Qualifications.docx

DOCX document 20 KB Posted

Attached to
Retamal Dam Buoy System
Solicitation number
191BWC26R0006
Issued by

About this file

This is a Qualifications document for the Retamal Dam Buoy System Design-Build solicitation issued by the United States Section of the International Boundary and Water Commission (USIBWC). The document establishes the qualifications and experience requirements that bidders must demonstrate to be considered for this project. Contractors must provide evidence of relevant prior experience, technical expertise, and capability to successfully design and build a waterway barrier system with integrated warning systems and signage. The file likely specifies required years of experience, previous similar projects, certifications, staffing qualifications, and other credentials necessary to establish contractor responsibility.

The solicitation is for the complete Design-Build of a waterway barrier line system at Retamal Dam that will prevent public access to dangerous hydraulics and alert the public to hazards through warning systems and signage. Work includes site preparation, inspection of systems and structures, debris disposal, and quality control testing. Contractor operations are restricted to USIBWC working hours (7:00 AM to 3:30 PM, Monday through Friday) and facility closures on federal holidays. Contractors must possess identifying vehicles for border area operations and comply with proximity restrictions to adjacent US Fish and Wildlife property. This requirement is being solicited under FAR Part 36 and FAR Part 15, with a prebid site visit requiring submission of Form 358.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dry Soil Mix Design Engineer

1. The soil mixing shall be designed and overseen by a civil engineer currently licensed in the State of Texas.

2. The soil mix design engineer shall have:

a. At least 10 years of experience in soil mixing construction and design.

b. Planned and directed the methods of work on at least 10 similar projects.

3. Submit certificates and resume substantiating the qualifications of the soil mix design engineer. Include project descriptions, minimum dimensions of work, type of binder material, volumetric proportions, and equipment description for each project to show the engineer's qualifications.

Aggregate Pier Design Engineer

1. The aggregate pier ground improvement system shall be designed and overseen by a professional engineer registered in the State of Texas.

2. The aggregate pier design engineer shall have:

a. At least 10 years of experience in aggregate pier construction

b. Planned and directed the methods of work on at least 10 similar projects.

3. Include project descriptions, minimum dimensions of work, and equipment description for each project to show the engineer's qualifications Articulated Concrete Block Mattress Design Engineer

1. The ACBM shall be designed and overseen by a civil engineer currently licensed in the State of Texas.

2. The ACBM design engineer shall have:

a. At least 10 years of experience in articulated concrete block construction and design.

b. Planned and directed the methods of work on at least 10 similar projects.

3. Submit certificates and resume substantiating the qualifications of the ACBM design engineer.

Include project descriptions, minimum dimensions of work, type of binder material, volumetric proportions, and equipment description for each project to show the engineer's qualifications

1.8. QUALIFICATIONS OF SCHEDULING PERSONNEL

1.8.A. The Contractor shall identify a scheduler who will be dedicated to the project.

1. The scheduler shall have 4 years or more of verifiable experience preparing and utilizing CPM schedules.

a. This experience shall be in construction scheduling of civil works (earthwork, roads, highways, utilities, infrastructure, paving, levees, etc.) projects.

b. All experience shall be with the preferred scheduling software.

2. The Contractor's scheduler shall have a minimum of 40 hours of scheduling training.

3. Qualifications of the scheduler shall be submitted to the COR for compliance confirmation.

1.8.B. The Government reserves the right to require the Contractor to make changes in scheduling personnel to obtain an accurate, workable schedule.

1.8.C. Should the Contractor require a change in scheduler during the project, the Contractor shall notify the Government immediately and provide qualifications of the replacement scheduler to the COR for compliance confirmation.

Superintendent and Project Manager There is no specific requirements for Project Manager or Superintendent roles in the Technical Specifications. However, it is Contractor’s responsibility to proposed qualified competent project management personnel with sufficient experience on projects similar in size and complexity. Provide resumes following the requirements listed below.

i. Resumes shall contain the following information:

(a) Name

(b) Qualifying educational background, including (if applicable) degree, year obtained, and name of educational institution. This includes required technical training.

(c) Qualifying professional license, if applicable, including the state of licensure, discipline, and license number.

(d) Qualifying experience covering at least the minimum experience periods required:

1. Project name, location, and dates of assignment.

2. Description of primary project features.

3. Name, address, and phone number of project owner.

4. Name, address, and phone number of employer on each project.

5. Name, address, and phone number of superior.

6. Position(s) occupied on each assignment.

7. Description of duties and responsibilities of each position occupied.

(e) Training certificates for those key positions with training requirements.