This is an Invitation for Bids (IFB) issued by the Maryland Department of Transportation State Highway Administration (MDOT SHA) for carpentry services at the Centreville Maintenance Facility and related SHA properties in Queen Anne's County, Maryland. The solicitation seeks a qualified contractor to provide miscellaneous carpentry services on an as-needed basis at three locations: Centreville Maintenance Shop (111 Safety Drive, Centreville, MD 21617), Stevensville Maintenance Yard (334 State Street, Stevensville, MD 21666), and Kent Narrows Drawbridge House (Grasonville, MD 21638). Services include demolition, rough and finish carpentry, masonry, sheetrock and taping, wall relocation, suspended ceiling installation, molding and trim repair and replacement, door and jamb work, counter and bookcase construction, and coordination with other trades. The contractor must provide a skilled journeyman carpenter capable of communicating proficiently in English, reading blueprints, and responding to work requests within three working days with detailed cost estimates. The contract term is three years (36 months) or until quantities are exhausted, whichever comes first, with a total contract value not to exceed $50,000. Questions are due by February 5, 2026 at 1:00 PM, and bids must be submitted electronically via eMMA by February 6, 2026 at 1:00 PM, with public bid opening scheduled for the same date and time via Microsoft Teams.
This is a Small Business Reserve (SBR) procurement limited to certified small business vendors as defined under Maryland State Finance and Procurement Article 14-501 through 14-505. Bidders must be licensed and bonded in Maryland with a minimum of seven years of commercial experience, and the assigned carpenter must have a minimum of five years of active carpentry experience. Bidders must submit three references from firms receiving carpentry services within the preceding 24 months. No pre-bid conference is scheduled, but site visits may be arranged at the contractor's request. Pricing is fixed and based on hourly labor rates submitted on the Price Form; all materials and supplies are provided by SHA at no cost to the contractor. Normal work hours are Monday through Friday, 6:30 AM to 3:00 PM, with no travel time reimbursed; overtime is not anticipated but would be compensated at one and one-half times straight time if authorized. The contractor must maintain Commercial General Liability insurance of at least $100,000 combined single limit per occurrence and $300,000 annual aggregate, and Worker's Compensation insurance of at least $100,000 per occurrence. There are no MBE/DBE or VSBE subcontracting goals, no federal funding is involved, and the procurement uses the Competitive Sealed Bidding method with award to the lowest responsive and responsible bidder. Invoices are processed only after work completion and acceptance by SHA, with payment via electronic funds transfer, check by mail (approximately 15 days), or card payment for invoices under $5,000 (provided no card processing fee is charged).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Carpentry Services MDOT SHA QAC
Solicitation #: QACARP29SB IFB Document
IFB for MDOT SHA Centreville Shop (QAC) Page 1 of 19
STATE OF MARYLAND
STATE HIGHWAY ADMINISTRATION
SHA
INVITATION FOR BIDS (IFB)
CARPENTRY SERVICES MDOT SHA QAC
IFB NUMBER QACARP29SB
ISSUE DATE: 01/30/2026
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace
Advantage (eMMA) https://procurement.maryland.gov should register on eMMA https://emma.maryland.gov/
NOTICE TO BIDDERS
SMALL BUSINESS RESERVE PROCUREMENT
This is a Small Business Reserve Procurement for which the award will be limited to certified small business vendors. Only businesses that meet the statutory requirements set forth in State Finance and
Procurement Article, §§14-501—14-505, Annotated Code of Maryland, and that are certified by the
Governor’s Office of Small, Minority & Women Business Affairs (GOSBA) Small Business Reserve
Program are eligible for award of a contract. Before awarding a contract under a procurement designated as a small business reserve procurement, the Procurement Officer shall verify that the apparent awardee is certified by the GOSBA as a small business through eMMA. However, if small businesses do not show interest in this solicitation, the Procurement Officer has the right to remove the SBR designation via an
Amendment on eMMA.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED TO RESPOND TO THIS
SOLICITATION.
https://procurement.maryland.gov/ https://emma.maryland.gov/ https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx https://gomdsmallbiz.maryland.gov/Pages/sbr-program.aspx
IFB for MDOT SHA Centreville Shop (QAC) Page 2 of 19
KEY INFORMATION SUMMARY SHEET (KISS)
Invitation for Bids Maintenance – Carpentry Services for MDOT SHA Queen Anne’s County
Solicitation
Number:
QACARP29SB
IFB Issue Date: 01/30/2026
IFB Issuing
Office:
MDOT SHA – Centreville Shop
Procurement
Officer:
Keith Rhodes
111 Safety Dr. Centreville, MD 21617
Email:
Phone Number:
krhodes@mdot.maryland.gov
410-758-0700
Bids are to be sent to:
Submit on emma.maryland.gov
To submit a bid, bidders must first register on emma.maryland.gov. We recommend registering in advance to become acquainted with the site.
Pre-Bid
Conference:
N/A
Scheduled Site
Visit If you would like to schedule a site visit, please contact the procurement officer. This is not required and does not impact our evaluation of the bids, but may help you understand the scope of work better.
