Quality Assurance Surveillance Plan (QASP).docx
DOCX document 56 KB Posted
- Attached to
- Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
- Solicitation number
- HT003826RE001
- Issued by
-
Defense Health Agency
About this file
This is a Quality Assurance Surveillance Plan (QASP) that establishes performance objectives, acceptable quality levels (AQL), surveillance methods, and remedies for a Defense Healthcare Management Systems (DHMS) Deployment Solutions contract.
The QASP defines performance standards across seven key areas: Timely and Accurate Program Management (covering Quality Control Plans, transition plans, cost/schedule reports, work breakdown structures, and monthly progress reports with 100% on-time submission required and no more than 4 minor corrections permitted); Integrated Master Schedule management (initial baseline approved with no more than 1 minor revision and updates submitted on time with no more than 2 minor corrections); Comprehensive and Actionable Deployment Planning (Deployment Approach and Implementation Plan requiring no more than 1 major revision cycle); Accurate Product Configuration Data Collection (98% first-pass validation accuracy with 100% accuracy required for critical data fields); Secure and Accurate Data Migration (99.9% data accuracy rate for critical patient data elements with zero tolerance for non-recoverable patient record data loss); Safe and Timely Hardware Delivery (98% on-time delivery, no more than 1% hardware damage, no more than 1% hardware failure); and Product Connectivity and Interface Validation (more than 98% medical product functionality). Each performance area includes five rating levels from "Does Not Meet Most Contract Requirements" through "Meets & Exceeds Many Contract Requirements," with corresponding remedies ranging from deliverable rejection and rework at no additional cost to PCO negotiation of consideration for mission impact mitigation. Remedies are progressively more stringent for lower performance ratings, with data migration failures potentially warranting contract termination for default.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//PROCURE
Quality Assurance Surveillance Plan (QASP)
| Performance Objective |
| Deliverable |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| Unsatisfactory 1 |
| Marginal 2 |
| Satisfactory 3 |
| Very Good 4 |
| Exceptional 5 |
| Timely and Accurate Program Management |
| · Quality Control Plan (QCP) (A001) |
· Transition-In Plan (A004)
· PEO DHMS Cost, Schedule, Performance (CSP) Report (A006)
· Contractor Work Breakdown Structure (CWBS) (A007)
· Cost and Hour Report (A008)
· Technical Data Report (A008)
· Monthly Progress Report (MPR) (D006) Timeliness: 100% of reports are submitted on or before the due date.
Quality: The QCP, Transition-In Plan, CSP, CWBS, Cost and Hour Report, Technical Data Report, MPR, and all subsequent monthly updates (as applicable) require no more than 4 minor[footnoteRef:1] corrections for accuracy or completeness. A report requiring correction for a material inaccuracy fails the AQL. [1: Minor is defined as an imperfection or deviation from the quality standard that does not affect the usability, safety, or core functionality of the performance objective. ]
| 100% inspection of deliverable submission dates and content by the COR and designated Government SMEs (e.g., cost/schedule analysts). The COR will document the number of revision cycles required for initial deliverables. |
| Does Not Meet Most Contract Requirements: |
Report is more than 2 business days late OR requires correction due to material inaccuracy.
Does Not Meet Some Contract Requirements:
Report is 1-2 business days late OR requires more than 5 minor1 corrections.
Meets Contract Requirements:
Report is submitted on time and requires no more than 4 minor1 corrections.
Meets & Exceeds Some Contract Requirements: Recurring Report is submitted on time and requires no more than 2 minor1 corrections.
Meets & Exceeds Many Contract Requirements: Recurring Report is submitted ahead of schedule and requires zero corrections.
| REMEDY: Reject submitted deliverable. Rework until corrected with no change in price. |
| REMEDY: Reject submitted deliverable. Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| Timely and Accurate Program Management |
| · Integrated Master Schedule (IMS) (A011) |
| Timeliness: 100% of IMS submissions are on or before the due date. |
Initial Baseline: The initial baseline IMS is successfully established and approved within the timeframe specified in the PWS or task order after requiring no more than 1 minor revision cycle.
Updates: All subsequent IMS updates are submitted on time and require no more than 2 minor1 corrections for logic or status.
| 100% inspection of deliverable submission dates and content by the COR and designated Government SMEs (e.g., cost/schedule analysts). The COR will document the number of revision cycles required for initial baseline deliverable. |
| Does Not Meet Most Contract Requirements: |
Initial: Requires more than 2 major[footnoteRef:2] revisions, causing a significant delay to the project baseline. [2: Major is defined as an omission, substantive flaw, or material inaccuracy that does not affect the usability, safety, or core functionality of the performance objective. ]
Updates: Submitted more than 2 business days late OR contains fundamental flaws (e.g., invalid critical path, broken logic) requiring complete rework.
