Attachment F Irrigation Sheets Northwoods National Cemetery.pdf

PDF 7 MB Posted

Attached to
Amendment 02 36C78625Q50295 Northwood Ground Maintenance Services -- S208
Solicitation number
QSE--36C78625Q50295
Issued by

About this file

The file contains two detailed irrigation plan sheets (LI102 and LI103) for the Northwoods National Cemetery Burial Grounds Master Plan and Design-Build Phase I project located on Lakewood Road in Oneida County, Wisconsin. The irrigation plans provide a comprehensive layout of the irrigation system, including specific details such as water flow rates, pipe sizes, and irrigation head locations across the cemetery grounds. The plans include 18 and 36-inch irrigation zones with multiple water flow rates ranging from 10 to 64 gallons per minute (gpm), and specify precise installation requirements such as maintaining 6 inches of distance from building walls, verifying existing utilities before trenching, and coordinating head locations with existing plants to ensure proper coverage. The drawings are dated October 15, 2018, and were prepared by NCA Design and Construction Services, with the project being overseen by Eirik Heikes and Elizabeth Monohan.

View the file

Other files

File Type Posted
Attachment B- Grounds Maintenance Performance Work.pdf PDF
36C78625Q50295 0002.docx DOCX document
Attachment C Subcontractor Participation Document.pdf PDF
Attachment F Irrigation Sheets Northwoods National Cemetery.pdf PDF
Revised Price Schedule.xlsx XLSX spreadsheet
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
Attachment E SCA WD 2015-4919 Wage Determination.pdf PDF
Revised Price Schedule 06302025.xlsx XLSX spreadsheet
36C78625Q50295 0001.docx DOCX document
36C78625Q50295 Combined Synopsis Solicitation Northwood National Cemetery.docx DOCX document
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
Attachment E SCA WD 2015-4919 Wage Determination.pdf PDF
36C78625Q50295 Combined Synopsis Solicitation Northwood National Cemetery.docx DOCX document
36C78625Q50295 0001.docx DOCX document
Revised Price Schedule.xlsx XLSX spreadsheet
Attachment C Subcontractor Participation Document.pdf PDF
Attachment B- Grounds Maintenance Performance Work.pdf PDF
Attachment C Subcontractor Participation Document.pdf PDF
Attachment E SCA WD 2015-4919 Wage Determination.pdf PDF
Attachment F Irrigation Sheets Northwoods National Cemetery.pdf PDF
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
Attachment A Price Schedule Northwoods National Cemetery.xlsx XLSX spreadsheet
Attachment B- Grounds Maintenance Performance Work.pdf PDF
36C78625Q50295 Combined Synopsis Solicitation Northwood National Cemetery.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2

75 76

37 38

665A

9998979695949392

89888786858483828180797877

747372717069686766656463

616059585756555453525150

4746454443424140393837

3433323130292827262524

21201918171615141312

10987654321

665A

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

4132 33 34 35 36 37 38 39 40

1 2 3 4 5 6 7 8 9 10

LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED

LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED

LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED

LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED

LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED LEFT OPEN ENDED

LEFT OPEN ENDED

CLOSED ENDED

O O

O O

O O

O O

O O

O O

O O

C E

OOOOOOOOOOO

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

LAKEW

OOD ROAD

W W

W

W

1.5" 62gpm

X-4 1" 12 gpm

1.5" 65 gpm

1.5" 46gpm

X-15 1" 12 gpm

1.5" 64gpm

1.5" 42gpm

1.5" 60gpm

1.5" 64gpm

X-7 1.5" 10gpm

1" 64gpm

1.5" 45gpm

X-12 1" 12 gpm

X-16

X-9 1" 12 gpm

X-17 1" 12 gpm

C

F F F

F F F

F F

F F

F F

36 36

18 18 18 18

18 18

18 18

18 18

18 18

F F

F F F F F

F F F

F F F F

F

F F F

F

F

FF

F F

FF

F

F

FF

FF

FFF

FFFF

FF

F

F

P

F F

F F

F F

F

P

FFFF

BFP

IRRIGATION PLAN #2

LI102

Department of Veterans Affairs

L:

\1

7-

R hi ne la nd er N at io na l V et er an s

Bu ria l G ro un ds

\D ra w in gs \L an ds ca pe

\S H

EE

TS

\8

C M

-L I-1

-L

I-1

.d w g

0-

-1

4:

:3

PM

j er em y.

m al lo y

517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 fourfrontdesign.com

FOURFRONT

D E S I G N I N C.