Questions Due
Date and Time:
02/05/2026 at 1PM
Bid Due (Closing)
Date and Time:
02/06/2026 at 1PM
Public Bid
Opening Date, Time, and
Location
02/06/2026 at 1PM
Microsoft Teams Need help?
Join the meeting now
Meeting ID: 234 581 095 347 61 https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWE0MmYxMDgtY2QwNy00MGUwLTk1ZjItYzA5NTczYzhhYWU4%40thread.v2/0?context=%7b%22Tid%22%3a%22b38cd27c-57ca-4597-be28-22df43dd47f1%22%2c%22Oid%22%3a%22a50dd5e7-31f0-4b3a-950f-d2e7e204602d%22%7d
IFB for MDOT SHA Centreville Shop (QAC) Page 3 of 19
Passcode: fz99Cw7r
Dial in by phone
+1 667-262-2962,,35257670# United States, Baltimore
Find a local number
Phone conference ID: 352 576 70#
MBE/DBE
Subcontracting
Goal:
An overall Minority Business Enterprise (MBE) or Disadvantaged
Business Enterprise (DBE) subcontract participation goal of zero percent of the total contract dollar amount, including all renewal option terms, if any, has been established for this procurement.
VSBE
Subcontracting
Goal:
This solicitation includes a VSBE participation Goal of zero percent.
Procurement
Method:
A Contract will be awarded in accordance with the Competitive Sealed
Bidding method under COMAR 21.05.02.
Multiple or
Alternate Bids:
Multiple or alternate Bids will not be accepted.
Contract Type: Fixed Price
Contract
Duration:
Three years (36 months) or until quantities exhausted.
Primary Place of
Performance:
MDOT SHA Centreville Shop, 111 Safety Dr, Centreville, MD 21617
SBR Designation: Yes
Federal Funding: No tel:+16672622962,,35257670 https://dialin.teams.microsoft.com/bf475622-ba25-438e-9483-abd330e2c794?id=35257670
IFB for MDOT SHA Centreville Shop (QAC) Page 4 of 19
1 Minimum Qualifications
1.1 Bidder Minimum Qualifications
The Bidder must document in its Bid that it satisfies the following Minimum Qualifications:
A. The Bidder shall be licensed and bonded in the State of Maryland with a minimum of seven
(7) years of commercial experience. The carpenter provided must have been regularly and actively engaged in the carpentry business with a thorough knowledge of techniques, tools and materials for a minimum of five (5) years.
B. The Contractor must be able to provide a record of prior experience on jobs of similar nature in scope. The Contractor shall submit three (3) references with the bid, the name, address, telephone number and point-of-contact of at least three firms, for which the bidder provided carpentry services within the preceding 24 months. References may be checked prior to award. Any negative responses received may result in disqualification of the bid. The Bidder shall provide its Bid "Attachment E Reference Checks" with one or more references filled out.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK.
IFB for MDOT SHA Centreville Shop (QAC) Page 5 of 19
2 Contractor Requirements: Scope of Work
2.1 Summary Statement
2.1.1 This Invitation for Bids (IFB) is issued to procure the goods or services, as specified in this Section 2, from a contract between the successful bidder(s) and the State of Maryland
(“State”): The State Highway Administration is soliciting bids for a qualified contractor to provide carpentry services on an “as needed” basis at the Centreville Maintenance
Facility and all other SHA properties located in Queen Anne’s County.
Centreville Maintenance Shop - 111 Safety Drive Centreville, MD 21617
Stevensville Maintenance Yard – 334 State Street Stevensville, MD 21666
Kent Narrows Drawbridge House – Grasonville, MD 21638
2.1.2
It is the State’s intention to obtain goods and services, as specified in this IFB, from a contract between the selected Bidder and the State.
2.1.3 This is a single award IFB. See IFB Section 4.21 Bid Evaluation Criteria and Award
Basis for more Contract award information.
A Contract award does not ensure a Contractor will receive all or any State business under the
Contract.
2.2 Background and Purpose
To obtain a qualified contractor to provide carpentry services on an “as needed” basis at the
Centreville Maintenance Facility and all other SHA properties located in Queen Anne’s County.
2.3 Contractor Responsibilities and Tasks
Carpentry services under this contract will be for miscellaneous projects on an as- needed job specific basis at the locations specified in the Invitation for Bid (IFB) for a period of 36 months or total payments of $50,000 whichever comes first. This proposal will establish labor hourly rates.
Quantities listed are estimated and are only given for the purpose of bid evaluation. They do not indicate the actual amount which will be spent, since such expenditures will depend upon requirements which develop during the contract period.
The Contractor shall provide a skilled carpenter that is considered a journeyman by carpentry standards. The carpenter shall be able to perform all tasks and use any or all tools and equipment typical of the carpentry trade. The Carpenter must be able to communicate proficiently in English, both verbally and in writing.
