This is a Question and Answer document (Set #1) for RFP DGS 56956 regarding EVSE Portable DCFC Charger procurement for the State of California. The document addresses five specific questions related to the technical and operational aspects of portable DC fast charging units.
The Q&A clarifies that the charging systems do not require network connectivity or services for data logging/usage reports. Grid connection is only necessary when the units need recharging. The document also confirms that not all deployment sites will have cellular signal or WiFi service, which is not a requirement for the units. Two questions regarding items 13 and 14 of the pricing spreadsheet were addressed by referring bidders to Section 45A (EVSE Services) of the IFB, and noting that Attachment 1 Pricing Workbook has been updated through Addendum 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Pricing_Workbook.xlsx | XLSX spreadsheet | |
| Attachment_2a_-_Technical_Questionnaire.xlsx | XLSX spreadsheet | |
| Addendum_Cover_Sheet.docx | DOCX document | |
| Attachment_1_-_Pricing_Workbook,_Addendum_1.xlsx | XLSX spreadsheet | |
| IFB_31603,_Adddendum_2.docx | DOCX document | |
| Attachment_2_-_Bid_Specification_6115-BS-0195760.pdf | ||
| Attachment_3_-_Narrative_Response.docx | DOCX document | |
| Attachment_4_-_Contractors_License_Requirements.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Bid_Spec._6115-BS-0195760RevA.pdf | ||
| Addendum_Cover_Sheet,_Addendum_2.docx | DOCX document | |
| Question___Answer_Set_3.docx | DOCX document | |
| Addendum_Cover_Sheet,_Addendum_3.docx | DOCX document | |
| IFB_31603,_Adddendum_3.docx | DOCX document | |
| APP_Cover_Page_(rev_1-15).docx | DOCX document | |
| Portable_DCFC_Chargers_IFB_31603.docx | DOCX document | |
| Question___Answer_Set_2.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| RFP DGS 56956 | Question and Answer (Q&A) Set #1 |
| DRAFT (rev 4/8/2009) |
| Event ID #: 31603 | EVSE Portable DCFC Charger |
| 12/16/2024 |
Question and Answer (Q&A) Set # 1
| Item |
| IFB Section |
| Question |
| State’s Response |
| 1-1 |
| IFB Section 1, Scope |
| Should the systems be networked for data logging/usage reports? |
| No. This solicitation does not include network connectivity or services. |
| 1-2 |
| IFB Section 45, EVSE Services |
| Will the systems be grid connected or not during a charging event? |
| Grid connection will only be required when charging units require recharging. |
| 1-3 |
| Attachment 1 - Pricing Workbook |
| Can you explain item 13 of the pricing spreadsheets in further detail please? |
| Please refer to Section 45A, EVSE Services of the IFB for additional details. Attachment 1 Pricing Workbook, Addendum 1 has been updated. |
| 1-4 |
| Attachment 1 - Pricing Workbook |
| Can you explain item 14 of the pricing spreadsheets in further detail please? |
| Please refer to Section 45A, EVSE Services of the IFB for additional details. Attachment 1 Pricing Workbook, Addendum 1 has been updated. |
| 1-5 |
| Other |
| Will the planned sites have cellular signal/WiFi? |
| Not all sites will have cellular signal/WiFi service. Attachment 2, Addendum 1, Bid Specifications has been updated. Cellular signal or Wi-FI is not a requirement. |