Exh A_Standard Specifications and Special Provisions.pdf
PDF 392 KB Posted
- Attached to
- ITB - D3 Sanding Aggregate Production 2024
- Solicitation number
- S-73000-00010442
- Issued by
- Lake County, Siletz City, Oregon
About this file
This document contains the Standard Specifications and Special Provisions related to a state and local contract opportunity for the production and stockpiling of sanding aggregate. The contract opportunity, issued by the Oregon Department of Transportation (ODOT), seeks one qualified contractor to deliver 250,000 cubic yards of 1/2"-0 sanding aggregate and stockpile it at the Santiam (Little Nash) Cinder Pit, located at mile point 73.92 on Santiam Highway, US20. The contractor has the option to use an ODOT-provided material source, the Santiam (Little Nash) Cinder Pit, which is described in detail in the Special Provisions. The contractor must comply with specific requirements for source development, operations, and clean-up within the material source.
The Special Provisions outline the pricing and payment terms, including that no separate or additional payment will be made for the work performed, and that payment will be included in the payment for the appropriate items under which the work is required. The contract opportunity is for the state of Oregon, specifically Linn County, and the term of the contract is not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00010442_Bid Cover Sheet.docx | DOCX document | |
| 00010442_ITB~3.docx | DOCX document | |
| Exh B_Prospective Material Source Narrative.pdf | ||
| 900527 plans.pdf | ||
| 00010442_Sample Contract~1.docx | DOCX document | |
| Bid tab~57.xlsx | XLSX spreadsheet | |
| Q and A_6.28~1.docx | DOCX document | |
| 900527 specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
STANDARD SPECIFICATIONS: Contractor shall furnish aggregates in stockpile according to the applicable 2024 Oregon Standard Specifications for Construction (“Standard Specifications”), incorporated herein by reference, as supplemented or modified in the following Special Provisions. Applicable Standard Specifications sections are those identified in the Special Provisions and any sections that are referenced within the applicable sections identified.
The Standard Specifications are available at:
oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf
SPECIAL PROVISIONS BEGIN ON NEXT PAGE
EXHIBIT A
https://www.oregon.gov/odot/Business/Specs/2024_STANDARD_SPECIFICATIONS.pdf
(a) Prospective Material Source, Santiam (Little Nash) Cinder Pit:
• Source Number - OR- 22-011-2
• DOGAMI Number – 22-0066
• Location – Approximately 26 miles west of Sisters on US20 in the SE 1/4 of Section
15, T. 13 S , R. 7 E W.M.
• Access - Adjacent north of MP 73.92 US20
• Available Area for Equipment Setup, Stockpiling, and Processing Aggregate:
• Existing – 8 acres
• Development - 0 acres
If the Contractor elects not to utilize the above listed source(s) 00160.60 applies.
00235.03 Laws - Conduct operations within the material source according to all applicable State, county, and federal laws including mining and fire laws. Provide, operate, and maintain wildland firefighting equipment appropriate for the current fire levels on-site at all times during all material source operations.
00235.04 Permits - Copies of the Plans, permits, agreements and the material source narrative for the material source are available for inspection at the Project Manager's office.
Operations within the material source shall conform to the stipulations and conditions of these documents and to all of the requirements of the Contract.
SPECIAL PROVISIONS
All number references in these Special Provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.
SECTION 00235 - AGENCY PROVIDED MATERIAL SOURCES
Section 00235, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00235.00 Scope - This Work consists of utilizing Agency provided prospective or mandatory material sources as the Contractor elects or as required for the construction of the Contract.
00235.01 Material Source Specific Requirements - The following prospective material sources, for the production of sanding aggregate , that may warrant investigation and consideration for use by the Contractor on this Project is as follows:
Subsection Source Name Documents 00235.01(a) Santiam (Little
Nash) Cinder Pit
Department of Geology and Mineral Industries Operating Permit (#22-0066)
United States Forest Service Contract for the Sale of Mineral Materials (#MM-WIL-2024-
MCK-001)
United States Forest Service Special Use Permit (#WIL74)
00235.05 Pre-Work Meeting - Before occupying a material source, attend a pre-work meeting at the material source with the Engineer and the following owners or representatives:
Subsection Source Name
Contact Names and phone numbers
00235.01(a) Santiam (Little Nash) Cinder Pit
ODOT Geologist- Sarah Hunt (503)302-7231
U.S. Forest Representative- Jered Hogansen (541)780-4279
00235.06 Source Occupancy - Coordinate material source occupancy with the Engineer.
The material source information listed in Table 00235-1 below shall be as shown. Do not operate beyond the material source Project boundary or in no Work area(s) as shown unless otherwise directed in writing.
