Attachment S_VCUM24008C_Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- BPM039180
- Issued by
- Allegany County, Cumberland City, Maryland
About this file
The provided document is a set of drawings associated with the VCUM24008C contract opportunity issued by the Maryland Motor Vehicle Administration (MVA) to replace the Computer Room Air Conditioner (CRAC) and Clean Fire Agent Suppression System at the Cumberland MVA Branch Office, located in Allegany County and Cumberland City. The contract requires the replacement of the existing CRAC and fire suppression systems at the facility. The contract documents do not provide details on quantities, response dates, site visits, or award information.
The contract documents do not include pricing terms, set asides, incumbent information, funding requirements or sources, or other financial details. The scope of work is limited to the replacement of the CRAC and fire suppression systems as depicted in the provided drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT No.1.pdf | ||
| Attachment P_Prevailing Wage Determination Document.pdf | ||
| Q & A _ VCUM24008C_Cumberland MVA.pdf | ||
| Attachment B-1_BID FORM.xlsx | XLSX spreadsheet | |
| AMENDMENT No.2.pdf | ||
| AMENDMENT No. 3.pdf | ||
| Attachment R_VCUM24008C_Specifications.pdf | ||
| GeneralConditionsforConstruction2018.pdf.pdf | ||
| IFB_VCUM24008C.pdf | ||
| Addendum No. 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
TA
T E
O F MARYLAN
D
A
R C H I T ECT
JA
M E S E . FICKES
N o . 1 9412
SCVTO
B
O N
Æ V I K
V B T A T U S T V Æ
C O
R O
N A
S T
I
NOS
1 6 3 2
ATTACHMENT S - DRAWINGS
CONTRACT NO. V-CUM-24008-C
1. ALL MATERIALS AND WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL APPLICABLE PERMITS AND LICENSES AND FOR PAYING ALL REQUIRED FEES. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL INTERRUPTIONS OF UTILITIES SERVICES WITH MVA.
2. THE WORK OF THIS CONTRACT INCLUDES COORDINATION OF THE ENTIRE WORK OF THE PROJECT, INCLUDING PREPARATION OF GENERAL COORDINATION DRAWINGS, DIAGRAMS AND SCHEDULES, AND CONTROL OF SITE UTILIZATION, FROM BEGINNING OF
CONSTRUCTION ACTIVITY THROUGH PROJECT CLOSE-OUT AND WARRANTY PERIODS.
3. THE DOCUMENTS INDICATE THE GENERAL ARRANGEMENT OF THE INSTALLATIONS. DETAILS OF PROPOSED DEPARTURES DUE TO ACTUAL FIELD CONDITIONS OR OTHER CAUSES SHALL BE SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION. REWORK OF COMPLETED ITEMS DUE TO IMPROPER FIELD COORDINATION SHALL BE AT THE CONTRACTOR’S EXPENSE.
4. IT IS THE RESPONSIBILITY OF ALL SUBCONTRACTORS TO REVIEW ALL GENERAL NOTES.
5. FOLLOW ALL APPLICABLE INSPECTION PROCEDURES FOR THE INSPECTION OF FRAMING, PLUMBING, ELECTRICAL, OCCUPANCY
AND OTHER APPLICABLE WORK.
6. REVIEW SITE RULES WITH MVA AND BUILDING MANAGEMENT ; CONTACT: GIL GOLDENBERG (MVA DEPUTY DIRECTOR) AT 410-762-5129.
7. PROVIDE LABOR MATERIALS AND EQUIPMENT NECESSARY TO PROVIDE THE WORK AS SHOWN ON THE CONTRACT DOCUMENTS, EXCEPT WHERE NOTED NIC (NOT IN CONTRACT).
8. NOTE IN WRITTEN FORM, ALL PRE-EXISTING DAMAGE IN EXISTING CONSTRUCTION TO REMAIN.
9. IN THE WORK OF ALL TRADES, PERFORM ANY AND ALL CUTTING PATCHING, REPAIRING, RESTORING AND THE LIKE NECESSARY TO COMPLETE THE WORK AND TO RESTORE ANY DAMAGE OR AFFECTED SURFACES RESULTING FROM THE WORK OF THIS CONTRACT TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE ARCHITECT AND THE OWNER. PATCH EXISTING WALLS
ADJACENT TO DEMOLISHED AND/OR NEW CONSTRUCTION AS REQUIRED.
10. EXECUTE WORK PER CONTRACT DOCUMENTS. DO NOT MAKE CHANGES WITHOUT HAVING FIRST RECEIVED WRITTEN PERMISSION
FROM THE ARCHITECT OR MVA PROJECT MANAGER.
11. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT OR MVA PROJECT MANAGER. START OF WORK CONSTITUTES ACCEPTANCE OF EXISTING CONDITIONS AND/OR
SUBSTRATE.
12. IT IS THE GENERAL CONTRACTOR’S RESPONSIBILITY TO REVIEW ALL EXISTING ON-SITE SALVAGE AND/OR DEMOLITION
CONDITIONS WITH MVA PROJECT MANAGER.
13. KEEP EXISTING DRIVEWAYS, RIGHT OF WAYS, PERMANENT AND TEMPORARY ENTRANCES SERVING THE PREMISES CLEAR AND
AVAILABLE. COORDINATE DELIVERIES WITH MVA AND BUILDING MANAGEMENT.
14. SMOKING OR OPEN FIRES WILL NOT BE PERMITTED WITHIN THE BUILDING ENCLOSURES OR ON THE PREMISES.
15. MAINTAIN CONTINUOUS PROTECTION OF ADJACENT AND EXISTING PREMISES SO AS TO PREVENT DAMAGE TO PROPERTY DUE
TO PERFORMANCE OF THE CONTRACTOR’S WORK.
16. PROVIDE EXISTING BUILDING FINISH PROTECTION AS REQUIRED THROUGHOUT THE COURSE OF CONSTRUCTION. VERIFY EXTENT
WITH MVA PROJECT MANAGER AND BUILDING MANAGEMENT.
17. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE WORK TO BE DONE AND SHALL EXAMINE THE SITE AND CONSIDER THE CONDITIONS UNDER WHICH HE WILL BE OBLIGATED TO OPERATE IN THE PERFORMANCE OF THE CONTRACT WORK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY IN THIS CONNECTION, FOR ANY ERRORS THROUGH NEGLIGENCE ON HIS PART.
THE CONTRACTOR IS HEREBY ADVISED THAT HE WILL BE REQUIRED TO OBSERVE ALL RECOMMENDED PRACTICES OF FIRE AND
SAFETY PRECAUTIONS FOR THE PROTECTION OF THE EXISTING AND NEW FACILITY.
18. ALL CONSTRUCTION AND MATERIALS SHALL BE OF FIRST QUALITY. STRICTLY ADHERE TO ALL MANUFACTURER’S
RECOMMENDATIONS FOR STORAGE AND INSTALLATION OF PRODUCTS.
19. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND DISPOSING OF ALL REFUSE ON A DAILY BASIS. GENERAL CONTRACTOR SHALL SUPPLY THEIR OWN DUMPSTER, COORDINATE LOCATION WITH MVA AND BUILDING MANAGEMENT. TOXIC MATERIALS SHALL NOT BE FLUSHED INTO WASTE LINES. DISPOSE OF SUCH MATERIALS IN ACCORDANCE WITH STATE AND LOCAL
GUIDELINES.
20. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUBMITTALS FOR ALL MANUFACTURED PRODUCTS. SUBMIT PRODUCT DATA AND SAMPLES WHERE APPROPRIATE FOR ARCHITECT’S REVIEW AND APPROVAL PRIOR TO FABRICATION/INSTALLATION.
PROVIDE SHOP DRAWINGS FOR REVIEW AND APPROVAL FOR ALL MILLWORK INCLUDED IN THESE CONSTRUCTION DOCUMENTS.
SUBMIT TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. ACTUAL FINISH STRIKE-OFFS IN DUPLICATE.
PAINT MAY BE ON A HEAVY STOCK PAPER SWATCH, MINIMUM 8 ½” x 11”, LAMINATES SHALL BE 5” x 8” MINIMUM. CARPET SHALL BE 2’ x 2’ MINIMUM FROM DESIGNATED DYE LOT STOCK.
21. WHERE FACTORY FINISHED OR FACTORY PRIMED ITEMS OCCUR SUCH AS GRILLES, DIFFUSERS, METAL TRIM AND ACCESSORIES, ETC. THEY SHALL BE PAINTED TO MATCH THE ADJACENT SURFACE OR AS DIRECTED BY THE ARCHITECT/ PM.
22. ALL POWER OUTAGES, INTERRUPTIONS, OR DISCONNECTIONS MUST BE COORDINATED WITH THE MVA PROJECT MANAGER AND BUILDING MANAGEMENT BEFORE PERFORMING WORK. OUTAGES CAN ONLY BE PERFORMED AFTER NORMAL WORKING HOURS
AND/OR WEEKENDS.
23. TEST ALL SYSTEMS PRIOR TO COMPLETION AND ACCEPTANCE OF PROJECT TO DEMONSTRATE THAT INSTALLATION AND
PERFORMANCE CONFORM TO APPLICABLE CODES AND FUNCTIONAL NEEDS.
24. INFORM THE MVA PROJECT MANAGER AND ARCHITECT, IMMEDIATELY, OF ITEMS OR DELIVERIES WHICH WOULD CAUSE DELAYS IN
CONSTRUCTION AND/OR COMPLETION OF THE PROJECT.
25. THE CONTRACTOR SHALL SUBMIT THE PROPOSED CONSTRUCTION SCHEDULE IN WRITING TO MVA PROJECT MANAGER AND ARCHITECT FOR THE PROJECT WITHIN TEN (10) DAYS AFTER THE OWNER’S AWARD OF CONTRACT.
