Attachment A Price Schedule.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- QSE--36C78626R50141
About this file
This is a Price Schedule attachment for grounds maintenance services at Marion National Cemetery under solicitation 36C78626R50141 issued by the Department of Veterans Affairs National Cemetery Administration.
The contract covers a comprehensive range of grounds maintenance services across a base year and four optional years. Base services include mowing 53 acres of turf areas (39 job-based instances), headstone cleaning (16,000 each), raising and realigning (2,100 each), fine-tuning alignment (3,500 each), snow removal on roads/parking areas (10 jobs), salting roads and parking areas (10 jobs), snow removal on walkways (10 jobs), and ice melt application on walkways/columbarium (10 jobs). Additional recurring base services include headstone trimming for 13,909 headstones plus 400 estimated per option year, string trimming, blade edging flat markers, blade edging curbing and sidewalks (6,349 linear feet), and irrigation system operation and maintenance (7 months). Optional services include core aeration, overseeding, herbicide applications (pre- and post-emergence, yellow nutsedge), fertilization, grub insecticide, leaf removal, floral pickup, mulching, tree-related services (pruning, removal at various diameters, stump removal), power washing hardscapes, turf renovation (250,868 square feet), and pest control. The price schedule template provides columns for unit prices and extended prices for all line items across the base year and each of the four option years, though specific pricing has not been populated in this version.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Performance Work Statement Marion National Cemetery.docx | DOCX document | |
| 36C78626R50141 0001 Amendment.docx | DOCX document | |
| Attachment E - SCA WD 2015-4813 Wage Determination.pdf | ||
| Attachment F Davis Bacon Act.pdf | ||
| Performance Work Statement Grounds Maintenance.pdf | ||
| Section D Instructions to Offerors Evaluations Addendum.docx | DOCX document | |
| Attachment C Subcontractor Participation Document.docx | DOCX document | |
| Solicitation.pdf | ||
| Attachment D -- Past Performance Questionnaire.pdf | ||
| Attachment B Quality Assurance Surveillance Plan.docx | DOCX document | |
| Attachment A Price Schedule.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| Services | |||||
| Line Item | Description (Job, Labor Category) | Est. Qty | Unit | Unit Price | Extended Price |
| 0001 | Mow all turf areas (53 acres) | 39 | JB | ||
| 0002 | Headstone Trimming (13,909 Headstones)+400 estimated each OY | 39 | JB | ||
| 0003 | String Trim Other Areas (List areas in SOW) | 39 | JB | ||
| 0004 | Blade Edge All Flat Markers (2 Flat Markers) | 39 | JB | ||
| 0005 | Blade Edge All Curbing and Sidewalks (6,349 Linear Ft) | 7 | JB | ||
| 0006 | Core Aerate (53 acres) | 2 | JB | ||
| 0007 | Overseed (53 acres)(Option) | 1 | JB | ||
| 0008 | Pre-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0009 | Post-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0010 | Fertilize (53 acres) | 3 | JB | ||
| 0011 | Yellow Nutsedge Herbicide (53 acres) | 1 | JB | ||
