Q and A_6.28~1.docx
DOCX document 24 KB Posted
- Attached to
- ITB - D3 Sanding Aggregate Production 2024
- Solicitation number
- S-73000-00010442
- Issued by
- Lake County, Siletz City, Oregon
About this file
The document provided is a Questions and Answers (Q&A) document related to an Invitation to Bid (ITB) for the D3 Sanding Aggregate Production 2024 project issued by the Oregon Department of Transportation (ODOT). The project involves one qualified contractor delivering 250,000 cubic yards of 1/2"-0 sanding aggregate and stockpiling it at the Santiam (Little Nash) Cinder Pit. The contractor has the option to use an ODOT-provided material source. ODOT is willing to amend the contract by a few weeks to allow for overtime and weekend work, provided the work is completed before the winter season begins.
The document also addresses how the piles will be measured and paid, with progress payments based on estimates or contractor measurements, and final quantities measured by ODOT surveyors via drone fly-over. The contract administrator will forward the final quantity to the contractor for the final invoice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00010442_Bid Cover Sheet.docx | DOCX document | |
| 00010442_ITB~3.docx | DOCX document | |
| Exh A_Standard Specifications and Special Provisions.pdf | ||
| Exh B_Prospective Material Source Narrative.pdf | ||
| 900527 plans.pdf | ||
| 00010442_Sample Contract~1.docx | DOCX document | |
| Bid tab~57.xlsx | XLSX spreadsheet | |
| 900527 specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S-73000-00010442 D3 Sanding Aggregate Production 2024
QUESTIONS AND ANSWERS
1. It will be difficult if not impossible to produce 250,000 by August 31. Is ODOT willing to add time?
a. ODOT’s main concern is to get the material to its maintenance yards before snowfall. It is understood that overtime and weekend work will most likely need to be included in the bids. So long as the awarded contractor is proceeding in earnest with the work, ODOT is willing to amend the contract by a few weeks so long as the work is completed before the winter season begins.
2. Is the material to be stockpiled in the “stockpile” area shown on the plans, or the maintenance yard farther away?
a. The material is to be stockpiled on site as shown on the plans. ODOT will move it out to the maintenance yards as needed at a later time.
3. How will the piles be measured and paid? Will ODOT survey them? Does the contractor survey them?
a. Progress payments may be based on estimates or contractor can make their own measurements. Once production is finished, ODOT surveyors will measure the piles digitally by drone fly-over. The contract administrator will forward the final quantity to the contractor so they may prepare the final invoice.