26. CONTRACTOR IS RESPONSIBLE FOR FINAL AND THOROUGH CLEANING OF ALL SURFACES WITHIN LIMITS OF CONTRACT AT
COMPLETION OF CONSTRUCTION.
27. SCHEDULE A PUNCH LIST WALKTHROUGH AT SUBSTANTIAL COMPLETION REPRESENTATIVES FROM THE ARCHITECT, MVA AND
CONTRACTOR SHALL ATTEND.
28. CONTRACTOR IS RESPONSIBLE TO HONOR A TWO (2) YEAR WARRANTY FOR DEFECTS IN WORKMANSHIP FOR ALL WORK WITHIN
THE LIMITS CONTRACT UPON SIGN-OFF BY MVA OF COMPLETION OF WORK.
29. EXISTING CONSTRUCTION SHALL REMAIN AS INDICATED.
30. SHOULD THE GENERAL CONTRACTOR BECOME AWARE OF OR SUSPECT THE PRESENCE OF HAZARDOUS MATERIALS, OTHER THAN ALREADY DISCLOSED BY THE OWNER WITHIN THE TECHNICAL SPECIFICATIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AFFECTED AREA AND NOTIFY THE OWNER. THE OWNER WILL BE RESPONSIBLE FOR TAKING ANY AND ALL ACTIONS NECESSARY TO CORRECT THE CONDITION IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. THE CONTRACTOR SHALL BE REQUIRED TO RESUME PERFORMANCE OF THE WORK OR ANY OWNER REQUESTED WORK IN THE AFFECTED AREAS ONLY IN THE ABSENCE OF HAZARDOUS MATERIALS OR WHEN THE AFFECTED AREA HAS BEEN RENDERED HARMLESS. EXCEPT AS SET FORTH IN THE TECHNICAL SPECIFICATIONS, THE CONTRACTOR SHALL NOT BE OBLIGATED TO TRANSPORT OR HANDLE HAZARDOUS MATERIAL TO PROVIDE ANY NOTICES TO ANY GOVERNMENTAL AUTHORITY OR AGENCY, OR
TO INSPECT OR EXAMINE THE FACILITIES FOR THE PRESENCE OF HAZARDOUS MATERIAL.
GENERAL PROJECT NOTES
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
C:
\U se rs
\m di m itr i\A
CC
Do cs
\G
AN
NE
TT
F
LE
M
IN
G
IN
C\
-M
DO
T_ M
VA
_V
_M
UL
\P ro je ct
F ile s\ T1
1_ Cu m be rla nd
_B ra nc h_
CR
AC
\A rc hi te ct ur al \0
6-
_G
EN
ER
AL
_G
2.
dw g
/2
8/
:0
PM
D
GENERAL
JUNE 21, 2023
MD MD JEF
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PA-19412
PROFESSIONAL
Gannett Fleming, Inc.
10200 Grand Central Ave • Suite 310 Owings Mills • MD • 21117 t 443 • 348 • 2017 www. gannettfleming.com
GENERAL NOTES
G002
S
TA
T E
O F MARYLAN
D
A
R C H I T ECT
JA
M E S E . FICKES
N o . 1 9412
SCVTO
B
O N
Æ V
I K V B T A T U S T V Æ
C O
R O
N A
S T
I
NOS
1 6 3 2
1COMBINATION
PANEL
FIRE SUPPRESSION
SYSTEM ASSEMBLY
SUBFLOOR
EMITTER
(TYP.)
EMITTER NOZZLE
(TYP.)
FSCP
ACCESS
PANEL 2
PIPING ABOVE
CEILING (TYP.)
ACCESS
CLEARANCE
PORTABLE
WATER TANK
NITROGEN &
WATER PIPING
1. CONTRACTOR TO KEEP EXISTING FIRE SUPPRESSION SYSTEM ACTIVE
DURING ENTIRE PERIOD OF CONSTRUCTION. THE EXISTING FIRE
SUPPRESSION SYSTEM SHALL BE DEMOLISHED AFTER COMMISSIONING
OF NEW FIRE SUPPRESSION SYSTEM.
2. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM RELATED DESIGN.
3. CONTRACTOR TO WORK WITH VICTAULIC FIRE SUPPRESSION SYSTEM
MANUFACTURER TO CALCULATE, DESIGN AND COMMISSION ENTIRE
VORTEX 1500 FIRE SUPPRESSION SYSTEM.
4. CONTRACTOR TO MAINTAIN ALL REQUIRED CLEARANCES REQUIRED BY
MANUFACTURER. DO NOT PLACE THE EMITTER DIRECTLY BELOW THE IT
EQUIPMENT / RACKS; LOCATE AS REQUIRED BY MANUFACTURER
RECOMMENDATIONS.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
SUBMITTALS FOR ALL MANUFACTURED PRODUCTS FOR ARCHITECT / PM
APPROVAL.
6. CONTRACTOR TO MEASURE THE ROOM DIMENSIONS AND SUB-FLOOR
DIMENSIONS AND PROVIDE THE DATA TO VICTAULIC VORTEX 1500
MANUFACTURER FOR PROPER DESIGN OF THE FIRE SUPPRESSION
SYSTEM.
GENERAL NOTES :
1. PROVIDE A COMPLETE PACKAGE OF VICTAULIC VORTEX 1500 HYBRID
TOTAL FLOODING FIRE SUPPRESSION SYSTEM WITH ALL ASSOCIATED
ACCESSORIES INCLUDING NITROGEN TANKS, WATER TANK,
FLUID/COMBINATION PANEL, PIPING, FITTINGS, FIRE-EXTINGUISHING
AGENT, DISCHARGE EMITTERS, HIGH PRESSURE MANIFOLD/PIPING, FIRE
SUPPRESSION CONTROL PANELS, DETECTION DEVICES, MANUAL
STATION, TRANSDUCERS, ALARM DEVICES, ETC, AND ALL REQUIRED
ACCESSORIES TO FUNCTION AS DESIGNED/INTENDED BY THE
MANUFACTURER. THE FIRE SUPPRESSION CONTROL PANEL SHALL BE
ABLE TO COMMUNICATE WITH EXISTING FIRE ALARM CONTROL PANEL.
2. PROVIDE A 24" X12" ACCESS PANEL FOR THE SUBFLOOR NOZZLE ACCESS.
3. REMOVE THE EXISTING ANSUI HALON FIRE SUPPRESSION SYSTEM WITH
ASSOCIATED PIPING, DISCHARGE HEAD, FIRE SUPPRESSION AGENT,
DETECTION DEVICES, ALARM, TRANSDUCER, FSCP, ETC. SEAL AND
PATCH ANY OPENINGS DUE TO DEMOLITION WORK.
4. PROVIDE MANUAL RELEASE SWITCH, AND HORN / STROBES..
NEW WORK NOTES :X
ABC
2 2
1 1
FACP
RX. SPRINKLER
HEADRX. HALON
TANK
RX. PIPING
RX. FSCP
SYMBOL ABBREVIATION DESCRIPTION
LEGEND
PIPE TURNING DOWN
PIPE TURNING UP
DRAWING NOTE NUMBER
NEW PIPING (DARK LINED)
EXISTING PIPING (LIGHT LINED)
ISOLATION VALVE IN VERTICAL
CONNECTION OF NEW TO EXISTING
EXISTING EQUIPMENT/FIXTURE TO BE REMOVED
REMOVE TO POINT FOR RECONNECTION
REMOVE TO POINT AND CAP
EXISTING TO BE REMOVEDRX
PIPING CONTINUATION
DEMOLISH TO THIS POINT
FIRST FLOOR PLAN - NEW WORK
SERVER ROOM ENLARGED PLAN - FIRE PROTECTION NEW WORK
SCALE: 1/4" = 1'-0"
FP-101 0 2' 4' 8'
SCALE: 1/16" = 1' - 0"
FP-101
0 8' 16' 32'
FIRST FLOOR PLAN
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
FP
\F
P-
1.
dw g
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 29683, EXPIRATION DATE: 01-16-2025
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
FP-101
AS, SK SK AS
FSCP
A MR S S
FIRE SUPPRESSION CONTROL PANEL - BLOCK DIAGRAM
NOT TO SCALE
SERVER ROOM ENLARGED PLAN - FIRE PROTECTION DEMOLITION
SCALE: 1/4" = 1'-0"
FP-101 0 2' 4' 8'
ABBREVIATIONS
A
MR
S
ALARM
ALARM WITH STROBE
ACTUATOR SWITCH
SMOKE DETECTOR
MASTER RESET
FIRE SUPPRESSION CONTROL PANELFSCP
END OF LINEEOL
SINGLE LOOP CONTROLLERSLC
FIRE ALARM CONTROL PANELFACP
NORTH
EX.FACP
FSCP
A MR S S
FIRE SUPPRESSION CONTROL PANEL - BLOCK DIAGRAM
NOT TO SCALE
EX.FACP
NORTHNORTH
KEY PLAN
SCALE: NTS
WORKING AREA
(FLOOR AND ROOF)
1. CONTRACTOR TO KEEP EXISTING FIRE SUPPRESSION SYSTEM ACTIVE
DURING ENTIRE PERIOD OF CONSTRUCTION. THE EXISTING FIRE
SUPPRESSION SYSTEM SHALL BE DEMOLISHED AFTER COMMISSIONING
OF NEW FIRE SUPPRESSION SYSTEM.
2. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM RELATED DESIGN.
3. CONTRACTOR TO WORK WITH VICTAULIC FIRE SUPPRESSION SYSTEM
MANUFACTURER TO CALCULATE, DESIGN AND COMMISSION ENTIRE
VORTEX 1500 FIRE SUPPRESSION SYSTEM.
