Exhibit 3 Applegate Dam Safety Requirements.pdf
PDF 676 KB Posted
- Attached to
- Rogue River Basin Grounds Maintenance Federal contract opportunity
- Solicitation number
- W9127N25QA010
About this file
This document is a Vegetation Control Plan for Applegate Dam, detailing specific vegetation management requirements across different priority zones. The plan categorizes vegetation control into three priority levels: 1) High priority areas include the dam structure, abutments, toe, survey lines of sight, and instruments, 2) Medium priority zones cover the spillway channel, regulating outlet structure, and upper tailrace area, and 3) Low priority areas include the lower tailrace area and areas upstream of the dam.
The plan provides a detailed map with color-coded and annotated zones specifying vegetation control guidelines, including vegetation-free zones (grass only), vegetation maintenance areas (grass and brush only, with no trees), and multiple survey line of sight control areas. A note indicates that a proposed new hydropower plant may result in future changes to this vegetation control plan. The document was created by CENWP-EC-HC on 12 April 2012 and is marked as version APP-V1, suggesting it is a technical planning document for dam safety and maintenance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - W9127N25QA0100002.pdf | ||
| Performance Work Statement - Amended.pdf | ||
| Solicitation Amendment - W9127N25QA0100001.pdf | ||
| Exhibit 4 Optional Tasks.pdf | ||
| Exhibit 2.b Hatchery Dam and Levee.pdf | ||
| Exhibit 1 LCL Specific Areas.pdf | ||
| Exhibit 2.a William Jess Dam.pdf | ||
| QASP for Lost Creek Lake Grounds Maintenance.pdf | ||
| Attachment 4_EM 385-1-1 15 Mar 24 3.15.24es (002).pdf | ||
| Attachment 3_AHA_Eng_Form_6206_Sep 2024 - FINAL.pdf | ||
| EXHIBIT 4 - OPTIONAL TASK.pdf | ||
| Attachment 1_Contract Descrepency Form.pdf | ||
| Attachment 2_APP_Eng_Form_6293_Aug 2024 - FINAL.pdf | ||
| Solicitation - W9127N25QA010.pdf | ||
| PWS_RRB_GROUNDS_MAINTENANCE Final.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-1
SP-4
AG-2
AG-3
AG-4
AG-1
INTA-1
INTAKE
A-1
A-2
A-3
A-9 A-11
A-10
0 200 400 600 800 1,000 Feet
CENWP-EC-HC 12 April 2012 G. Henrie Z:\Misc_Resources\Dam_Safety_Routine_Tasks\Vegetation_Plan\Control_Plan_GIS\MXD\APP-V1.mxd ®
Legend Vegetation-Free Zone (grass only) Vegetation Maintenance Area (grass and brush only - no trees) Vegetation-Free Zone (grass only, 5 ft radius around instruments) Multiple Survey Lines of Sight Control (maintain lines of sight)
Applegate Dam Vegetation Control Plan
A p p l e g a t e D a m
APP-V1
Note: The proposed new hydropower plant may result in changes to this plan.
Priority of Areas of Control:
1) High - Dam Structure, Abutments, Toe, Survey Lines of Sight, Instruments
2) Medium - Spillway Channel, Regulating Outlet Structure and Upper Tailrace Area
3) Low - Lower Tailrace Area, Areas Upstream of Dam
File details come from the government source that posted it. Updated .