Glass Unit Masonry 04 41 00 00 Stone Wall Facing 04 42 00 00 Exterior Stone Cladding 04 72 00 00 Precast Architectural Concrete 04 72 00 00a Cast Stone Masonry
05 Metals
05 01 70 51 Decorative Metal Cleaning 05 01 70 61 Decorative Metal Repair 05 01 70 63 Decorative Metal Refinishing 05 12 00 00 Structural Steel Framing 05 12 00 00a Architecturally Exposed Structural Steel Framing 05 21 00 00 Steel Joist Framing 05 31 00 00 Steel Decking 05 40 00 00 Cold-Formed Metal Framing 05 50 00 00 Metal Fabrications 05 51 13 00 Metal Pan Stairs 05 51 13 00a Metal Floor Plate Stairs 05 51 19 00 Metal Grating Stairs 05 52 13 00 Pipe And Tube Railings 05 53 00 00 Expanded Metal Gratings 05 53 13 00 Bar Gratings 05 58 00 00 Heating_Cooling Unit Covers 05 70 00 00 Decorative Metal 05 71 00 00 Decorative Metal Stairs 05 71 13 00 Fabricated Metal Spiral Stairs 05 73 00 00 Decorative Metal Railings 05 73 00 00a Glazed Decorative Metal Railings 05 75 00 00 Decorative Formed Metal
06 Wood, Plastics, and Composites
06 10 00 00 Rough Carpentry 06 13 00 00 Heavy Timber Construction 06 15 00 00 Wood Roof Decking 06 15 00 00a Wood Patio Decking 06 16 00 00 Sheathing 06 17 00 00 Engineered Structural Wood 06 17 53 00 Shop-Fabricated Wood Trusses 06 18 00 00 Glued-Laminated Construction 06 20 00 00 Exterior Finish Carpentry 06 20 00 00a Interior Finish Carpentry 06 40 00 00 Exterior Architectural Woodwork 06 40 00 00a Interior Architectural Woodwork 06 41 00 00 Architectural Wood Casework 06 41 13 00 Residential Cabinets 06 42 16 00 Flush Wood Paneling 06 42 19 00 Plastic-Laminate-Faced Wood Paneling 06 42 19 00a Plastic Paneling 06 44 00 00 Ornamental Woodwork 06 74 13 00 Fiberglass Reinforced Gratings
07 Thermal And Moisture Protection
07 01 50 19 Preparation for Reroofing 07 01 50 81 Built-Up Coal Tar Roofing
County of San Mateo, Hazardous Materials TOC - 3
07 11 13 00 Bituminous Dampproofing 07 13 53 00 Elastomeric Sheet Waterproofing 07 14 13 00 Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 14 16 00 Cold Fluid-Applied Waterproofing 07 16 13 00 Polymer Modified Cement Waterproofing 07 16 16 00 Crystalline Waterproofing 07 16 19 00 Metal Oxide Waterproofing 07 17 00 00 Bentonite Waterproofing 07 18 00 00 Traffic Coatings 07 19 00 00 Water Repellents 07 21 00 00 Thermal Insulation 07 21 19 00 Foamed-In-Place Insulation 07 24 13 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 13 00a Water-Drainage Exterior Insulation And Finish System (EIFS) 07 25 00 00 Weather Barriers 07 26 00 00 Vapor Retarders 07 27 00 00 Nonbituminous Self-Adhering Sheet Air Barriers 07 31 13 00 Asphalt Shingles 07 31 16 00 Metal Shingles 07 31 26 00 Slate Shingles 07 31 29 00 Wood Shingles And Shakes 07 32 13 00 Clay Roof Tiles 07 32 16 00 Concrete Roof Tiles 07 41 13 00 Formed Metal Roof Panels 07 41 13 00a Standing-Seam Metal Roof Panels 07 41 13 00b Batten-Seam Metal Roof Panels 07 41 16 00 Insulated Metal Roof Panels 07 42 13 19 Insulated Metal Wall Panels 07 42 13 23 Composite Wall Panels 07 42 93 00 Soffit Panels 07 46 16 00 Metal Plate Wall Panels 07 46 16 00a Aluminum Siding 07 46 19 00 Steel Siding 07 46 33 00 Plastic Siding 07 46 46 00 Fiber-Cement Siding 07 51 13 00 Built-Up Asphalt Roofing 07 52 13 00 Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing 07 52 16 00 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing 07 53 16 00 Chlorosulfonate-Polyethylene (CSPE) Roofing 07 53 23 00 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing 07 54 19 00 Polyvinyl-Chloride (PVC) Roofing 07 54 23 00 Thermoplastic-Polyolefin (TPO) Roofing 07 55 52 13 Atactic-Polypropylene (APP) Modified Bituminous Protected Membrane Roofing 07 55 52 16 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Protected Membrane Roofing 07 56 00 00 Fluid-Applied Protected Membrane Roofing 07 57 00 00 Coated Foamed Roofing 07 61 00 00 Sheet Metal Roofing 07 62 00 00 Sheet Metal Flashing And Trim 07 71 00 00 Roof Specialties 07 72 00 00 Roof Accessories 07 72 53 00 Snow Guards 07 81 00 00 Applied Fire Protection 07 81 23 00 Intumescent Fire Protection 07 84 13 00 Penetration Firestopping 07 84 43 00 Joint Firestopping 07 84 56 13 Board Fire Protection 07 91 00 00 Preformed Joint Seals 07 92 00 00 Joint Sealants 07 92 19 00 Acoustical Joint Sealants 07 95 13 13 Interior Expansion Joint Cover Assemblies 07 95 13 16 Manufactured Roof Expansion Joints 07 95 13 16a Exterior Expansion Joint Cover Assemblies
08 Openings
08 01 52 61 Wood Window Repairs 08 05 13 00 Stainless-Steel Doors and Frames 08 11 13 00 Hollow Metal Doors and Frames
TOC - 4 County of San Mateo, Hazardous Materials
