Questions and Answers - Asbestos Abatement - B-52382.docx
DOCX document 17 KB Posted
- Solicitation number
- 26-444DHS-DEVDI-B-52382
- Issued by
- Cook County, Illinois
About this file
This is a Questions and Answers document issued by the Illinois Department of Human Services (DHS) for Asbestos Abatement services at the Elisabeth Ludeman Center located at 114 N. Orchard Drive, Park Forest, Illinois. The project involves the removal of asbestos-containing tiles and associated mastic from Buildings 43 and 52 at the facility. The specific square footage for the work has not been finalized at the time of the Q&A document, as the final scope will be determined by location and may increase if tiles are disturbed or damaged during the removal process. The project scope includes any rooms within the buildings where damaged tiles are present, including the laundry room in House 52.
Vendors should include all related project costs in their bid submissions, including permit fees and final air sample testing and clearances. The Department has indicated a preference for the most cost-effective removal method for mastic that causes the least disturbance to surrounding areas, leaving the specific methodology to vendor discretion. This approach allows bidders flexibility in their technical approach while controlling overall project expenses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2 - Asbestos Abatement - B-52382.docx | DOCX document | |
| FY26 Asbestos Abatement Services Scope of Work - B-52382~1.docx | DOCX document | |
| RMU150~38.docx | DOCX document | |
| Illinois Standard Terms and Conditions v.23.2~40.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois Department of Human Services DHS SP Ludeman - Asbestos Abatement Bid# 26-444DHS-DEVDI-B-52382 Questions and Answers
| Q: | What method would the Ludeman Center prefer for removal of the mastic; solvent or grinding? |
| A: | We would ultimately leave the specific method up to the vendor but would prefer whatever is the most cost-effective method that causes the least amount of disturbance to the surrounding area. |
| Q: | Is there a known square footage for the work to be performed? |
| A: | There is not a known square footage at this time as the final square footage would be determined by each location; if tiles are disturbed or damaged while other tiles are being removed, the footage could change. |
| Q: | Should final clearances be included in the bid? |
| A: | Yes, any related costs such as permit fees, final air sample testing, etc., should be included in the price submitted with the bid. |
| Q: | In house 52, would the entire laundry room need to be included? |
| A: | Overall, any possible room of the house where damaged tile is present would be included in the project. |