Exhibit A004 Transition-In Plan CDRL.pdf
PDF 117 KB Posted
- Attached to
- Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
- Solicitation number
- HT003826RE001
- Issued by
-
Defense Health Agency
About this file
This document is a PDF viewer error message, not a federal contract opportunity file. The document contains only technical instructions for upgrading Adobe Reader and troubleshooting PDF display issues. No contract information, solicitation details, requirements, timelines, or procurement data are present. The file cannot be analyzed for contract opportunity content.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Instructions
Instructions:
FINANCIALS:
· The Contractor shall develop a detailed financial plan for each Task Order in the PEO CSP Report Template. The detailed financial plan shall include the following fields for each financial line item:
Field Type Description Possible Values
Name Text The name of the financial line item.
Contractor Unique ID Text Alignment of Cost Element to Contractor Unique ID
WBS Element Text Alignment of Cost Element to WBS Element in MIL-STD-881F See MIL-STD-881F Appendix J
Status Dropdown The status of the financial line item. * (Blank)
* Open
* Closed
Health Dropdown An indicator of the financial line item’s health. * (Blank) for financial line items which do not need to report Health.
* “On-Track” for financial line items with a Planned/Actual Estimate at Completion less than or equal to the Baselined Budget at Completion.
* “At-Risk” for financial line items with a Planned/Actual Estimate at Completion between 0-10% over the Baselined Budget at Completion.
* “Off-Track” for financial line items with a Planned/Actual Estimate at Completion greater than 10% over the Baselined Budget at Completion.
* “Unknown” for financial line items which need to report Health but have not yet been baselined.
CLIN/SLIN Text The Contract Line Item Number, or Sub-contract Line Item Number, whichever level of detail is lower
Start Date Date The planned/actual start date of the financial line item. This is used to determine which cost periods are applicable to the financial line item.
Finish Date Date The planned/actual finish date of the financial line item. This is used to determine which cost periods are applicable to the financial line item.
Category Dropdown The category of expense for the line item * (Blank)
* Labor
* Travel
* Materials
* Equipment
Description Text Description or Notes for this line item
Escalation Flag Dropdown Toggles On for escalating this item to attention * (Blank)
* On
Budget Currency The budgeted amount for each financial line item and period.
Estimate Currency The estimated amount for each financial line item and period.
Actual Currency The actual amount for each line financial item and period.
· The Contractor shall work with the Government to mutually agree to baseline the detailed finanical plan within 60 days of Contract award.
o The Contractor shall work with the Government to mutually agree to any changes to the baselined detailed financial plan thereafter
· The Contractor shall update and deliver the detailed financial plan in the PEO CSP Report Template by the 15th of each month.
SCHEDULES:
· The Contractor shall develop a detailed scheduled for each Task Order in the PEO CSP Report Template. The detailed scheduled shall align contract tasks and milestones with the MIL-STD-881F Work Breakdown Structure (WBS) in accordance with the Contractor Work Breakdown Structure (CWBS) Dictionary (CDRL A0##), and shall include the following fields:
Field Type Description Possible Values
Name Text The name of work breakdown structure (WBS) or task.
Contractor Unique ID Text Alignment of Task to Contractor Unique ID
WBS Element Text Alignment of Task to WBS Element in MIL-STD-881F See MIL-STD-881F Appendix J
Duration Integer The number of standard work days that it will take to complete the task.
Start Date Date The planned/actual start date of the task.
Finish Date Date The planned/actual finish date of the task.
Percent Complete Dropdown The percentage complete for the task. 0-100 (integers only).
Health Dropdown An indicator of the task’s health. * (Blank) for tasks which do not need to report Health.
* “On-Track” for tasks with a Planned/Actual Finish Date before or on the Baselined Finish Date.
* “At-Risk” for tasks with a Planned/Actual Finish Date between 1 and 30 days after the Baselined Finish Date.
* “Off-Track” for tasks with a Planned/Actual Finish Date greater than 30 days after the Baselined Finish Date.
