QSE_36C78626Q50253.pdf
PDF 5 MB Posted
- Solicitation number
- 36C78626Q50253
About this file
This is a Request for Quote (RFQ) for solid waste removal and disposal services at Fort Sam Houston National Cemetery in San Antonio, Texas. The solicitation number is 36C78626Q50253, with an offer due date of October 2, 2026 at 10:00 AM. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 561730 (Waste Collection) with a size standard of $9.5 million.
The contract requires waste collection services for a base period from January 1, 2027 through December 31, 2027, with four optional one-year extension periods through December 31, 2031. The primary requirement is weekly pickup and disposal of one 30-yard roll-off dumpster containing approximately 10 tons of general waste (52 pickups per year on Wednesdays between 8:00 AM and 3:30 PM). Additional requirements include two on-call 30-yard dumpster deliveries and pickups annually (with 48-hour delivery and 24-hour retrieval timeframes), and up to five optional unscheduled pickups per year. The contractor must provide dumpster maintenance, comply with all environmental regulations, maintain required licenses and permits (including CDL for drivers), provide proof of insurance, and maintain dumpster appearance standards. Dumpsters must be dark brown, washable, and clearly labeled. The contractor's trucks cannot exceed 15-ton weight limits or 11'6" clearance within the cemetery and must exit via designated North Gate. Invoices must include detailed service information and be submitted monthly for payment via electronic funds transfer. Award will be made to the lowest-priced, technically acceptable, responsible SDVOSB offeror. A site visit is scheduled for September 18, 2026 at 10:30 AM, and vendor questions must be submitted by September 21, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626Q50253 Amended 9.29.2026.pdf | ||
| 36C78626Q50253 0001 questions and answers.pdf | ||
| FSH_Waste_CLIN.docx | DOCX document | |
| QSE_36C78626Q50253.pdf | ||
| Administative Guidance for Offerors.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: 36C78626Q50253 Page 1 of 44
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30 1. REQUISITION NUMBER
F367471-27-2000002
PAGE 1 OF
5. SOLICITATION NUMBER
36C78626Q50253
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
09/11/2026
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME David Hester
b. TELEPHONE NUMBER (No collect calls) 8. OFFER DUE DATE / LOCAL
TIME
10/02/2026 10:00
CODE 36C786
NATIONAL CEMETERY ADMIN (786)
NATIONAL CEMETERY ADMINISTRATION
DEPT OF VETERANS AFFAIRS
18434 JOPLIN RD.
TRIANGLE, VA 22172
9. ISSUED BY UNRESTRICTED OR X SET ASIDE: 100.00 % FOR
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
X SERVICE-DISALBED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED WOMEN-
OWNED SMALL BUSINESS (EDWOSB)
8(A)
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS): 561730
SIZE STANDARD: 9.5 million
10. THE ACQUISITION IS
SEE
SCHEDULE
11. DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS BLOCK IS
MARKED
0 Days: 0.00 %
0 Days: 0.00 % 0 Days: 0.00 % 0 Days: 0.00 %
12. DISCOUNT TERMS
13a. THIS CONTRACT IS
RATED ORDER UNDER THE
DEFENSE PRIORITIES AND
ALLOCATIONS SYSTEM –
DPAS (15 CFR 700)
13b. RATING
X REQUEST
FOR
QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
14. METHOD OF SOLICITATION
367471CODE15. DELIVER TO
FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
CODE 36C78616. ADMINISTERED BY
NATIONAL CEMETERY ADMIN (786)