4. CONTRACTOR TO MAINTAIN ALL REQUIRED CLEARANCES REQUIRED BY
MANUFACTURER. DO NOT PLACE THE EMITTER DIRECTLY BELOW THE IT
EQUIPMENT / RACKS; LOCATE AS REQUIRED BY MANUFACTURER
RECOMMENDATIONS.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL
SUBMITTALS FOR ALL MANUFACTURED PRODUCTS FOR ARCHITECT / PM
APPROVAL.
6. CONTRACTOR TO MEASURE THE ROOM DIMENSIONS AND SUB-FLOOR
DIMENSIONS AND PROVIDE THE DATA TO VICTAULIC VORTEX 1500
MANUFACTURER FOR PROPER DESIGN OF THE FIRE SUPPRESSION
SYSTEM.
GENERAL NOTES :
1. PROVIDE A COMPLETE PACKAGE OF VICTAULIC VORTEX 1500 HYBRID
TOTAL FLOODING FIRE SUPPRESSION SYSTEM WITH ALL ASSOCIATED
ACCESSORIES INCLUDING NITROGEN TANKS, WATER TANK,
FLUID/COMBINATION PANEL, PIPING, FITTINGS, FIRE-EXTINGUISHING
AGENT, DISCHARGE EMITTERS, HIGH PRESSURE MANIFOLD/PIPING, FIR
SUPPRESSION CONTROL PANELS, DETECTION DEVICES, MANUAL
STATION, TRANSDUCERS, ALARM DEVICES, ETC, AND ALL REQUIRED
ACCESSORIES TO FUNCTION AS DESIGNED/INTENDED BY THE
MANUFACTURER. THE FIRE SUPPRESSION CONTROL PANEL SHALL BE
ABLE TO COMMUNICATE WITH EXISTING FIRE ALARM CONTROL PANEL.
2. PROVIDE A 24" X12" ACCESS PANEL FOR THE SUBFLOOR NOZZLE ACCE
3. REMOVE THE EXISTING ANSUI HALON FIRE SUPPRESSION SYSTEM WIT
ASSOCIATED PIPING, DISCHARGE HEAD, FIRE SUPPRESSION AGENT,
DETECTION DEVICES, ALARM, TRANSDUCER, FSCP, ETC. SEAL AND
PATCH ANY OPENINGS DUE TO DEMOLITION WORK.
4. PROVIDE MANUAL RELEASE SWITCH, AND HORN / STROBES..
NEW WORK NOTES :X
NOTE:
1. ALL MECHANICAL EQUIPMENT AND INSTALLATIONS SHALL CONFORM WITH THE REQUIREMENTS OF THE LATEST INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL ENERGY CONSERVATION CODE WITH ASHRAE 90.1-2010, INTERNATIONAL PLUMBING CODE, NFPA, UNDERWRITERS LABORATORIES AND ALL APPLICABLE LOCAL CODES AND ORDINANCES.
2. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND PAY ALL FEES RELATIVE TO THE INSTALLATION OF HIS WORK.
3. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL MECHANICAL EQUIPMENT WITH ELECTRICAL DRAWINGS PRIOR TO ORDERING EQUIPMENT OR SUBMITTING SHOP DRAWINGS, AND SHALL FURNISH EQUIPMENT
WIRED FOR THE VOLTAGES SHOWN THEREIN.
4. ALL MECHANICAL EQUIPMENT REQUIRING ELECTRICAL POWER SHALL BE INSTALLED WITH DISCONNECT SWITCHES AT EACH PIECE OF EQUIPMENT. COORDINATE SWITCH TYPE (FUSED OR NON-FUSED) WITH ELECTRICAL CONTRACTOR FOR EQUIPMENT
CHARACTERISTICS, MANUFACTURER'S RECOMMENDATIONS.
5. ALL REQUIRED CONTROL POWER, SUCH AS CIRCUIT BREAKER, CONDUIT AND CONDUCTORS NOT SHOWN ON THE ELECTRICAL
DRAWINGS SHALL BE INCLUDED AS PART OF THE MECHANICAL CONTROL WORK.
6. UNLESS NOTED OTHERWISE, TRANSFORMERS, CONTROL POWER, AND CONTROL WIRING REQUIRED FOR ALL MECHANICAL
SYSTEMS SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
7. ALL MECHANICAL EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A PERIOD OF TWO YEARS AFTER ACCEPTANCE BY
OWNER.
8. ALL HVAC COMPRESSORS SHALL HAVE 5-YEAR MANUFACTURER'S WARRANTY.
9. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH COOLING UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET AS INDICATED ON DRAWINGS. CONDENSATE PIPING LOCATED IN CEILING RETURN AIR PLENUM SHALL BE COPPER TUBE TYPE "M" AND SOLDER FITTINGS. THE HORIZONTAL COPPER PIPING SHALL BE APPLIED WITH 1/2" THICK ELASTOMERIC PIPE INSULATION. SCHEDULE 40 PVC PIPE WITH SOLVENT FITTINGS SHALL BE ALLOWED WHERE THE CEILING SPACE IS NOT USED FOR
A RETURN AIR PLENUM.
10. AFTER CONSTRUCTION, THE AC SYSTEM SHALL BE TESTED, ADJUSTED, AND BALANCED IN ACCORDANCE WITH THE UNIT MANUFACTURER'S INSTALLATION INSTRUCTION AND CHECK THE SYSTEM MAINTAIN THE SPACE TEMPERATURE SET POINT OF 8O
DEG F (ADJUSTABLE).
11. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL MECHANICAL EQUIPMENT, PIPING, ETC. TO FIT WITHIN THE EXISTING SPACE ALLOWED BY THE ARCHITECTURAL AND STRUCTURAL CONDITIONS. CUTTING OR OTHERWISE ALTERING ANY STRUCTURAL MEMBERS SHALL NOT BE PERMITTED WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
12. MOUNT THE TOP OF OPERABLE PARTS OF THERMOSTATS FULLY BELOW 4'-0" ABOVE FINISHED FLOOR IN COMPLIANCE WITH ADA
REQUIREMENTS.
13. CONCEAL ALL THE PIPING ABOVE CEILING, INTERIOR PARTITION, OR IN THE CHASES EXCEPT MECHANICAL ROOM.
14. HVAC CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER CONTRACTORS BEFORE INSTALLATION OF HIS WORK IN
CEILING SPACES AND OTHER AREAS WHERE CONFLICTS MAY OCCUR.
15. ALL WORK SHALL BE COORDINATED AND PERFORMED WITH PRIOR APPROVAL FROM THE OWNER TO SUIT HIS OPERATING CONDITIONS. NOTIFY THE OWNER IN WRITING AT LEAST 7 DAYS IN ADVANCE OF ANY SHUTDOWN OF WATER, HVAC, ELECTRICAL SERVICE, OR ANY OTHER UTILITY. UPON RECEIPT OF APPROVAL FROM THE OWNER, SHUTDOWNS SHALL BE PERFORMED BETWEEN THE HOURS AS DIRECTED, AND SHALL BE ACCOMPLISHED AT NO ADDITIONAL
COST TO THE OWNER.
16. ALL MECHANICAL EQUIPMENT SHALL BE LABELED WITH BAKELITE NAMEPLATE WITH 3/8" HEIGHT WHITE LETTERS ON A BLACK
BACKGROUND, NAMEPLATE SHALL SHOW EQUIPMENT TAG USED ON THESE DRAWINGS.
17. SEAL ALL WALL/FLOOR OPENING TO MAINTAIN THE INTEGRITY OF WALL OR FLOOR CONSTRUCTION REQUIREMENTS. PROVIDE
FIRE-STOPPING PER APPROVED UL ASSEMBLY SYSTEM, OR PER AHJ.
18. ALL PIPING SHALL BE SUPPORTED BY THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING TILES OR CEILING STRUCTURE.
19. ALL REFRIGERANT PIPING EXPOSED TO OUTDOORS SHALL BE WRAPPED IN ALUMINUM JACKETING.
GENERAL NOTES:
ADA AMERICANS WITH DISABILITIES ACT
MECHANICAL ABBREVIATION LIST
LWT LEAVING WATER TEMPERATURE
W/ WITH
U/G
TYP.
TEMP
TYPICAL
UNDERGROUND
TEMPERATURE
PSI POUNDS PER SQUARE INCH
SP
PSIG
STATIC PRESSURE
PSI GAUGE
No
MIN.
NUMBER
MINIMUM
CO CLEAN OUT
HWR
HW
DOMESTIC HOT WATER RECIRCULATING
DOMESTIC HOT WATER
GPM
FL
FT
GALLONS PER MINUTE
FLOOR
FOOT OR FEET
EX., EXIST., X
F
EL
EXISTING
FAHRENHEIT
ELEVATION
DIA, Ø
CONC.
