Questions and Answers B-54297 ~1.docx
DOCX document 17 KB Posted
- Solicitation number
- 27-494DOT-FINAD-B-54297
- Issued by
- Dekalb County, Illinois
About this file
This document is a Questions and Answers record related to Illinois Department of Transportation District 3's Invitation for Bid B-54297 for the installation of whole-site backup generators at the Ladd Maintenance Headquarters in Spring Valley and the Sycamore Maintenance Headquarters in Sycamore, Illinois. The project scope encompasses natural gas standby engine generators with all necessary equipment, fuel systems, transfer switches, electrical integration, and site-specific infrastructure modifications at both locations. The solicitation is open to all vendors registered in BidBuy, with bids due November 5, 2026. A non-mandatory pre-submission conference and site walk-through are scheduled for October 28, 2026 at 9:00 a.m. at Ladd and 11:00 a.m. at Sycamore, with attendance confirmation required two business days in advance. Contractors must submit a construction schedule within 30 days of contract execution and commence work between March 15 and November 15. The initial contract term is 24 months from the last dated signature, with a maximum total term not to exceed 10 years including extensions.
The Questions and Answers document clarifies critical project requirements and responsibilities. IDOT will complete surface material removal, excavation, trenching, backfill, and compaction in coordination with the contractor. The estimated 320 labor hours provided in BidBuy are estimates only, and bidders must quote total labor costs including travel; contractors are responsible for accounting for all materials, parts, accessories, and utility charges under miscellaneous parts line items and will receive no additional compensation for delays caused by material acquisition. A conduit schedule is referenced in specification section 26 05 33 page 7. Directional boring is permitted as an alternative to trenching at the Ladd Yard, provided the contractor locates utilities and assumes all liability for property or utility damage. Power line routing may deviate from the original plan to run outside and around the northeast corner of Building D0222. Generators must meet minimum specifications outlined in bid documents; substitutions such as a 100kW generator for the specified 96kW unit are not permitted. The project does not receive federal funding, and bids must remain firm for 180 days. Winning bids valued at $1,000 or more are subject to a $15 Minority Contractor Opportunity Initiative fee.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Blank ipg-active-registered-vendor-disclosure-formerly-forms B~2.docx | DOCX document | |
| contract Ladd Sycamore B-54297~1.docx | DOCX document | |
| Proposed Generator Parts Lists Ladd and Sycamore.pdf | ||
| Proposed Generator Plans 1.pdf | ||
| IFB offer-to-the-state-of-illinois B-54297 .pdf | ||
| contract Ladd Sycamore B-54297~3.docx | DOCX document | |
| vendor-disclosure-formerly-forms-a-v27-1-2026~2.docx | DOCX document | |
| IFB vendor-instructions-and-requirements B-54297~2.docx | DOCX document | |
| Supplemental Information~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District 3 Ladd and Sycamore Maintenance Yard Generator and Installation B-54297 Vendor’s Questions and Answers
1. Q. The number 1 of the general notes in the sheet 2 of the plans says IDOT would do all surface opening and backfill including concrete pads and bollards and etc, but number 23 of keyed notes in sheet 3 and number 27 of keyed notes in sheet 4 says contractor would provide it. Could you please clarify the Responsibility Assignment Matrix?
A. Both keyed notes 23 & 27 state: “Coordinate surface material removal, excavation, trenching, backfill materials and compaction requirements with I.D.O.T.” This is instructing the contractor to coordinate with I.D.O.T. when these tasks need done and I.D.O.T. will complete them. It is not telling the contractor to do tasks. I.D.O.T. cannot complete the tasks unless they are aware of the time when they need to be completed.
2. Q. Bidbuy lists 320 hours of labor for the project. Is this estimated for 3 workers for 40hours work week and 13.3hours travel time per week for each location? could you please confirm what would happen if hours spent to complete the project is more than 320 hours?
A. The labor hours listed in BidBuy are estimated and bidder shall quote the total labor cost on this line-item including any travel. For example, if bidder’s total labor cost is $20,000 bidder would enter $62.50 as the hourly rate ($20,000 divided by 320 hours).
3. Q. Since the project has broken down to 320 hours, how do we account for the charges from Utility as listed in the attached screenshot from top left corner of sheet 4 of the plans?
A. Utility charges should be accounted for under the miscellaneous parts line item in BidBuy (line items 2 and 4).
4. Q. I noticed the proposed parts that’s provided on bidbuy are missing a lot of materials, would IDOT provide the missing materials? If so, if providing the missing materials causes delay then would IDOT pay for contractor delayed time since we would be paying workers on the clock.
A. Bidder shall account for all materials, parts and accessories needed to complete the installation of the generators, transfer switches and other items outlined in the bid documents under the miscellaneous parts line item in BidBuy (line items 2 and 4). IDOT will not provide materials unless explicitly specified in the bid documents and specifications. Additional pay for workers needing to acquire parts will not be granted. Bidder shall account for that with bid.
5. Q. Could you please provide conduit schedule so we can know if the project calls for IMC or RMC or PVC or PVC coated RMC? Because I couldn’t find it on the plans.
A. A conduit schedule can be found on page 7 of specification section 26 05 33.
6. For the Ladd Yard, would directional boring be allowed instead of trenching across the parking lot.
A. Yes, the contractor would be responsible for the cost and under the condition that contractor is responsible for locating any utilities, fuel tanks and associated fuel lines, power lines, etc. Contractor will be responsible for any damage to IDOT property and/or utilities as a result of/associated with the directional boring.
7. For the Ladd Yard, it shows the power line from building coming from Building D0390 to building D0222 at the northeast corner of building D0222 and then going into and through the building to connect to panel D0222 MDP. Will it be allowable to stay on the outside of the building, going around the northeast corner of building D0222 and then enter the building from the north side close to Panel D0222 MDP.
A. This will be allowable.
8. Q. Can we substitute 100kw generator for the 96kW for Ladd?
A. The supplied generator needs to meet the minimum requirements outlined in the bid documents.
Supplemental Information has been added to attachments.