NCA DESIGN

AND CONSTRUCTION

SERVICE

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEERS:PRIME CONTRACTOR/ CONSULTANTS:

DateRevisions:

VA FORM 08-6231

on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

E

D

C

B

A

1 2 3 4 5 6 7 8 9 ofOctober 15, 2018

VA Cemetery Burial Grounds Master Plan and Design-Build Phase I

LAKEWOOD ROAD, ONEIDA COUNTY, WI 54501

823CM3022

52DN/JM/AWEH

ELIZABETH MONOHAN

PRIME CONTRACTOR:

DECATUR CONSTRUCTION, INC.

301 MAIN PLAZA, SUITE 304,

NEW BRAUNFELS, TX 78130

PHONE: 830.624.6541

FOR CONSTRUCTION Project Status

Eirik Heikes

1REMOVED "NOT IN CONTRACT" NOTE

2ROOF DRAIN AND UNDERDRAIN MODIFICATIONS

3FLAG POLE COORDINATES

IRRIGATION NOTES:

1. ALL IRRIGATION HEADS TO BE INSTALLED 6" AWAY FROM BUILDING WALLS.

2. CONTRACTOR TO VERIFY EXISTING CONDITIONS. ALL EXISTING UTILITIES ARE TO BE LOCATED BEFORE ANY

TRENCHING OF ANY KIND BEGINS.

3. PROTECT ALL EXISTING IMPROVEMENTS TO REMAIN AND REPAIR BACK TO ORIGINAL CONDITION AT CONTRACTOR'S

EXPENSE IF DAMAGE OCCURS RESULTANT FROM CONTRACTOR'S OPERATIONS OR NEGLIGENCE.

4. RE-GRADE AND SOD ALL EXISTING LAWN AREAS DISTURBED BY CONTRACTOR'S OPERATIONS AS PER SPECIFICATIONS.

A DISTURBED AREA SHALL BE WHERE CONSTRUCTION ACTIVITIES INCLUDING TRENCHING, DEMOLITION, EARTHWORK, MATERIAL STORAGE, STAGING, PARKING OR ANY OTHER FORM OF EXCAVATION, COMPACTION OR TRAFFIC RESULTS IN THE REMOVAL OR DISPLACEMENT OF EXISTING GROUND COVER OR GRADE. COORDINATE WITH GENERAL

CONTRACTOR.

5. COORDINATE WORK ON THIS SHEET WITH ALL OTHER TRADES.

6. SYSTEM DESIGN IS BASED UPON AVAILABILITY OF 65 GPM AT THE POINT OF CONNECTION, 55 PSI AT ROTORS AND 40 PSI

AT MP ROTATOR. NOTIFY LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. ZONES SHALL NOT EXCEED 65 GPM.

COORDINATE WATER BUDGET/ ZONING WITH CENTRAL CONTROL SYSTEM.

7. INSTALL IRRIGATION SYSTEM AS DETAILED AND PER SPECIFICATIONS.

8. IRRIGATION PIPING LAYOUT IS SCHEMATIC. ACTUAL LOCATION OF PIPING AND OTHER COMPONENTS MAY VARY DUE TO

EXISTING SITE CONDITIONS.

9. COORDINATE HEAD LOCATIONS WITH EXISTING PLANTS TO ENSURE PROPER COVERAGE.

10. INSTALL AN AIR RELIEF VALVE AT THE PIPE HIGH POINT AND AS SHOWN.

11. INSTALL CONTROL WIRES FROM ELECTRIC VALVES TO CONTROLLER. (PROVIDE 2 SPARE CONTROL WIRES & 1 SPARE COMMON WIRE TO LAST VALVE AT EAST & WEST ENDS OF SITE.) SPARE WIRES TO FILL IRRIGATION CONTROLLER. ALL

WIRING CONNECTIONS TO BE DBY COMPLIANT.