NATIONAL CEMETERY ADMINISTRATION
DEPT OF VETERANS AFFAIRS
18434 JOPLIN RD.
TRIANGLE, VA 22172
FACILITY
CODE
CODE
TELEPHONE NUMBER
17a. CONTRACTOR/
OFFEROR
NCA-VACOCODE18a. PAYMENT WILL BE MADE BY
TUNGSTEN
http://www.tungsten-network.com/customer-campaigns/ veterans-affairs/
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED
19. ITEM NUMBER 20. SCHEDULE OF SUPPLIES/SERVICES
(Use Reverse and/or Attach Additional Sheets as Necessary)
21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT
See Continuation Page (Section 1) Below
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REFERENCE _____________________________
OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK
5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT) David Hester
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
Document Number: 36C78626Q50253 Page 2 of 44
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
PARTIAL FINAL
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
COMPLETE PARTIAL FINAL
36. PAYMENT 37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 11/2021) BACK
Document Number: 36C78626Q50253 Page 3 of 44
Table of Contents
Section Description Page Number
1 Continuation Sheet 1 Solid Waste Removal SOW 1 Waste CLIN Sheets 1 Eval Criteria 1 Administative Guidance for Offerors.docx 2 Contract Clauses
52.252-2 Clauses Incorporated by Reference (Feb 1998) Deliveries or Performance 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) 52.219-8 Utilization of Small Business Concerns (Jan 2025) 52.219-9 Small Business Subcontracting Plan (Jan 2025) 52.222-3 Convict Labor (June 2003) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-41 Service Contract Labor Standards (Aug 2018) 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) 52.222-50 Combating Trafficking in Persons (Oct 2025) 52.225-1 Buy American-Supplies (Oct 2022) 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving (May 2024) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.232-18 Availability of Funds (Apr 1984) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Oct 2025) 52.216-18 Ordering (Aug 2020) 52.216-22 Indefinite Quantity (Oct 1995) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.219-14 Limitations on Subcontracting (Oct 2022) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) 52.232-19 Availability of Funds for the Next Fiscal Year (Apr 1984)
852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED
VETERAN-OWNED SMALL BUSINESSES (NOV 2022)
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF
COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)
852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
3 Documents, Exhibits, or Attachments 4 Solicitation Provisions
52.203-11 Certification And Disclosure Regarding Payments to Influence Certain Federal Transactions (Sept 2024) 52.204-7 System for Award Management (Nov 2024) 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services (Sep 2023)
Document Number: 36C78626Q50253 Page 4 of 44
52.217-5 Evaluation of Options (July 1990) 52.225-2 Buy American Certificate (Oct 2022) 52.233-2 Service of Protest (Sept 2006)
852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020)
852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
EOD Wage Determination 2015-5253.pdf
Document Number: 36C78626Q50253 Page 5 of 44
Section 1 - Continuation Sheet
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0001 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
52.000000 WK
Description: General Waste 30 Yard Roll-Off Container (Weekly Pickup)
Period of Performance: 01/01/2027 - 12/31/2027
Reference Line: F367471-27-2000002 - 0001
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0002 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
2.000000 EA
Description: General Waste 30 Yard Roll-Off Container (On-Call)
Period of Performance: 01/01/2027 - 12/31/2027
Reference Line: F367471-27-2000002 - 0002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0003 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
5.000000 EA
Description: OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
Period of Performance: 01/01/2027 - 12/31/2027
Reference Line: F367471-27-2000002 - 0003
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0004 See Description Below
PSC: S208
52.000000 WK
Document Number: 36C78626Q50253 Page 6 of 44
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
LANDSCAPING/
GROUNDSKEEPING
SERVICES
Description: General Waste 30 Yard Roll-Off Container (Weekly Pickup)
Period of Performance: 01/01/2028 - 12/31/2028
Reference Line: F367471-27-2000002 - 1001
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0005 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
2.000000 EA
Description: General Waste 30 Yard Roll-Off Container (On-Call)
Period of Performance: 01/01/2028 - 12/31/2028
Reference Line: F367471-27-2000002 - 1002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0006 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
5.000000 EA
Description: OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
Period of Performance: 01/01/2028 - 12/31/2028
Reference Line: F367471-27-2000002 - 1003
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0007 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
52.000000 WK
Description: General Waste 30 Yard Roll-Off Container (Weekly Pickup)
Period of Performance: 01/01/2029 - 12/31/2029
Reference Line: F367471-27-2000002 - 2001
Document Number: 36C78626Q50253 Page 7 of 44
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0008 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
2.000000 EA
Description: General Waste 30 Yard Roll-Off Container (On-Call)
Period of Performance: 01/01/2029 - 12/31/2029
Reference Line: F367471-27-2000002 - 2002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0009 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
5.000000 EA
Description: OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
Period of Performance: 01/01/2029 - 12/31/2029
Reference Line: F367471-27-2000002 - 2003
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0010 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
52.000000 WK
Description: General Waste 30 Yard Roll-Off Container (Weekly Pickup)
Period of Performance: 01/01/2030 - 12/31/2030
Reference Line: F367471-27-2000002 - 3001
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0011 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
2.000000 EA
Description: General Waste 30 Yard Roll-Off Container (On-Call)
Document Number: 36C78626Q50253 Page 8 of 44
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
Period of Performance: 01/01/2030 - 12/31/2030
Reference Line: F367471-27-2000002 - 3002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0012 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
5.000000 EA
Description: OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
Period of Performance: 01/01/2030 - 12/31/2030
Reference Line: F367471-27-2000002 - 3003
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0013 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
52.000000 WK
Description: General Waste 30 Yard Roll-Off Container (Weekly Pickup)
Period of Performance: 01/01/2031 - 12/31/2031
Reference Line: F367471-27-2000002 - 4001
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0014 See Description Below
PSC: S208
LANDSCAPING/
GROUNDSKEEPING
SERVICES
2.000000 EA
Description: General Waste 30 Yard Roll-Off Container (On-Call)
Period of Performance: 01/01/2031 - 12/31/2031
Reference Line: F367471-27-2000002 - 4002
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
0015 See Description Below
PSC: S208
5.000000 EA
Document Number: 36C78626Q50253 Page 9 of 44
Number Supplies or Services Qty Unit Unit Price Total (Inc. disc., tax, and fees) Quantity Price Break
LANDSCAPING/
GROUNDSKEEPING
SERVICES
Description: OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
Period of Performance: 01/01/2031 - 12/31/2031
Reference Line: F367471-27-2000002 - 4003
Document Number: 36C78626Q50253 Page 10 of 44
Fort Sam Houston National Cemetery
Solid Waste Removal Contract
Statement of Work
1. Introduction
The National Cemetery Administration is looking for interested parties who wish to submit an offer for the collection and disposal of solid waste that are generated on Government owned and
Government operated premises at Fort Sam Houston National Cemetery, San Antonio, TX 78209.
