QASP_Fire alarm and supression.pdf
PDF 208 KB Posted
- Attached to
- S202-- Preventative Maintenance Fire Alarm & Suppression Federal contract opportunity
- Solicitation number
- 36C25920Q0723
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity solicitation for fire alarm and suppression system monitoring, inspection, testing, maintenance, and repair services. The QASP defines performance standards and acceptable quality levels for tasks including fire alarm monitoring, inspection and testing schedules, documentation requirements, and deficiency reporting. It identifies oversight roles for the contracting officer, contracting officer's technical representative, and contractor program manager. The related solicitation is a 100% small business set-aside for service-disabled veteran-owned small businesses to provide preventative maintenance for fire alarm and suppression systems at a Veterans Administration medical center. Quotes are due by September 23, 2020 and will be evaluated based on price alone. The contract will have a base year plus four option years and utilize firm-fixed pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2. SLCVA_FIRE_ALARMS DRAWING PDF.pdf | ||
| 3. FIRE PROTECTION RECORD DRAWINGS.pdf | ||
| 36C25920Q0723 0001_1.docx | DOCX document | |
| 4. SLC VAMC Fire Alarm Inventory 2020_0915.xlsx | XLSX spreadsheet | |
| Questions and Answers.doc | DOC document | |
| 36C25920Q0723 0001.doc | DOC document | |
| 5. Fire Safety Matrix.xlsx | XLSX spreadsheet | |
| 1. Joint Commission Accreditation_Reports.pdf | ||
| VHA Directive 7701.pdf | ||
| Joint Commission Life Safety and Environment of Care.pdf | ||
| VHA Directive 7703.pdf | ||
| 36C25920Q0723.docx | DOCX document | |
| 36C25920Q0723_1.docx | DOCX document | |
| WD 2015-5489 REV 11.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Fire Alarm and Fire Suppressions Systems monitoring, inspection, testing, maintenance, and repair (MITMR)
Contract Number: < Upon award, Government will enter contract number>
Contract Description: This contract is to provide fire alarm and suppression system monitoring, inspection, testing, maintenance, and repair.
Contractor’s name: <Enter your company name.> (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored, inspected, tested, maintained, and repaired.
• How monitoring, inspection, testing, maintenance, and repair will take place.
• Who will conduct the monitoring, inspection, testing, maintenance, and repair?
• How monitoring, inspection, testing, maintenance, and repair efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: TBD Organization or Agency: Department of Veterans Affairs, Office of Acquisition and Materiel
Management
b. Contracting Officer’s Technical Representative (COTR) - The COTR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COTR shall keep a quality assurance file. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COTR: TBD
c. Other Key Government Personnel – TBD
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – TBD
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph 4 in the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Task ID Indicator Standard Acceptable
Quality Level
Method of Surveillance
Incentive
Fire Alarm and Fire Suppression System Monitoring, Inspection, Testing, Maintenance, and Repair
(MITMR)
Contractor must be able to inspect, test, maintain, and repair 100% of all fire alarm and fire suppression system devices in accordance with NFPA 25, NFPA 72, NFPA
80, and NFPA 101 codes and TJC standards.
Testing meets code requirements.
100%
Contractor check in upon arrival. Random observation of work progress.
Exercise of Option Period and performance ratings.
Quality Level
Method of Surveillance
Incentive
Fire alarm monitoring
Provide monitoring and notification to first responders of the campus Fire Alarm System(s) 24 hours/day, 7 days per week by receiving the alarm signal and assuring notification of the fire service.
Within 10 seconds of receipt of the alarm signal.
100%
Review of time stamp and print out of alarms relative to time of deployment of the fire service.
Exercise of Option Period and performance ratings
Inspection and testing schedules
Inspection and testing scheduling.
Compliance to the inspection and testing schedule
100%
Review of scheduled work relative to regulatory requirements.
Exercise of Option Period and performance ratings
Fire Alarm
MITMR
Review fire alarm panel sensitivity self-diagnostic report.
Detectors reported to be outside of the allowable range will be repaired or replaced.
(within 24 hours.)
100% Review of documentation
Exercise of Option Period and performance ratings
Ensure access control doors with fire alarm interface release upon operation of the fire alarms.
Doors reported to not meet code requirements repaired.
(within 24 hours.)
100% Review of documentation
Exercise of Option Period and performance ratings
Fire dampers physically tested to ensure proper electrical and mechanical operation of motor, linkage and dampers.
Dampers reported to not meet code requirements repaired.
(within 24 hours.)
100% Review of documentation
Exercise of Option Period and performance ratings
Water flow indicating devices and tamper switches shall be tested to ensure signals are received and processed by the fire alarm system.
Initiating devices activated and signal the fire alarm system.
100% Review of documentation
Exercise of Option Period and ratings
Quality Level
Method of Surveillance
Incentive
Contractor provides all necessary test equipment and labor to perform required inspection, testing, maintenance, and repairs
Contractor work meets schedule
100%
Daily observation of work relative to task definitions and milestones
Exercise of Option Period and performance ratings
Contractor provides a daily in-brief prior to any work completed and out-brief prior to departure to the COR (or representative).
A daily log of all activities provided to the COR detailing work performed, condition found, corrective actions, and the as left condition by the Contractor on Contractor letterhead
Contractor meets schedule and documentation requirements
100% Daily review of documentation
Exercise of Option Period and performance ratings
Provide a
UID for every device in the fire alarm system;
Inventories and inspection reports organized by the UID
Review of documentation relative to inventory
Exercise of Option Period and
Quality Level
Method of Surveillance
Incentive
FireSuppression
All devices of the fire suppression system shall have a Unique
Identifier (UID) number.
1.Vendor will provide a UID for every device in the fire alarm system.
2.All inventories and inspection reports shall be organized by the UID.
3.UID numbers shall never change over the lifetime of the device (cradle to grave data maintenance).
4.UID numbers must never be re-used or re-issued to new devices from a previously retired device.
Provide inventory and UID.
100%
Review of documentation relative to inventory and field verification
Exercise of Option Period and performance ratings
Inspection and testing scheduling.
Compliance to the inspection and testing schedule
100%
Review of scheduled work relative to regulatory requirements.
Exercise of Option Period and
Quality Level
Method of Surveillance
Incentive
Documentation
Provide electronic and hard copies of MITMR reports for Fire Alarm and Fire Suppression systems
Provide 2 electronic and 1 hard copy (in 3 ring binder).
Report data is sorted by Joint Commission standards and elements of performance.
Hard copies use tabs and cover sheets.
Review of documentation
Exercise of Option Period and performance ratings
All documentation shall be kept current and up-to date.
Documented results are due to the COR within five (5) business days after each ITM cycle. No hand-written reports will be accepted
Documents received within 5 business days.
100% Review of documentation
Exercise of Option Period and performance ratings
Contractor shall provide results of all work in the following format:
i. Name of the activity
ii. Date of the activity
iii. Required frequency of the activity
iv. Name and contact information, including affiliation, of individual who performed the activity
v. Result of the activity.
Report contains the appropriate verbiage
100% Review of documentation
Exercise of Option Period and
Quality Level
Method of Surveillance
Incentive
The Contractor will initiate a Deficiency Notice (DN) using electronic correspondence to the VA COR identifying device (description/UID), location, date, and discovered condition of any failed device. DN to remain open until repairs are complete.
Repair completed and verification of functionality
100%
Observation of daily work and review of daily logs
Exercise of Option Period and performance ratings
Maintain CAD drawing and complete schematic of the fire alarm and fire suppression systems at the locations identified
Final as -built drawings reviewed by
Fire
Protection
Engineer
100% Review of as-built drawings
Exercise of
Option
Period and
5. INCENTIVES
The Government shall use exercise of Option Period and past performance as incentives.
Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COTR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
8; 9; 14; 15; 16
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. 100% INSPECTION. (Evaluates all outcomes.)
1; 3; 5; 7; 12; 13; 17
d. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
2; 4
e. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
10; 11
f. Progress or status meetings.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COTR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COTR shall document the discussion and place it in the COTR file.
When the COTR determines formal written communication is required, the COTR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COTR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
Metrics and methods
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COTR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COTR shall meet with the contractor monthly to assess performance and shall provide a written assessment.
<After award, both the contractor’s Program Manager and the COTR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Technical Representative