SOLICITATION QUESTIONS AND ANSWERS
11/5/10
GENERAL QUESTIONS PERTAINING TO THE FOLLOWING SOLICITATION: QMAA-JC-100001-N
Q1:
In the AutoBid system, under GSA minimum requirement, it lists "Front supplemental restraint system driver & front passenger." Can you please explain what this is and how it relates to Item number 134E. Currently, this vehicle complies with standard, restraint systems but we are not sure what exactly you are looking for under the "supplemental restraint system."
A1:
Front Supplemental Restraint System Driver and Front Passenger refers to the Air Bag safety system included with the vehicle.
Q2:
Audited Annual Report- We recently were audited per DCAA Audit through DOE, but will not have that information for at the earliest another month or so. The other audit information we have is from over a year ago without much in the way of production on it. We do have CCR and ORCA, will this be acceptable or do we need to submit the older audit?
A2:
Section E.2 of the solicitation addresses these questions. Financial Data requirements, Central Contractor Registration (CCR), and Online Representations & Certifications Application (ORCA) requirements are described within E.2.
Q3:
VETS 100- We do not submit information for this. However, we do have an un-official copy that we can submit, will this work?
A3:
Section E.2 describes the requirement for the VETS-100 report.
Proof of completion of this report is a requirement.
Q4:
Small Business Sub-Contracting Plan- We are going to be sub-contracting the body; does this mean this plan is applicable to us? If so, what information can you give me on guidelines of the plan itself?
A4:
A Small Business Subcontracting Report is required by all business that fall within the guidelines described in sections A.3, D.7 and E.1 (a) of the solicitation.
The Small Business Subcontracting Plan requirement applies to the prime contractor only, and does not flow through to subcontractors performing on the prime contractor’s behalf.
Q5:
From my understanding, this solicitation is for 100 vehicles per year. Is the time period what is specified in A.2 as far as production? Please explain the dates if not. If so, is the base what would be awarded from the bid, and the remaining options what GSA could continue to order?
Period: Base – November 1, 2010 through August 31, 2011 Option 1 – September 1, 2011 through August 31, 2012 Option 2 – September 1, 2012 through August 31, 2013 Option 3 – September 1, 2013 through August 31, 2014
A5:
The 100 vehicle sales estimate is for the Base Period of Performance. The Option Periods shown do not include a number of estimated sales. This is a solicitation for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract. Within the terms and conditions of the solicitation, there is no set minimum or maximum number of units with the exception of section C.11 which describes a Guaranteed Minimum Quantity for the contract. Actual sales for any period of performance could exceed, or fail to meet the 100 vehicle estimate.
Q6:
In regards to the TAB I Inspection Point/ Place of Performance
Since we will send an Incomplete Vehicle to the Body Builder, XXXXXX, can they serve as the inspection point/ and place of performance?
A6:
Yes.
The upfitter must be approved by the GSA as an Inspection Point or Place of Performance.
Please provide the upfitter’s complete information with your proposal.
Q7:
TAB H- We will be the dealer. Can the Body Builder serve as a pass through for delivery? If so, then does that need to be specified?
A7:
Yes.
The upfitter may be utilized as a pass through for delivery to the end user.
Any vehicle subject to inspection by the Industrial Operations Analyst (IOA) will be approved or rejected from its final completion location. The units may be shipped from the final completion location upon approval by the IOA.
This must be specified and is subject to GSA approval.