This document is a set of Questions and Answers regarding RFP # S-10700-00005334 issued by the Oregon Liquor Control Commission (OLCC) for the OLCC Warehouse and Headquarters Relocation project. The project involves the installation of a conveyance system, including the implementation and integration of the software element, which will be included in the Construction Manager/General Contractor (CM/GC) contract resulting from this RFP. Any future maintenance of the conveyance system after the warranty period will be conducted by the OLCC. The RFP allows for potential negotiation of the project schedule during the CM/GC contract award process, considering factors such as the impact on the cost of the work, overall benefit for the public, and other relevant factors.
The RFP does not require the CM/GC to provide any additional office space at the job site beyond what is intended for their own personnel. The project involves the jurisdictions of Marion County and the City of Salem, Oregon.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP # S-10700-00005334 - Questions and Answers # 2
Q: Will the conveyance contract be held by the
CM/GC or direct to the OLCC/State?
A: Installation of the conveyance system
(including implementation and integration of the software element to make it operational) will be included in the CM/GC Contract resulted from this RFP. See RFP, Section II.A. Any future maintenance of the conveyance system (after the warranty period for the Project ends) will be conducted by the OLCC.
Q: Are you interested or positioned to take the building earlier than scheduled (i.e. accelerated schedule)?
A: Preliminary Project Schedule is provided in
Attachment D as Exhibit F and may be a subject to negotiation during the CM/GC Contract Award process (negotiation period). Potential impact on the Cost of the Work, overall benefit for the public, and other factors will be taken into consideration during the negotiation. Any changes to the Project
Schedule after the CM/GC Contract Award shall be subject to written approval by all Parties.
Q: On page 10, the RFP mentions co-location. Is the CM/GC to provide co-location space? If so, please provide a number of desk spaces required.
A: RFP, Section II.C. states: “…..The CM/GC approach to the Project requires that all Project participants embrace the following principles of an integrated process for the management and execution of the Project:……11. Co-location of design and construction;…..” Clarification:
CM/GC is not required to provide any offices at the job site in addition to the ones that are intended for the CM/GC’s personnel stationed at the project site (e.g. job trailer).