08 11 73 00 Interior Aluminum Doors and Frames 08 11 73 00a Sliding Metal Fire Doors 08 12 13 00 Hollow Metal Frames 08 12 16 00 Aluminum-Framed Entrances And Storefronts 08 13 73 00 Folding Doors 08 14 16 00 Flush Wood Doors 08 14 16 00a Stile And Rail Wood Doors 08 18 16 00 Sliding Aluminum-Framed Glass Doors 08 18 16 00a Multipanel Sliding Aluminum-Framed Glass Doors 08 18 16 00b Sliding Wood-Framed Glass Doors 08 18 16 00c Multipanel Sliding Wood-Framed Glass Doors 08 31 13 00 Access Doors And Frames 08 33 13 00 Coiling Counter Doors 08 33 23 00 Overhead Coiling Doors 08 33 26 00 Overhead Coiling Grilles 08 33 43 00 Overhead Coiling Smoke Curtains 08 34 73 13 Metal Sound Control Door Assemblies 08 34 73 16 Wood Sound Control Door Assemblies 08 36 13 00 Sectional Doors 08 38 00 00 Traffic Doors 08 42 13 00 Aluminum-Framed Entrances 08 42 26 00 All-Glass Entrances And Storefronts 08 42 26 00a All-Glass Entrances 08 42 29 23 Sliding Automatic Entrances 08 42 29 23a Intensive Care Unit_Critical Care Unit (ICU_CCU) Entrances 08 42 29 33 Swinging Automatic Entrances 08 42 33 00 Revolving Door Entrances 08 43 13 00 Aluminum-Framed Storefronts 08 44 13 00 Glazed Aluminum Curtain Walls 08 44 13 00a Structural-Sealant-Glazed Curtain Walls 08 44 13 00b Sloped Glazing Assemblies 08 45 23 00 Structured-Polycarbonate-Panel Assemblies 08 45 23 00a Fiberglass-Sandwich-Panel Assemblies 08 51 13 00 Aluminum Windows 08 51 13 00a Aluminum Replacement Windows 08 51 19 00 Stainless Steel Windows 08 51 69 00 Metal Storm Windows 08 52 00 00 Wood Windows 08 53 13 00 Vinyl Windows 08 56 19 00 Security Windows 08 62 00 00 Roof Windows 08 62 00 00a Unit Skylights 08 63 00 00 Metal-Framed Skylights 08 71 00 00 Door Hardware 08 71 11 00 Detention Door Hardware 08 71 13 00 Power Door Operators 08 78 00 00 All-Glass-Entrance Hardware 08 80 00 00 Glazing 08 83 00 00 Mirrors 08 84 00 00 Plastic Glazing 08 88 53 00 Security Glazing 08 91 16 00 Operable Wall Louvers 08 91 19 00 Fixed Louvers 08 95 16 00 Wall Vents
09 Finishes
09 01 20 00 Gypsum Board Renovation 09 01 20 91 Plaster Restoration 09 01 90 52 Maintenance Repainting 09 05 61 13 Moisture Vapor Emission Control 09 22 13 13 Gypsum Veneer Plastering 09 22 16 00 Non-Structural Metal Framing 09 23 00 00 Gypsum Plastering 09 24 00 00 Cement Plastering 09 29 00 00 Gypsum Board
County of San Mateo, Hazardous Materials TOC - 5
09 30 13 00 Ceramic Tiling 09 30 33 00 Stone Tiling 09 51 13 00 Acoustical Panel Ceilings 09 51 23 00 Acoustical Tile Ceilings 09 51 33 00 Acoustical Metal Pan Ceilings 09 54 00 00 Suspended Wood Ceilings 09 54 00 00a Stretched-Fabric Ceiling Systems 09 54 00 00b Fabric-Wrapped Ceiling Panels 09 54 23 00 Linear Metal Ceilings 09 57 00 00 Security Ceiling Assemblies 09 63 13 00 Brick Flooring 09 63 13 00a Chemical-Resistant Brick Flooring 09 64 00 00 Wood Flooring 09 64 66 00 Wood Athletic Flooring 09 65 13 00 Resilient Base and Accessories 09 65 13 13 Cork Flooring 09 65 16 00 Resilient Sheet Flooring 09 65 19 00 Resilient Tile Flooring 09 65 43 00 Linoleum Flooring 09 65 66 00 Resilient Athletic Flooring 09 65 66 00a Fluid-Applied Athletic Flooring 09 66 13 00 Portland Cement Terrazzo Flooring 09 66 23 00 Resinous Matrix Terrazzo Flooring 09 67 23 00 Resinous Flooring 09 68 13 00 Tile Carpeting 09 68 16 00 Sheet Carpeting 09 69 00 00 Access Flooring 09 70 00 00 Stone Trim 09 70 00 00a Stretched-Fabric Wall Systems 09 70 00 00b Fabric-Wrapped Panels 09 72 00 00 Wall Coverings 09 91 13 00 Exterior Painting 09 91 13 00a High-Temperature-Resistant Coatings 09 91 23 00 Interior Painting 09 91 23 00a Multicolor Interior Finishing 09 93 00 00 Staining and Transparent Finishing 09 96 00 00 High-Performance Coatings 09 96 53 00 Elastomeric Coatings 09 97 26 00 Cementitious Coatings
10 Specialties
10 11 00 00 Visual Display Units 10 12 00 00 Display Cases 10 13 00 00 Directories 10 14 16 00 Plaques 10 14 19 00 Dimensional Letter Signage 10 14 23 00 Panel Signage 10 14 23 00a Room-Identification Panel Signage 10 14 23 00b Modular Signage 10 14 23 00c Painted Signage 10 21 13 13 Metal Toilet Compartments 10 21 13 14 Stainless Steel Toilet Compartments 10 21 13 16 Plastic-Laminate-Clad Toilet Compartments 10 21 13 19 Plastic Toilet Compartments 10 21 13 43 Phenolic-Core Pedestal-Mounted Privacy Toilet Compartments 10 21 16 17 Phenolic-Core Shower and Dressing Compartments 10 21 23 00 Cubicle Curtains and Track 10 22 00 00 All-Glass Partitions 10 22 13 00 Wire Mesh Partitions 10 22 19 00 Demountable Partitions 10 22 33 00 Accordion Folding Partitions 10 22 33 00a Folding Panel Partitions 10 26 00 00 Wall and Door Protection 10 28 00 00 Toilet, Bath, and Laundry Accessories 10 28 13 63 Detention Toilet Accessories 10 28 19 00 Tub and Shower Enclosures 10 44 13 00 Fire Protection Cabinets
TOC - 6 County of San Mateo, Hazardous Materials
10 44 16 00 Fire Extinguishers 10 51 13 00 Metal Lockers 10 51 13 00a Wire Mesh Storage Lockers 10 51 26 00 Plastic-Laminate-Clad Lockers 10 55 00 00 USPS-Delivery Postal Specialties 10 55 00 00a Private-Delivery Postal Specialties 10 56 13 00 Metal Storage Shelving 10 73 13 00 Awnings 10 75 16 00 Ground-Set Flagpoles 10 75 23 00 Wall-Mounted Flagpoles 10 86 00 00 Detention Furniture