* “Unknown” for tasks which need to report Health but have not yet been baselined.
Reporting Level Dropdown An indicator of the task’s reporting level. * (Blank)
* Executive
* Program Manager
* Project Manager
* Project Support
Escalation Flag Dropdown Toggles On for escalating this item to attention * (Blank)
* On
· The Contractor shall work with the Government to mutually agree to baseline the detailed schedule within 60 days of Contract award.
o The Contractor shall work with the Government to mutually agree to any changes to the baselined detailed schedule thereafter
· The Contractor shall update and deliver the detailed schedule in the PEO CSP Report Template by the 15th of each month.
METRICS:
· The Contractor shall develop a detailed metric plan for each Task Order in the PEO CSP Report Template. The detailed metric plan shall include the following fields for each metric line item:
Field Type Description Possible Values
Name Text The name of the metric line item.
WBS Element Text Alignment of Metric to WBS Element in MIL-STD-881F See MIL-STD-881F Appendix J
Status Dropdown The status of the metric line item. * (Blank)
* Open
* Closed
Health Dropdown An indicator of the metric line item’s health. * (Blank) for metric line items which do not need to report Health.
* “On-Track” for metric line items with a Planned/Actual Estimate at Completion which meets performance or overperforms compared to the Baseline at Completion.
* “At-Risk” for metric line items with a Planned/Actual Estimate at Completion which underperforms the Baseline at Completion by 0-10%.
* “Off-Track” for metric line items with a Planned/Actual Estimate at Completion which underperforms the Baseline at Completion by greater than 10%.
* “Unknown” for metric line items which need to report Health but have not yet been baselined.
Category Dropdown The category of metric line item. * (Blank)
* Quality
* DevSecOps
* Usage
* Delivery
* Process
* Technical Characteristics
* Cyber
Unit of Measure Text The unit of measure of the metric line item.
Description Text Description or Notes for this line item
Escalation Flag Dropdown Toggles On for escalating this item to attention * (Blank)
* On
Baseline Number The baselined amount for each metric line item and period.
Target Number The targeted amount for each metric line item and period.
Actual Number The actual amount for each line metric item and period.
· The Contractor shall work with the Government to mutually agree to baseline the detailed metric plan within 60 days of Contract award.
o The Contractor shall work with the Government to mutually agree to any changes to the baselined detailed metric plan thereafter
· The Contractor shall update and deliver the detailed metrics in the PEO CSP Report Template by the 15th of each month.
Financials
Tracker: Costs
Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 TOTAL
| Line Item Name | Contractor | ||||||||||||||||||||||||||||||||||||||||||||||||
| Unique ID | WBS Element | Status | Health | CLIN/SLIN | Start Date | Finish Date | Category | Description | Escalation Flag | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget | Estimate | Actual | Budget |
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Schedules
Tracker: Tasks
Task Name Contractor Unique ID WBS Element Duration Start Date Finish Date Percent Complete Health Reporting Level Escalation Flag
Metrics
Tracker: Metrics
Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24
Metric Name WBS Element Status Health Category Unit of Measure Description Escalation Flag Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual Baseline Target Actual
Risks
Tracker: Risks
| Risk Name | Contractor | ||||||||||||||||