| 0012 | Grub insecticide (53 acres) | 1 | JB | ||
| 0013 | Leaf Removel & Pickup (53 Acres) | 10 | JB | ||
| 0014 | Irrigation Start-up and backflow testing | 1 | JB | ||
| 0015 | Irrigation System (Operation & Maintenance) | 7 | MO | ||
| 0016 | Irrigation Winterization | 1 | JB | ||
| 0017 | Floral Pickup (20 Sections) (Option) | 7 | JB | ||
| 0018 | Mulch Planting Beds & Tree Rings (Option) | 1 | JB | ||
| 0019 | Planting beds tree rings - pre-emergence herbicide (Option) | 2 | JB | ||
| 0020 | Planting beds tree rings - Emerged weed removal/control (Option) | 7 | MO | ||
| 0021 | Japanese Beetle Spray (35 Trees) (Option) | 1 | JB | ||
| 0022 | Tree Pruning (Option) | 10 | EA | ||
| 0023 | Tree removal (25 inches to 60 inches in diameter) (Option) | 3 | EA | ||
| 0024 | Tree Removal (12 inches or 24 inches in diameter) (Option) | 3 | EA | ||
| 0025 | Tree Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0026 | Stump Removal (25 inches to 60 Inches in diameter) (Option) | 3 | EA | ||
| 0027 | Stump Removal (12 Inches to 25 inches in diameter) (Option) | 3 | EA | ||
| 0028 | Stump Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0029 | Col Wall/Committal Shelter, Other hardscapes sidewalks curbs ETC. Power Wash Cleaning (Option) | 2 | JB | ||
| 0030 | Headstone Cleaning (Base) | 16,000 | EA | ||
| 0031 | Raise and Realign (Base) | 2,100 | EA | ||
| 0032 | Fine Tune Alignment (Base) | 3,500 | EA | ||
| 0033 | Sunken Gave Repair (Option) | 50 | EA | ||
| 0034 | Turf Renovation (Option) | 250,868 | SF | ||
| 0035 | Snow Removal on Roads/Parking Areas (Base) | 10 | JB | ||
| 0036 | Salt Roads and Parking Areas (Base) | 10 | JB | ||
| 0037 | Snow Removal on Walkways (Base) | 10 | JB | ||
| 0038 | Ice Melt on Walkways / Columbarium (Base) | 10 | JB | ||
| 0039 | Pest Control (Option) | 7 | JB | ||
| Subtotal (Service) | |||||
| Aggregated Total |
| Base Year | |
| Option Year 1 | |
| Option Year 2 | |
| Option Year 3 | |
| Option Year 4 | |
| Aggreated Base thru Option Year 4 Total | $ - 0 |
INTERNAL FOR OFFICIAL GOVERNMENT USE ONLY
OY1
| Line Item | Description (Job, Labor Category) | Est. Qty | Unit | Unit Price | Extended Price |
| 0001 | Mow all turf areas (53 acres) | 39 | JB | ||
| 0002 | Headstone Trimming (13,909 Headstones)+400 estimated each OY | 39 | JB | ||
| 0003 | String Trim Other Areas (List areas in SOW) | 39 | JB | ||
| 0004 | Blade Edge All Flat Markers (2 Flat Markers) | 39 | JB | ||
| 0005 | Blade Edge All Curbing and Sidewalks (6,349 Linear Ft) | 7 | JB | ||
| 0006 | Core Aerate (53 acres) | 2 | JB | ||
| 0007 | Overseed (53 acres)(Option) | 1 | JB | ||
| 0008 | Pre-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0009 | Post-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0010 | Fertilize (53 acres) | 3 | JB | ||
| 0011 | Yellow Nutsedge Herbicide (53 acres) | 1 | JB | ||
| 0012 | Grub insecticide (53 acres) | 1 | JB | ||
| 0013 | Leaf Removel & Pickup (53 Acres) | 10 | JB | ||
| 0014 | Irrigation Start-up and backflow testing | 1 | JB | ||
| 0015 | Irrigation System (Operation & Maintenance) | 7 | MO | ||
| 0016 | Irrigation Winterization | 1 | JB | ||
| 0017 | Floral Pickup (20 Sections) (Option) | 7 | JB | ||