CW
DIAMETER
DOMESTIC COLD WATER
CONCRETE
AFF ABOVE FINISHED FLOOR
TP TRAP PRIMER
RX REMOVE EXISTING
UFS UNDER FLOOR SLAB
EWT ENTERING WATER TEMPERATURE
LAV LAVATORY
WC WATER CLOSET
IPC
IBC
INTERNATIONAL PLUMBING CODE
INTERNATIONAL BUILDING CODE
ETC. ETCETERA
PVC POLYVINYL CHLORIDE
AWWA AMERICAN WATER WORKS ASSOCIATION
PPM PARTS PER MILLION
ASSE AMERICAN SOCIETY FOR TESTING MATERIALS
CPVC CHLORINATED POLYVINYL CHLORIDE
SPEC SPECIFICATIONS
GPF GALLONS PER FLUSH
HR HOUR
FD FLOOR DRAIN
DWG DRAWING
ARCH ARCHITECT / ARCHITECTURAL
ASME AMERICAN SOCIETY OF SANITATION ENGINEERS
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
NSF NATIONAL SCIENCE FOUNDATION
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
SAN SANITARY
W.C. WATER COLUMN
HP HORSE POWER
CFM CUBIC FEET PER MINUTE
HZ HERTZ
V VOLTS / VENT
PH PHASE
IN INCH
EA EXHAUST AIR
EF EXHUAST FAN
NFPA NATIONAL FIRE PROTECTION ASSOCATION
CMU CONCRETE MASONRY UNIT
ECM ELECTRONICALLY COMMUTATED MOTOR
WH WALL HYDRANT
AC AIR CONDITIONING UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CD CONDENSATE DRAIN
CU CONDENSING UNIT
MBH THOUSAND BTUH
MCA MINIMUM CIRCUIT AMP
WET BULBWB
SYMBOL ABBREVIATION DESCRIPTION
MECHANICAL LEGEND
TRAP PRIMERTP TP
VENT
FLOOR DRAIN
FLOOR CLEANOUT/CLEANOUT
GATE/BALL VALVE
HOT WATER RETURN PIPING
SOIL, WASTE PIPING
SHOCK ABSORBER/WATER HAMMER ARRESTOR
UNION
WALL CLEANOUT
HOT WATER PIPING
V
WCO
SA
SAN
HW
FD
FCO/CO
COLD WATER PIPINGCW
PIPE TURNING DOWN
PIPE TURNING UP
DRAWING NOTE NUMBER
NEW PIPING (DARK LINED)
EXISTING PIPING (LIGHT LINED)
ISOLATION VALVE IN VERTICAL
CONNECTION OF NEW TO EXISTING
EXISTING EQUIPMENT/FIXTURE TO BE REMOVED
REMOVE TO POINT FOR RECONNECTION
REMOVE TO POINT AND CAP
EXISTING TO BE REMOVEDRX
PLUMBING FIXTURE DESIGNATIONP-X
PIPING CONTINUATION
EXHAUST AIREA
DEMOLISH TO THIS POINT
CONDENSATE DRAIN PIPINGCD
3" SAN
2" V
HR
ASHREA AMERICAN SOCIETY OF HEATING, REFRIGERATING AND
AIR-CONDITIONING ENGINEERS
DESCRIPTION ABBREVIATION
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
M ec h\ M
-0
.d wg
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 29683, EXPIRATION DATE: 01-16-2025
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
M-001
AS, SK SK AS
INSULATION
BACKUP MATERIAL
(WHERE REQUIRED)
WALL
SEALANT
CONCRETE FLOOR 3/8" BEAD OF CAULKING
(TYP.)
APPLY FIRE STOPPING SEALANT TO
MIN. 1" DEPTH. APPLY BOTH SIDES OF
FLOORS/WALLS FOR HOLLOW-CORE
PRECAST CONCRETE
CONCRETE ANCHOR SCREWS FIRESTOP PIPE COLLAR
WOOD FIRE BACKING MATERIAL
ALUMINUM JACKET WITH FACTORY
APPLIED MOISTURE BARRIER.
EXTEND 2" BOTH SIDES & SECURE
BOTH ENDS WITH A BAND.
MINIMUM 1/4" GAP
ALL AROUND PIPE
PROVIDE ESCUTCHEON
FOR EXPOSED PIPING. OMIT
INSIDE MECH. ROOMS.
SCHEDULE 40 STEEL OR CAST-IRON
PIPE SLEVE CUT FLUSH WITH WALL
1. OMIT ALUMINUM JACKET IF PIPING IS UNINSULATED.
2. FOR GYP. BOARD WALLS PROVIDE MIN. 16 GAUGE GALV. STEEL
W/ LOCK-TYPE LONGITUDINAL SEAM.
EXIST.
THREADED
PIPE SIZE
PER PLAN
HANGER ROD W/ JAM NUT
EXPANSION CASE
GRINNELL FIG. 117
THREADED
HANGER ROD
PIPE
INSULATION
CONCRETE
A
SHIELD
INSULATION
PROTECTION
TYPE 1 CLEVIS HANGER
OR EQUAL
M-001
1 TYPICAL PIPE PENETRATION DETAIL
NOT TO SCALE
M-001
M-001
TYPICAL PIPE HANGER DETAIL
NOT TO SCALE
M-001
ABBREVIATIONS, DETAIL
AND GENERAL NOTES
1" X 1" CHAMFER ALL AROUND
FLOOR/GRADE
3" MIN
NOTE:
1. CONCRETE PAD SHALL BE 4 INCHES GREATER IN ALL HORIZONTAL DIRECTIONS THAN THE EQUIPMENT BASE PLATE.
PROVIDE #3 BARS, 12" ON CENTER, EACH WAY, IN THE BASE AND
DOWEL BASE TO FLOOR.
3,000 PSI CONCRETE
2"
2"
1 1/2" CLEAR
#4, 12" EACH WAY
1 1/2" CLEAR
PIPING SUPPORT
ROOF DECK
SHEET METAL
FLASHING RECEIVER
1 1/2" THICK, 3
LBS. RIGID
INSULATION
SEAL AND FLASHING
PIPING (TYP.)
CONCRETE ANCHOR
SCREWS
PIPING SUPPORT IN
VERTICAL
18" HEIGHT ROOF
CURB
FLASHING MEMBRANE
PIPE INSULATION (TYP.)
SHEET METAL
ENCLOSURE W/
REMOVABLE TOP
INSULATE VOID
SLOPE PIPES
DOWN AWAY
FROM HOOD
WOOD NAILERS
AND CURB
SHEET METAL
COUNTER FLASHING
SHEET METAL
COLLAR
PIPE FLASHING THRU ROOF DETAIL
NOT TO SCALE
EQUIPMENT PAD DETAIL
NOT TO SCALE
ABC
2 2
1 1
RX. 1" CD ABOVE
CEILING
T
1. REMOVE EXISTING COMPUTER ROOM AIR CONDITIONING UNIT WITH
ASSOCIATED POWER, CONTROL WIRING, THERMOSTATS, AND REFRIGERANT
PIPING. REMOVE AND CAPTURE EXISTING REFRIGERANT IN ACCORDANCE WITH
EPA REQUIREMENTS AND LOCAL CODES.
2. REMOVE EXISTING CONDENSATE DRAIN PUMP.
3. REMOVE EXISTING CONDENSATE DRAIN PIPING.
4. REMOVE EXISTING CONDENSING UNIT AND REFRIGERANT PIPING. REMOVE AND
CAPTURE EXISTING REFRIGERANT IN ACCORDANCE WITH EPA REQUIREMENTS
AND LOCAL CODES. DISCONNECT ELECTRICAL POWER.
DEMOLITION NOTES :X
1. COVER ALL ROOF OPENINGS DURING CONSTRUCTION TO PROTECT THE
BUILDING FROM THE OUTDOOR WEATHER CONDITIONS.
2. REINSTALL PITCH POCKETS AS PER THE DETAILS.
3. COMPLY WITH ROOFING MANUFACTURER'S WARRANTY REQUIREMENTS WHEN
UTILIZING THE ROOF.
GENERAL NOTES :
EX. AIR INTAKE
HOOD
EX. RTU-2 EX. RTU-5
EX. RTU-4EX. RTU-3EX. RTU-1
EX. CU-3
EX. 4" VTR
EX. 3" VTR
EX. EF-1
ACCESS HATCH
EX. PRV
FIRST FLOOR PLAN - DEMOLITION
SCALE: 1/16" = 1' - 0"
SERVER ROOM ENLARGED PLAN - HVAC
SCALE: 1/4" = 1'-0"
MD-101
MD-101
ROOF PLAN - DEMOLITION
SCALE: 1/16" = 1' - 0"0 8' 16' 32'
FIRST FLOOR & ROOF -
DEMOLITION PLAN
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
M ec h\ M
D-
1.
dw g
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 29683, EXPIRATION DATE: 01-16-2025
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
MD-101
AS, SK SK AS
0 8' 16' 32'
0 2' 4' 8'
NORTHNORTH
NORTHNORTH
KEY PLAN
SCALE: NTS
WORKING AREA
(FLOOR AND ROOF)
1. REMOVE EXISTING COMPUTER ROOM AIR CONDITIONING UNIT WITH
ASSOCIATED POWER, CONTROL WIRING, THERMOSTATS, AND REFRIGERANT
PIPING. REMOVE AND CAPTURE EXISTING REFRIGERANT IN ACCORDANCE WITH
EPA REQUIREMENTS AND LOCAL CODES.
2. REMOVE EXISTING CONDENSATE DRAIN PUMP.
3. REMOVE EXISTING CONDENSATE DRAIN PIPING.
4. REMOVE EXISTING CONDENSING UNIT AND REFRIGERANT PIPING. REMOVE AND
CAPTURE EXISTING REFRIGERANT IN ACCORDANCE WITH EPA REQUIREMENTS
AND LOCAL CODES. DISCONNECT ELECTRICAL POWER.
DEMOLITION NOTES :X
1. COVER ALL ROOF OPENINGS DURING CONSTRUCTION TO PROTECT THE
BUILDING FROM THE OUTDOOR WEATHER CONDITIONS.
2. REINSTALL PITCH POCKETS AS PER THE DETAILS.
3. COMPLY WITH ROOFING MANUFACTURER'S WARRANTY REQUIREMENTS WHEN
UTILIZING THE ROOF.
GENERAL NOTES :
1" EX. CD ABOVE
CEILING
T
CRAC-1
EX. 3" CW ABOVE
CEILING
EX. 3/4" CW ABOVE
CEILING
1/4" CW
CO
UP TO
ACCU-1
1. COVER ALL ROOF OPENINGS DURING CONSTRUCTION TO PROTECT THE
BUILDING FROM THE OUTDOOR WEATHER CONDITIONS.