The contractor shall provide all management, supervision, labor, tools, materials, supplies equipment and any other items necessary to perform and solid waste disposal for the National Cemetery.
Contractor shall plan, schedule, coordinate and assure effective and economical completion of all contract actions described herein. This contract is for base period with the opportunity of four (4) option years.
2. Requirements
a. Requirement One - General Waste – One (1) 30-yard Roll-Off Dumpster:
i. The contractor shall provide one (1) 30-yard roll-off dumpster for the disposal of general waste that averages 10 tons.
ii. The contractor shall perform pick-up (empty dumpster) every week (52 pick-ups per year). Dumpsters will be picked up and emptied every Wednesday between
8:00 am and 3:30pm.
iii. The dumpster shall be located near the maintenance building. The contractor shall contact designated COR to ascertain the proper location for dumpster placement.
b. Requirement Two - General Waste On-Call - One (1) 30 Yard Roll-Off Dumpster
i. Upon notification of cemetery personnel, the contractor shall deliver, and pickup of one thirty yard roll-off dumpster on an as needed basis. The government estimates that this service will be required 2 times (2 jobs) during each performance period of 12 months.
ii. The Contracting Officer Representative (COR) will contact the contractor to request the delivery of the dumpster. The contractor shall deliver the dumpster within 48 hours of receiving the call from the government. Cemetery personnel shall determine dumpster placement upon delivery of the dumpster.
iii. The Contracting Officer Representative (COR) will contact the contractor to request the retrieval of the dumpster. The contractor shall retrieve the dumpster within 24 hours of receiving the call from the government.
iv. Upon receipt, the government shall hold the on-call dumpster for no longer than five (5) business days.
v. The Contractor and COR will maintain a request log of all requested pickups to ensure they do not exceed the specific quantities specified in the Contract and/or
Task Order.
Document Number: 36C78626Q50253 Page 11 of 44
3. Contract Changes
The Fort Sam Houston National Cemetery located at 1520 Harry Wurzbach Road, San Antonio, TX
78209. The government has the right to add or delete roll-off locations under its authority during performance of this contract. The service costs incurred for any additional site(s) not listed in this
Schedule will be negotiated and added to this Schedule. However, if the Contractor has performed work for the location up to the date the location becomes deleted, the Government will pay those actual costs incurred by performance under this contract. Any contractor proposed changes, additions, or deletions from this listing shall be made known to the COR in advance and in writing no less than 30 days from proposed effective date.
4. Goals
The primary goal of this contract is for an experienced Contractor to successfully perform the
“Required Service”, which is to collect and dispose of solid waste as designated in this Statement of
Work.
5. Required Service
Services on this requirement will be on a fixed schedule. On occasion, the Contractor may be required to make additional pick-ups for a location on the fixed schedule. The Contracting Officer’s
Representative (COR) or the designated Cemetery Staff will notify the Contractor by telephone. The
Contractor shall perform within 48 hours of notification. On-call pickups shall be at the same unit price as a scheduled pickup. The Contractor will be paid for actual services performed.
6. Option Year Line Items.
a. Option line items for the following years will be evaluated for award purposes. But only those line items that are for the base period total will be awarded for the base period.
Future exercise of line item options will be made by the Contracting Officer (CO) after a determination of satisfactory performance by the Contractor. If exercised, the
Contracting Officer will exercise the option through a modification to the contract. All line items, once exercised, will be added and considered "required service". The
Government does not guarantee the Contractor every option year(s).
7. Contractor Requirements
a. Contractor Qualifications
Contractors shall have the necessary knowledge, skills, abilities and resources to perform the work herein; within the best industry standards and practices; and have a minimum of five (5) years prior experience in the business of recycling and waste services.
