The file's text, extracted by GovTribe without its formatting.
Alliant 2 Unrestricted GWAC Solicitation No.: QTA0016JCA0003 Section J.P-5
ATTACHMENT J.P-5
PAST PERFORMANCE RATING FORM
PAST PERFORMANCE PROJECT IDENTIFICATION (To be filled out by the Offeror):
| CONTRACTOR NAME: |
| Click here to enter text. |
| CONTRACT NUMBER: |
| Click here to enter text. |
| ORDER NUMBER (if applicable): |
| Click here to enter text. |
| PROJECT TITLE: |
| Click here to enter text. |
| TOTAL PERIOD OF PERFORMANCE, INCLUDING OPTIONS: MM/YYYY - MM/YYYY or MM/YYYY - Present |
| Click here to enter text. |
| PSC GROUP PROJECT: (Choose One) |
| Choose PSC Group Project from drop-down list. |
PAST PERFORMANCE REFERENCE INFORMATION (To be filled out by the Rater):
| NAME: |
| Click here to enter text. |
| TITLE: |
| Click here to enter text. |
| AGENCY or CUSTOMER: |
| Click here to enter text. |
| PHONE: |
| Click here to enter text. |
| E-MAIL |
| Click here to enter text. |
| SIGNATURE OF RATER: (Rating must be provided by a Warranted Contracting Officer or Corporate Officer with cognizance over the project for the ordering activity) |
For each of the six (6) criteria listed below, the rater must choose one (1) Adjectival Rating by checking the box, as applicable. At a minimum, for any rating that is checked Marginal or Unsatisfactory, please submit additional comments to substantiate the rating. For any rating that is checked Not Applicable, please explain why it does not apply.
1. QUALITY OF SERVICE
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| |_| |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| |_| |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| |_| |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| |_| |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
ADDITIONAL COMMENTS:
Click here to enter text.
2. SCHEDULE
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| |_| |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| |_| |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| |_| |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| |_| |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Click here to enter text.
3. COST CONTROL
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or subelement being evaluated was |
accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
| |_| |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| |_| |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| |_| |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| |_| |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Click here to enter text.
4. BUSINESS RELATIONS
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or subelement being evaluated was |
accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
| |_| |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| |_| |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| |_| |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| |_| |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Click here to enter text.
5. MANAGEMENT OF KEY PERSONNEL
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or subelement being evaluated was |
accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
| |_| |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or subelement being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| |_| |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or subelement contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| |_| |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or subelement being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| |_| |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Click here to enter text.
6. UTILIZATION OF SMALL BUSINESS
| Rating |
| Adjectival Rating |
| Definition |
| |_| |
| Exceptional |
| Exceeded all statutory goals or goals as negotiated. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business(SDVOSB). Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. |
| |_| |
| Very Good |
| Met all of the statutory goals or goals as negotiated. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with FAR 52.219- 8, Utilization of Small Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. |
| |_| |
| Satisfactory |
| Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract/order. Fulfilled the requirements of the subcontracting plan included in the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. |
| |_| |
| Marginal |
| Deficient in meeting key subcontracting plan elements. Deficient in complying with FAR 52.219-8, Utilization of Small Business Concerns, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do so. Required a corrective action plan. |
| |_| |
| Unsatisfactory |
| Noncompliant with FAR 52.219-8 and 52.219-9, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Showed little interest in bringing performance to a satisfactory level or is generally uncooperative. Required a corrective action plan.. |
Click here to enter text.
Source Selection Information – See FAR 2.101 and 3.104