Exhibit 2.a William Jess Dam.pdf

PDF 1 MB Posted

Attached to
Rogue River Basin Grounds Maintenance Federal contract opportunity
Solicitation number
W9127N25QA010
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

This document is a Vegetation Control Plan for the William L. Jess Dam, dated 12 April 2012. The plan details a comprehensive vegetation management strategy with three priority levels of control areas: 1) High Priority - Dam Structure, Abutments, Toe, Survey Lines of Sight, and Instruments, 2) Medium Priority - Spillway Channel, Regulation Outlet Structure, Upper Tailrace Area, and 3) Low Priority - Lower Tailrace Area and Areas Upstream of Dam. The map clearly delineates different vegetation zones, including vegetation-free zones (grass only), vegetation maintenance areas (grass and brush only, no trees), and multiple survey lines of sight control areas. The plan provides detailed geographic mapping with specific zone markings, measurement scales, and precise area demarcations to guide vegetation management efforts, ensuring clear visibility, structural integrity, and operational safety of the dam infrastructure.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTAKE

Pill-3

Pill-2

Pill-1

A-9

A-8

A-7

A-14

A-11

SMA-6

A-5,A-6

A-3,A-4

A-1,A-2

0 200 400 600 800 1,000 Feet

CENWP-EC-HC 12 April 2012 G. Henrie Z:\Misc_Resources\Dam_Safety_Routine_Tasks\Vegetation_Plan\Control_Plan_GIS\MXD\LOS-V1.mxd ®

Legend Vegetation-Free Zone (grass only)

Vegetation Maintenance Area (grass and brush only - no trees)

Vegetation-Free Zone (grass only, 5 ft radius around instruments)

Multiple Survey Lines of Sight Control (maintain lines of sight)

William L. Jess Dam Vegetation Control Plan

W i l l i a m L . J e s s D a m

LOS-V1

See LOS-V2

Priority of Areas of Control:

1) High - Dam Structure, Abutments, Toe, Survey Lines of Sight, Instruments

2) Medium - Spillway Channel, Regulation Outlet Structure, Upper Tailrace Area

3) Low - Lower Tailrace Area, Areas Upstream of Dam