Question___Answer_Set_2.docx
DOCX document 32 KB Posted
- Attached to
- EVSE Portable DCFC Charger
- Solicitation number
- 0000031603
- Issued by
- California
About this file
This is a Question and Answer Set #2 document for RFP DGS 56956 from the State of California regarding EVSE Portable DCFC Charger procurement. The document addresses five specific questions related to electrical connections, skid specifications, and repair services for portable DC fast charging equipment. Key clarifications include that the estimated quantity is 10 individual skids (each capable of having multiple ports), and the Battery Storage requirement for Skid EVSE is specified at 200 kWh.
The pricing terms were modified through Addendum 1 (released 12/16/2024), which changed the Connection of EVSE line items from "each" to "hourly" billing. Repair services will also be billed hourly, with an estimated 5 repair hours per year. The Connection of EVSE line item specifically excludes site preparation services, and the state maintained its requirement for standardized electrical connection pricing despite a request to move to a time-and-materials model.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Pricing_Workbook.xlsx | XLSX spreadsheet | |
| Attachment_2a_-_Technical_Questionnaire.xlsx | XLSX spreadsheet | |
| Addendum_Cover_Sheet.docx | DOCX document | |
| Attachment_1_-_Pricing_Workbook,_Addendum_1.xlsx | XLSX spreadsheet | |
| IFB_31603,_Adddendum_2.docx | DOCX document | |
| Addendum_Cover_Sheet,_Addendum_3.docx | DOCX document | |
| IFB_31603,_Adddendum_3.docx | DOCX document | |
| APP_Cover_Page_(rev_1-15).docx | DOCX document | |
| Portable_DCFC_Chargers_IFB_31603.docx | DOCX document | |
| Question___Answer_Set_1.docx | DOCX document | |
| Attachment_2_-_Bid_Specification_6115-BS-0195760.pdf | ||
| Attachment_3_-_Narrative_Response.docx | DOCX document | |
| Attachment_4_-_Contractors_License_Requirements.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Bid_Spec._6115-BS-0195760RevA.pdf | ||
| Addendum_Cover_Sheet,_Addendum_2.docx | DOCX document | |
| Question___Answer_Set_3.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| RFP DGS 56956 | Question and Answer (Q&A) Set #1 |
| DRAFT (rev 4/8/2009) |
| Event ID #: 31603 | EVSE Portable DCFC Charger |
| 12/23/2024 |
Question and Answer (Q&A) Set # 2
| Item |
| IFB Section |
| Question |
| State’s Response |
| 2-1 |
| IFB Section 45, EVSE Services |
| Will the State of California amend or delete the requirement for a one-price-fits-all all electrical connection for available power sources (buildings, panels, etc) to a "time and materials" charge based on the vast majority of building plans, electrical conduit installations, existing panels, available power, and county regulations (permits)? |
| Addendum 1 released on 12/16/2024, includes Attachment 1 - Pricing Workbook, Addendum 1. Unit of Measure for the Connection of EVSE line items were changed from each to hourly. That requirement will remain the same. The Connection of EVSE line item does not include any site preparation services. |
| 2-2 |
| Attachment 1 - Pricing Workbook |
| CLIN T-100, Does quantity 10 charge ports refer to one skid or multiple skids? |
| The estimated quantity of 10 refers to 10 individual skids. Each skid can have one or more ports. |
| 2-3 |
| Attachment 1 - Pricing Workbook |
| SKID Connection/Disconnection. Could you please clarify whether this refers to 10 total charge ports on a single skid or 10 total skids? |
| The estimated quantity of 10 refers to the number of individual skids. Each skid can have one or more ports. |
| 2-4 |
| Attachment 1 - Pricing Workbook |
| Repair Pricing. Does the pricing of five refer to repairs per visit, meaning it would be a contract price multiplied by five? |
| No. Addendum 1 released on 12/16/2024, includes Attachment 1 - Pricing Workbook, Addendum 1. Unit of Measure was changed from each to hourly. Proposed cost will be an hourly charge. The quantity of 5 is the estimated yearly quantity, meaning an estimated 5 repair hours per year. |
| 2-5 |
| Attachment 2, Bid Specification |
| Battery Backup Specification.100 kW or higher. Should this be included in the skid proposal? |
| The Battery Storage requirement for Skid EVSE is ≥200 kWh, in accordance with Section 3.1.2.5, Battery Storage, under 3.1.2, Skid EVSE requirements. |