11 Equipment
11 11 36 00 Vehicle Charging Equipment 11 12 00 00 Parking Control Equipment 11 13 13 00 Loading Dock Bumpers 11 13 16 00 Loading Dock Seals and Shelters 11 13 19 00 Stationary Loading Dock Equipment 11 13 23 00 Portable Dock Equipment 11 30 13 00 Residential Appliances 11 40 00 00 Foodservice Equipment 11 41 33 00 Residential Casework 11 52 13 00 Projection Screens 11 52 13 00a Rear Projection Screens 11 68 00 00 Play Field Equipment and Structures 11 73 00 00 Patient Care Equipment 11 82 26 00 Facility Waste Compactors 11 98 12 00 Detention Enclosures 11 98 12 00a Detention Doors And Frames
13 Special Construction
13 34 16 13 Stadium and Arena Bench Seating 13 34 19 00 Metal Building Systems 13 34 23 16 Fabricated Control Booths 13 46 13 00 Lightning Protection for Structures 13 47 13 00 Cathodic Protection 13 49 00 00 Radiation Protection
21 Fire Suppression
21 01 10 91 Commissioning Of Fire Suppression 21 05 00 00 Common Work Results for Fire Suppression 21 05 23 00 General-Duty Valves for Water-Based Fire-Suppression Piping 21 05 29 00 Hangers and Supports for Fire-Suppression Piping and Equipment 21 05 33 00 Heat Tracing for Fire-Suppression Piping 21 05 48 00 Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 21 05 48 13 Vibration Controls for Fire-Suppression Piping and Equipment 21 05 53 00 Identification for Fire-Suppression Piping and Equipment 21 07 00 00 Fire-Suppression Systems Insulation 21 10 00 00 Water-Based Fire-Suppression Systems 21 13 39 00 Foam-Water Systems 21 21 00 00 High-Pressure, Carbon-Dioxide Fire-Extinguishing Systems 21 21 00 00a Low-Pressure, Carbon-Dioxide Fire-Extinguishing Systems 21 22 00 00 Clean-Agent Fire-Extinguishing Systems 21 31 13 00 Electric-Drive, Centrifugal Fire Pumps 21 31 13 00a Pressure-Maintenance Pumps 21 31 16 00 Diesel-Drive, Centrifugal Fire Pumps
County of San Mateo, Hazardous Materials TOC - 7
22 Plumbing
22 05 00 00 Common Work Results for Plumbing 22 05 00 00a Testing, Adjusting, and Balancing for Plumbing 22 05 23 00 General-Duty Valves for Plumbing Piping 22 05 29 00 Hangers and Supports for Plumbing Piping and Equipment 22 05 33 00 Heat Tracing for Plumbing Piping 22 05 48 00 Vibration And Seismic Controls For Plumbing Piping And Equipment 22 05 48 13 Vibration Controls for Plumbing Piping and Equipment 22 05 53 00 Identification for Plumbing Piping and Equipment 22 05 76 00 Storm Drainage Piping Specialties 22 07 16 00 Plumbing Equipment Insulation 22 07 19 00 Plumbing Piping Insulation 22 11 00 00 Gray-Water Piping 22 11 16 00 Domestic Water Piping 22 11 16 00a Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 16 00b Vacuum Piping For Laboratory And Healthcare Facilities 22 11 16 00c Steam And Condensate Piping 22 11 19 00 Domestic Water Piping Specialties 22 11 23 13 Domestic-Water Packaged Booster Pumps 22 11 23 23 Inline, Domestic-Water Pumps 22 12 19 00 Facility Ground-Mounted, Potable-Water Storage Tanks 22 12 23 00 Facility Indoor Potable-Water Storage Tanks 22 12 23 26 Facility Fuel-Oil Piping 22 13 00 00 Facility Gray-Water Storage Tanks 22 13 16 00 Sanitary Waste And Vent Piping 22 13 19 00 Sanitary Waste Piping Specialties 22 13 19 13 Sanitary Drains 22 13 23 00 Sanitary Waste Interceptors 22 13 29 00 Sanitary Sewerage Pumps 22 14 00 00 Facility Storm-Water Retention Tanks 22 14 13 00 Storm Drainage Piping 22 14 29 00 Sump Pumps 22 15 13 00 General-Service Compressed-Air Piping 22 15 19 00 General-Service Packaged Air Compressors and Receivers 22 31 00 00 Domestic Water Softeners 22 31 16 00 Water Treatment Plant Electrical Controls And Instrumentation 22 32 00 00 Domestic Water Filtration Equipment 22 33 00 00 Electric Domestic-Water Heaters 22 34 00 00 Fuel-Fired, Domestic-Water Heaters 22 35 00 00 Domestic-Water Heat Exchangers 22 41 00 00 Residential Plumbing Fixtures 22 42 00 00 Commercial Plumbing Fixtures 22 43 00 00 Healthcare Plumbing Fixtures 22 45 00 00 Emergency Plumbing Fixtures 22 46 00 00 Security Plumbing Fixtures 22 47 00 00 Drinking Fountains And Water Coolers 22 63 13 00 Gas Piping For Laboratory And Healthcare Facilities 22 66 00 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities
23 Heating, Ventilating, and Air-Conditioning (HVAC)
23 01 30 51 Existing HVAC Air Distribution System Cleaning 23 05 00 00 Common Work Results for HVAC 23 05 00 00a Coatings for HVAC 23 05 23 00 General-Duty Valves for HVAC Piping 23 05 29 00 Hangers and Supports for HVAC Piping and Equipment 23 05 33 00 Heat Tracing for HVAC Piping 23 05 48 00 Vibration and Seismic Controls for HVAC 23 05 48 13 Vibration Controls for HVAC 23 05 48 13a Vibration Instruments 23 05 53 00 Identification for HVAC Piping and Equipment 23 05 66 00 AntiMicrobial Ultraviolet Lamp Systems for HVAC 23 05 93 00 Testing, Adjusting, and Balancing for HVAC