Does Not Meet Some Contract Requirements:
Initial: Requires 1 major2 revision cycle to be deemed acceptable.
Updates: Submitted 1-2 business days late OR requires more than 2 minor1 corrections or 1 major2 logic correction.
Meets Contract Requirements:
Initial: Approved after no more than 1 minor1 revision cycle.
Updates: Submitted on time and requires no more than 2 minor1 corrections.
Meets & Exceeds Some Contract Requirements: Initial: Approved with only minor1 comments on the first draft (no revision cycle needed).
Updates: Submitted on time and requires only 1 minor1 correction.
Meets & Exceeds Many Contract Requirements:
Initial: Submitted ahead of schedule and approved on first submission with no changes required. Updates: Submitted ahead of schedule with zero corrections, and the contractor proactively identifies risk and schedule optimization opportunities.
| REMEDY: Reject submitted deliverable. Rework until corrected with no change in price. |
| REMEDY: Reject submitted deliverable. Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| Comprehensive and Actionable Deployment Planning |
| · Deployment Approach (A003) |
· Implementation Plan (A010)
| The initial submission of the Deployment Approach and the Implementation Plan is comprehensive, logical, and requires no more than 1 major2 revision cycle to be deemed acceptable for baseline by the Government. |
| Detailed review and analysis of the submitted Deployment Approach and the Implementation Plan by the COR and an integrated Government review team. The plan will be evaluated against PWS requirements and the findings from the Readiness Assessment Report. |
| Does Not Meet Most Contract Requirements: |
The Deployment Approach and Implementation Plan require more than 2 major2 revision cycles, causing significant delay to the project baseline.
Does Not Meet Some Contract Requirements:
The Deployment Approach and Implementation Plan require 2 major2 revision cycles to be deemed acceptable by the Government.
Meets Contract Requirements:
The Deployment Approach and Implementation Plan is acceptable after no more than 1 major2 revision cycle.
| Meets & Exceeds Some Contract Requirements: The Deployment Approach and Implementation Plan require only minimal comments on the first draft and is accepted without the need for a major2 revision cycle. |
| Meets & Exceeds Many Contract Requirements: |
The Deployment Approach and Implementation Plan is submitted ahead of schedule and accepted on first submission with no changes required.
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" to reduce adverse impact to mission. |
| REMEDY: Reject submitted deliverable. Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| Accurate Product Configuration Data Collection |
| Product Configuration Data (D009) |
| 98% of all fields in the product configuration are validated by the contractor as accurate on the first pass. 100% accuracy is required for all critical data fields that would prevent accurate product configuration. |
| Government SMEs will perform random sampling of general data fields and 100% inspection of pre-identified critical data sections of the contractor-validated product configuration data. Surveillance occurs prior to the Government granting approval to proceed with product configuration. |
| Does Not Meet Most Contract Requirements: Validation accuracy is less than 95% OR allows any errors in critical data fields, requiring Government intervention and causing a delay. |
| Does Not Meet Some Contract Requirements: Validation accuracy is between 95% and 97.9%, requiring minor1 rework by the contractor, requiring some Government intervention and causing a delay. |
| Meets Contract Requirements: |
Validation accuracy is 98% or greater with no critical errors on the first pass.
| Meets & Exceeds Some Contract Requirements: Validation accuracy is 99% or greater with no critical errors. |
| Meets & Exceeds Many Contract Requirements: Validation accuracy is 100% and the contractor proactively identifies and resolves potential data conflicts before submission. |
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" to reduce adverse impact to mission. |
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" to reduce adverse impact to mission. |
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| Secure and Accurate Data Migration |
| · Data Migration (PWS 3.6) |
| Post-migration validation confirms a 99.9% data accuracy rate for all critical data elements (e.g., patient demographics, allergies, medications) that are recoverable. |
No instances of data loss (i.e., non-recoverable) for patient records are permissible.
| The Government will perform its own validation through a combination of automated data queries (comparing counts and checksums) and manual spot-checking of a sample of migrated patient records by clinical and administrative SMEs. |
| Does Not Meet Most Contract Requirements: |
Data accuracy rate is less than 99.5% for all critical data elements that are recoverable.
A non-recoverable patient record data loss has occurred.
Does Not Meet Some Contract Requirements:
Post-migration validation confirms an accuracy rate between 99.5% and 99.89% for critical data elements that are recoverable.
There is no instance of patient record data loss (i.e., non-recoverable).
Meets Contract Requirements:
Post-migration validation confirms a 99.9% or greater data accuracy rate for critical data elements.
There is no instance of patient record data loss (i.e., non-recoverable).