2. CONTRACTOR TO PROVIDE TEMPORARY COOLING FOR THE SERVER
ROOM DURING CONSTRUCTION UNTIL NEW CRAC UNIT AND FIRE
SUPPRESSION SYSTEM HAS BEEN COMMISSIONED. PROVIDE
TEMPORARY POWER FOR THE COOLING UNIT. COORDINATE WITH OWNER
FOR INSTALLATION LOCATION ON SITE. THE UNIT SHALL BE CAPABLE OF
24/7 OPERATION DURING ENTIRE PERIOD OF CONSTRUCTION.
GENERAL NOTES :
1. PROVIDE A COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT WITH
ASSOCIATED CONTROL, WIRING, REFRIGERANT PIPING, CONDENSATE
PIPING, HUMIDIFIER SUPPLY LINE PIPING, ETC. INSTALL CRAC UNIT &
ASSOCIATED ACCESSORIES AS PER MANUFACTURER'S INSTALLATION
REQUIREMENTS. MAINTAIN ALL THE REQUIRED MAINTENANCE
CLEARANCE AS PER MANUFACTURER RECOMMENDATIONS. PROVIDE A
18" PLENUM WITH 3 SIDE REGISTER FOR SUPPLY AIR.
2. CONNECT 1/4" CW LINE TO THE CRAC UNIT HUMIDIFIER SUPPLY LINE
CONNECTION.
3. PROVIDE 1/2" CONDENSATE DRAIN PIPING AND CONNECT IT TO CRAC
UNIT BUILT-IN CONDENSATE PUMP CONNECTION.
4. PROVIDE CONDENSING UNIT (ACCU-1) AND INSTALL IT ON EXISTING STEEL
RAIL SUPPORTS ON ROOF. CONTRACTOR TO PROVIDE RAIL SUPPORT
EXTENSIONS AS REQUIRED TO SUPPORT THE NEW CONDENSING UNIT.
CONTRACTOR TO SEND SUPPORTS SUBMITTAL TO ARCHITECTS/
STRUCTURAL ENGINEER FOR APPROVAL BEFORE CONSTRUCTION.
PROVIDE REFRIGERANT PIPING, CONTROL WIRING, AND CONDUITS PER
UNIT MANUFACTURER'S INSTALLATION INSTRUCTIONS. CHARGE THE UNIT
WITH REFRIGERANT PER EQUIPMENT MANUFACTURER'S REQUIREMENTS.
REFER TO ELECTRICAL DRAWINGS FOR RECONNECTION OF POWER.
5. INSTALL THE CRAC-1 UNIT ON A 3" CONCRETE PAD. REFER TO DETAIL.
6. PROVIDE REFRIGERANT PIPING PER UNIT MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
NEW WORK NOTES :X
EX. AIR INTAKE
HOOD
EX. RTU-2 EX. RTU-5
EX. RTU-4EX. RTU-3EX. RTU-1
EX. CU-3
EX. 4" VTR
EX. 3" VTR
EX. EF-1
ACCESS HATCH
EX. PRV 4ACCU-1
ABC
2 2
1 1
FIRST FLOOR PLAN - NEW WORK
SERVER ROOM ENLARGED PLAN - HVAC
SCALE: 1/4" = 1'-0"
M-101
ROOF PLAN - NEW WORK
SCALE: 1/16" = 1' - 0"
0 2' 4' 8'
SCALE: 1/16" = 1' - 0"
M-101
0 8' 16' 32'
FIRST FLOOR & ROOF -
NEW WORK PLAN
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
M ec h\ M
-1
.d wg
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 29683, EXPIRATION DATE: 01-16-2025
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
M-101
AS, SK SK AS
0 8' 16' 32'
NORTH NORTH
NORTHNORTH
KEY PLAN
SCALE: NTS
WORKING AREA
(FLOOR AND ROOF)
1. COVER ALL ROOF OPENINGS DURING CONSTRUCTION TO PROTECT THE
BUILDING FROM THE OUTDOOR WEATHER CONDITIONS.
2. CONTRACTOR TO PROVIDE TEMPORARY COOLING FOR THE SERVER
ROOM DURING CONSTRUCTION UNTIL NEW CRAC UNIT AND FIRE
SUPPRESSION SYSTEM HAS BEEN COMMISSIONED. PROVIDE
TEMPORARY POWER FOR THE COOLING UNIT. COORDINATE WITH OWNER
FOR INSTALLATION LOCATION ON SITE. THE UNIT SHALL BE CAPABLE OF
24/7 OPERATION DURING ENTIRE PERIOD OF CONSTRUCTION.
GENERAL NOTES :
1. PROVIDE A COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT WITH
ASSOCIATED CONTROL, WIRING, REFRIGERANT PIPING, CONDENSATE
PIPING, HUMIDIFIER SUPPLY LINE PIPING, ETC. INSTALL CRAC UNIT &
ASSOCIATED ACCESSORIES AS PER MANUFACTURER'S INSTALLATION
REQUIREMENTS. MAINTAIN ALL THE REQUIRED MAINTENANCE
CLEARANCE AS PER MANUFACTURER RECOMMENDATIONS. PROVIDE A
18" PLENUM WITH 3 SIDE REGISTER FOR SUPPLY AIR.
2. CONNECT 1/4" CW LINE TO THE CRAC UNIT HUMIDIFIER SUPPLY LINE
CONNECTION.
3. PROVIDE 1/2" CONDENSATE DRAIN PIPING AND CONNECT IT TO CRAC
UNIT BUILT-IN CONDENSATE PUMP CONNECTION.
4. PROVIDE CONDENSING UNIT (ACCU-1) AND INSTALL IT ON EXISTING STE
RAIL SUPPORTS ON ROOF. CONTRACTOR TO PROVIDE RAIL SUPPORT
EXTENSIONS AS REQUIRED TO SUPPORT THE NEW CONDENSING UNIT.
CONTRACTOR TO SEND SUPPORTS SUBMITTAL TO ARCHITECTS/
STRUCTURAL ENGINEER FOR APPROVAL BEFORE CONSTRUCTION.
PROVIDE REFRIGERANT PIPING, CONTROL WIRING, AND CONDUITS PER
UNIT MANUFACTURER'S INSTALLATION INSTRUCTIONS. CHARGE THE U
WITH REFRIGERANT PER EQUIPMENT MANUFACTURER'S REQUIREMEN
REFER TO ELECTRICAL DRAWINGS FOR RECONNECTION OF POWER.
5. INSTALL THE CRAC-1 UNIT ON A 3" CONCRETE PAD. REFER TO DETAIL.
6. PROVIDE REFRIGERANT PIPING PER UNIT MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
NEW WORK NOTES :X
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
M ec h\ M
-0
.d wg
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 29683, EXPIRATION DATE: 01-16-2025
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
M-601
AS, SK SK AS
CONTROL RISER DIAGRAM - COMPUTER ROOM AC SYSTEM
CRAC-1 / ACCU-1
NOT TO SCALE
SPACE COOLING - DATA ROOM
SYSTEM OVERVIEW:
A. SPACE COOLING FOR DATA ROOM AS INDICATED, ON EQUIPMENT SCHEDULES ON DRAWING M601.
B. SPACE COOLING SHALL BE PROVIDED BY SPLIT TYPE D-X COOLING INDOOR AC UNIT AND OUTDOOR CONDENSING UNIT. EACH SPLIT-TYPE AC UNIT SHALL BE PROVIDED WITH A UNIT MOUNTED MICROPROCESSOR
PROGRAMMABLE CONTROLLER WITH BACnet COMMUNICATION CARD. PROVIDE NETWORK COMMUNICATION AND CONTROL WIRING WITH CONDUITS, AS REQUIRED. PROVIDE RIGID CONDUITS FOR ALL EXTERIOR
EXPOSED CONTROL WIRING.
C. THE SPACE COOLING SYSTEM OPERATING STATUS, TEMPERATURE SET POINTS, AND EQUIPMENT ALARM CONDITIONS SHALL BE CONTROLLED AND MONITORED THROUGH THE HMI ON THE MAIN CONTROL PANEL OR
REMOTE BAS WORKSTATION.
SEQUENCE OF OPERATION
A. GENERAL:
a. COMPLETE CONTROL WIRING BETWEEN INDOOR COOLING UNITS AND OUTDOOR AIR COOLED CONDENSER UNITS, AND ENSURE THE AC UNITS ARE FULLY OPERATIONAL IN ACCORDANCE WITH THE UNIT
MANUFACTURER'S INSTALLATION AND OPERATION MANUALS.
b. BAS SHALL ENABLE THE AC UNITS TO MAINTAIN THE SPACE TEMPERATURE SET POINT OF 70°F (ADJUSTABLE).
B. SAFETY:
a. WHENEVER THE SPACE TEMPERATURE FALLS BELOW ITS LOW LIMIT SETPOINT (60°F, ADJUSTABLE) OR RISES ABOVE ITS HIGH LIMIT SET POINT (80°F, ADJUSTABLE), THE UNIT CONTROLLER SHALL SIGNAL AN
ALARM TO THE BAS.
b. SMOKE DETECTOR FOR CRAC-1: INSTALL SMOKE DETECTOR WITH THE SENSING ELEMENT IN THE SUPPLY AIR STREAM. WHEN THE SMOKE DETECTOR IS ACTIVATED, IT SHALL IMMEDIATELY SHUT DOWN THE UNIT
AND SIGNAL AN ALARM TO BAS.