| 0018 | Mulch Planting Beds & Tree Rings (Option) | 1 | JB | ||
| 0019 | Planting beds tree rings - pre-emergence herbicide (Option) | 2 | JB | ||
| 0020 | Planting beds tree rings - Emerged weed removal/control (Option) | 7 | MO | ||
| 0021 | Japanese Beetle Spray (35 Trees) (Option) | 1 | JB | ||
| 0022 | Tree Pruning (Option) | 10 | EA | ||
| 0023 | Tree removal (25 inches to 60 inches in diameter) (Option) | 3 | EA | ||
| 0024 | Tree Removal (12 inches or 24 inches in diameter) (Option) | 3 | EA | ||
| 0025 | Tree Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0026 | Stump Removal (25 inches to 60 Inches in diameter) (Option) | 3 | EA | ||
| 0027 | Stump Removal (12 Inches to 25 inches in diameter) (Option) | 3 | EA | ||
| 0028 | Stump Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0029 | Col Wall/Committal Shelter, Other hardscapes sidewalks curbs ETC. Power Wash Cleaning (Option) | 2 | JB | ||
| 0030 | Headstone Cleaning (Base) | 16,000 | EA | ||
| 0031 | Raise and Realign (Base) | 2,100 | EA | ||
| 0032 | Fine Tune Alignment (Base) | 3,500 | EA | ||
| 0033 | Sunken Gave Repair (Option) | 50 | EA | ||
| 0034 | Turf Renovation (Option) | 250,868 | SF | ||
| 0035 | Snow Removal on Roads/Parking Areas (Base) | 10 | JB | ||
| 0036 | Salt Roads and Parking Areas (Base) | 10 | JB | ||
| 0037 | Snow Removal on Walkways (Base) | 10 | JB | ||
| 0038 | Ice Melt on Walkways / Columbarium (Base) | 10 | JB | ||
| 0039 | Pest Control (Option) | 7 | JB | ||
| Subtotal (Service) | |||||
| Aggregated Total |
OY2
| Line Item | Description (Job, Labor Category) | Est. Qty | Unit | Unit Price | Extended Price |
| 0001 | Mow all turf areas (53 acres) | 39 | JB | ||
| 0002 | Headstone Trimming (13,909 Headstones)+400 estimated each OY | 39 | JB | ||
| 0003 | String Trim Other Areas (List areas in SOW) | 39 | JB | ||
| 0004 | Blade Edge All Flat Markers (2 Flat Markers) | 39 | JB | ||
| 0005 | Blade Edge All Curbing and Sidewalks (6,349 Linear Ft) | 7 | JB | ||
| 0006 | Core Aerate (53 acres) | 2 | JB | ||
| 0007 | Overseed (53 acres)(Option) | 1 | JB | ||
| 0008 | Pre-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0009 | Post-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0010 | Fertilize (53 acres) | 3 | JB | ||
| 0011 | Yellow Nutsedge Herbicide (53 acres) | 1 | JB | ||
| 0012 | Grub insecticide (53 acres) | 1 | JB | ||
| 0013 | Leaf Removel & Pickup (53 Acres) | 10 | JB | ||
| 0014 | Irrigation Start-up and backflow testing | 1 | JB | ||
| 0015 | Irrigation System (Operation & Maintenance) | 7 | MO | ||
| 0016 | Irrigation Winterization | 1 | JB | ||
| 0017 | Floral Pickup (20 Sections) (Option) | 7 | JB | ||
| 0018 | Mulch Planting Beds & Tree Rings (Option) | 1 | JB | ||
| 0019 | Planting beds tree rings - pre-emergence herbicide (Option) | 2 | JB | ||
| 0020 | Planting beds tree rings - Emerged weed removal/control (Option) | 7 | MO | ||
| 0021 | Japanese Beetle Spray (35 Trees) (Option) | 1 | JB | ||
| 0022 | Tree Pruning (Option) | 10 | EA | ||
| 0023 | Tree removal (25 inches to 60 inches in diameter) (Option) | 3 | EA | ||
| 0024 | Tree Removal (12 inches or 24 inches in diameter) (Option) | 3 | EA | ||