Work shall consist of renovation of existing buildings, including offices, storage areas, salt domes, sheds, drawbridge houses, storage cabinets and other work as assigned. Carpentry services shall include, but are not limited to, demolition, rough carpentry, finish carpentry, masonry, sheetrock and taping; relocating/provide interior walls and petitions, suspended ceilings: repair/replace of moldings
IFB for MDOT SHA Centreville Shop (QAC) Page 6 of 19 or trim, doors and door jambs; construct counters, bookcases etc, and coordination of the Work with other trades. Duties include the receipt of work assignments, review of work sites, estimates, planning of the project means and methods, preparation of the work area, protection of furniture and equipment and other no-work structures as well as cleaning of the work area upon completion.
All work shall be quality work performed according to the standards of the carpentry industry and to the complete satisfaction of the State Highway Administration (SHA). SHA can perform on-site inspections at any time during the work.
The Contractor shall be able to start all projects within five (5) working days of authorization from
State Highway Administration (SHA). The Contractor shall complete each non-emergency job within the time specified in the project estimate.
B. SERVICE REQUIREMENTS:
1. The Contractor shall furnish all labor, supervision, tools, equipment, transportation, and insurance necessary to complete a variety of carpentry assignments related to but not limited to various office renovations/ emergency services.
2. The Contractor shall have the ability to read and understand blueprints, plans and sketches.
Where work is being performed in preparation for other trades to coordinate, the carpenter shall have the ability to make sketches and write instructions on how the interfacing works with the other trades during the preparation.
3. The Contractor must be able to respond to requests for measurements and job estimates within three (3) working days upon notification. The Contractor shall provide "not to exceed' written estimates for each work project prior to the commencement of any work. Estimate shall include:
• Total cost (labor & materials)
• Breakdown of cost (labor-# of men, # of hours)
• Materials- Types and amounts
• Special equipment needs
• Other special conditions
• Specify what work to be done
• Number of days to complete the work, and the number of days needed to start the job after receiving authorization from SHA
IFB for MDOT SHA Centreville Shop (QAC) Page 7 of 19
Note: Any specialized equipment which is rented by the Contractor for use on a project and is intended to be billed as a direct charge must be identified on the initial “not to exceed cost estimate” and shall be charge to SHA at actual cost to the Contractor.
4. Crew Size: A normal work crew will consist of one (1) carpenter. On complicated work assignments, additional carpenters or helpers may be used if pre-approved by the SHA authorized representative.
5. Work Hours: Normal work hours provided under this Contract are defined as Mondays through Fridays, 6:30 a.m. to 3:00 p.m. each day. No overtime work is anticipated however in the event that overtime is required Contractor shall be paid at the rate of one and one-half hours straight time for each hour the Contractor’s employee(s) work. Workers assigned under this Contract will be required to sign in and out with the SHA authorized representative Contractor’s log. Billable hours shall be verified with the log.
Billable hours under this Contract are for productive hours at the job site. Time spent for transportation of workers, material acquisition, handling, delivery, or movement of Contractor own or rental equipment shall not be chargeable directly but should be considered as Contractor’s overhead and shall be included in the hourly rates quoted for labor or services.
No travel time to or from the jobsites will be compensated for. However, if SHA authorizes the Contractor’s employee(s) to travel between jobsites during a normal workday, compensation will be permitted.
6. Location of work shall include but not limited to:
Centreville Maintenance Shop - 111 Safety Drive
Centreville, MD 21617
Stevensville Maintenance Yard – 334 State Street
Stevensville, MD 21666
Kent Narrows Drawbridge House – Grasonville, MD 21638
7. Materials & Supplies: The Contractor shall be responsible to prepare & provide a list of all materials and supplies needed for each task assignment. SHA shall be responsible for obtaining the materials and supplies. Should the Contractor be requested to provide any material or supplies, the
Contractor shall be reimbursed by attaching actual copy of the invoice for materials supplied showing the
Contractor’s actual cost including any and all discounts offered by their supplier. No mark-ups shall be allowed.
IFB for MDOT SHA Centreville Shop (QAC) Page 8 of 19
8. All work shall conform to Federal, State, county and local codes, rules and regulations. The
Contractor shall be responsible for obtaining all necessary permits before any work is started.
9. Workers must wear proper attire for the work being performed, including appropriate personnel protective and safety equipment, provided by the Contractor at their own expense.
10. The Contractor must be capable of coordinating with other trades performing work on designated projects (i.e.) electricians, plumbers, painters, carpet installers, etc.
11. The Contractor shall keep the premises free from accumulation of waste materials or rubbish caused by his operations at all times. The Contractor shall leave the work area clean and free of materials, debris, and Contractor’s equipment to the satisfaction of the authorized SHA authorized representative daily. Contractor shall be responsible for removal and disposal of all debris, old and defective materials removed in performance of the work and in strict accordance with all applicable regulations, codes, laws, and ordinances.
12. All work provided under this contract shall have, as a minimum, a one (1) year warranty from the date of final acceptance thereof against any latent defects, designs, materials, workmanship and installation.
13. No sub-contractors shall be permitted to work under this contract without the consent of SHA
Contract Manager.