12. SLEEVES SHALL BE (2) SIZES LARGER THAN PIPE OR COMBINATION OF PIPES THEREIN ENCLOSED, WITH MINIMUM SIZE TO BE 4" SUPPLY (1) EXTRA SLEEVE WITH EACH MAIN LINE SLEEVE FOR CONTROL WIRES. BORE UNDER EXISTING

PAVING WHERE REQUIRED. BORE SEPARATELY FOR CONTROL WIRES.

13. PROVIDE TEMPORARY WATERING AS REQUIRED. COORDINATE PROTECTION OF EXISTING TREES AND PLANTS DURING

CONSTRUCTION ACTIVITIES.

14. CONTRACTOR TO ADJUST IRRIGATION HEADS TO PROVIDE COMPLETE COVERAGE AND TO MINIMIZE OVER SPRAY ONTO

BUILDINGS.

15. SEE DETAILS IN 35% CONSTRUCTION DOCUMENTS, SHEETS LI501 AND LI502 FOR INSTALLATION OF IRRIGATION

COMPONENTS.

16. CONTRACTOR TO PROVIDE POWER TO ALL IRRIGATION CONTROLLERS (IF APPLICABLE).

17. CONTRACTOR TO SUBMIT IRRIGATION AS-BUILT DRAWINGS FOR REVIEW BY THE LANDSCAPE ARCHITECT.

18. WHERE NON POTABLE WATER PARALLELS IRRIGATION WATER OR STORM/SANITARY SEWER, ENSURE MINIMUM 4'

DISTANCE AND WHERE CROSSING IRRIGATION OR STORM SEWER ENSURE MINIMUM 1' VERTICAL DISTANCE BETWEEN

PIPES.

0 40

GRAPHIC SCALE: 1" = 20'

SEE SHEET LI103IRRIGATION MODIFICATIONS N.I.C.

AutoCAD SHX Text P

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

4132 33 34 35 36 37 38 39 40

1 2 3 4 5 6 7 8 9 10

O O

OOOOOOOOOOOOO

T

T OH

W

W

1.5" 62 gpm

1.5" 45gpm

X-16 1" 12 gpm

X-9 1" 12 gpm36 36

36 36

FFFF

IRRIGATION PLAN #3

LI103

Department of Veterans Affairs

L:

\1

7-

R hi ne la nd er N at io na l V et er an s

Bu ria l G ro un ds

\D ra w in gs \L an ds ca pe

\S H

EE

TS

\8

C M

-L I-1

-L

I-1

.d w g

0-

-1

4:

:4

PM

j er em y.

m al lo y

517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 fourfrontdesign.com

FOURFRONT

D E S I G N I N C.

NCA DESIGN

AND CONSTRUCTION

SERVICE

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEERS:PRIME CONTRACTOR/ CONSULTANTS:

DateRevisions:

VA FORM 08-6231

on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

E

D

C

B

A

1 2 3 4 5 6 7 8 9 ofOctober 15, 2018

VA Cemetery Burial Grounds Master Plan and Design-Build Phase I

LAKEWOOD ROAD, ONEIDA COUNTY, WI 54501

823CM3022

52DN/JM/AWEH

ELIZABETH MONOHAN

PRIME CONTRACTOR:

DECATUR CONSTRUCTION, INC.

301 MAIN PLAZA, SUITE 304,

NEW BRAUNFELS, TX 78130

PHONE: 830.624.6541

FOR CONSTRUCTION Project Status

Eirik Heikes

1REMOVED "NOT IN CONTRACT" NOTE

2ROOF DRAIN AND UNDERDRAIN MODIFICATIONS

3FLAG POLE COORDINATES

IRRIGATION NOTES:

1. ALL IRRIGATION HEADS TO BE INSTALLED 6" AWAY FROM BUILDING WALLS.

2. CONTRACTOR TO VERIFY EXISTING CONDITIONS. ALL EXISTING UTILITIES ARE TO BE LOCATED BEFORE ANY

TRENCHING OF ANY KIND BEGINS.