TOC - 8 County of San Mateo, Hazardous Materials
23 07 13 00 Duct Insulation 23 07 16 00 HVAC Equipment Insulation 23 07 19 00 HVAC Piping Insulation 23 08 00 00 Commissioning Of HVAC 23 09 00 00 Speed Instruments 23 09 23 00 Direct Digital Control (DDC) System for HVAC 23 09 23 00a Leak Detection Instruments 23 09 23 00b Position Instruments 23 09 23 00c Sequence of Operations for HVAC DDC 23 09 23 11 Control Valves 23 09 23 12 Control Dampers 23 09 23 13 Energy Meters 23 09 23 14 Flow Instruments 23 09 23 16 Gas Instruments 23 09 23 19 Moisture Instruments 23 09 23 21 Motion Instruments 23 09 23 23 Pressure Instruments 23 09 23 27 Temperature Instruments 23 11 23 00 Facility Natural-Gas Piping 23 11 26 00 Facility Liquefied-Petroleum Gas Piping 23 12 13 00 Facility Fuel-Oil Pumps 23 13 13 00 Facility Underground Fuel-Oil Storage Tanks 23 13 23 00 Facility Aboveground Fuel-Oil Storage Tanks 23 21 00 00 Underground Hydronic Piping 23 21 13 00 Hydronic Piping 23 21 13 23 Radiant-Heating Hydronic Piping 23 21 16 00 Hydronic Piping Specialties 23 21 23 00 Hydronic Pumps 23 21 23 23 Electric-Drive, Vertical-Turbine Fire Pumps 23 21 23 23a Diesel-Drive, Vertical-Turbine Fire Pumps 23 22 00 00 Underground Steam and Condensate Heating Piping 23 22 16 00 Steam and Condensate Heating Piping Specialties 23 22 23 00 Steam Condensate Pumps 23 23 00 00 Refrigerant Piping 23 25 00 00 HVAC Water Treatment 23 25 00 00a Water Treatment for Open-Loop Hydronic Systems 23 25 00 00b Water Treatment for Steam System Feedwater 23 25 00 00c Water Treatment for Humidification Steam System Feedwater 23 25 00 00d HVAC Makeup-Water Filtration Equipment 23 25 13 00 Water Treatment for Closed-Loop Hydronic Systems 23 31 00 00 Shop-Fabricated HVAC Casings 23 31 13 00 Metal Ducts 23 31 16 00 Nonmetal Ducts 23 33 00 00 Air Duct Accessories 23 34 00 00 HVAC Fans 23 34 33 00 Commercial Air Curtains 23 34 33 00a Industrial Air Curtains 23 35 00 00 Listed Kitchen Ventilation System Exhaust Ducts 23 36 00 00 Air Terminal Units 23 37 13 00 Fabric Air-Distribution Devices 23 37 13 13 Air Diffusers 23 37 13 13a Registers and Grilles 23 37 13 43 Security Registers and Grilles 23 37 23 00 HVAC Gravity Ventilators 23 38 13 00 Commercial-Kitchen Hoods 23 41 00 00 Particulate Air Filtration 23 41 33 00 High-Efficiency Particulate Air Filtration 23 42 00 00 Gas-Phase Air Filtration 23 43 00 00 Electronic Air Cleaners 23 51 13 00 Draft Control Fans 23 51 13 00a Gas Vents 23 51 13 00b Insulated Sectional Chimneys 23 51 13 16 Vent Dampers 23 51 16 00 Fabricated Breechings and Accessories 23 52 13 00 Electric Boilers 23 52 16 00 Condensing Boilers 23 52 23 00 Cast-Iron Boilers 23 52 33 00 Water-Tube Boilers 23 52 39 00 Fire-Tube Boilers 23 53 13 00 Boiler Feedwater Pumps
County of San Mateo, Hazardous Materials TOC - 9
23 53 16 00 Deaerators 23 54 13 00 Electric-Resistance Furnaces 23 54 16 13 Gas-Fired Furnaces 23 54 16 16 Oil-Fired Furnaces 23 55 23 13 Low-Intensity, Gas-Fired, Radiant Heaters 23 55 23 13a Radiant-Heating Electric Panels 23 55 33 13 Oil-Fired Unit Heaters 23 55 33 16 Gas-Fired Unit Heaters 23 57 00 00 Heat Exchangers for HVAC 23 62 00 00 Packaged Compressor and Condenser Units 23 63 13 00 Air-Cooled Refrigerant Condensers 23 64 13 00 Direct-Fired Absorption Water Chillers 23 64 13 16 Indirect-Fired Absorption Water Chillers 23 64 16 00 Centrifugal Water Chillers 23 64 23 13 Air-Cooled, Scroll Water Chillers 23 64 23 16 Water-Cooled, Scroll Water Chillers 23 64 26 13 Air-Cooled, Rotary-Screw Water Chillers 23 64 26 16 Water-Cooled, Rotary-Screw Water Chillers 23 65 13 16 Closed-Circuit, Forced-Draft Cooling Towers 23 65 14 13 Open-Circuit, Induced-Draft, Counterflow Cooling Towers 23 65 14 14 Open-Circuit, Induced-Draft, Crossflow Cooling Towers 23 65 14 16 Closed-Circuit, Induced-Draft, Counterflow Cooling Towers 23 72 13 00 Heat Wheel Air-To-Air Energy Recovery Units 23 72 16 00 Heat Pipe Air-to-Air Energy Recovery Units 23 73 00 00 Indoor, Indirect, Gas-Fired Heating and Ventilating Units 23 73 00 00a Indoor, Direct-Fired Heating and Ventilating Units 23 73 13 00 Indoor, Basic Air-Handling Units 23 73 13 00a Indoor, Semi-Custom Air-Handling Units 23 73 13 00b Indoor, Custom Air-Handling Units 23 74 00 00 Outdoor, Semi-Custom Air-Handling Units 23 74 00 00a Outdoor, Custom Air-Handling Units 23 74 00 00b Dedicated Outdoor-Air Units 23 74 16 13 Packaged, Large-Capacity, Rooftop Air-Conditioning Units 23 74 16 13a Self-Contained Air-Conditioners 23 74 16 13b Unit Ventilators 23 74 23 00 Packaged, Indirect-Fired, Outdoor, Heating-Only Makeup-Air Units 23 74 23 13 Packaged, Direct-Fired, Outdoor, Heating-Only Makeup-Air Units 23 81 00 00 Variable-Refrigerant-Flow