Meets & Exceeds Some Contract Requirements: Data accuracy rate is greater than 99.95% for all critical data elements that are recoverable.
There is no instance of patient record data loss (i.e., non-recoverable).
Meets & Exceeds Many Contract Requirements:
Data accuracy rate is 100% for all critical data elements that are recoverable.
There is no instance of patient record data loss (i.e., non-recoverable).
| REMEDY: Reject submitted deliverable. PCO to determine benefit of rework, completion, or if contract warrants termination for default. If rework is warranted, profit for rework is excluded. |
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" to reduce adverse impact to mission. |
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |
| Safe and Timely Hardware Delivery |
| · DD Form 1149 (D011) |
| Timeliness: 98% of all hardware shipped arrives on or before the agreed-upon delivery date. Condition: No more than 1% of hardware shipped is damaged due to improper packaging by the contractor or their agent. |
Functionality: No more than 1% of all hardware delivered and connected fails during validation.
| 100% inspection of the DD Form 1149 by Government logistics and site personnel. The COR will compare delivery dates against the approved IMS and review any documented reports of damage attributed to improper packaging, handling and functionality issues. |
| Does Not Meet Most Contract Requirements: |
Timeliness: More than 5% of shipments are late.
Condition: More than 3% of the total hardware is damaged due to improper packaging and handling.
Functionality: More than 3% of hardware does not function when validated.
Does Not Meet Some Contract Requirements:
Fails to meet one of the AQL thresholds:
Timeliness: 2.1% to 5% of hardware shipped is late.
Condition: 1.1% to 3% of hardware is damaged due to improper packaging and handling.
Functionality: 1.1% to 3% or greater of hardware fails during validation.
Meets Contract Requirements:
Timeliness: No more than 2% of hardware shipped is late.
Condition: No more than 1% of the hardware is damaged due to improper packaging and handling.
Functionality: 1% of hardware does not function when validated.
Meets & Exceeds Some Contract Requirements: Timeliness: 100% of hardware shipped is on time.
Condition: Less than 0.5% of the hardware is damaged due to improper packaging and handling.
Functionality: Less than 0.5% of hardware does not function when validated.
Meets & Exceeds Many Contract Requirements: Timeliness: 100% of hardware shipped is on time.
Condition: 100% of hardware is fully functional upon validation.
Functionality: 100% of hardware has zero damage due to improper packaging.
| REMEDY: Rectify shipping delays within 72 hours with shipment delivered no later than 5 working days upon notification. Replace damaged or inoperable hardware within 5 working days. |
| REMEDY: Rectify shipping delays within 72 hours with shipment delivered no later than 5 working days upon notification. Replace damaged or inoperable hardware within 5 working days. |
| REMEDY: Rectify shipping delays within 72 hours with shipment delivered no later than 5 working days upon notification. Replace damaged or inoperable hardware within 5 working days. |
| REMEDY: Rectify shipping delays within 72 hours with shipment delivered no later than 5 working days upon notification. Replace damaged or inoperable hardware within 5 working days. |
| Product Connectivity and Interface Validation |
| Product Validation Plan (D012) |
| Functionality: More than 98% of medical products function when validated. |
| 100% inspection of medical product connectivity and validation. |
| Does Not Meet Most Contract Requirements: |
More than 3% of medical products fail when validated.
Does Not Meet Some Contract Requirements:
2% of medical products fail when validated.
Meets Contract Requirements:
More than 98% of medical products function when validated.
Meets & Exceeds Some Contract Requirements:
99% of medical products function when validated.
Meets & Exceeds Many Contract Requirements:
100% of medical products are fully functional upon validation.
| REMEDY: Resolve medical device connectivity issues within 72 hours upon receipt of notification. |
| REMEDY: Resolve medical device connectivity issues within 72 hours upon receipt of notification. |
| REMEDY: Resolve medical device connectivity issues within 72 hours upon receipt of notification. |
| REMEDY: Resolve medical device connectivity issues within 72 hours upon receipt of notification. |
| Quality of Training Program Development |
| · Training Curriculum (A002) |
| The initial submission of the Training Curriculum and supporting Training Plan is comprehensive, meets all PWS requirements, and requires no more than 1 major2 revision cycle to be deemed acceptable by the Government. |
| COR and Government Training SMEs will review the submitted Training Curriculum and supporting Training Plan for completeness, instructional soundness, and alignment with the PWS and task order. |
| Does Not Meet Most Contract Requirements: Training Curriculum and supporting Training Plan require more than 2 major2 revision cycles, causing a delay to downstream activities. |
| Does Not Meet Some Contract Requirements: Training Curriculum and supporting Training Plan require 1 major2 revision cycle, causing a delay to downstream activities. |
| Meets Contract Requirements: |
Training Curriculum and supporting Training Plan are acceptable after no more than 1 major2 revision cycle.