ROOF
OUTDOOR
CONDENSER
ACCU-1
SA
INDOOR CRAC
CRAC-1
SD
BAS
T
SMOKE
DETECTOR TO BE
FURNISHED BY
MANUFACTURER
DATA ROOM
SCHEDULES &
CONTROLS
ABBREVIATIONS
A, AMP AMPERE
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
BLDG BUILDING
C, COND CONDUIT
CKT CIRCUIT
CU COPPER
DET DETAIL
DETAIL X/Y DETAIL "X" ON DRAWING 'Y'
DIA, Ø DIAMETER
DWG DRAWING
ELEC ELECTRIC
EX., EXIST EXISTING
FT FEET, FOOT
FSCP FIRE SUPPRESSION CONTROL PANEL
GRC GALVANIZED RIGID STEEL
IBC INTERNATIONAL BUILDING CODE
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
JB JUNCTION BOX
LTG LIGHTING
LTS LIGHTS
MTD MOUNTED
MTG MOUNTING
NEC NATIONAL ELECTRICAL CODE
NECA NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION
NEMA NATIONAL ELECTRICAL MANUFACTERERS ASSOCIATION
NETA INTERNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NICET NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
No. NUMBER
NTS NOT TO SCALE
PNL PANEL
RECEP RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
TYP TYPICAL
UPS UNINTERRUPTIBLE POWER SUPPLY
U.O.N. UNLESS OTHERWISE NOTED
V VOLTS
W WATTS
WP WEATHERPROOF
GENERAL NOTES FOR ALL WORKS
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE
FEDERAL/STATE/LOCAL CODES, INTERNATIONAL BUILDING CODE, NFPA 72 2018, NFPA 70 2017, IECC 2018, AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION.
2. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. FURNISH AND INSTALL ALL REQUIRED JUNCTION BOXES, PULL BOXES, SURFACE/RECESSED DEVICE BOXES, FITTINGS, CONDUIT BODIES, SUPPORTS, ACCESS DOORS, HARDWARE, ACCESSORIES, ETC. REQUIRED FOR A COMPLETE AND WORKING
ELECTRICAL SYSTEM, WHETHER OR NOT SUCH EQUIPMENT IS INDICATED ON THE DRAWINGS.
3. CONTRACTOR SHALL PERFORM SITE VISITS AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE PLANS, SPECIFICATIONS AND FIELD CONDITIONS, BEFORE SUBMITTING A BID OR BEFORE SUBMITTING A
PRICE PROPOSAL. FIELD VERIFY ALL IMPORTANT DIMENSIONS.
4. THE ELECTRICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER CONTRACTORS AND ALL OTHER TRADES BEFORE INSTALLATION OF HIS WORK IN CHASES, CEILING SPACES AND OTHER AREAS
WHERE CONFLICT MAY OCCUR.
5. THE ELECTRICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL CONTRACT DOCUMENTS, SHOP DRAWINGS AND EQUIPMENT DRAWINGS. THE ELECTRICAL CONTRACTOR SHALL OBTAIN A COPY OF ALL
CONTRACT DOCUMENTS, INCLUDING ALL DRAWINGS AND ALL SPECIFICATIONS.
6. PROVIDE ALL EQUIPMENT, COMPONENTS AND DEVICES SHOWN ON THE POWER RISER DIAGRAMS, POWER ONE-LINE DIAGRAMS, BLOCK DIAGRAMS, AND SPECIAL SYSTEMS (INCLUDING, BUT NOT LIMITED TO: FIRE ALARM, SECURITY, TELEPHONE, DATA, CATV) RISER OR BLOCK DIAGRAMS WHETHER OR NOT SUCH
EQUIPMENT, COMPONENTS AND DEVICES ARE INDICATED ON THE FLOOR PLANS.
7. THE ELECTRICAL CONTRACTOR SHALL PERFORM ALL CORE-DRILLING, CUTTING, DIGGING OR TRENCHING REQUIRED FOR THE ELECTRICAL INSTALLATION UNDER THE SUPERVISION OF THE GENERAL CONTRACTOR SUBJECT TO THE DIRECTION AND APPROVAL OF THE OWNER'S REPRESENTATIVE. DO NOT ENDANGER THE
STABILITY OF THE STRUCTURE OR ANY PART THEREOF.
8. THE ELECTRICAL CONTRACTOR SHALL EXTEND WIRING AND CONDUIT TO ALL EQUIPMENT REQUIRING
ELECTRICAL CONNECTIONS. BEFORE "ROUGH-IN" OF OUTLETS, THE LOCATION AND TYPE OF
CONNECTIONS/OUTLET SHALL BE VERIFIED FROM SHOP DRAWINGS OF THE EQUIPMENT.
9. WHERE JUNCTION BOXES OR ELECTRICAL EQUIPMENT ARE REQUIRED TO BE INSTALLED ABOVE NON-ACCESSIBLE CEILINGS OR CONCEALED INSIDE WALLS, THE CONTRACTOR SHALL FURNISH AND INSTALL ACCESS DOORS TO MAKE THE JUNCTION BOXES OR ELECTRICAL EQUIPMENT ACCESSIBLE.
10. ALL ELECTRICAL EQUIPMENT SHALL BE UNDERWRITER'S LABORATORY (U.L.) LISTED AND LABELED. ALL
EQUIPMENT SHALL BE NEW U.O.N.
11. EXACT LOCATION OF ALL EQUIPMENT AND ACCESSORIES SHALL BE VERIFIED IN THE FIELD AND COORDINATED WITH OTHER TRADES. ADJUST LOCATIONS TO SUIT FIELD CONDITIONS. COMPLY WITH
CLEARANCES AS REQUIRED BY THE NEC, THE MANUFACTURER, AND APPLICABLE CODES.
12. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF MECHANICAL EQUIPMENT.
13. COMPLY WITH ALL SAFETY REGULATIONS INCLUDING BUT NOT LIMITED TO OSHA, MOSHA AND ALL
ELECTRICAL SAFETY REGULATIONS.
14. CONTRACTOR SHALL FIELD VERIFY THE SWITCH AND/OR CIRCUIT BREAKER SOURCE OF EACH BRANCH OR
FEEDER CIRCUIT BEFORE PERFORMING ANY WORK.
15. UNLESS OTHERWISE NOTED AS "EXISTING" OR "BY OTHERS" OR "NIC", ALL WORK, DEVICES AND
EQUIPMENT ARE NEW AND SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
16. WHERE THE WORD "PROVIDE" IS USED, THIS SHALL MEAN "FURNISH AND INSTALL".
17. PROVIDE DEDICATED NEUTRAL WIRES FOR ALL BRANCH CIRCUITS.
18. ALL RACEWAY SHALL BE CONCEALED WHEREVER POSSIBLE. WHERE RACEWAY CANNOT BE CONCEALED, THE RACEWAY AND ASSOCIATED SUPPORTS SHALL BE PAINTED TO MATCH SURROUNDING WALLS OR
CEILING.
19. CABLES AND RACEWAY SHALL RUN PARALLEL OR PERPENDICULAR TO WALL AND CEILING STRUCTURES
(COLUMNS, JOISTS, SUPPORT BEAMS, ETC.) FOR A NEAT APPEARANCE.
20. PROVIDE HACR TYPE BREAKERS FOR HEATING, AIR CONDITIONING AND REFRIGERATION EQUIPMENT
WHERE RECOMMENDED BY THE MANUFACTURER.
21. PROVIDE FIRESTOPPING AROUND PENETRATIONS OF FLOORS AND FIRE RATED WALLS. MAINTAIN THE FIRE RESISTANCE RATING OF THE FLOORS AND WALLS. INSTALL UL LISTED FIRESTOPPING MATERIAL IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS, AND UL's REQUIREMENTS.
22. WHEREVER NEW CIRCUIT BREAKERS ARE BEING INSTALLED INSIDE EXISTING PANELBOARDS, SWITCHBOARDS, MCCs, OR SIMILAR EQUIPMENT, THE CIRCUIT BREAKER SHALL COME FROM THE SAME
MANUFACTURER AS THE EXISTING EQUIPMENT.
23. WHEREVER, NEW CIRCUIT BREAKERS ARE BEING PROVIDED AT EXISTING PANELBOARDS, SWITCHBOARDS, MCCs, OR SIMILAR EQUIPMENT, OR WHEREVER EXISTING BREAKERS ARE BEING RE-USED TO FEED NEW LOADS, THE SCHEDULES/LABELS ON THE EQUIPMENT SHALL BE REVISED TO REFLECT THE LOADS.
24. SOME MECHANICAL EQUIPMENT ARE PROVIDED BY THE MECHANICAL CONTRACTOR BUT INSTALLED, WIRED, AND CONNECTED BY THE ELECTRICAL CONTRACTOR. COORDINATE WITH MECHANICAL
CONTRACTOR.
25. 600V POWER WIRING SHALL BE THHN/THWN-2, COPPER CONDUCTOR. SEE SPECIFICATION WIRING AND
CABLE SECTION FOR MORE DETAILS ABOUT WIRING.
26. DO NOT COMBINE SEPARATE BRANCH CIRCUITS IN THE SAME CONDUIT UNLESS OTHERWISE NOTED.
27. PROVIDE SLEEVES FOR ALL CABLE AND RACEWAY PENETRATIONS OF CONCRETE WALLS AND FLOORS.
28. PROVIDE GROUNDING AND BONDING OF ALL METALLIC RACEWAY, BOXES, TROUGH, WIREWAY, DEVICES
AND EQUIPMENT IN ACCORDANCE WITH THE NEC.
29. INSTALL ALL DEVICES AND EQUIPMENT ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS AND
UL'S REQUIREMENTS.
30. CONNECTORS AND TERMINATIONS FOR CONDUCTORS SHALL BE COMPATIBLE WITH THE CONDUCTOR SIZE
AND MATERIAL, AND SHALL BE UL LISTED AND NEC COMPLIANT.