HVAC Systems 23 81 13 11 Packaged Terminal Air-Conditioners, Through-Wall Units 23 81 13 13 Packaged Terminal Air-Conditioners, Outdoor, Wall-Mounted Units 23 81 23 00 Small Capacity Computer-Room Air-Conditioners Floor-Mounted Units 23 81 23 00a Computer-Room Air-Conditioners, Console Units 23 81 23 00b Computer-Room, Rack-Cooling Equipment 23 81 23 12 Large Capacity (7 Tons (25 kW) and Larger), Computer-Room Air-Conditioners, Floor-Mounted Units 23 81 23 13 Computer-Room Air-Conditioners, Ceiling-Mounted Units 23 81 26 00 Split-System Air-Conditioners 23 81 46 00 Water-Source Unitary Heat Pumps 23 81 46 00a Water-To-Air Heat Pumps 23 82 00 00 Chilled Beams 23 82 16 11 Hydronic Air Coils 23 82 16 12 Steam Air Coils 23 82 16 13 Refrigerant Air Coils 23 82 16 14 Electric-Resistance Air Coils 23 82 19 00 Fan Coil Units 23 82 29 00 Radiators 23 82 33 00 Convectors 23 82 36 00 Finned-Tube Radiation Heaters 23 82 39 13 Cabinet Unit Heaters 23 82 39 16 Propeller Unit Heaters 23 82 39 19 Wall and Ceiling Unit Heaters 23 83 13 00 Radiant-Heating Electric Cables 23 84 13 00 Heat Exchanger Humidifiers 23 84 13 16 Wetted-Element Humidifiers 23 84 13 23 Direct-Steam-Injection Humidifiers 23 84 13 29 Self-Contained Steam Humidifiers 23 84 16 16 Indoor, Mechanical Dehumidification Units
TOC - 10 County of San Mateo, Hazardous Materials
26 Electrical
26 01 00 00 Supplemental Requirements for Electrical 26 05 00 00 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 13 00 Medium-Voltage Cables 26 05 19 00 Low-Voltage Electrical Power Conductors and Cables 26 05 23 00 Control-Voltage Electrical Power Cables 26 05 26 00 Grounding and Bonding for Electrical Systems 26 05 29 00 Hangers And Supports For Electrical Systems 26 05 29 00a Vibration And Seismic Controls For Electrical Systems 26 05 33 13 Conduits for Electrical Systems 26 05 33 16 Boxes and Covers for Electrical Systems 26 05 33 23 Surface Raceways for Electrical Systems 26 05 36 00 Cable Trays for Electrical Systems 26 05 39 00 Underfloor Raceways For Electrical Systems 26 05 43 00 Underground Ducts and Utility Structures 26 05 46 00 Poles for Electrical Systems 26 05 53 00 Identification for Electrical Systems 26 09 23 00 Electrical Power Monitoring 26 09 23 00a Lighting Control Devices 26 09 23 00b Modular Dimming Controls 26 11 16 00 Secondary Unit Substations with Switchboard Secondary 26 11 16 00a Secondary Unit Substations with Motor Control Center Secondary 26 11 16 11 Secondary Unit Substations with Switchgear Secondary 26 12 13 00 Liquid-Filled, Medium-Voltage Transformers 26 12 16 00 Dry-Type, Medium-Voltage Transformers 26 12 19 00 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 26 13 29 00 Medium-Voltage Compartmentalized Switchgear 26 22 13 00 Low-Voltage Distribution Transformers 26 24 13 00 Switchboards 26 24 16 00 Panelboards 26 24 16 00a Electronically Operated Circuit-Breaker Panelboards 26 24 19 00 Motor-Control Centers 26 25 00 00 Low-Voltage Enclosed Bus Assemblies 26 27 13 00 Electricity Metering 26 27 16 00 Electrical Cabinets and Enclosures 26 27 19 00 Multi-Outlet Assemblies 26 27 26 00 Wiring Devices 26 27 26 00a General-Use Switches, Dimmer Switches, and Fan-Speed Controller Switches 26 27 26 00b General-Grade Single Straight-Blade Receptacles 26 27 26 00c General-Grade Duplex Straight-Blade Receptacles 26 27 26 00d Hospital-Grade Straight-Blade Receptacles 26 27 26 00e Receptacles with Arc-Fault and Ground-Fault Protective Devices 26 27 26 00f Locking Receptacles 26 27 26 00g Pin-and-Sleeve Receptacles 26 27 26 00h Special-Purpose Power Outlet Assemblies 26 27 26 00i Connectors, Cords, and Plugs 26 27 33 00 Power Distribution Units 26 28 13 00 Fuses 26 28 16 00 Enclosed Switches And Circuit Breakers 26 29 13 00 Manual and Magnetic Motor Controllers 26 29 13 00a Soft-Start Motor Controllers 26 29 23 00 Variable-Frequency Motor Controllers 26 31 00 00 Photovoltaic Collectors 26 32 13 13 Diesel-Engine-Driven Generator Sets 26 32 13 19 Bi-Fuel-Engine-Driven Generator Sets 26 33 43 00 Battery Chargers 26 33 43 00a Public Address Systems 26 33 53 00 Static Uninterruptible Power Supply 26 35 33 00 Power Factor Correction Equipment 26 36 00 00 Transfer Switches 26 43 13 00 Surge Protective Devices for Low-Voltage Electrical Power Circuits 26 50 00 00 Lighting 26 55 61 00 Theatrical Lighting 26 55 68 00 Athletic Field Lighting
County of San Mateo, Hazardous Materials TOC - 11
27 Communications
27 11 00 00 Communications Equipment Room Fittings 27 13 13 00 Communications Copper Backbone Cabling 27 13 23 00 Communications Optical Fiber Backbone Cabling 27 15 13 00 Communications Copper Horizontal Cabling 27 15 23 00 Communications Optical Fiber Horizontal Cabling 27 15 33 00 Communications Coaxial Horizontal Cabling 27 16 00 00 Communications Hybrid Cabling 27 41 33 00 Master Antenna Television System 27 51 43 00 Educational Intercommunications and Program Systems 27 52 23 00 Nurse Call Code Blue Systems 27 53 13 00 Clock Systems