Additionally, the Contractor represents that it is familiar with the scope and nature of the work required by the National Cemetery and understands the conditions under which it will be obligated to operate. The Contractor shall identify and submit with quote, to the
Contracting Officer, the following information for the key personnel working directly on the project: name, title, project role position and phone number. The Contractor shall make no substitutions or subcontracts without obtaining prior Contracting Officer’s approval of the persons. The Contractor shall describe the educational background, Document Number: 36C78626Q50253 Page 12 of 44 directly related work experience, professional development, and demonstrated performance record of key personnel.
b. Personnel Qualifications
i. Qualified personnel are essential for the performance of this contract to ensure that requests for pick-ups are responded to in a prompt, responsive, and safe manner. All
Contractor personnel performing under this contract shall be able to speak English and communicate effectively.
ii. The Contractor shall provide drivers, as well as other employees necessary to work under this contract, which have participated in organizational driver training and
OSHA required safety programs. Every driver performing under this contract shall possess a current, valid Commercial Driver’s License (CDL) with the appropriate endorsements when operating vehicles that require such licenses. Operators of any equipment or vehicle within the Cemetery shall follow all traffic regulations and rules such as but not limited to speed limits and weight restrictions.
iii. The individual proposed by the Contractor must be acceptable to the National
Cemetery. There shall be no change in personnel holding this position without prior written approval of the National Cemetery. This individual is always subject to the rules and regulations of the National Cemetery Administration while on National
Cemetery property. Dress and appearance must be neat and reflect the professional image of the Contractor’s company. The selected individuals shall always carry proper identification on them while on National Cemetery property.
c. Contractor Uniforms
• All workers on site shall be recognizable as employees of the contractor by wearing distinctive clothing bearing the name of the company, or by wearing appropriate badges which display the Contractor’s company and employee name.
d. Contractor Vehicles
• The name or logo of the Contractor shall be clearly displayed on all vehicles used on the job site.
• Maximum weight limitation for bridges within the Cemetery is fifteen (15) tons .
Therefore, the Contractor’s truck if using the Cemetery roadways shall not exceed this 15-ton limit loaded nor unloaded.
• The maximum clearance at some locations in the Cemetery is limited to an overhead clearance of 11’ 6”.
• The contractor, when loaded, will exit the Cemetery via the North Gate located adjacent to the Northwest corner of the Maintenance yard, travel west down Winan’s
Road to the intersection of Harry Wurzbach and Winan’s Road.
• The contractor shall use vehicles constructed to prevent loss of waste or fluid/gray water from vehicle beds during transport and vehicles shall be covered or enclosed to prevent contents from escaping. Any material thrown from or falling off the truck shall be immediately collected and returned to the truck by the Contractor. Any property damage resulting from an unsecure load or from material being dropped or thrown shall be the responsibility of the contractor and must be reported immediately.
Document Number: 36C78626Q50253 Page 13 of 44
• The COR will inspect the Contractor’s vehicles, all dumpsters and surrounding areas for quality of service as stated in this contract.
• All vehicles shall have required standard safety equipment, spill kits and current valid state inspection, DOT and/or other endorsements/requirements.
8. Contractor’s Representative
Upon contract award, the Contractor shall furnish to the Contracting Officer the name of the person that has been designated and assigned to this contract as the Prime Contractor’s
Representative. The Prime Contractor’s Representative will exercise overall management responsibility for the contract effort, receive technical direction, and handle problems arising under the contract, as well as serve as the primary point of contact for day to day operations of the program. The Prime Contractor’s Representative is further responsible for coordinating matters of mutual concern with the Government representatives. The Prime Contractor’s
Representative may designate an inspector for purposes of this contract who may work with the contractor regarding extra pick-ups or minor issues if they arise.
9. Supervision
a. The Contractor shall supervise the removal, transportation, and disposal of the solid waste and recyclable materials to ensure compliance with the terms and conditions of this contract.
b. The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity. The Contractor shall be responsible for taking disciplinary actions with respect to Contractor’s employees as may be necessary.
c. The Contracting Officer may require removal from the job site any employee of the
Contractor deemed to be unsuitable or otherwise objectionable or whose continued employment under this contract is deemed to be contrary to the public interest or inconsistent with the best interests of the Government.
10. Regulatory Compliance, Permits, Licenses.
a. The Contractor shall have applicable licenses and permits necessary to perform the work required under this contract prior to the start of performance. Copies of all such permits and licenses shall be current and valid. The Contractor shall provide to the Contracting Officer when requested, specifically, but not limited to, proof of all licenses, state and local permits, as well as copies of organizational participation in driver training and safety programs. The
Contractor shall provide evidence that every driver performing under this contract has a current and valid CDL with the appropriate endorsements if the vehicles they operate require such certification.
b. Contractor shall, without expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State, and municipal laws, codes, and regulations.
c. The Contractor must submit to the Contracting Officer proof of insurance coverage and the amount of coverage at contract award. The Contractor shall notify the Contracting Officer if the insurance coverage is terminated or modified below the limits originally provided to the
Contracting Officer.
