Questions and Answers_OB~1.pdf
PDF 48 KB Posted
- Attached to
- Empire Lake Fishing Dock & Gangway Fabrication
- Solicitation number
- S-63500-00014410
- Issued by
- Columbia County, Condon City, Oregon
About this file
This document is a Questions and Answers file for Solicitation S-63500-00013955, relating to the Empire Lake Fishing Dock & Gangway Fabrication project. The document addresses six specific technical inquiries from potential bidders about the project's fabrication details. Key clarifications include confirming that all bare aluminum parts will receive a soda blast finish, with transition plates receiving an additional traction coating, and that the shore mount is a supply-only item without installation requirements.
The technical specifications reveal that the project involves fabricating a fishing dock and gangway using primarily aluminum materials, with two 48" x 48" x 12" floats specified for the gangway. The fabrication requires specific finishing processes, including soda blasting for aluminum parts, and selective galvanization for steel components like the shore mount. The document demonstrates the project's attention to material specifications, surface treatments, and precise fabrication requirements, indicating a structured approach to the procurement process.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation S-63500-00013955 – Empire Lake Fishing Dock & Gangway Fabrication
Questions & Answers
1. Dock Material list calls out "CFC -Aluminum" What is that referring to? My supplier does not know either.
Please disregard the call out for CFC Aluminum.
2. Is the dock getting soda blast finish just like the Gangway ramp?
Yes, all bare aluminum parts get soda blasted.
3. Is soda blast finish the final finish for this project?
Yes. Soda blast is the final finish, except for the transition plates that are coated with the traction coating called out in the plan-set.
4. I did not see anything that talked about installing the shore mount that looks like it will need to be set in concrete. Is this a supply only item?
Yes, this is a supply only item. No installation required.
5. On the gangway drawing there is a float specified as 48" x 48" x 12" (buoy 878). It isn't shown in the model where or how many floats are on the gangway. Is this something you have more detail on?
There are two of the floats for the gangway, and the mounting bracket that is required is on the drawing under details.
6. Does the Gangway need to be completely galvanized or just certain parts?
You cannot galvanize aluminum and would never have to since it will not rust. So, no they will not have to galvanize the entire gangway since it is being built out of aluminum. They will have to galvanize the shore mount since it is built out of steel.
Questions & Answers
File details come from the government source that posted it. Updated .