| Meets & Exceeds Some Contract Requirements: Training Curriculum and supporting Training Plan require only minor1 comments on the first draft and are accepted without a major2 revision cycle. |
| Meets & Exceeds Many Contract Requirements: Training Curriculum and supporting Training Plan are accepted on first submission with no changes required. |
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" due to mission impact. |
| REMEDY: Reject submitted deliverable. PCO to negotiate "consideration" due to mission impact. |
| REMEDY: Rework at no additional price. |
| REMEDY: Rework at no additional price. |
| User Training and Readiness |
| · User Training Completion Reports (D007) |
| Meets all defined performance standards: |
Deployment Readiness: ≥95% of total population trained[footnoteRef:3]. [3: Trained means that a user has passed the competency assessment with a score of 80% or higher.]
| 100% inspection of User Training Completion Report. . |
| Does Not Meet Most Contract Requirements: |
Deployment Readiness: <90% of total population trained3, forcing a "No-Go" decision.
Does Not Meet Some Contract Requirements:
Deployment Readiness: 90% - 94.9% of total population trained3.
Meets Contract Requirements:
Deployment Readiness: ≥95% of total population trained3.
Meets & Exceeds Some Contract Requirements:
Deployment Readiness: ≥98% of total population trained3.
Meets & Exceeds Many Contract Requirements:
Deployment Readiness: 100% of total population trained3.
REMEDY: Provide remediation training.
PCO to negotiate "consideration" due to mission impact.
REMEDY: Provide remediation training at no additional cost.
| REMEDY: Provide remediation training at no additional cost. |
| REMEDY: Provide remediation training at no additional cost. |
| Deployment Event Execution |
| · Post Deployment Stabilization Report (D010) |
| No patient safety issues. 90% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period. |
| As specified at the task order level, examples include: Review of the Post Deployment Stabilization Report, input from SMEs, and direct analysis of the issue tracking system (e.g., ServiceNow, Jira) logs. |
| Does Not Meet Most Contract Requirements: |
Patient safety issue(s) occur OR less than 80% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period.
Does Not Meet Some Contract Requirements:
No patient safety issue(s). 80% - 89% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period.
Meets Contract Requirements:
No patient safety issue(s). 90% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period.
Meets & Exceeds Some Contract Requirements:
No patient safety issue(s). >95% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period.
Meets & Exceeds Many Contract Requirements:
No patient safety issue(s). >98% of ‘Severity 1’ (system-down) incidents are resolved during the Post Deployment support period.
| REMEDY: Resolve ‘Severity 1’ incidents between the Post Go-Live support period and transition period at no additional price. |
| REMEDY: Resolve ‘Severity 1’ incidents between the Post Go-Live support period and transition period at no additional price. |
| REMEDY: Resolve ‘Severity 1’ incidents between the Post Go-Live support period and transition period at no additional price. |
| REMEDY: Resolve ‘Severity 1’ incidents between the Post Go-Live support period and transition period at no additional price. |
| REMEDY: Resolve ‘Severity 1’ incidents between the Post Go-Live support period and transition period at no additional price. |
| Transition to Sustainment |
| · Transition-Out Plan (A005) |
| The Transition-Out Plan is accepted by the Government. All required documentation, credentials, and system artifacts are successfully transferred to the Government sustainment team 60 days prior to the end of the task order. |
| Review and acceptance of the Transition-Out Plan. The COR will use a formal Government close-out checklist to validate the successful transfer and receipt of all required documentation, credentials, and system artifacts by the sustainment team. |
| Does Not Meet Most Contract Requirements: |
The Transition-Out Plan is rejected by the Government OR the Transition-Out Plan is submitted late (<54 days prior to the end of the task order).
Does Not Meet Some Contract Requirements:
The Transition-Out Plan is rejected by the Government OR the Transition-Out Plan is submitted late (54-60 days prior to the end of the task order).
Meets Contract Requirements:
The Transition-Out Plan is accepted by the Government. All required documentation, credentials, and system artifacts are successfully transferred to the Government sustainment team 60 days prior to the end of the task order.
| Meets & Exceeds Some Contract Requirements: The Transition-Out Plan is accepted by the Government. All required documentation, credentials, and system artifacts are successfully transferred to the Government sustainment team 61 days prior to the end of the task order. |
| Meets & Exceeds Many Contract Requirements: |
The Transition-Out Plan is accepted by the Government. All required documentation, credentials, and system artifacts are successfully transferred to the Government sustainment team 62 days prior to the end of the task order.
| REMEDY: Rework until corrected with no change in price. |
| REMEDY: Rework until corrected with no change in price. |