Document Number: 36C78626Q50253 Page 14 of 44
d. The Contractor shall perform operations associated with this contract in accordance with all current Federal/State/Local environmental protection regulations applicable to the management of recycled materials and solid waste.
11. Disposal Sites and Facilities
a. The Contractor shall identify all sites/facilities to be used for waste disposal before contract performance. The Contractor shall inform the Contracting Officer at time of contract award, if any past or ongoing violations have occurred at disposal sites/facilities to be used by the
Contractor. The Contractor shall notify the Contracting Officer of the specific violations, how they were rectified, if violations are ongoing, and whether the Contractor is still using that specific disposal site or facility.
b. If at any time during the course of the contract, a disposal site/facility is used by the
Contractor receives a Notice of Violation, the Contractor shall immediately notify the
Contracting Officer.
c. Contractors shall utilize only disposal sites/facilities that are certified by Federal, State, Local agencies and the Environmental Protection Agency. Contractor shall submit a listing (by company name, address and type of material accepted), with quote, of all disposal sites/facilities intended to be utilized under this contract to the Contracting Officer.
12. Billing
a. Fort Sam Houston National Cemetery will pay the Contractor once per month for services performed.
b. For the waste pickups, the Contractor shall submit an itemized invoice monthly. Invoices shall reflect the following:
i. Name and Address of the Contractor;
ii. Invoice date;
iii. Contract order number and line item(s);
iv. Description, quantity, unit of measure, unit price, and extended price of services performed;
v. Driver name(s);
vi. Truck number;
vii. Pick-up date(s);
viii. Number of dumpsters;
ix. Container pick-up location; and
x. Name, title, phone number and mailing address of person to be notified in the event of a defective invoice.
c. All Contractor’s service tickets for trash services shall be given as proof of service performed to the COR and the designated Cemetery Staff. The Contractor shall indicate on the ticket their company name, truck number, date and container pickup locations.
Both the Contracting Officer’s Representative or designated Cemetery Staff and the
Contractor’s driver shall sign the ticket upon completion of the pickup(s). The
Contractor shall leave 1 copy of the ticket with the Contracting Officer’s Representative.
Another copy shall be submitted with the Contractor’s monthly invoice.
Document Number: 36C78626Q50253 Page 15 of 44
d. The Contractor shall be accountable for the delivery tickets. If a ticket is voided or lost, the Contractor shall furnish the Contracting Officer with the voided ticket or a written explanation for the lost ticket.
e. The Contracting Officer will work with Contractor, after award, for the most efficient way to bill that will be agreeable to both the Government and to the Contractor. The
Government will accept invoices only after services are rendered. Invoices received before the performance of service will be rejected and returned to the Contractor.
f. All quantities are estimated and not binding on the Government. The Contractor will be paid for actual services approved by the Contracting Officer and successfully performed by the Contractor.
13. Verification of Service
a. The Contractor shall forward all monthly invoices to the Contracting Officer and designated COR.
b. Copies of each invoice shall be forwarded to the COR and Cemetery Director.
c. The COR will be responsible for checking the invoice against contract requirements and verifying service items indicated on the invoice. If service was not delivered or incorrectly invoiced, the COR will document in writing the discrepancies and will forward to the CO. The CO will contact the Contractor and/or return the invoice.
d. If the CO does not contact the Contractor, it will be assumed the invoice is correct and has been approved for payment. The cemetery will retain copies of the approved invoice for their records and for future reference if questions should arise.
e. Invoices will then be paid by way of electronic funds transfer.
14. Dumpsters
a. Container/Dumpster Type
The dumpsters shall be dark brown in color for trash. Additionally, the dumpsters must be labeled appropriately for trash with a minimum of 6” letters and shall also have cemetery approved decal of approximately 12 inches square. All trash and recycling dumpsters shall be pre-approved by the COR, washable, without holes, durable workable wheels (if applicable to the container) and with all operable drain plugs.
b. Delivery of Dumpsters
After the Contractor submits a proposed delivery schedule of dumpsters to the Contracting
Officer, the Contractor shall contact the Contracting Officer’s Representative (COR) to establish the container delivery schedule. If the COR is not available to be onsite for the delivery, the COR can designate the Cemetery Staff to work with the contractor on the establishment of delivery schedule. The exact location of the placement and the approval of all container styles and types prior to placement of container(s) should be provided to the
Contractor by the COR. The Contractor shall notify the COR or the designated inspector of any problems associated with the delivery of dumpsters in order to resolve any logistical problems or misinformation.