EQUIPMENT
The Contractor shall maintain an adequate stock of industry-standard supplies, parts, and tools necessary for performing carpentry services at all times. The Contractor shall also furnish and maintain work vehicle(s) equipped with an adequate stock of industry-standard supplies, parts, and tools necessary for performing carpentry services while engaged in said performance.
Service vehicles shall be equipped with all tools, ladders, equipment, and routine materials needed to fulfill the terms of this Contract. No pay item has been established for these vehicles and their cost is considered incidental to all other bid items. All tools and test equipment shall also be considered incidental to all other bid items.
IFB for MDOT SHA Centreville Shop (QAC) Page 9 of 19
SUPERVISION
The Contractor shall assign to the Contract, as his agent, competent supervision capable of communicating in English, and capable of reading and thoroughly understanding the Contract
Documents.
PREAPPROVAL OF WORK
Any work performed outside the Scope of Work described in this Contract, including emergency work, will not be paid if not preapproved by the Engineer.
The Administration reserves the right to limit the number of persons performing the work as required.
The Administration may, at its discretion, limit any personnel from performing service, require temporary or permanent removal of the employee from work being performed, or require additional training of personnel at no cost to the Administration.
No Subcontractor shall be permitted to work under the Contract without the written approval of the
Engineer. Any subcontracted work must be preapproved by the Engineer and shall be invoice at cost. A copy of the Subcontractor's invoice shall be provided to the Administration for recordkeeping purposes.
ACCEPTANCE OF WORK
The Contractor shall guarantee all work included in the Contract against any defects in workmanship, and shall satisfactorily correct, at no cost to the Administration, any such defect that may become apparent within a period of one calendar year after completion of work. The warranty period shall commence upon the date of acceptance by the Administration.
The Engineer or his representative will inspect all work performed and be the final judge in determining if the work has been performed correctly and completely. All unsatisfactory findings shall have corrective actions made within a forty-eight hour period. All temporary repairs shall be corrected within ten business days following the initial work
IFB for MDOT SHA Centreville Shop (QAC) Page 10 of 19
3 Standard Terms and Conditions
3.1 Contract Initiation Requirements
Once all approvals have been obtained and the Contract is fully executed, the Procurement Officer may schedule a kickoff meeting to be held prior to commencement of Contract performance.
3.2 End of Contract Transition
The Contractor shall cooperate in the orderly transition of services from it to a subsequent contractor at the end of the contract term or upon receipt of a Notice of Termination from the State. Transition shall be provided in a prompt and timely manner and shall proceed in accordance with the schedule provided to the Contractor by the State in the Notice of Transition. Additional instructions regarding transition services may be provided in the event of a Notice of Termination issued by the State.
3.3 Invoicing
Submission of an invoice constitutes the Contractor’s verification that the information in the invoice is accurate as of the time of submission.
An invoice not satisfying the requirements of a Proper Invoice (as defined in COMAR 21.06.09) will not be processed for payment. To be considered a Proper Invoice, invoices must include the following information, without error:
A. Contractor name and address;
B. Remittance address;
C. Federal taxpayer identification (FEIN) number, social security number, as appropriate;
D. Invoice period (i.e. time period during which services covered by invoice were performed);
E. Invoice date;
F. Invoice number;
G. State assigned Contract number;
H. State assigned (Blanket) Purchase Order number(s);
I. Goods or services provided;
J. Amount due; and
K. Any additional documentation required by regulation or the Contract.
Invoices that contain both fixed price and labor hour or time and material items shall clearly identify each item as either fixed price, and labor hour, or time and material billing.
The State reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide all required deliverables within the time frame specified in the Contract or otherwise breaches the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.
The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of
Columbia sales taxes and transportation taxes. The Contractor, however, is not exempt from such sales and use taxes and may be liable for the same.
IFB for MDOT SHA Centreville Shop (QAC) Page 11 of 19
Invoices for final payment shall be clearly marked as “FINAL” and submitted when all work requirements have been completed and no further charges are to be incurred under the Contract. In no event shall any invoice be submitted later than 60 calendar days from the Contract termination date.
3.3.1 Invoice Submission Schedule
The Contractor shall submit invoices in accordance with the following schedule:
A. For items of work for which there is one-time pricing (see Attachment B –The Price
Form), those items shall be billed in the month following the acceptance of the work by the State.
B. Invoices for work performed on a labor hour or time and materials basis shall be submitted on or before the _20__ business day of the month following the end of the invoice period.
3.3.2 Travel Reimbursement
Travel will not be reimbursed under this IFB.