| Unique ID | Status | Health | Type | Category | Likelihood | Impact | Score | Rating | Description | Raised On | Response | Response Due Date | Response Action | Response Update | Escalation | Status Report | Closed On |
Issues
Tracker: Issues
| Issue Name | Contractor | |||||||||||||
| Unique ID | Status | Health | Type | Category | Impact | Description | Raised On | Response | Response Due Date | Response Action | Response Update | Escalation | Status Report | Closed On |
Master Data - Trackers
Dimension: Schedule
Tracker: Tasks
Fields Values
Percent Complete
100%
90%
75%
50%
25%
10%
0%
Health
On-Track
At-Risk
Off-Track
Unknown
Reporting Level
Level 1 - Executive
Level 2 - Program Manager
Level 3 - Project Manager
Level 4 - Project Support
Tracker: Risks
Fields Values
Status
Open
Closed
Health
Mitigation Plan Implemented
Mitigation Plan Identified
Mitigation Plan Not Identified
Unknown
Type
Threat
Opportunity
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Likelihood
5: Highly Likely (90-100%)
4: Likely (70-90%)
3: Possible (30-70%)
2: Unlikely (10-30%)
1: Highly Unlikely (0-10%)
Impact
5: Critical
4: Major
3: Moderate
2: Minor
1: Trivial
Rating
Very High (Score: 20-25)
High (Score: 15-16)
Medium (Score: 5-14)
Low: (Score: 3-4)
Very Low (Score: 1-2)
Score
Response
Threat - Accept
Threat - Transfer
Threat - Mitigate
Threat - Avoid
Opportunity - Accept
Opportunity - Share
Opportunity - Enhance
Opportunity - Exploit
Escalation
On
Status Report
On
Tracker: Issues
Fields Values
Status
Open
Closed
Health
Mitigation Plan Implemented
Mitigation Plan Identified
Mitigation Plan Not Identified
Unknown
Type
Problem
Conflict
Gap
Overlap
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Impact
Critical
Major
Moderate
Minor
Trivial
Response
Accept
Transfer
Mitigate
Avoid
Escalation
On
Status Report
On
Tracker: Assumptions
Fields Values
Status
Open
Closed (Validated)
Closed (Invalidated)
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Assumption
Constraint
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Validate
Accept
Influence
Challenge
Escalation
On
Status Report
On
Tracker: Dependencies
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Inbound
Outbound
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Accept
Transfer
Mitigate
Avoid
Escalation
On
Status Report
On
Tracker: Decisions
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Governance
Delivery
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Evaluate
Accept
Influence
Challenge
Reject
Escalation
On
Status Report
On
Tracker: Actions
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Governance
Delivery
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Plan
Execute
Validate
Accept
Reject
Escalation
On
Status Report
On
Tracker: Lessons
Fields Values
Status
Draft
Review
Final
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Strength
Weakness
Recommendation
Category
Integration
Scope
Schedule
Cost
Quality
Resource
Communication
Procurement
Stakeholder
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Evaluate
Accept
Share
Enhance
Exploit
Escalation
On
Status Report
On
Tracker: Costs
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Appropriation
Sub-Type
Direct
Indirect
Overhead
Profit
Category
Labor
Travel
Equipment
Materials
Sub-Category
Labor - Project Management
Labor - Business Analysis
Labor - Solution Architecture
Labor - Software Development
Labor - Quality Assurance
Labor - Change Management
Equipment - Software
Equipment - Hardware
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Plan
Estimate
Budget
Control
Escalation
On
Status Report
On
Tracker: Metrics
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Financial
Non-Financial
Category
Quality
DevSecOps
Usage
Delivery
Process
Technical Characteristics
Cyber