c. Contractor’s Responsibility for dumpsters
Document Number: 36C78626Q50253 Page 16 of 44
1. The Contractor shall be responsible for the delivery, maintenance, and removal of dumpsters and equipment, throughout the contract period. All dumpsters shall be kept free from holes, vermin, or foreign matter which might cause personal injury or damage to clothing. The dumpsters must not emit unpleasant odors, as identified by the COR or
Cemetery representative. Unpleasant odors shall be immediately corrected by the
Contractor at the Contractor’s expense. The Contractor must have approval in writing from the COR prior to any chemical or biological agent application or use on government land/facilities prior to application. Contractor shall provide in advance with the COR an
SDS sheet for any such agent prior to approved use. Failure by the Contractor to take action to correct a container(s) defective condition will be grounds for finding the
Contractor in default and could cause the termination of this contract.
2. Dumpsters shall be always kept in proper repair, cleaned and sanitized in accordance with sanitation codes (Federal or County). Dumpster’s exterior painted surfaces, lettering and decals shall be maintained in good condition without fading or missing components or information. Waste water shall be emptied into the Contractor’s truck.
3. Dumpsters shall be both picked up and returned/replaced empty on the same day. Also, all dumpsters shall be returned substantially on the landing pad after emptying (for those areas with landing pads).
4. The Contractor shall provide substitute dumpsters within 24 hours of notification of defective container/dumpster, including weekends and holidays, for areas that the CO determines to be critical. The Contractor shall provide a substitute container within 72 hours for areas determined to be non-critical by the CO. All dumpsters shall be approved by the COR before use.
5. The Government will not be held responsible for damage to the Contractor's equipment.
All Contractor equipment shall be properly maintained by the Contractor so as to minimize mechanical problems and breakdowns. All vehicles shall have required standard safety equipment, spill kits and current valid state inspection, DOT and/or other endorsements/requirements. The contractor will be responsible for the immediate clean-up, proper disposal and reporting of all hazard waste spills within the Cemetery. All spills shall be reported to the COR and the Cemetery Director immediately for action and documentation. Failure to do so may result in criminal or civil action and grounds for finding the Contractor in default and could cause the termination of this contract.
6. Contractor shall remove all dumpsters belonging to the Contractor from the site upon expiration of this contract.
15. Inspection of Services – Fixed Price.
a. Definitions- “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
b. The Contractor shall provide and maintain an inspection system acceptable to the
Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
Document Number: 36C78626Q50253 Page 17 of 44
c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
d. If the Government performs inspections or tests on the premises of the Contractor or subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, without additional charge, all reasonable facilities and assistance for the safe and convenient performance of these duties.
e. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements with no increase in contract amount. When the defects in services cannot be corrected by performing the work again, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may
(1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.
g. The COR will inspect the Contractor’s vehicles, all dumpsters and surrounding areas for the quality of service performed.
16. General Conditions
a. Negotiating Season Pick-Up/Pull Dates.
Where the Cemetery’s ability to provide a safe and healthy area will not be impaired, the specific days of the week that the Cemetery has specified for service may not be negotiated after award.
b. Maintaining the Container/Dumpster Sites.
The Contractor shall leave the service loading area in a clean and orderly condition.
Contractor shall pick-up debris/trash that is in immediate area (10 feet) of receptacle after each pickup. Lids shall be left in the closed position on all dumpsters, where applicable, after being emptied by the contractor.
c. Receive Telephone Notification.
The Contractor shall receive telephone notification from the COR or designated
Cemetery Staff for unscheduled pickup. Upon notification, the Contractor shall make arrangements with the COR and the Cemetery Staff for pickup. The Contractor shall have 24 hours from the time of telephone notifications to provide the requested container/dumpster pull.
d. In Case of Damage.
a. Contractor shall be responsible for all damage to persons or property that occurs as a result of Contractor’s fault or negligence. The Contractor shall take proper safety and health precautions to protect the worksites, workers, the public and property of the
Government and others. Any incidents/accidents involving the operation of the contractor’s vehicles or equipment shall be immediately reported to the COR and
Document Number: 36C78626Q50253 Page 18 of 44
Cemetery Staff. Failure to do so may result in criminal or civil action and grounds for finding the Contractor in default and could cause the termination of this contract.
b. Contractor shall be responsible for the repair or replacement of any portion of loading docks, building structure, or landscape features, damaged by the Contractor in the performance of this contract. All substantial damage to docks and or buildings may require NHPA compliance, documentation and repair by historic methods. Damaged areas or materials shall be restored, repaired, or replaced to the original condition, and to the satisfaction of the Contracting Officer, at no expense to the Government. The
Government reserves the right to perform work deemed of historical value, for which the contractor will be billed.
e. Access to Government Facilities.