| 0025 | Tree Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0026 | Stump Removal (25 inches to 60 Inches in diameter) (Option) | 3 | EA | ||
| 0027 | Stump Removal (12 Inches to 25 inches in diameter) (Option) | 3 | EA | ||
| 0028 | Stump Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0029 | Col Wall/Committal Shelter, Other hardscapes sidewalks curbs ETC. Power Wash Cleaning (Option) | 2 | JB | ||
| 0030 | Headstone Cleaning (Base) | 16,000 | EA | ||
| 0031 | Raise and Realign (Base) | 2,100 | EA | ||
| 0032 | Fine Tune Alignment (Base) | 3,500 | EA | ||
| 0033 | Sunken Gave Repair (Option) | 50 | EA | ||
| 0034 | Turf Renovation (Option) | 250,868 | SF | ||
| 0035 | Snow Removal on Roads/Parking Areas (Base) | 10 | JB | ||
| 0036 | Salt Roads and Parking Areas (Base) | 10 | JB | ||
| 0037 | Snow Removal on Walkways (Base) | 10 | JB | ||
| 0038 | Ice Melt on Walkways / Columbarium (Base) | 10 | JB | ||
| 0039 | Pest Control (Option) | 7 | JB | ||
| Subtotal (Service) | |||||
| Aggregated Total |
OY3
| Line Item | Description (Job, Labor Category) | Est. Qty | Unit | Unit Price | Extended Price |
| 0001 | Mow all turf areas (53 acres) | 39 | JB | ||
| 0002 | Headstone Trimming (13,909 Headstones)+400 estimated each OY | 39 | JB | ||
| 0003 | String Trim Other Areas (List areas in SOW) | 39 | JB | ||
| 0004 | Blade Edge All Flat Markers (2 Flat Markers) | 39 | JB | ||
| 0005 | Blade Edge All Curbing and Sidewalks (6,349 Linear Ft) | 7 | JB | ||
| 0006 | Core Aerate (53 acres) | 2 | JB | ||
| 0007 | Overseed (53 acres)(Option) | 1 | JB | ||
| 0008 | Pre-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0009 | Post-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0010 | Fertilize (53 acres) | 3 | JB | ||
| 0011 | Yellow Nutsedge Herbicide (53 acres) | 1 | JB | ||
| 0012 | Grub insecticide (53 acres) | 1 | JB | ||
| 0013 | Leaf Removel & Pickup (53 Acres) | 10 | JB | ||
| 0014 | Irrigation Start-up and backflow testing | 1 | JB | ||
| 0015 | Irrigation System (Operation & Maintenance) | 7 | MO | ||
| 0016 | Irrigation Winterization | 1 | JB | ||
| 0017 | Floral Pickup (20 Sections) (Option) | 7 | JB | ||
| 0018 | Mulch Planting Beds & Tree Rings (Option) | 1 | JB | ||
| 0019 | Planting beds tree rings - pre-emergence herbicide (Option) | 2 | JB | ||
| 0020 | Planting beds tree rings - Emerged weed removal/control (Option) | 7 | MO | ||
| 0021 | Japanese Beetle Spray (35 Trees) (Option) | 1 | JB | ||
| 0022 | Tree Pruning (Option) | 10 | EA | ||
| 0023 | Tree removal (25 inches to 60 inches in diameter) (Option) | 3 | EA | ||
| 0024 | Tree Removal (12 inches or 24 inches in diameter) (Option) | 3 | EA | ||
| 0025 | Tree Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0026 | Stump Removal (25 inches to 60 Inches in diameter) (Option) | 3 | EA | ||
| 0027 | Stump Removal (12 Inches to 25 inches in diameter) (Option) | 3 | EA | ||
| 0028 | Stump Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0029 | Col Wall/Committal Shelter, Other hardscapes sidewalks curbs ETC. Power Wash Cleaning (Option) | 2 | JB | ||
| 0030 | Headstone Cleaning (Base) | 16,000 | EA | ||
| 0031 | Raise and Realign (Base) | 2,100 | EA | ||
| 0032 | Fine Tune Alignment (Base) | 3,500 | EA | ||
