Q & A _ VCUM24008C_Cumberland MVA.pdf
PDF 137 KB Posted
- Solicitation number
- BPM039180
- Issued by
- Allegany County, Cumberland City, Maryland
About this file
This document is a Question and Answer (Q&A) related to a solicitation issued by the Maryland Motor Vehicle Administration (MVA) for the replacement of the Computer Room Air Conditioner (CRAC) and Clean Fire Agent Suppression System at the Cumberland MVA Branch Office. The solicitation number is VCUM24008C, and the project includes the replacement of these systems at the MVA's Cumberland Branch Office. The Q&A addresses three specific questions regarding the existing ceiling height, subfloor height, and the status of the current Halon protection system within the server room. The responses indicate that the existing ceiling and subfloor heights are to remain, and the current Halon system will not be part of the new design.
The state and local contract opportunity is for the Maryland MVA to replace the CRAC and Clean Fire Agent Suppression System at the Cumberland MVA Branch Office, located in Allegany County and the City of Cumberland. The solicitation does not provide details on pricing terms, set-asides, incumbents, funding requirements, or other salient information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT No.1.pdf | ||
| Attachment P_Prevailing Wage Determination Document.pdf | ||
| Attachment B-1_BID FORM.xlsx | XLSX spreadsheet | |
| AMENDMENT No.2.pdf | ||
| Attachment S_VCUM24008C_Drawings.pdf | ||
| AMENDMENT No. 3.pdf | ||
| Attachment R_VCUM24008C_Specifications.pdf | ||
| GeneralConditionsforConstruction2018.pdf.pdf | ||
| IFB_VCUM24008C.pdf | ||
| Addendum No. 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V-CUM-24008-C Cumberland MVA Branch CRAC Replacement Q & A No.: 1
CUMBERLAND CRAC REPLACEMENT MVA BRANCH
SOLICITATION NO.: VCUM24008C
September 14, 2023
QUESTIONS AND RESPONSES No.: 1
Question 1: What is the protected ceiling height within the Server Room
Response: The existing ceiling height is to remain. Contractor shall confirm existing conditions.
Question 2: What is the protected subfloor height within the Server Room?
Response: The existing subfloor height is to remain. Contractor shall confirm existing conditions.
Question 3: Is the above ceiling plenum currently protected with Halon?
Response: The ceiling plenum is currently not protected by cleaning agent and will not be in the new design.