31. WHERE THE SIZE OF A JUNCTION BOX, PULL BOX OR WIREWAY IS NOT INDICATED ON THE DRAWINGS, THE SIZE SHALL BE SELECTED IN ACCORDANCE WITH THE NEC. WHERE THE ENCLOSURE TYPE OF THE JUNCTION BOX, PULL BOX OR WIREWAY IS NOT INDICATED ON THE DRAWINGS, THE ENCLOSURE TYPE SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS BEING INSTALLED IN ACCORDANCE WITH THE
NEC AND OTHER APPLICABLE CODES.
32. REPAIR, PATCH, AND PAINT ANY DISTURBED AREA TO MATCH EXISTING.
33. MVA BUSINESS HOURS ARE BETWEEN 8:30AM TO 4:30PM MONDAYS THROUGH FRIDAYS AND 8:30AM TO
1:00PM ON SATURDAYS. CONTRACTOR SHALL NOT INTERRUPT ANY POWER NOR COMMUNICATIONS
DURING BUSINESS HOURS. IF INTERRUPTING POWER OR COMMUNICATIONS IS REQUIRED, CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FORM FOR INTERRUPTING POWER OR COMMUNICATIONS TO MVA FOR APPROVAL 10 DAYS IN ADVANCE. CONTRACTOR SHALL INTERRUPT POWER OR COMMUNICATIONS OUTSIDE OF BUSINESS HOURS: FROM 5:00PM TO 6:00AM MONDAY THROUGH FRIDAY AND 1:30PM TO 6:00AM
SATURDAY THROUGH MONDAY - WITH WRITTEN APPROVAL FROM MVA.
34. CALL CENTER HAS DIFFERENT BUSINESS HOUR THAN MVA. CONTRACTOR SHALL COORDINATE WITH CALL CENTER OPERATION MANAGER AND MVA PROJECT MANAGER TO DETERMINE FOR THE CONSTRUCTION WORKING HOURS AND DAYS. CONTRACTOR SHALL NOT INTERRUPT ANY POWER NOR COMMUNICATIONS DURING BUSINESS HOURS. IF INTERRUPTING POWER OR COMMUNICATIONS IS REQUIRED, CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FORM FOR INTERRUPTING POWER OR COMMUNICATIONS TO MVA
AND CALL CENTER FOR APPROVAL 10 DAYS IN ADVANCE.
35. ALL SITES SHALL BE KEPT CLEAN AT ALL TIMES. CONTRACTORS SHALL CLEAN THE SITE BEFORE LEAVING
EACH WORKING DAY.
36. CONTRACTOR SHALL TAKE CARE NOT TO DISRUPT THE OWNER'S WORK AND OPERATIONS. CONTRACTOR
SHALL NOT BLOCK OR ALTER THE MOVEMENT OF PEOPLE.
37. ALL WORK STATION EQUIPMENTS SHALL BE RECONNECTED UP ON COMPLETION OF CONSTRUCTION.
COORDINATE WITH MVA PROJECT MANAGER FOR PLACEMENT AND CONNECTION OF WORK STATION
EQUIPMENTS UP ON COMPLETION OF CONSTRUCTION.
1. REMOVE ALL ELECTRICAL DEVICES, DATA/TELEPHONE/VIDEO/AUDIO, LIGHTING AND CONTROL INSTALLED AT DEMOLISHED WALLS AND CEILING, AND ASSOCIATED WIRING/CABLES AND CONDUIT BACK TO SOURCE
PANELS.
2. KEEP EXISTING CIRCUITS CONTINUOUS FOR EXISTING DEVICES TO REMAIN. SPLICE, EXTEND, AND PROVIDE WIRING AND CONDUIT AS REQUIRED. REROUTE ALL REMAINING WIRING/CABLES AND CONDUIT AS
REQUIRED.
3. FOR EXISTING EQUIPMENT TO BE REMOVED, REMOVE DISCONNECTS, COMBINATION STARTERS, MANUAL STARTERS, AND WIRING/CONDUIT ASSOCIATED WITH THE EQUIPMENT ALL THE WAY UP TO THE SOURCE
PANEL, SWITCHBOARD OR MOTOR CONTROL CENTER, UNLESS OTHERWISE NOTED. WHERE THE
WIRING/CONDUIT ASSOCIATED WITH THE EQUIPMENT ALSO FEEDS EXISTING EQUIPMENT TO REMAIN, ONLY THAT PORTION OF THE WIRING/CONDUIT THAT FEEDS THE EQUIPMENT TO REMAIN SHALL REMAIN. SEAL ALL
OPENINGS IN THE CONDUIT, JUNCTION BOXES, AND ENCLOSURES.
4. SEAL ALL OPENINGS IN WALLS AND FLOORS, WHERE SUCH OPENINGS WERE CAUSED BY REMOVAL OF EXISTING WIRING, CONDUIT AND OTHER EQUIPMENT. PROVIDE FIRESTOPPING TO MAINTAIN THE FIRE
RESISTANCE RATING OF THE WALLS AND FLOORS.
5. MAINTAIN AND RESTORE, IF INTERRUPTED BY REMOVALS, OR IN THE PATH OF NEW CONSTRUCTION, ALL CIRCUITS, CONDUIT AND FEEDERS PASSING THROUGH AND SERVING UNDISTURBED AREAS WHETHER
INDICATED ON THE DRAWINGS OR NOT.
6. EXISTING UNUSED WIRING SHALL BE COMPLETELY REMOVED UP TO THE SOURCE.
7. DEMOLITION SHALL BE COORDINATED AND CONFIRMED WITH OTHER DISCIPLINES AND MVA PROJECT MANAGER PRIOR TO ANY WORKS. DEMOLITION SHALL BE PROVIDED IN ACCORDANCE WITH PHASING
PLANS. SEE PHASING PLANS FOR MORE DETAILS.
GENERAL NOTES FOR ALL WORKS
GENERAL DEMOLITION NOTES
, DRAWING NOTES, "#" IS DRAWING NOTE NUMBER OR LETTER##
NORTH ARROW (ARROW POINTING NORTH)
E-XXX
Y DETAIL OR SECTION Y/E-XXX
DETAIL OR SECTION NUMBER OR LETTER
DRAWING NUMBER WHERE DETAIL OR SECTION IS SHOWN
E-XXX
Y DETAIL Y/E-XXX
DETAIL NUMBER OR LETTER
DRAWING NUMBER WHERE DETAIL IS SHOWN
DISCONNECT SWITCH, SEE DRAWING NOTES FOR SWITCH DETAILS. SWITCH
SHALL BE WALL MOUNTED AT 54" AFF TO TOP OF OPERATING HANDLE U.O.N.
ELECTRICAL WIRING AND CONDUIT U.O.N. REFER TO PANEL SCHEDULE,
ONE-LINE DIAGRAM, OR DRAWING NOTES FOR WIRING AND CONDUIT
INFORMATION. WIRING AND CONDUIT INFORMATION SHALL APPLY TO THE
ENTIRE LENGTH OF THE CIRCUIT, THROUGH SWITCHES, DISCONNECTS,
CONTROLLERS, STARTERS, JUNCTION BOXES OR OTHER INTERMEDIATE POINTS,
ALL THE WAY UP TO THE FINAL LOAD AT THE END OF THE CIRCUIT, U.O.N.
A-1
ELECTRICAL WIRING AND CONDUIT HOMERUN TO PANEL. LETTER DENOTES
PANEL DESIGNATION, NUMBER DENOTES CIRCUIT NUMBER. FOR WIRING AND
CONDUIT INFORMATION, REFER TO PANEL SCHEDULE, ONE-LINE DIAGRAM, OR
DRAWING NOTES. WIRING AND CONDUIT INFORMATION SHALL APPLY TO THE
ENTIRE LENGTH OF THE CIRCUIT, THROUGH SWITCHES, DISCONNECTS,
CONTROLLERS, STARTERS, JUNCTION BOXES OR OTHER INTERMEDIATE POINTS,
ALL THE WAY UP TO THE FINAL LOAD AT THE END OF THE CIRCUIT, U.O.N. IF
MORE THAN ONE ARROW IS INDICATED, THE NUMBER OF ARROWS INDICATE
THE NUMBER OF CIRCUITS IN THE SAME CONDUIT.
EX. FIRE ALARM DEVICE, ADDRESSABLE MONITOR MODULE.
FIRE ALARM DEVICE, ADDRESSABLE CONTROL MODULE.
MM
CM
EX
SYMBOL LISTS
GENERAL NOTES, SYMBOL
LISTS AND ABBREVIATIONS
K.S K.S J.Y
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
El ec
\E
G
EN
ER
AL
N
O
TE
S, S
YM
BO
L
LI
ST
S
AN
D
AB
BR
EV
IA
TI
O
NS
.d wg
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 38316, EXPIRATION DATE: 01-05-2024
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
E001
ACCU-1
ECB-ACCU-1 C
D UPS2-20,22,24 1. EXISTING TO REMAIN.
2. EX. CRAC UNIT TO BE REMOVED. DISCONNECT POWER TO UNIT AND REMOVE
ASSOCIATED DISCONNECTS, WIRING AND CONDUIT BACK TO SOURCE PANEL (CSC
LP-1). ASSOCIATED CB TO BE LABELED AS SPARE.
3. EX. FIRE SUPPRESSION SYSTEM TO BE REPLACED. DISCONNECT POWER TO SYSTEM,
AND REMOVE ALL ASSOCIATED FIRE SUPPRESSION DEVICES AND CABLES AND
CONDUITS. EXISTING FIRE SUPPRESSION SYSTEM WILL REMAIN UNTIL THE NEW FIRE
SUPPRESSION SYSTEM ARE INSTALLED COMPLETELY AND FULLY FUNCTIONAL
OPERATION. THE EXISTING SYSTEM TO BE REMOVED AFTER NEW SYSTEM PASSED
INSPECTION AND FULLY FUNCTIONAL OPERATION.