3. PROTECT ALL EXISTING IMPROVEMENTS TO REMAIN AND REPAIR BACK TO ORIGINAL CONDITION AT CONTRACTOR'S

EXPENSE IF DAMAGE OCCURS RESULTANT FROM CONTRACTOR'S OPERATIONS OR NEGLIGENCE.

4. RE-GRADE AND SOD ALL EXISTING LAWN AREAS DISTURBED BY CONTRACTOR'S OPERATIONS AS PER SPECIFICATIONS.

A DISTURBED AREA SHALL BE WHERE CONSTRUCTION ACTIVITIES INCLUDING TRENCHING, DEMOLITION, EARTHWORK, MATERIAL STORAGE, STAGING, PARKING OR ANY OTHER FORM OF EXCAVATION, COMPACTION OR TRAFFIC RESULTS IN THE REMOVAL OR DISPLACEMENT OF EXISTING GROUND COVER OR GRADE. COORDINATE WITH GENERAL

CONTRACTOR.

5. COORDINATE WORK ON THIS SHEET WITH ALL OTHER TRADES.

6. SYSTEM DESIGN IS BASED UPON AVAILABILITY OF 65 GPM AT THE POINT OF CONNECTION, 55 PSI AT ROTORS AND 40 PSI

AT MP ROTATOR. NOTIFY LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. ZONES SHALL NOT EXCEED 65 GPM.

COORDINATE WATER BUDGET/ ZONING WITH CENTRAL CONTROL SYSTEM.

7. INSTALL IRRIGATION SYSTEM AS DETAILED AND PER SPECIFICATIONS.

8. IRRIGATION PIPING LAYOUT IS SCHEMATIC. ACTUAL LOCATION OF PIPING AND OTHER COMPONENTS MAY VARY DUE TO

EXISTING SITE CONDITIONS.

9. COORDINATE HEAD LOCATIONS WITH EXISTING PLANTS TO ENSURE PROPER COVERAGE.

10. INSTALL AN AIR RELIEF VALVE AT THE PIPE HIGH POINT AND AS SHOWN.

11. INSTALL CONTROL WIRES FROM ELECTRIC VALVES TO CONTROLLER. (PROVIDE 2 SPARE CONTROL WIRES & 1 SPARE COMMON WIRE TO LAST VALVE AT EAST & WEST ENDS OF SITE.) SPARE WIRES TO FILL IRRIGATION CONTROLLER. ALL

WIRING CONNECTIONS TO BE DBY COMPLIANT.

12. SLEEVES SHALL BE (2) SIZES LARGER THAN PIPE OR COMBINATION OF PIPES THEREIN ENCLOSED, WITH MINIMUM SIZE TO BE 4" SUPPLY (1) EXTRA SLEEVE WITH EACH MAIN LINE SLEEVE FOR CONTROL WIRES. BORE UNDER EXISTING

PAVING WHERE REQUIRED. BORE SEPARATELY FOR CONTROL WIRES.

13. PROVIDE TEMPORARY WATERING AS REQUIRED. COORDINATE PROTECTION OF EXISTING TREES AND PLANTS DURING

CONSTRUCTION ACTIVITIES.

14. CONTRACTOR TO ADJUST IRRIGATION HEADS TO PROVIDE COMPLETE COVERAGE AND TO MINIMIZE OVER SPRAY ONTO

BUILDINGS.

15. SEE DETAILS IN 35% CONSTRUCTION DOCUMENTS, SHEETS LI501 AND LI502 FOR INSTALLATION OF IRRIGATION

COMPONENTS.

16. CONTRACTOR TO PROVIDE POWER TO ALL IRRIGATION CONTROLLERS (IF APPLICABLE).

17. CONTRACTOR TO SUBMIT IRRIGATION AS-BUILT DRAWINGS FOR REVIEW BY THE LANDSCAPE ARCHITECT.

18. WHERE NON POTABLE WATER PARALLELS IRRIGATION WATER OR STORM/SANITARY SEWER, ENSURE MINIMUM 4'

DISTANCE AND WHERE CROSSING IRRIGATION OR STORM SEWER ENSURE MINIMUM 1' VERTICAL DISTANCE BETWEEN

PIPES.

0 40

GRAPHIC SCALE: 1" = 20'

SEE SHEET LI102

File details come from the government source that posted it. Updated .