3.4 Liquidated Damages
3.4.1 Problem Escalation Procedure
No later than ten (10) Business Days after notice of recommended award or after the date of the
Notice to Proceed, whichever is earlier, the Contractor must provide, and thereafter, maintain a
Problem Escalation Procedure (PEP) for both routine and emergency situations. The PEP must state how the Contractor will address problem situations as they occur during the performance of the Contract, especially problems that are not resolved to the satisfaction of the State within appropriate timeframes and must include:
A. Contact information
B. The process for establishing the existence of a problem;
C. Names, titles, and contact information for progressively higher levels of personnel in the Contractor’s organization who would become involved in resolving a problem;
D. For each individual listed in the Contractor’s PEP, the maximum amount of time a problem will remain unresolved with that individual before the problem escalates to the next contact person listed in the Contractor’s PEP;
E. Expedited escalation procedures and any circumstances that would trigger expediting them;
F. The method of providing feedback on resolution progress, including the frequency of feedback to be provided to the State;
G. Contact information for persons responsible for resolving issues after normal business hours (e.g., evenings, weekends, holidays) and on an emergency basis; and
H. A process for updating and notifying the Contract Monitor of any changes to the PEP.
I. The PEP must be updated within ten (10) Business Days after any change in circumstance which changes the PEP but not less than annually within ten (10)
Business Days after the start of each Contract year .
Nothing in this section shall be construed to limit any rights of the Contract Monitor or the
State which may be allowed by the Contract or applicable law.
3.5 Payments by Electronic Funds Transfer
By submitting a Bid in response to this solicitation, the Bidder, if selected for award:
IFB for MDOT SHA Centreville Shop (QAC) Page 12 of 19
Agrees to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s
Office grants an exemption. The successful Bidder shall register using the COT/GAD X-10
Vendor Electronic Funds (EFT) Registration Request Form.
Any request for exemption must be submitted to the State Comptroller’s Office for approval at the address specified on the COT/GAD X-10 form, must include the business identification information as stated on the form, and must include the reason for the exemption. The COT/GAD
X-10 form may be downloaded from the Comptroller’s website at:
http://comptroller.marylandtaxes.com/Vendor_Services/Accounting_Information/Static_Files/GA
DX10Form20150615.pdf.
3.6 Prompt Payment Policy
This procurement and the Contract(s) to be awarded pursuant to this solicitation are subject to the
Prompt Payment Policy Directive issued by the Governor’s Office of Small, Minority & Women
Business Affairs (GOSBA) and dated August 1, 2008. Promulgated pursuant to Md. Code Ann., State Finance and Procurement Article, §§ 11-201, 13-205(a), and Title 14, Subtitle 3, and
COMAR 21.01.01.03 and 21.11.03.01, the Directive seeks to ensure the prompt payment of all subcontractors on non-construction procurement contracts. The Contractor shall comply with the prompt payment requirements outlined in the Contract; Section 31 “Prompt Pay Requirements”
Additional information is available on GOSBA’s website at:
http://www.gomdsmallbiz.maryland.gov/documents/legislation/promptpaymentfaqs.pdf.
3.7 Conflict of Interest Affidavit and Disclosure
The Bidder shall complete and sign the Conflict of Interest Affidavit and Disclosure (Attachment I) and submit it with its Bid. By submitting a Conflict of Interest Affidavit and Disclosure, the
Contractor shall be construed as certifying all Contractor Personnel and subcontractors are also without a conflict of interest as defined in COMAR 21.05.08.08A.
Additionally, a Contractor has an ongoing obligation to ensure that all Contractor Personnel are without conflicts of interest prior to providing services under the Contract. For policies and procedures applying specifically to Conflict of Interests, the Contract is governed by COMAR
21.05.08.08.
3.8 Maryland Healthy Working Families Act Requirements
On February 11, 2018, the Maryland Healthy Working Families Act went into effect. All Bidders should be aware of how this Act could affect your potential contract award with the State of
Maryland. See the Department of Labor, Licensing and Regulations website for Maryland
Healthy Working Families Act Information: https://dllr.state.md.us/paidleave/.
3.9 The State of Maryland’s Commitment to Purchasing Environmentally
Preferred Products and Services (EPPs)
Maryland’s State Finance & Procurement Article §14-410 defines environmentally preferable purchasing as “the procurement or acquisition of goods and services that have a lesser or reduced effect on human health and the environment when compared with competing goods or services that serve the same purpose.” Accordingly, Bidders are strongly encouraged to offer EPPs to fulfill this contract, to the greatest extent practicable.
https://dllr.state.md.us/paidleave/ https://trackbill.com/bill/maryland-house-bill-629-environmentally-preferable-procurement-maryland-green-purchasing-committee/647077/
IFB for MDOT SHA Centreville Shop (QAC) Page 13 of 19
3.10 Insurance Requirements
The Contractor shall maintain, at a minimum, the insurance coverages outlined below, or any minimum requirements established by law if higher, for the duration of the Contract, including option periods, if exercised:
3.10.1 The following type(s) of insurance and minimum amount(s) of coverage are required:
A. Commercial General Liability - One hundred thousand dollars ($100,000) combined single limit per occurrence for bodily injury, property damage, and personal and advertising injury and three hundred thousand ($300,000) annual aggregate. The minimum limits required herein may be satisfied through any combination of primary and umbrella/excess liability policies.