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Identify
Analyze
Plan
Track
Escalation
On
Status Report
On
Tracker: Benefits
Fields Values
Status
Open
Closed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Financial
Non-Financial
Category
Asset
Brand
Compliance
Cost
Culture
Customer
Data
Decision
Efficiency
Knowledge
Market
Pricing
Product
Productivity
Quality
Resilience
Revenue
Risk
Service
Sustainability
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Identify
Analyze
Plan
Realize
Escalation
On
Status Report
On
Tracker: Meetings
Fields Values
Status
Active
Inactive
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Governance
Delivery
Category
Investment Review Board
Steering Committee
Portfolio Board
Program Board
Project Board
Workstream Board
Sprint Planning
Daily Standup
Sprint Review
Sprint Retrospective
Frequency
Annually
Semi-Annually
Quarterly
Monthly
Semi-Monthly
Fortnightly
Weekly
Daily
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Evaluate
Accept
Share
Enhance
Exploit
Escalation
On
Status Report
On
Tracker: Contracts
Fields Values
Status
Not Started
In Progress
Under Review
Completed
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Cost Plus
Fixed Price
Time & Materials
Phase
Contract Creation
Contract Review
Contract Approval
Contract Execution
Contract Performance
Contract Expiry
Category
Corporate
HR
Finance
IT
Customer
Supply Chain
Priority
Critical
Major
Moderate
Minor
Trivial
Response
Create Contract
Review Contract
Approve Contract
Execute Contract
Manage Performance
Expire Contract
Escalation
On
Status Report
On
Tracker: Stakeholders
Fields Values
Status
Active
Inactive
Health
On-Track
At-Risk
Off-Track
Unknown
Type
Project Sponsor
Senior Supplier
Senior User
Portfolio Manager
Program Manager
Project Manager
PMO Manager
Project Coordinator
Project Expeditor
Stakeholder
Functional Manager
Key Stakeholder
On-Track
RACI
Responsible
Accountable
Consulted
Informed
Influence
Very High
High
Medium
Low
Very Low
Interest
Very High
High
Medium
Low
Very Low
Engagement
Manage Closely
Keep Satisfied
Keep Informed
Monitor
Escalation
On
Status Report
On
Cost Line Items v2
| Line Item Name | Government | |||||||||||
| Unique ID | Contractor | |||||||||||
| Unique ID | Status | Health | Appropriation | Category | Priority | Description | Response | Response Due Date | Response Action | Response Update | Escalation | Status Report |
Enterprise Information Systems 1 1 Open On-Track RDT&E Labor Critical Line item description. Control
Change Management Planning 2 2 Open On-Track RDT&E Labor Critical Line item description. Control
Configuration and Integration Testing 3 3 Open At-Risk RDT&E Labor Critical Line item description. Control
Training Services 4 4 Open On-Track RDT&E Labor Critical Line item description. Control
User Training 5 5 Open On-Track RDT&E Labor Critical Line item description. Control
Contractor System Engineering 6 6 Open On-Track RDT&E Labor Critical Line item description. Control
Test and Evaluation Support 7 7 Open At-Risk RDT&E Labor Critical Line item description. Control
External System Interface Development 8 8 Open On-Track RDT&E Labor Critical Line item description. Control
System Level Integration 9 9 Open On-Track RDT&E Labor Critical Line item description. Control
Total
Cost Periods v2
Cost Periods
1/1/20
2/1/20
3/1/20
4/1/20
5/1/20
6/1/20
7/1/20
8/1/20
9/1/20
10/1/20
11/1/20
12/1/20
1/1/21
2/1/21
3/1/21
4/1/21
5/1/21
6/1/21
7/1/21
8/1/21
9/1/21
10/1/21
11/1/21
12/1/21
1/1/22
2/1/22
3/1/22
4/1/22
5/1/22
6/1/22
7/1/22
8/1/22
9/1/22
10/1/22
11/1/22
12/1/22
1/1/23
2/1/23
3/1/23
4/1/23
5/1/23
6/1/23
7/1/23
8/1/23
9/1/23
10/1/23
11/1/23
12/1/23
1/1/24
2/1/24
3/1/24
4/1/24
5/1/24
6/1/24
7/1/24
8/1/24
9/1/24
10/1/24
11/1/24
12/1/24
1/1/25
2/1/25