28 Electronic Safety and Security
28 10 00 00 Access Control 28 10 00 00a Access Control Software and Database Management 28 10 00 00b Access Control System Hardware 28 15 00 00 Integrated Access Control Hardware Devices 28 15 00 00a Access Control Credentials 28 15 00 00b Electrified Locking Devices and Accessories 28 15 00 00c Egress Management Devices 28 15 00 00d Telephone Entry Systems 28 15 00 00e Intercom Entry Systems 28 15 00 00f Electronic Key Management Systems 28 15 00 00g Access Control Electronic Turnstiles and Mobility Systems 28 15 11 00 Integrated Credential Readers and Entry Management 28 16 11 00 Intrusion Detection 28 16 11 00a Area and Perimeter Intrusion Detection 28 20 00 00 Video Surveillance 28 40 00 00 Emergency Responder Communications Enhancement System ERCES 28 46 00 00 Fire Detection and Alarm 28 47 00 00 Mass Notification
31 Earthwork
31 10 00 00 Site Clearing 31 20 00 00 Earth Moving 31 23 19 00 Dewatering 31 24 13 00 Levee Closure 31 31 16 00 Termite Control 31 32 19 16 Pond and Reservoir Liners 31 41 13 00 Drilled Concrete Piers and Shafts 31 50 00 00 Excavation Support and Protection 31 62 13 00 Concrete Piles 31 62 16 00 Steel Piles 31 62 19 00 Timber Piles 31 62 23 00 Composite Piles
32 Exterior Improvements
32 12 16 00 Asphalt Paving 32 12 16 00a Imprinted Asphalt 32 13 13 00 Concrete Paving 32 13 16 00 Decorative Concrete Paving 32 13 73 00 Concrete Paving Joint Sealants 32 14 00 00 Unit Paving 32 14 16 00 Vitrified Brick Pavement Replacement 32 14 33 13 Porous Unit Paving
TOC - 12 County of San Mateo, Hazardous Materials
32 17 13 00 Parking Bumpers 32 17 16 00 Manufactured Traffic-Calming Devices 32 17 23 00 Pavement Markings 32 17 26 00 Tactile Warning Surfacing 32 18 16 13 Playground Protective Surfacing 32 31 13 00 Chain Link Fences And Gates 32 31 13 13 High-Security Chain Link Fences and Gates 32 31 16 00 Welded Wire Fences and Gates 32 31 19 00 Decorative Metal Fences and Gates 32 32 23 00 Segmental Retaining Walls 32 33 00 00 Site Furnishings 32 84 00 00 Planting Irrigation 32 91 13 00 Soil Preparation 32 91 19 13 Facility Septic Tanks 32 92 00 00 Turf and Grasses 32 93 00 00 Plants 32 96 00 00 Transplanting
33 Utilities
33 01 30 41 Cleaning of Sewers 33 05 00 00 Common Work Results For Utilities 33 11 13 00 Rehabilitation of Water Supply Wells 33 11 13 00a Potable Water Supply Wells 33 14 00 00 Site Water Distribution Piping 33 14 13 23 Ground-Loop Heat-Pump Piping 33 31 00 00 Site Sanitary Sewerage Piping 33 32 00 00 Site Packaged Sewage Pumping Stations 33 42 00 00 Stormwater Conveyance 33 44 36 00 Oil Water Separator 33 46 00 00 Subdrainage 33 71 00 00 Overhead Medium-Voltage Wiring
01 - General Requirements
October 2025 General Requirements County of San Mateo, Hazardous Materials 01 00 00 00 - 1
SECTION 01 00 00 00 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 BRACKETED OPTIONS
A. Within these Technical Specifications there are bracketed options. For example [6ft] [12ft] [24ft]. The final selection will be made by the Owner and set forth in the Detailed Scope of Work.
1.2 WARRANTY
A. Within these Technical Specifications there are warranty periods listed. The warranty periods listed cover both material and labor for that period. If a manufacture will warranty a material for a longer period than what is listed, the material is covered as a replacement by the manufacture for the extra period.
The labor to replace will be at the installation price for the contractor.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 00 00 00
General Requirements October 2025 01 00 00 00 - 2 County of San Mateo, Hazardous Materials
THIS PAGE INTENTIONALLY LEFT BLANK
October 2025 Summary County of San Mateo, Hazardous Materials 01 10 00 00 - 1
SECTION 01 10 00 00 - SUMMARY
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction.
4. Work performed by Owner.
5. Multiple Work Packages.
6. Work under Owner's separate contracts.
7. Future work not part of this Project.
8. Owner's product purchase contracts.
9. Owner-furnished/Contractor-installed (OFCI) products.
10. Owner-furnished/Owner-installed (OFOI) products.
11. Contractor-furnished/Owner-installed (CFOI) products.
12. Contractor's use of site and premises.
13. Coordination with occupants.
14. Work restrictions.
15. Specification and Drawing conventions.
16. Miscellaneous provisions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
2. Section 017300 "Execution" for coordination of Owner-installed products.
1.2 DEFINITIONS
A. Work Package: A group of specifications, drawings, and schedules prepared by the design team to describe a portion of the Project Work for pricing, permitting, and construction.