Table 00235-1
Subsection Source Name Source items shown 00235.01(a) Santiam (Little
Nash) Cinder Pit
Project Boundary Excavation Area Stockpile Area Reject Fines Stockpile Overburden Stockpile Oversized Stockpile Slash Disposal Area Safety Berms Access Roads
00235.07 Source Development - If proposing changes to a material source development plan, submit a source development plan as an unstamped Working Drawing according to
00150.35. Do not begin Work in a material source until the source development plan has been approved in writing by the Engineer.
Develop a site-specific Erosion and Sediment Control Plan for each material source according to 00280.04 and submit it to the Engineer at or before the pre-work meeting.
Construct stormwater control berm(s) as shown to control runoff. Do not allow any materials, including sediments, Aggregate or crushing by-products to enter into waterways or Wetlands.
Develop a site-specific Pollution Control Plan for each material source according to 00290.30(b), and submit it to the Engineer at or before the pre-work meeting. Include the following requirements in the Pollution Control Plan:
• Do not discharge waste or by-product if it contains any substance in concentrations that could contaminate Soils or result in harm to fish, wildlife, or water sources.
• Store bag-house sludge, lime, and all potentially hazardous materials and solid waste in a manner that prevents seepage into the ground or groundwater sources. Lined sumps or pits are allowable options for storage. If pits or sumps are used, construct adequate berms or provide other measures to prevent breaching of the pits or sumps.
• For materials capable of causing water pollution if discharged, locate storage facilities in an area that prevents spillage into waterways or Wetlands.
Construction
00235.40 General - All vehicles and Equipment, prior to entering the site for the first time, and each subsequent time if the vehicle has left the Roadway outside the construction Project limits, shall be steam cleaned of all debris (soil, dirt, plant parts, and vegetative matter) before being brought back to the site. Notify the Engineer before moving each vehicle onto the site.
Certify, in writing, that the Equipment has been steam cleaned.
00235.41 Restrictions and Protection of Resources - Comply with the following for all operations within the material source:
• Protect cultural resources according to 00290.50.
• Protect migratory birds according to 00290.36(a).
• Do not utilize, contaminate, or disperse material from existing stockpiles. If existing stockpiles interfere with the Contractor’s operations, move the stockpiles to other locations within the material source area as directed, at no additional cost to the Agency.
(b) USDA Forest Service Owned Sources - Material source Santiam (Little Nash) Cinder Pit (00235.01(a)) is under Agency control through a "Contract for the Sale of Mineral Materials" or a "Special Use Permit" agreement with USDA Forest Service.
Operations within this material source shall conform to the requirements of this agreement, the Plans, and the Specifications.
00235.42 Source Setup - Before proceeding with Work in the material source, the following apply:
(a) Access:
• For material source Santiam (Little Nash) (00235.01(a) routine road maintenance activities such as grading and watering of the access road do not need review or approval. Maintain or develop drain dips, water bars, road crowning, in-slopes and out-slopes during road maintenance.
• For material source Santiam (Little Nash) Cinder Pit (0235.01(a)) use overburden or existing, loose and non-stockpiled material or imported or clean soil or a combination of clean soil and rock, to construct a safety berm along the top edge of the new excavation or existing slopes as shown. Maintain a 10-foot buffer between the top edge of the excavation or slope and the toe of the safety berm. Construct the berm 3 feet high, with side slopes of 1V:2H.
(b) Clearing and Grubbing - Before stripping of overburden clear and grub all trees within the excavation area, to be developed for stockpile and processing and the area to be developed as access roads. Place all logs in the log decks and other woody debris in the slash disposal area as shown.
(c) Overburden - Before excavating, including drilling and blasting when required, strip and stockpile all soil overburden from within the excavation area, from the area to be developed for stockpile and processing, and from areas to be developed as access road(s). Incorporate grass and small shrubs into the stockpiles. Do not remove grass or small shrubs from the overburden. Place stockpiles in the overburden storage area(s).
Maintain a minimum 10-foot buffer strip between the toe of the overburden storage area(s) and the excavation area. Store overburden stripped from the stockpile and processing area as shown, a minimum of 10 feet from the toe of the Aggregate stockpiles. Smooth and contour overburden storage berms to form side Slopes no steeper than 1V:2H.
00235.44 Source Operations - The following apply during material source operations:
• Construct slopes, benches, and floor of the excavation area as shown.
• To control dust, apply water to material source access, haul road(s), and crushing and processing operations.
