This document is a Summary Scoring Sheet for the Proposer Information (PI) and Cost Proposal (CP) components of an OLCC Warehouse and Headquarters Relocation CM/GC Services RFP (RFP # S-10700-00005334). The jurisdictions involved are Marion County and the City of Salem, Oregon. The RFP requested proposals for Construction Manager/General Contractor (CM/GC) services for the relocation project. The scoring sheet details the evaluation criteria and scores provided by 4 evaluators for 3 proposers: Balfour Beatty Construction LLC dba Howard S. Wright, JE Dunn Construction, and Perlo Construction. The criteria included General Construction Project Experience, Background, CM/GC GMP Project Experience, Qualifications of Proposed Personnel, and Project Approach. The total possible points for the PI was 80, and the total possible points for the CP was 20, for a combined total of 100 points.
The summary scoring sheet indicates that all 3 proposers were found to be within the competitive range based on the total points awarded for the PI and CP components. The highest-scoring proposer was JE Dunn Construction with 93.90 total points, followed by Perlo Construction with 90.33 points and Balfour Beatty Construction LLC dba Howard S. Wright with 89.39 points.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: 03/02/2023
Evaluation Criteria Balfour Beatty Construction
LLC dba Howard S. Wright JE Dunn Construction Perlo Construction
Evaluator 1 5.00 5.00 5.00
Evaluator 2 5.00 5.00 5.00
Evaluator 3 5.00 5.00 5.00
Evaluator 4 3.00 5.00 5.00
Evaluator 5 - NA
Average: 4.50 5.00 5.00
Evaluator 1 13.00 15.00 15.00
Evaluator 2 14.00 15.00 14.50
Evaluator 3 13.00 15.00 15.00
Evaluator 4 11.00 13.00 11.00
Evaluator 5 - NA
Average: 12.75 14.50 13.88
OLCC Warehouse and Headquarters Relocation - CM/GC Services
RFP # S-10700-00005334 - SUMMARY SCORING SHEET FOR PI AND CP
General Construction Project Experience (Possible Points - 15)
Background (Possible Points - 5)
Evaluation Criteria Balfour Beatty Construction
LLC dba Howard S. Wright JE Dunn Construction Perlo Construction
Evaluator 1 13.00 15.00 15.00
Evaluator 2 15.00 15.00 15.00
Evaluator 3 12.00 14.00 15.00
Evaluator 4 12.00 13.00 11.00
Evaluator 5 - NA
Average: 13.00 14.25 14.00
Evaluator 1 20.00 19.00 20.00
Evaluator 2 16.50 19.00 20.00
Evaluator 3 17.00 17.00 17.00
Evaluator 4 14.00 16.00 12.00
Evaluator 5 - NA
Average: 16.88 17.75 17.25
Evaluator 1 25.00 25.00 25.00
Evaluator 2 24.00 24.00 25.00
Evaluator 3 25.00 25.00 25.00
Evaluator 4 22.00 20.00 20.00
Evaluator 5 - NA
Average: 24.00 23.50 23.75
Total (Average) Points for Proposer
Information (PI) (Possible Points -
80)
71.13 75.00 73.88
CM/GC GMP Project Experience (Possible Points - 15)
Qualifications of Proposed Personnel (Possible Points - 20)
Project Approach (Possible Points - 25)
Evaluation Criteria Balfour Beatty Construction
LLC dba Howard S. Wright JE Dunn Construction Perlo Construction
Evaluator 1 76.00 79.00 80.00
Evaluator 2 74.50 78.00 79.50
Evaluator 3 72.00 76.00 77.00
Evaluator 4 62.00 67.00 59.00
Evaluator 5 - NA
Total Points for Cost Proposal (CP)
(Possible Points - 20)
18.26 18.9 16.45
Total (Average) Points for PI and
CP
89.39 93.90 90.33
Competitive Range x x x
Proposers Information Total Points (Possible Points - 80)