B. Worker’s Compensation - The Contractor shall maintain such insurance as necessary or as required under Workers’ Compensation Acts, the Longshore and Harbor Workers’
Compensation Act, and the Federal Employers’ Liability Act, to not be less than one hundred thousand dollars ($100,000) per occurrence (unless a state’s law requires a greater amount of coverage). Coverage must be valid in all states where work is performed.
3.10.2 All insurance policies shall be endorsed to include a clause requiring the insurance carrier to provide the Procurement Officer, by certified mail, not less than 30 days’ advance notice of any non-renewal, cancellation, or expiration. The Contractor shall notify the
Procurement Officer in writing, if policies are canceled or not renewed within five (5) days of learning of such cancellation or nonrenewal. The Contractor shall provide evidence of replacement insurance coverage to the Procurement Officer at least 15 days prior to the expiration of the insurance policy then in effect.
3.10.3 Any insurance furnished as a condition of the Contract shall be issued by a company authorized to do business in the State.
3.10.4 The recommended awardee must provide current certificate(s) of insurance with the prescribed coverages, limits and requirements set forth in this section within five (5)
Business Days from notice of recommended award. During the period of performance for multi-year contracts, the Contractor shall provide certificates of insurance annually, or as otherwise directed by the Contract Monitor.
3.10.5 Subcontractor Insurance
The Contractor shall require any subcontractors to obtain and maintain comparable levels of coverage and shall provide the Contract Monitor with the same documentation as is required of the Contractor.
IFB for MDOT SHA Centreville Shop (QAC) Page 14 of 19
4 Bid Submission Information and Instructions
4.1 eMaryland Marketplace Advantage (eMMA) eMMA is the electronic commerce system for the State of Maryland. The IFB, Pre-Bid Conference
(Conference)summary and attendance sheet, Bidders’ questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be made available via eMMA.
To receive a contract award, a vendor must be registered on eMMA. Go to emma.maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.
4.2 Electronic Means
The following transactions related to this procurement and any Contract awarded pursuant to it are not authorized to be conducted by electronic means; any transaction, submission, or communication where the Procurement Officer has specifically directed that a response from the Contractor or
Offeror be provided in writing or hard copy. Any e-mail transmission is only authorized to the email addresses for the identified person as provided in the solicitation, the Contract, or in the direction from the Procurement Officer or Contract Monitor.
4.3 Pre-Bid Conference
If a Conference will be held, the date, time, and location is indicated on the Key Information
Summary Sheet. Attendance at the Conference is not mandatory, but all interested parties are encouraged to attend to facilitate better preparation of their Bids.
To assure adequate accommodations at the Conference, please email the completed Attachment 2 for those expected to attend the Conference to the Procurement Officer no later than the time and date indicated on the Key Information Summary Sheet. In addition, if there is a need for sign language interpretation or other special accommodations due to a disability, please notify the Procurement
Officer at least five (5) Business Days prior to the Conference date. Reasonable efforts will be made to provide such special accommodation. If the Conference is in person, attendees should bring a copy of the solicitation and a business card to help facilitate the sign-in process.
4.4 Questions
All questions, including concerns, shall identify in the subject line the Solicitation Number and Title for this IFB and must be submitted in writing via e-mail or eMMA to the Procurement Officer no later than the date and time specified in the Key Information Summary Sheet. The Procurement
Officer, based on the availability of time to research and communicate an answer, shall decide whether an answer can be given before the Bid due date.
4.4.1 Answers to all questions that are not clearly specific only to the requestor will be distributed via the same mechanism as for IFB amendments and posted on eMMA.
4.4.2 The statements and interpretations contained in responses to any questions, whether responded to verbally or in writing, are not binding on the State unless it issues an amendment to the solicitation in writing.
4.5 Bid Due (Closing) Date and Time
Bids must be received by the Procurement Officer no later than the Bid due date and time indicated on the Key Information Summary Sheet to be considered. Except as provided in COMAR
21.05.02.10. Bids received after that date will not be considered. Requests for an extension of this date or time shall not be granted.
https://emma.maryland.gov/page.aspx/en/usr/login?ReturnUrl=%2fpage.aspx%2fen%2fbuy%2fhomepage
IFB for MDOT SHA Centreville Shop (QAC) Page 15 of 19
Bids may be modified or withdrawn by written notice received by the Procurement Officer before the time and date set forth in the Key Information Summary Sheet for receipt of Bids.
4.6 Receipt, Opening and Recording of Bids
Upon receipt, each Bid and any timely modification(s) to a Bid shall be stored in a secure place until the time and date set for Bid opening. Before Bid opening, the State may not disclose the identity of any Bidder. Bids shall be opened publicly at the time, date and place designated in the Key
Information Summary Sheet. The name of each Bidder, the Total Bid Price, and such other information as is deemed appropriate shall be read aloud or otherwise made available and recorded at the time of Bid opening.
4.7 Duration of Bids
Bids submitted in response to this IFB are irrevocable for the latest of the following: 120 days following the Bid due date and time or the date any protest concerning this IFB is finally resolved.