1.3 PROJECT INFORMATION
A. Project Identification: <Insert Project identifier, such as Project name and number>.
1. Project Location: <Insert Project location (street address, city, and state)>.
B. Owner: <Insert name and address of Owner>.
1. Owner's Representative: <Insert name and contact information for Owner's representative>.
C. Architect: <Insert name and contact information for Architect>.
1. Architect's Representative: <Insert name and contact information for Architect's representative>.
Summary October 2025 01 10 00 00 - 2 County of San Mateo, Hazardous Materials
D. Architect's Consultants: Architect has retained the following design professionals, who have prepared designated portions of the Contract Documents:
1. <Insert title of design discipline>: <Insert name of Architect's consultant firm>.
a. <Insert title of design discipline> Representative: <Insert name and contact information for Architect's consultant representative>.
E. Other Owner Consultants: Owner has retained the following design professionals who have prepared designated portions of the Contract Documents:
1. <Insert title of design discipline>: <Insert name for consultant firm> has prepared the following portions of the Contract Documents:
a. <Insert title of design discipline> Representative: <Insert name and contact information of Owner consultant representative>.
b. Scope of Service: <Insert description of scope of service for Owner consultant>.
F. Contractor: <Insert name of Contractor firm> has been engaged as Contractor for this Project.
1. Contractor Representative: <Insert name and contact information for Contractor representative>.
G. Construction Manager: <Insert name of Construction Manager firm>.
1. Construction Manager Representative: <Insert name and contact information for Construction Manager representative>.
2. Construction Manager has been engaged for this Project to serve as an advisor to Owner and to provide assistance in administering the Contract for construction between Owner and[ each] Contractor, according to a separate contract between Owner and Construction Manager.
a. Construction Manager also serves as Project coordinator, as defined in Section 011200 "Multiple Contract Summary."
3. Construction Manager for this Project is Project's constructor. The terms "Construction Manager" and "Contractor" are synonymous.
H. Design-Builder: <Insert name of design-builder firm>.
1. Design-Builder Representative: <Insert name and contact information for design-builder representative>.
2. Design-builder has been engaged for this Project to provide architectural and engineering services and to serve as Project's constructor. The terms "design-builder" and "Contractor" are synonymous.
I. Project Coordinator for Multiple Contracts: <Insert name and contact information of Project coordinator> has been engaged by Owner to serve as Project coordinator.
J. Project Coordinator for Multiple Contracts: Owner shall serve as Project coordinator.
K. Project Mechanical/Electrical Coordinator for Multiple Contracts:
1. <Insert name and contact information of mechanical/electrical Project coordinator> has been engaged by Owner to serve as Project coordinator.
County of San Mateo, Hazardous Materials 01 10 00 00 - 3
2. [HVAC Contractor][Electrical Contractor][Plumbing Contractor][Construction Manager]<Insert entity> shall act as mechanical/electrical coordinator.
L. Web-Based Project Software: Project software will be used for purposes of managing communication and documents during the construction stage.
1. See Section 013100 "Project Management and Coordination" for requirements for using web-based Project software.
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:
1. <Insert a brief description of Project indicating the size, code classification for occupancy and construction type, and general description of major building assemblies> and other Work indicated in the Contract Documents.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
2. Project will be constructed under coordinated, concurrent multiple contracts. See Section 011200
"Multiple Contract Summary" for a list of multiple contracts, a description of work included under each of the multiple contracts, and the responsibilities of Project coordinator.
1.5 PHASED CONSTRUCTION
A. Construct the Work in phases, with each phase substantially complete as indicated [on Drawings][below].
1. Phase <Insert designation>: <Briefly describe work of this phase>.
a. Commencement of Construction:
1) Notice to Proceed: Work of this phase shall commence within <Insert number of days> after the Notice to Proceed.
2) Start Date: Work of this phase shall commence by <Insert date>.
b. Substantial Completion:
1) Within <Insert number of days> after [commencement of construction of this phase][after the Notice to Proceed].
2) By <Insert date>.
2. Phase <Insert designation>: Perform the remaining Work. The remaining Work shall be substantially complete at time of Substantial Completion of the Work.
B. Before commencing Work of each phase, submit an updated copy of Contractor's construction schedule, showing the sequence, commencement and completion dates[, and move-out and -in dates of Owner's personnel] for all phases of the Work.
01 10 00 00 - 4 County of San Mateo, Hazardous Materials
1.6 WORK PERFORMED BY OWNER
A. Cooperate fully with Owner, so work may be carried out smoothly, without interfering with or delaying Work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
B. Preceding Work: Owner will perform the following construction operations at Project site. Those operations are scheduled to be substantially complete before Work under this Contract begins.
1. <Insert a brief description of work performed by Owner>.
C. Concurrent Work: Owner will perform the following construction operations at Project site. Those operations will be conducted simultaneously with Work under this Contract.
1. <Insert a brief description of work performed by Owner>.
D. Subsequent Work: Owner will perform the following additional work at site after Substantial Completion.
Completion of that work will depend on successful completion of preparatory Work under this Contract.
1. <Insert a brief description of work performed by Owner>.
1.7 MULTIPLE WORK PACKAGES
A. Construction Documents for this Project will be issued in a series of Work Packages, each defining the Work under individual Contracts. Coordinate the Work under this Contract with separate contracts defined by other work packages. [Work Packages consist of the following:]
1. [Early Site Package]<Insert Work Package title>: <Insert description of Work>. To be issued <Insert date of anticipated issue>.
2. [Foundations and Structure Package]<Insert Work Package title>: <Insert description of Work>. To be issued <Insert date of anticipated issue>.
3. [General Building Package]<Insert Work Package title>: <Insert description of Work>. To be issued <Insert date of anticipated issue>.
4. [Interior Upfit Package]<Insert Work Package title>: <Insert description of Work>. To be issued <Insert date of anticipated issue>.
1.8 WORK UNDER OWNER'S SEPARATE CONTRACTS
A. Work with Separate Contractors: Cooperate fully with Owner's separate contractors, so work on those contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under Owner's separate contracts.
B. Preceding Work: Owner [has awarded][or][will award] separate contract(s) for the following construction operations at Project site. Those operations [are scheduled to be substantially complete before Work under this Contract begins][may be substantially complete or may be partially conducted simultaneously with Work under this Contract].
1. <Insert name of the Contract>: To <Insert name of Owner's separate Contractor>[to][for]<Insert a brief description of work performed under Owner's separate contract>.