During the life of the contract, the rights of ingress and egress to and from
Government facilities for the Contractor will be made available between the hours of
8:00 a.m. and 3:30 p.m. in all areas via the North Gate. The Government reserves the right to require Contractor’s employees to sign in upon ingress and sign out upon egress to and from Government facilities. For security purposes, keys to government facilities will not be issued to the contractor.
f. Contents
The trash generated is usually found at cemetery grounds, administrative offices, maintenance areas and in households.
g. Failure by the Contractor to remove the waste within the time specified or to not comply with all other terms of the contract may result in the Contractor’s default in performance of this contract.
END OF WORK STATEMENT
Document Number: 36C78626Q50253 Page 19 of 44
B.1 SUPPLIES OR SERVICES AND SCHEDULE OF PRICES
Base Year: November 1, 2026 or Date of award through October 31, 2027
CLIN
No.
Description:
Waste Collection Services Quantity Unit Unit Cost Est. Total Cost
Rental, pick-up and dispose of general waste, 30 yd container
(weekly pickup)
52 WK $ ________ $ ____________
Rental, pick-up and dispose of general waste, 30 yd container (On
Call)
2 EA $ ________ $ ____________
OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
5 EA $ ________ $ ____________
Total Estimated
Cost:
Option Year 1: November 1, 2027 through October 31, 2028
No.
Description:
Waste Collection Services Quantity Unit Unit Cost Est. Total Cost
Rental, pick-up and dispose of general waste, 30 yd container
(weekly pickup)
52 WK $ ________ $ ____________
Rental, pick-up and dispose of general waste, 30 yd container (On
Call)
2 EA $ ________ $ ____________
OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
5 EA $ ________ $ ____________
Total Estimated
Option Year 2: November 1, 2028 through October 31, 2029
No.
Description:
Waste Collection Services Quantity Unit Unit Cost Est. Total Cost
Rental, pick-up and dispose of general waste, 30 yd container
(weekly pickup)
52 EA $ ________ $ ____________
Document Number: 36C78626Q50253 Page 20 of 44
Rental, pick-up and dispose of general waste, 30 yd container (On
Call)
2 EA $ ________ $ ____________
OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
5 EA $ ________ $ ____________
Total Estimated
Option Year 3: November 1, 2029 through October 31, 2030
No.
Description:
Waste Collection Services Quantity Unit Unit Cost Est. Total Cost
Rental, pick-up and dispose of general waste, 30 yd container
(weekly pickup)
52 EA $ ________ $ ____________
Rental, pick-up and dispose of general waste, 30 yd container (On
Call)
2 EA $ ________ $ ____________
OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
5 EA $ ________ $ ____________
Total Estimated
Option Year 4: November 1, 2030 through October 31, 2031
No.
Description:
Waste Collection Services Quantity Unit Unit Cost Est. Total Cost
Rental, pick-up and dispose of general waste, 30 yd container
(weekly pickup)
52 EA $ ________ $ ____________
Rental, pick-up and dispose of general waste, 30 yd container (On
Call)
2 EA $ ________ $ ____________
OPTIONAL: Unscheduled pick-up and dispose of general waste 30 yd container
5 EA $ ________ $ ____________
Total Estimated
Document Number: 36C78626Q50253 Page 21 of 44
Total Cost
Base Year – date of award thru 10/31/27: $_______________________
Option Year 1 – 11/1/27 – 10/31/28: $ ______________________
Option Year 2 – 11/1/28 – 10/31/29: $ ______________________
Option Year 3 - 11/1/29 – 10/31/30: $ ______________________
Option Year 4 - 11/1/30 – 10/31/31: $ ______________________
Grand Total (Base + all Option Years): $ ______________________
NOTE: Contract Line Items Numbers (CLINs) and Associated Price.
Offerors shall enter unit cost and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
Offerors shall enter the Total Cost for each year in the “Summary Totals” where indicated. Offeror shall calculate the Grand Total for all years and enter where indicated.
Ft Sam Houston National Cemetery Contacts
Gerald Lefler, Cemetery Director (210) 805-2555
Graham L. Wright III, Assistant Director (210) 805-2554
Document Number: 36C78626Q50253 Page 22 of 44
Source Selection Plan
Ft Sam Houston National Cemetery – Waste Management Services
I. BACKGROUND
A. Purpose. The purpose of this Source Selection Plan is to set forth the process by which the NCA
Contracting Office will evaluate offers received in response to Ft Sam Houston Waste
Management Services Solicitation
B. Source selection approach. This plan covers the approach for soliciting and evaluating offers, provides the source selection organizational structure, and designates persons who will perform the evaluation.