This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
4.8 Revisions to the IFB
4.8.1 All revisions to the IFB before the due date for Bids will be published in an addendum to the IFB and posted on eMMA and reasonable effort will be made to provide such addenda to all prospective Bidders that were sent this IFB or are otherwise known by the
Procurement Officer to have obtained this IFB. It is the responsibility of all prospective
Bidders to check eMMA for any addenda issued prior to the submission of Bids.
4.8.2 Bidders shall acknowledge in the Bid the receipt of all addenda to this IFB issued before the Bid due date.
4.8.3 Failure to acknowledge receipt of an addendum does not relieve the Bidder from complying with the terms, additions, deletions, or corrections set forth in the addendum, and may cause the Bid to be deemed not responsive.
4.9 Cancellations
4.9.1 This IFB may be cancelled as provided in COMAR 21.06.02.02
4.9.2 The State reserves the right to cancel this IFB, accept or reject any and all Bids, in whole or in part, received in response to this IFB and to waive or permit the cure of minor irregularities.
4.9.3 In the event a government entity proposes and receives the recommendation for award, this procurement may be canceled, and the award processed in accordance with COMAR
21.01.03.01.A(4).
4.9.4 If the services that are the subject of the IFB are currently being provided under an interagency agreement with a public institution of higher education and the State determines that the services can be provided more cost effectively by the public institution of higher education, then the IFB may be canceled in accordance with Md.
Code Ann., State Finance and Procurement Art., § 3-207(b)(2).
IFB for MDOT SHA Centreville Shop (QAC) Page 16 of 19
4.10 Incurred Expenses
The State will not be responsible for any costs incurred by any Bidder in preparing and submitting a
Bid or performing any other activities related to submitting a Bid in response to this solicitation.
4.11 Protest/Disputes
Any protest or claim related to this IFB or the Contract award hereunder shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
4.12 Bidder Responsibilities
4.12.1 A Bidder, either directly or through its subcontractor(s), must be able to provide all goods and services and meet all of the requirements requested in this solicitation and the successful Bidder (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work.
4.12.2 If the Bidder is the subsidiary of another entity, all information submitted by the Bidder, including but not limited to references, financial reports, or experience and documentation (e.g., insurance policies, bonds, letters of credit) used to meet minimum qualifications, if any, shall pertain exclusively to the Bidder, unless the parent organization will guarantee the performance of the subsidiary. If applicable, the Bidder’s
Bid shall contain an explicit statement, signed by an authorized representative of the parent organization, stating that the parent organization will guarantee the performance of the subsidiary.
4.12.3 A parental guarantee of the performance of the Bidder under this section will not automatically result in crediting the Bidder with the experience or qualifications of the parent under any evaluation criteria pertaining to the actual Bidder’s experience and qualifications. Instead, the Bidder’s responsibility will be assessed to the extent to which the State determines that the experience and qualifications of the parent are applicable to and shared with the Bidder, any stated intent by the parent to be directly involved in the performance of the Contract, and the value of the parent’s participation as determined by the State.
4.13 Acceptance of Terms and Conditions
By submitting a Bid in response to this IFB, the Bidder, if selected for award, is deemed to have accepted the terms and conditions of this IFB and the Contract, attached hereto as Exhibit 2 –
Sample Contract. Any questions or exceptions to this IFB or the Contract must be submitted by the
“Questions Due Date and Time” prior to Bid submission. Changes to the solicitation, including the
Bid Form or Contract, made by the Bidder may result in Bid rejection.
4.14 Compliance with Laws/Arrearages
By submitting a Bid in response to this IFB, the Bidder, if selected for award, agrees that it will comply with all federal, State, and local laws applicable to its activities and obligations under the
Contract. By submitting a response to this solicitation, each Bidder represents that it is not in arrears in the payment of any obligations due and owing the State, including the payment of taxes and employee benefits, and shall not become so in arrears during the term of the Contract if selected for
Contract award.
IFB for MDOT SHA Centreville Shop (QAC) Page 17 of 19
4.15 Verification of Registration and Tax Payment
Before a business entity can do business in the State, it must be registered with the State Department of Assessments and Taxation (SDAT). SDAT is located at State Office Building, Room 803, 301
West Preston Street, Baltimore, Maryland 21201. For registration information, visit https://egov.maryland.gov/BusinessExpress/.
It is strongly recommended that any potential Bidder complete registration prior to the Bid due date and time. The Bidder’s failure to complete registration with SDAT may disqualify an otherwise responsive successful Bidder from final consideration and recommendation for Contract award.
4.16 False Statements
Bidders are advised that Md. Code Ann., State Finance and Procurement Article, § 11-205.1 provides as follows:
In connection with a procurement contract a person may not willfully:
A. Falsify, conceal, or suppress a material fact by any scheme or device;
B. Make a false or fraudulent statement or representation of a material fact; or
C. Use a false writing or document that contains a false or fraudulent statement or entry of a material fact.
A person may not aid or conspire with another person to commit an act under this section. A person who violates any provision of this section is guilty of a felony and on conviction is subject to a fine not exceeding $20,000 or imprisonment not exceeding five (5) years or both.