• For material source Santiam (Little Nash) Cinder Pit (00235.01(a) a water source is not available on-site within the material source. A possible water source is located at the ODOT Santiam Pass Maintenance Yard located approximately 1 mile east of the cinder pit at 13000 US20 Sisters, Oregon 97759.
• Stockpile reject fines in separate and accessible stockpiles as shown.
• For material source Santiam (Little Nash) Cinder Pit (00235.01(a) if the Contractor chooses to utilize this material source, maintain the condition of NF-820 at all times.
Provide traffic control related to ingress and egress movements in a manner that allows a safe work zone and safe passage of vehicles.
00235.45 Source Clean-up - The following apply at the completion of operations:
• Leave no loose material on the site exceeding 1 foot diameter, except as noted below.
Process existing oversize material, and all material loosened in the source by the Contractor that meets quality requirements, with the following exception(s):
• For material source Santiam (Little Nash) Cinder Pit (00235.01(a) a maximum of 100 cubic yards of oversize material with a maximum dimension of 2.5 feet may be stockpiled in the material source. Consolidate oversize material as shown.
• Place all excess produced Aggregate remaining at the end of operations in separate and accessible stockpiles on Agency owned or controlled property in areas designated by the Engineer, at no additional cost to the Agency.
• Leave the material source haul road and bench access road open. Do not rip or block the roads except a few boulders greater than approximately three feet in diameter may be used to block off access to the upper bench areas.
• Remove all loose, hanging or potentially dangerous Rock on or above the excavated surface.
• Pile and burn all construction slash and combustible debris resulting from use and development of the source, including the preexisting refuse identified at the pre-work meeting, even if it is from outside the material source project boundary except for grass and small shrubs that are incorporated into the overburden. Comply with all open burning regulations in effect at the time of source occupancy. If burning is not allowed, all construction slash and combustible debris become the property of the Contractor, to be treated as noncombustible and removed from material source.
00235.47 Source Vacating - Before vacating the material source the following apply:
• Remove all structures, noncombustible debris, and equipment from the material source, even if it was pre-existing, except for grass and small shrubs incorporated into the overburden.
• Remove solid waste and hazardous material from the site and dispose of properly.
These include, but are not limited to, bag-house sludge or fines, lime, excess liquid asphalt, rejected and excess asphalt mixture, plant cleanings, materials placed in sumps, tires, pipes, belts, screens and truck cleanings. Provide documentary evidence of proper disposal and verify the amount of material removed.
• If a spill or dumping has occurred or if a spill or dumping is suspected to have occurred, the Contractor shall clean up the contaminated materials according to Section 00290.
After clean up, the Engineer may, sample and test materials at the spill or dumping locations to verify the clean up has been completed. If the Engineer’s verification testing demonstrates remaining contamination, the Contractor shall perform additional clean up until the requirements of Section 00290 including 00290.20(g) are met.
• Attend a post-work meeting at the material source to evaluate material source rehabilitation work with the Engineer and attendees listed under 00235.05.
Measurement
00235.80 Measurement - No measurement of quantities will be made for Work performed under this Section.
Payment
00235.90 Payment - No separate or additional payment will be made for Work performed under this Section. Payment will be included in payment made for the appropriate items under which this Work is required.
SECTION 00680 - STOCKPILED AGGREGATES
Comply with Section 00680 of the Standard Specifications modified as follows:
Add the following subsection:
00680.11(c) Sanding Aggregates - Provide cinder sanding Aggregates in stockpiles meeting the following grading requirements:
Percent Passing Sieve Size (by Weight)
3/4" 100 1/2" 60 - 90
No. 10 0 - 25 No. 40 0 - 5
00680.40(a) Source Sites - Replace this subsection, except for the subsection number and title, with the following:
Prepare and develop the source site according to Section 00235.
00680.42 Places of Delivery - Add the following to the end of this subsection:
Deliver 250,000 cubic yards of ½”- 0 Sanding Aggregate, and stockpile at Santiam (Little Nash) Cinder Pit, located at MP 73.92 on Santiam Highway, US20 as shown.
00680.70 Cleaning Up Source Sites - Replace this subsection, except for the subsection number and title, with the following:
Clean up the source sites according to Section 00235.
| 24_SP00235_final (2).pdf |
| SECTION 00235 - AGENCY PROVIDED MATERIAL SOURCES |
| Description |
| Construction |
| Measurement |
| Payment |
| 24_SP00680_final (1).pdf |
| SECTION 00680 - STOCKPILED AGGREGATES |
File details come from the government source that posted it. Updated .