| 0033 | Sunken Gave Repair (Option) | 50 | EA | ||
| 0034 | Turf Renovation (Option) | 250,868 | SF | ||
| 0035 | Snow Removal on Roads/Parking Areas (Base) | 10 | JB | ||
| 0036 | Salt Roads and Parking Areas (Base) | 10 | JB | ||
| 0037 | Snow Removal on Walkways (Base) | 10 | JB | ||
| 0038 | Ice Melt on Walkways / Columbarium (Base) | 10 | JB | ||
| 0039 | Pest Control (Option) | 7 | JB | ||
| Subtotal (Service) | |||||
| Aggregated Total |
OY4
| Line Item | Description (Job, Labor Category) | Est. Qty | Unit | Unit Price | Extended Price |
| 0001 | Mow all turf areas (53 acres) | 39 | JB | ||
| 0002 | Headstone Trimming (13,909 Headstones)+400 estimated each OY | 39 | JB | ||
| 0003 | String Trim Other Areas (List areas in SOW) | 39 | JB | ||
| 0004 | Blade Edge All Flat Markers (2 Flat Markers) | 39 | JB | ||
| 0005 | Blade Edge All Curbing and Sidewalks (6,349 Linear Ft) | 7 | JB | ||
| 0006 | Core Aerate (53 acres) | 2 | JB | ||
| 0007 | Overseed (53 acres)(Option) | 1 | JB | ||
| 0008 | Pre-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0009 | Post-emergence Herbicide Applications (53 acres) | 2 | JB | ||
| 0010 | Fertilize (53 acres) | 3 | JB | ||
| 0011 | Yellow Nutsedge Herbicide (53 acres) | 1 | JB | ||
| 0012 | Grub insecticide (53 acres) | 1 | JB | ||
| 0013 | Leaf Removel & Pickup (53 Acres) | 10 | JB | ||
| 0014 | Irrigation Start-up and backflow testing | 1 | JB | ||
| 0015 | Irrigation System (Operation & Maintenance) | 7 | MO | ||
| 0016 | Irrigation Winterization | 1 | JB | ||
| 0017 | Floral Pickup (20 Sections) (Option) | 7 | JB | ||
| 0018 | Mulch Planting Beds & Tree Rings (Option) | 1 | JB | ||
| 0019 | Planting beds tree rings - pre-emergence herbicide (Option) | 2 | JB | ||
| 0020 | Planting beds tree rings - Emerged weed removal/control (Option) | 7 | MO | ||
| 0021 | Japanese Beetle Spray (35 Trees) (Option) | 1 | JB | ||
| 0022 | Tree Pruning (Option) | 10 | EA | ||
| 0023 | Tree removal (25 inches to 60 inches in diameter) (Option) | 3 | EA | ||
| 0024 | Tree Removal (12 inches or 24 inches in diameter) (Option) | 3 | EA | ||
| 0025 | Tree Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0026 | Stump Removal (25 inches to 60 Inches in diameter) (Option) | 3 | EA | ||
| 0027 | Stump Removal (12 Inches to 25 inches in diameter) (Option) | 3 | EA | ||
| 0028 | Stump Removal (Less than 12 inches in diameter) (Option) | 2 | EA | ||
| 0029 | Col Wall/Committal Shelter, Other hardscapes sidewalks curbs ETC. Power Wash Cleaning (Option) | 2 | JB | ||
| 0030 | Headstone Cleaning (Base) | 16,000 | EA | ||
| 0031 | Raise and Realign (Base) | 2,100 | EA | ||
| 0032 | Fine Tune Alignment (Base) | 3,500 | EA | ||
| 0033 | Sunken Gave Repair (Option) | 50 | EA | ||
| 0034 | Turf Renovation (Option) | 250,868 | SF | ||
| 0035 | Snow Removal on Roads/Parking Areas (Base) | 10 | JB | ||
| 0036 | Salt Roads and Parking Areas (Base) | 10 | JB | ||
| 0037 | Snow Removal on Walkways (Base) | 10 | JB | ||
| 0038 | Ice Melt on Walkways / Columbarium (Base) | 10 | JB | ||
| 0039 | Pest Control (Option) | 7 | JB | ||
| Subtotal (Service) | |||||
| Aggregated Total |
File details come from the government source that posted it. Updated .