II. BASIS OF AWARD: This procurement is being conducted pursuant to FAR Part 12 procedures.
The Government intends to award a contract resulting from this solicitation to the responsible offeror who offers the lowest price, whose quoted price is found to be reasonable, and whose quote is found to be technically acceptable when considering the non-price evaluation factors described below. Offerors who fail to meet any technical acceptability evaluation factors below will not be eligible to receive contract award.
III. EVALUTION FACTORS
1) Factor 1: Technical Approach and Understanding of the Work: Proposal shall be evaluated in accordance with the criteria contained in the Statement of Work and on how well the technical and performance plan approach meets the Government requirements. The proposal shall be more than restating the SOW. Technical and performance plan approach will be evaluated for the following:
a) Contractor-provided statements and/or literature that clearly explain their experience, approach and/or abilities to perform the tasks described in the Statement of Work.
b) Prime Contractor has the necessary knowledge, skills, abilities, and resources to perform the work herein; within the best industry standards and practices; and has a minimum of three (3) years prior experience in the business of waste services.
c) Offerors shall describe the proposed staffing plan to include with any subcontracting.
d) The Contractor shall identify all sites/facilities to be used for waste disposal and single stream recycling disposal before contract performance.
e) Qualifications of any proposed subcontractors and percentage of work they will perform.
2) Factor 2: Past Performances: Past performance shall be evaluated based on the Contractor’s technical qualifications on projects within the last 3 years that are comparable in size, complexity, and scope. Past Performance information shall be obtained by the following methods.
a) The Contracting Officer’s knowledge of previous experience with the service is being acquired.
b) Contractor’s past performance descriptions.
c) The Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov
d) Any other reasonable basis.
3) Factor 3: Price: Proposed price will be evaluated for LPTA and accuracy in the provided CLIN structure.
Document Number: 36C78626Q50253 Page 23 of 44
ADMINISTRATIVE GUIDANCE FOR OFFERORS
100% SDVOSB Set-aside
Please note you must have the NAICS code of the solicitation on your SAM.gov profile to qualify to bid and must be a registered certified SDVOSB with the SBA by the time all bids are due.
Site Visit:
A site visit is scheduled for 9/18/2026@ 10:30 am, the meeting place is the Maintenance Building at Sam Houston National Cemetery Vendors are strongly encouraged to attend the site visit to ensure a full understanding of the requirements. No additional or repeat site visits will be scheduled.
Vendor Questions:
All vendor questions regarding this solicitation shall be submitted by email to the david.hester@va.gov no later 9/21/2026. Questions received after this deadline may not be addressed, and answers will be provided via amendment no later than 9/28/2026 on SAM.gov.
Late Quotes:
Late quotes will not be accepted. Vendors are responsible for ensuring that their complete quote is submitted prior to the solicitation closing date and time.
SAM Registration:
Only quotes submitted by vendors that are actively registered in SAM.gov at the time of quote submission and award will be considered. Quotes from vendors that are not actively registered in SAM.gov will be rejected as non-responsive.
Amendments:
Vendors are responsible for monitoring SAM.gov for all solicitation amendments up to the closing date.
Failure to acknowledge or comply with amendments may result in the quote being deemed non-responsive.
Review of the Solicitation:
Vendors shall read the entire solicitation, including all sections, attachments, specifications, and amendments, prior to submitting a quote. Vendors are responsible for ensuring that all requirements are addressed in their submission.
Completeness of Quote:
The Government will evaluate only the information submitted. The Government will not make assumptions about vendor capabilities, technical approaches, or past performance not clearly documented in the quote. Vendors must provide complete, accurate, and detailed responses to all solicitation requirements.
(End of Document)
Document Number: 36C78626Q50253 Page 24 of 44
Section 2 - Contract Clauses
52.252-2 Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/ these address(es):
www.acquisition.gov/browse/index/far (FAR) www.va.gov/oal/library/vaar/index.asp (VAAR) [Insert one or more Internet addresses]
(End of clause)
Deliveries or Performance
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0001/1 52.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0002/1 2.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0003/1 5.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0004/1 52.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0005/1 2.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0006/1 5.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0007/1 52.000000 FORT SAM HOUSTON NATL CEMETERY (846)
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB Point Address
0008/1 2.000000 FORT SAM HOUSTON NATL CEMETERY (846)
Document Number: 36C78626Q50253 Page 25 of 44
DEPT OF VETERANS AFFAIRS (846)
FORT SAM HOUSTON NATL CEMETERY
1520 HARRY WURZBACK ROAD
SAN ANTONIO, TX 78209
Line Number/ Delivery Number
Delivery Quantity FOB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .