Quality Assurance Surveillance Plan (QASP) Summary

This Quality Assurance Surveillance Plan defines the Government's monitoring methodology for contractor performance and compliance with the Performance Work Statement (PWS). The plan establishes comprehensive surveillance methods including 100% inspection for critical activities (asbestos abatement, clearance, and final installation), periodic inspections for ongoing work, document review of submittals and reports, and direct observation of work activities. The Government will employ these methods continuously throughout the project execution.

The QASP specifies seven performance objectives with associated standards, metrics, and surveillance frequencies. Asbestos abatement must achieve full regulatory compliance with zero violations through continuous 100% inspection and document review, with work stoppage and rework as remedies for non-compliance. Clearance documentation must be provided prior to construction with 100% document review at each event. Installation work requires code-compliant installation with no deficiencies verified through 100% ongoing inspection. Accessibility must meet ABA/AS compliance standards with final inspection/testing, door performance must operate smoothly with final testing, and safety requires zero tolerance for incidents or violations with continuous observation. Documentation must be 100% complete and timely with ongoing review. Project acceptance occurs only when all work is completed in accordance with the PWS, all deficiencies are corrected, all documentation is submitted and approved, and final inspection confirms compliance. Failure to meet standards may result in re-performance at no additional cost, withholding of payment, work stoppage, or removal of personnel, with all deficiencies requiring correction prior to Government acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. PURPOSE

This QASP defines the Government’s method for monitoring contractor performance and ensuring compliance with the PWS.

2. SURVEILLANCE METHODS

The Government will use the following methods:

• 100% Inspection for critical activities (abatement, clearance, final installation)

• Periodic inspections for ongoing work

• Document review of submittals and reports

• Direct observation of work activities

3. PERFORMANCE STANDARDS

Performance

Objective Standard Performance

Metric AQL Surveillance

Method Frequency Remedy

Asbestos Abatement

Full regulatory compliance

No violations 100% Inspection, document review

Continuous Work stoppage, rework

Clearance Clearance achieved prior to construction

Documentation provided

100% Document review Each event Stop work

Installation Code-compliant installation

No deficiencies 100% Inspection Ongoing Rework

Accessibility ABAAS compliance

Full compliance 100% Inspection/testing Final Rework

Door Performance

Operates smoothly

No operational issues

100% Testing Final Rework

Safety No incidents or violations

Zero tolerance 100% Observation Continuous Stop work

Documentation Complete and timely

100% submission

100% Review Ongoing Withhold payment

4. ACCEPTANCE CRITERIA

The project will be accepted when:

• All work is completed in accordance with the PWS

• All deficiencies are corrected

• All documentation is submitted and approved

• Final inspection confirms compliance

5. CORRECTIVE ACTIONS

Failure to meet performance standards may result in:

• Re-performance at no additional cost

• Withholding of payment

• Work stoppage

• Removal of personnel from the project

All deficiencies shall be corrected prior to Government acceptance.

END OF DOCUMENT

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. PURPOSE
2. SURVEILLANCE METHODS
3. PERFORMANCE STANDARDS
5. CORRECTIVE ACTIONS

File details come from the government source that posted it. Updated .