3/1/25
4/1/25
5/1/25
6/1/25
7/1/25
8/1/25
9/1/25
10/1/25
11/1/25
12/1/25
1/1/26
2/1/26
3/1/26
4/1/26
5/1/26
6/1/26
7/1/26
8/1/26
9/1/26
10/1/26
11/1/26
12/1/26
1/1/27
2/1/27
3/1/27
4/1/27
5/1/27
6/1/27
7/1/27
8/1/27
9/1/27
10/1/27
11/1/27
12/1/27
1/1/28
2/1/28
3/1/28
4/1/28
5/1/28
6/1/28
7/1/28
8/1/28
9/1/28
10/1/28
11/1/28
12/1/28
1/1/29
2/1/29
3/1/29
4/1/29
5/1/29
6/1/29
7/1/29
8/1/29
9/1/29
10/1/29
11/1/29
12/1/29
1/1/30
2/1/30
3/1/30
4/1/30
5/1/30
6/1/30
7/1/30
8/1/30
9/1/30
10/1/30
11/1/30
12/1/30
Cost Line Item Periods v2
Line Item Name Period Budget Estimate Actual
Enterprise Information Systems 5/1/24 $1 $0 $2
Change Management Planning 5/1/24 $2 $1 $3
Configuration and Integration Testing 5/1/24 $3 $2 $4
Training Services 5/1/24 $4 $3 $5
User Training 5/1/24 $5 $4 $6
Contractor System Engineering 5/1/24 $6 $5 $7
Test and Evaluation Support 5/1/24 $7 $6 $8
External System Interface Development 5/1/24 $8 $7 $9
System Level Integration 5/1/24 $9 $8 $10
Enterprise Information Systems 6/1/24 $11 $10 $12
Change Management Planning 6/1/24 $12 $11 $13
Configuration and Integration Testing 6/1/24 $13 $12 $14
Training Services 6/1/24 $14 $13 $15
User Training 6/1/24 $15 $14 $16
Contractor System Engineering 6/1/24 $16 $15 $17
Test and Evaluation Support 6/1/24 $17 $16 $18
External System Interface Development 6/1/24 $18 $17 $19
System Level Integration 6/1/24 $19 $18 $20
Enterprise Information Systems 7/1/24 $21 $20 $22
Change Management Planning 7/1/24 $22 $21 $23
Configuration and Integration Testing 7/1/24 $23 $22 $24
Training Services 7/1/24 $24 $23 $25
User Training 7/1/24 $25 $24 $26
Contractor System Engineering 7/1/24 $26 $25 $27
Test and Evaluation Support 7/1/24 $27 $26 $28
External System Interface Development 7/1/24 $28 $27 $29
System Level Integration 7/1/24 $29 $28 $30
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of (Updated 20250617)
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of (Updated 20250617)
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" Hide Attachment Bar
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: 0001-0002, X001-X002 |
| exhibit: A |
| C. CATEGORY: Select for "TDP.": 0 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 1 |
| C. CATEGORY: Enter specification for "Other.": |
| System: |
| ContractNum: HT003826XXXXX |
| Contractor: |
| 1. DATA ITEM NUMBER: CDRL A004 |
| titleDataItem: Transition-In Plan |
| subtitle: Page 1 of 2 |
| 4. AUTHORITY (Data Acquisition Document Number): |
| contractRef: PWS 5.1 |
| reqOffice: PEO DHMS |
| 7. DD 250 REQUIREMENT: |
| 8. APPROVAL CODE : NA |
| 9. DISTRIBUTION STATEMENT REQUIRED: D |
| freq: ASREQ |
| asOfDate: |
| dateFirstSub: 5 Days After TO Award |
| dateSubseqSub: ASREQ |
| 16. REMARKS: |
The Contractor shall develop a Plan to demonstrate how all contract requirements will be met and ensure incoming personnel are functionally trained and qualified on the full performance start date. Personnel shall be trained/qualified within 30 days.
Block 14 - Distribution a. Addressee: Transition-In Plan shall be submitted electronically in a reproducible Microsoft Office format (unless otherwise approved by the Government) to the Contracting Officer Representative (COR) and/or the Program Management Office (PMO).
| Click to add continuation field for Remarks: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: See Block 16 |
| 15.TOTAL - Total draft copies is automatically calculated.: 0 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 0 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| priceGrp: |
| estTotalPrice: |
| remarks: |
| preparedBy: |
| J. SIGNATURE: H. SIGNATURE |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| approvedBy: |
| Click to add additional data items.: |