County of San Mateo, Hazardous Materials 01 10 00 00 - 5
C. Concurrent Work: Owner [has awarded][will award][and will assign to Contractor] separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with Work under this Contract.
1. <Insert name of the Contract>: To <Insert name of Owner's separate Contractor>[to][for]<Insert a brief description of work performed under Owner's separate contract>.
D. Subsequent Work: Owner [has awarded][will award] separate contract(s) for the following additional work to be performed at site following Substantial Completion. Completion of that work will depend on successful completion of preparatory Work under this Contract.
1. <Insert name of the Contract>: To <Insert name of Owner's separate Contractor>[to][for]<Insert a brief description of work performed under Owner's separate contract>.
E. Future Work Not Part of this Contract: The Contract Documents include requirements that will allow Owner to carry out future work following completion of this Project; provide for the following future work:
1. <Insert description of future work requiring consideration during construction of the Work of this Contract>.
1.9 OWNER'S PRODUCT PURCHASE CONTRACTS
A. Owner has negotiated Product Purchase contracts with suppliers of material and equipment to be incorporated into the Work. Owner will assign these Product Purchase contracts to Contractor. Include costs for purchasing, receiving, handling, storage if required, and installation of material and equipment in the Contract Sum unless otherwise indicated.
1. Contractor's responsibilities are same as if Contractor had negotiated Product Purchase contracts, including responsibility to renegotiate purchase and to execute final purchasing agreements.
B. Owner's Product Purchase Contracts Information:
1. <Insert product name>: See Section <Insert Section number> "<Insert Section title>."
a. Purchase Contract Firm and Representative: <Insert name and contact information of Product Purchase contract firm and representative>.
b. Product Purchase Contract Scope: [Furnishing material][Material and installation labor]<Insert description of contract>.
c. Product Purchase Status: [Price negotiated by Owner, to be incorporated into the Contract Sum by Contractor; see Section 012100 "Allowances" for cash allowance for Product Purchase contract][Price negotiated and incorporated into the Contract Sum by Contractor][Product reserved by Owner][Order placed and deposit paid by Owner][Order to be placed by Contractor]<Insert description of status of Product Purchase contract>.
d. Quantity: <Insert quantity ordered>.
e. Other Requirements: <Insert special requirements>.
1.10 OWNER-FURNISHED/CONTRACTOR-INSTALLED (OFCI) PRODUCTS
A. Owner's Responsibilities: Owner will furnish products indicated and perform the following, as applicable:
01 10 00 00 - 6 County of San Mateo, Hazardous Materials
1. Provide to Contractor Owner-reviewed Product Data, Shop Drawings, and Samples.
2. Provide for delivery of Owner-furnished products to Project site.
3. Upon delivery, inspect, with Contractor present, delivered items.
a. If Owner-furnished products are damaged, defective, or missing, arrange for replacement.
4. Obtain manufacturer's inspections, service, and warranties.
5. Inform Contractor of earliest available delivery date for Owner-furnished products.
B. Contractor's Responsibilities: The Work includes the following, as applicable:
1. Designate delivery dates of Owner-furnished products in Contractor's construction schedule, utilizing Owner-furnished earliest available delivery dates.
2. Review Owner-reviewed Product Data, Shop Drawings, and Samples, noting discrepancies and other issues in providing for Owner-furnished products in the Work.
3. Receive, unload, handle, store, protect, and install Owner-furnished products.
4. Make building services connections for Owner-furnished products.
5. Protect Owner-furnished products from damage during storage, handling, and installation and prior to Substantial Completion.
6. Repair or replace Owner-furnished products damaged following receipt.
C. Owner-Furnished/Contractor-Installed (OFCI) Products:
1. <Insert description, in separate subparagraphs, for each Owner-furnished/Contractor-installed product>.
1.11 OWNER-FURNISHED/OWNER-INSTALLED (OFOI) PRODUCTS
A. The Owner will furnish and install products indicated.
B. Owner-Furnished/Owner-Installed (OFOI) Products:
1. <Insert description, in separate subparagraphs, for each Owner-furnished/Owner-installed product>.
1.12 CONTRACTOR-FURNISHED/OWNER-INSTALLED (CFOI) PRODUCTS
A. Contractor shall furnish products indicated. The Work includes unloading, handling, storing, and protecting Contractor-furnished products as directed and turning them over to Owner at Project closeout.
B. Contractor-Furnished/Owner-Installed (CFOI) Products:
1. <Insert description, in separate subparagraphs, for each Contractor-furnished/Owner-installed product>.
1.13 CONTRACTOR'S USE OF SITE AND PREMISES
A. Unrestricted Use of Site: [Each]Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.
County of San Mateo, Hazardous Materials 01 10 00 00 - 7
B. Restricted Use of Site: [Each]Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
C. Limits on Use of Site: Limit use of Project site to [Work in areas][areas within the Contract limits] indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits on Use of Site: Confine construction operations to <Insert description of areas where work is permitted>.
2. Limits: Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet (12.2 m) beyond building perimeter; 10 feet (3 m) beyond surface walkways, patios, surface parking, and utilities less than 12 inches (300 mm) in diameter; 15 feet (4.5 m) beyond primary roadway curbs and main utility branch trenches; and 25 feet (7.6 m) beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities, and playing fields) that require additional staging areas in order to limit compaction in the constructed area.
3. Limits: Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet (12.2 m) beyond building perimeter; 15 feet (4.6 m) beyond surface walkways, patios, surface parking, and utilities; and 25 feet (7.6 m) beyond constructed areas with permeable surfaces that require additional staging areas to limit compaction in the constructed areas.
4. Driveways, Walkways and Entrances: Keep driveways[ parking garage,][ loading areas,] and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.14 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy Project site and [existing][adjacent] building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations.
Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
2. Notify Owner not less than [72]<Insert number> hours in advance of activities that will affect Owner's operations.
B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written
01 10 00 00 - 8 County of San Mateo, Hazardous Materials permission from Owner and authorities having jurisdiction.
2. Provide not less than [72]<Insert number> hours' notice to Owner of activities that will affect
Owner's operations.
C. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner acceptance of the completed Work.
2. Obtain a Certificate of Occupancy from authorities having jurisdiction before limited Owner occupancy.
3. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work.
4. On…