4.17 Confidentiality of Bids / Public Information Act Notice
The Bidder should give specific attention to the clear identification of those portions of its Bid that it considers to contain confidential and/or proprietary commercial information or trade secrets, and provide justification for why such materials, upon request, should not be disclosed by the State under the Public Information Act, Md. Code Ann., General Provisions Article, Title 4. This information should be identified by page number and placed in the Transmittal Letter with the Bid.
For requests for information made under the PIA, the Procurement Officer shall examine the Bids to determine the validity of any requests for nondisclosure. Nondisclosure is permissible only if approved by the Office of the Attorney General.
4.18 Use of Bidder’s Form Not Binding on State
The Bidder may not substitute, modify, or provide any other document in lieu of the documents provided with this Bid. Only those forms and documents provided with this solicitation and by the
Procurement Officer will be considered acceptable as bid submission.
4.19 Attachments and Documents Required with the Bid (Table A)
A Bidder shall include the following Attachments with its Bid as a single Bid Package:
https://egov.maryland.gov/BusinessExpress/
IFB for MDOT SHA Centreville Shop (QAC) Page 18 of 19
TABLE A - Attachments and Documents Required with the Bid
Attachment Attachment Name
A
Bid/Proposal Affidavit
A Bid submitted by the Bidder must be accompanied by a completed Bid/Proposal
Affidavit.
https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf
B
The Price Form (as specified within eMMA)
Do not alter this Price Form or the Bid may be determined to be not responsive.
The Price Form must be signed and dated, where requested, by an individual who is authorized to bind the Bidder to the prices entered on the Bid Form.
(See Appendix 2 for specific Price Form Instructions.)
C
Conflict of Interest Affidavit and Disclosure https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf
Note: If this solicitation will result in the “selection of a contractor who will assist a unit in the formation, evaluation, selection, award, or execution of another State contract” the Bidder shall provide this Affidavit and other times as requested by the Procurement Officer.
D
Mercury Affidavit https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-J.-Mercury-Affidavit.pdf
E
Reference Checks
(Each reference shall be from a customer for whom the Bidder has provided goods or services within the most recent past five years) https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf
Additional Required Documents with the Bid
Minimum Qualifications Documentation. The Bidder shall submit any Minimum Qualifications documentation that may be required, as set forth in IFB Section 1. If references are required in IFB
Section 1, those references shall be included in Attachment E. Reference Checks.
Acknowledgement of all addenda to this IFB.
4.20 Bid Delivery Instructions
Each Bidder shall submit its Bid Package as specified below.
https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-A.-Bid-Proposal-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-I.-Conflict-of-Interest-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-J.-Mercury-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-J.-Mercury-Affidavit.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf https://procurement.maryland.gov/wp-content/uploads/sites/12/2024/07/Attachment-L.-Reference-Checks.pdf
IFB for MDOT SHA Centreville Shop (QAC) Page 19 of 19
Bids shall only be accepted via the State’s internet-based electronic procurement system, eMMA.
Bidders shall provide their Bids in one submission through eMMA following the Quick Reference
Guides (QRG) labeled “4 - eMMA QRG Responding to Solicitations (IFB)” for single envelope submissions.
4.21 Bid Evaluation Criteria and Award Basis
The Bids will be evaluated based on the Total Bid Price, as per COMAR 21.05.02.13. All Bids will be ranked from the lowest (most favorable) to the highest (least favorable) price based on the Total
Bid Price as submitted in its Bid. A Contract shall be awarded to the responsible Bidder(s) submitting a responsive Bid with the most favorable Bid Price or most favorable evaluated Bid Price for providing the goods and services as specified in this IFB. The award for this solicitation will be made to the responsive and responsible Vendor with the lowest price, as determined by the Procurement
Officer to be in the best interests of the State of Maryland.
Vendor shall submit a bid price based on product description (specification) and unit of measure specified on each line. Award of this contract will not be final and complete until after: (1) the
Contractor submits complete and satisfactory documentation required under the Contract and/or documentation required by the Procurement Officer; and (2) the Contract is signed by the State
Highway Administration following any approvals of the Contract required by law or regulation.
4.22 Tie Bids
Tie Bids will be decided pursuant to COMAR 21.05.02.14.
4.23 Reciprocal Preference
Although Maryland law does not authorize procuring agencies to favor resident Bidders in awarding procurement contracts, many other states do grant their resident businesses preferences over Maryland contractors. COMAR 21.05.01.04 permits procuring agencies to apply a reciprocal preference under the following conditions:
A. The Maryland resident business is a responsible Bidder;
B. The lowest responsive Bid is from a responsible Bidder whose principal office, or principal base of operations, is in another state;
C. The other state gives a preference to its resident businesses through law, policy, or practice; and
D. The preference does not conflict with a federal law or grant affecting the procurement
Contract.
The preference given shall be identical to the preference that the other state, through law, policy, or practice gives to its resident businesses.
https://procurement.maryland.gov/emma-qrgs/ https://procurement.maryland.gov/emma-qrgs/
File details come from the government source that posted it. Updated .