This document is a Quality Assurance Surveillance Plan (QASP) for the Lost Creek Lake Grounds Maintenance contract at the Rogue River Projects. The QASP outlines the systematic methods for monitoring contractor performance, defining roles and responsibilities of the integrated project team, and ensuring the contractor meets specified performance standards. The plan focuses on a performance-based approach that emphasizes outcomes over strict process compliance, allowing the contractor flexibility in work execution while maintaining critical quality requirements.

The document details surveillance techniques including periodic inspections and customer feedback mechanisms, with performance objectives covering areas such as grass cutting, edging, turf repair, debris removal, shrub maintenance, fertilization, weed control, facility access, trails, dam safety, and herbicide application. The QASP establishes a framework for quarterly performance evaluations, with specific acceptable quality levels for each service category. The government will use monitoring forms to assess the contractor's performance, with potential financial implications for meeting or failing to meet performance standards, including incentives for exceeding requirements and deductions for substandard performance.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

1.1.1 This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Lost Creek Lake Grounds Maintenance at the Rogue River Projects. This plan sets forth the procedures and guidelines the Contracting Officer’s Representative’s (CORs) will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.2 Purpose

1.2.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

1.2.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.3 Performance Management Approach

1.3.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Willamette Valley Project and Rogue River Project to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management;

this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.3.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.4 Performance Management Strategy

1.4.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Willamette Valley Project and Rogue River Project contracting officer representative (COR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the

CO.

2.2 The Contracting Officer’s Representative

The COR’s are designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are

Periodic Inspection – COR/COR typically performs the periodic inspection on an unscheduled frequent occurrences.

100% Inspection – Zero room for any deviations to the contractual terms and conditions.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the CO/COR. The CO/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR and QA will be reported using the monitoring forms in Attachments 2 and 3. The forms and the government commissioning of the turbine unit, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results of turbine installation are being achieved.

5.2.1 The COR will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the QAR will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis

Issues and concerns of both parties

Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

Recommendations for improved efficiency and/or effectiveness

Issues arising from the performance monitoring processes

6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.

Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.

Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the at the convenience of the PCO/ACO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective

Standard Method of Surveillance

Validated Complaints/Allowed number of discrepancies

Grass Cutting Improved Grounds

Per section 5.1 in PWS: Grass shall be maintained at a height of not less than 2” or more than 4”.

The grass shall be cut to a uniform height.

Periodic Inspection 1 per quarter

Grass Cutting Unimproved Grounds

Per section 5.1 in PWS: Grass and weeds shall not exceed 6 inches (6”) in height after mowing treatments of unimproved areas.

Periodic Inspection

1 per quarter

Edging, trimming etc. Per section 5.2 in PWS:

Edging/trimming/weed whipping shall occur blocks so that grass or weed height does not exceed the maximum height of the adjacent grass in designated areas.

Periodic Inspection 1 per quarter

Turf Repair Per section 5.3 in PWS: Areas damaged by vehicular traffic, pollution spills, or normal wear and tear shall be filled in with soil, leveled, seeded or sodded, and maintained to conform to adjacent turf areas.

Periodic Inspection 1 per quarter

Debris removal Per section 5.4 in PWS: Leaves, needles, cones, fallen tree limbs and small woody debris shall be removed from all listed areas.

Periodic Inspection 1 per quarter

Shrub Maintenance Per section 5.5 in PWS: The Contractor shall accomplish all work necessary to maintain desired plants in plant beds indicated in Exhibit 3

Fertilization Per section 5.6 in PWS: The Contractor shall apply a commercial 24 - 4 -12 slow-release type of fertilizer at areas identified as improved grounds

Weed Control in plant beds

Per section 5.7 in PWS Periodic Inspection

1 per quarter

Facility Access Per section 5.8 in PWS Periodic Inspection 1 per quarter

Trails Per section 5.9 in PWS Periodic Inspection 1 per quarter

Pest Control Per Section 5.10 in PWS Periodic Inspection 1 per quarter

Lost Creek Dam Safety

Per section 5.11 in PWS Periodic Inspection 1 per quarter

Applegate Dam Safety Per section 5.12 in PWS Periodic Inspection 1 per quarter

Monthly Work Schedule

Submitted 5 days prior to the start of work month

Periodic Inspection 1 per quarter

Herbicide Application Target species

Per section 5.16 in PWS

Periodic Inspection 5% or more target plants not visibly affected per each treatment unit;

100% of cut-stump targets cut and stumps treated and dye visible

Herbicide Application Non-target species

Per section 5.16 in PWS Periodic Inspection 5% error in applicator species ID, 5% overspray beyond 8”

Broadcast application non-target

Per section 5.16 in PWS Periodic Inspection No drift beyond one meter, no damage to neighboring property

Cut-stump application non-target

Per section 5.16 in PWS Periodic Inspection 5% overspray beyond 3”

Unsusceptible non-target species

Per section 5.16 in PWS 100% inspection No evidence of non-specific damage

Rare and endangered species

Per section 5.16 in PWS 100% inspection Access routes to all units posted with complete information

Public posting (signage)

Per section 5.16 in PWS 100% inspection Access routes to all units posted with complete information

Documentation and reporting

Per section 5.16 in PWS 100% inspection No missing and erroneous documentation

ATTACHMENT 2: CONTRACTOR DISCREPANCY REPORT

Fillable Form can be found at the following link:

http://www.dtic.mil/whs/directives/forms/eforms/dd2772.pdf

ATTACHMENT 3: QUALITY ASSURANANCE MONITORING FORM

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint

LEVEL OF SURVEILLANCE (Check):

Monthly Quarterly As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check): Meets Standards

Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________