4. EX. OUTDOOR UNIT ASSOCIATED WITH CRAC UNIT TO BE REPLACED. DISCONNECT
POWER TO UNIT, AND REMOVE ASSOCIATED DISCONNECTS, WIRING AND CONDUIT
BACK TO SOURCE (CSC LP-1).
GENERAL NOTES :
A. PROVIDE 3P 70A 22KAIC CB FOR CRAC-1 AND 3P 15A 22KAIC CB FOR ACCU-1 AT THE
EXISTING PANEL SPACE.
B. 3P, 70A, 22KAIC, ENCLOSED CIRCUIT BREAKER WITH A SHUNT TRIP UNIT AND NEMA 1
ENCLOSURE.
C. 3P, 30A, FUSIBLE DISCONNECT SWITCH WITH NEMA 3R ENCLOSURE. PROVIDE 3-15A
FUSES AND INDEPENDENT SUPPORTS.
D. 3 #12 & #12 G IN 3 /4" C TO 3P 15A CB AT PANEL UPS2.
E. 3 #4 & #8 G IN 1 1/ 4" C TO 3P 70A CB AT PANEL UPS2.
F. 2 #12 & #12 G IN 3/4" TO SPARE 1P 20A CIRCUIT AT EX. PANEL REL.
EX.
FIRE ALARM
CONTROL
PANEL (FACP)
SIEMENS
#CERBERUS
MM
MM
MM
EX
EX
EX
FIRE
SUPPRESSION
CONTROL
PANEL (FSCP)
ALARM
SUPERVISORY
TROUBLE
EX. CIRCUIT
CM
CM
CM
SHUNT TRIP UNIT AT MCB OF EX. PANEL CPC-EP-2
SHUNT TRIP UNIT AT MCB OF EX. PANEL CPC-EP-1
SHUNT TRIP UNIT AT ECB-CRAC-1 FOR CRAC-1
2 #12 & #12 G IN 3/ 4" C TO EX. 1P 20A
SPARE CB AT PANEL RCC (SEC# 3)
PROVIDE FIELD WIRING IN CONDUITS PER WIRING DIAGRAM
SHOWN ON MECHANICAL/PLUMBING DRAWINGS. COORDINATE
WITH FIRE SUPPRESSION CONTRACTOR FOR FIELD WIRING
REQUIREMENTS.
FIRE ALARM NOTES:
1. COMPLY WITH THE REQUIREMENTS OF NFPA 70 (NEC), NFPA 72 (NATIONAL FIRE ALARM CODE), INTERNATIONAL BUILDING CODE, FEDERAL/STATE/LOCAL CODES, THE FIRE MARSHALL, THE
MANUFACTURER AND THE AUTHORITY HAVING JURISDICTION.
2. EQUIPMENT SHALL BE UL LISTED AND SHALL COMPLY WITH THE REQUIREMENTS OF NFPA.
3. COORDINATE WIRING REQUIREMENTS WITH THE MANUFACTURER. COMPLY WITH THE
REQUIREMENTS OF THE MANUFACTURER AND THE FOLLOWING:
3.1. ALL FIRE ALARM, COMMUNICATIONS, AND COAXIAL CABLES, AND ALL CLASS 2 POWER
LIMITED CIRCUITS SHALL COMPLY WITH ARTICLE 725, ARTICLE 760, ARTICLE 800, ARTICLE
810, ARTICLE 820, ARTICLE 830, AND OTHER APPLICABLE ARTICLES OF THE NATIONAL
ELECTRICAL CODE. PLENUM RATED, RISER RATED AND GENERAL-PURPOSE
COMMUNICATIONS AND COAXIAL SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE
WITH THE NATIONAL ELECTRICAL CODE. CABLES SHALL BE SUITABLE FOR THEIR
INTENDED USE. SECURE AND SUPPORT CABLE AT INTERVALS NOT EXCEEDING 3 FEET, OR
BY THE MANUFACTURER'S REQUIREMENT, WHICHEVER IS LESS. CABLE SHALL RUN IN
CONDUIT, 3/4" TRADE SIZE MINIMUM, UNDER THE FOLLOWING CONDITIONS: WHERE
SUBJECT TO PHYSICAL DAMAGE; WHERE INSTALLED OUTDOORS OR WET LOCATIONS;
WHERE EXPOSED; WHERE CONCEALED IN CONCRETE OR BLOCK WALLS; AND WHERE
REQUIRED BY THE NEC.
3.2. ALL OTHER CABLES AND CIRCUITS SHALL RUN IN CONDUIT, 3/4" TRADE SIZE MINIMUM.
4. DEVICES SHOWN ON TYPICAL FIRE ALARM RISER DIAGRAM ARE FOR INTENT ONLY AND DO NOT
INDICATE THE EXACT NUMBER OF DEVICES ON EACH FLOOR. SEE FLOOR PLANS FOR
NUMBERS OF DEVICES.
5. ALL FIRE ALARM DEVICES AND EQUIPMENT SHALL BE WIRED TOGETHER FOR A COMPLETE AND
FULLY OPERATIONAL FIRE ALARM SYSTEM.
6. MODIFY THE EXISTING GRAPHIC ANNUNCIATOR PANEL AT LOBBY IN ACCORDANCE WITH
CHANGES.
7. PROVIDE EQUIPMENT, PROGRAMMING, HARDWARE, AND ACCESSORIES TO IMPLEMENT THIS
SCHEME, INCLUDING, BUT NOT LIMITED TO: FIRE ALARM CONTROL MODULES, FIRE ALARM
RELAYS, WIRING, ETC. ALL ITEMS PROVIDED SHALL BE UL LISTED AND SUITABLE FOR THE
INTENDED USE.
8. PROVIDE AN INSTRUCTION SIGN AT EACH FIRE ALARM CONTROL PANEL THAT DESCRIBES HOW
TO RESET THE FIRE ALARM CONTROL PANEL AFTER AN ALARM CONDITION HAS BEEN CLEARED.
THIS INCLUDES ALARM CONDITIONS THAT WERE INITIATED BY THE OTHER FIRE ALARM
CONTROL PANEL.
9. ALL CONDUITS AND ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH NEC.
10. SUBMIT FIRE ALARM SYSTEM PLANS PREPARED BY FIRE ENGINEER AND CUT-SHEETS OF ALL
FIRE ALARM DEVICES/EQUIPMENT TO BE USED TO LOCAL FIRE MARSHAL AND PERMIT
DEPARTMENT FOR REVIEW AND APPROVAL. PROVIDE ALL HARDWARES/SOFTWARE AND
ACCESSORIES PER FIRE MARSHAL'S REQUIREMENTS.
FIRE ALARM AND SUPPRESSION SYSTEM BLOCK DIAGRAM
NOT TO SCALE
NEW
EX. PANEL CPC-EP-1
EX. PANEL UPS2
3PH, 4W,
208Y/120V 800A
MLO 22KAIC
GENERAL ELEC.
EX PANEL CSC-LP-1
EX PANEL CSC-EP-2
3PH, 4W, 208Y/120V
100A MCB
3PH, 4W, 208Y/120V
100A MCB
3PH, 4W, 208Y/120V
150A MCB
EX PANEL REL
3PH, 4W, 208Y/120V
60A MCB
EX PANEL RCC (SEC# 3)
3PH, 4W, 208Y/120V, 400A MCB
EX. PANEL CPC-EP-1
EX PANEL CSC-LP-1
EX PANEL CSC-EP-2
3PH, 4W, 208Y/120V
100A MCB
3PH, 4W, 208Y/120V
100A MCB
3PH, 4W, 208Y/120V
150A MCB
CRAC-1
ECB-CRAC-1
A
B
EX. PANEL UPS2
3PH, 4W,
208Y/120V 800A
MLO 22KAIC
GENERAL ELEC.
EX PANEL REL
3PH, 4W, 208Y/120V
60A MCB
F
FSCP
CM
CM
CM
MM
EX PANEL RCC (SEC# 3)
3PH, 4W, 208Y/120V, 400A MCB
E
MM
MM
EX
EX
EXREL
UPS2-25.27.29
A A
A A
PARTIAL PLANS AND DETAILS
K.S K.S J.Y
1 2 3 4 5
A
B
C
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5
REVISIONS
NO. DATE DESCRIPTION
L:
\2
3\
M
VA
O N-
CA
LL
G
F\
2A
M
VA
C
UM
BE
RL
AN
D
CR
AC
\D ra wi ng s\
El ec
\E
1.
dw g
/2
8/
:0
PM
D
OF 09
JUNE 21, 2023
BID-PERMIT SUBMISSION
067196-11
CU
M
BE
RL
AN
D
BR
AN
CH
C
RA
C
RE
PL
AC
EM
EN
T
W
IN
CH
ES
TE
R
RO
AD
S
W , C
UM
BE
RL
AN
D, M
D
M
AR
YL
AN
D
DE
PA
RT
M
EN
T O
F
TR
AN
SP
O
RT
AT
IO
N M
O
TO
R
VE
HI
CL
E
AD
M
IN
IS
TR
AT
IO
N
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND.
LICENSE NO. 38316, EXPIRATION DATE: 01-05-2024
10 Sudbrook Ln Pikesville, MD 21208
Phone: (410) 486-4692 Fax: (410) 486-0452
E101
SCALE : 1/4" = 1"-0"
PARTIAL FLOOR PLAN - DEMOLITION1
0 8'4'2'
SCALE: 1/4" = 1'-0"
GRAPHIC SCALE:
SCALE : 1/4" = 1"-0"
PARTIAL FLOOR PLAN - NEW WORK2
NORTHNORTH
SCALE : 1/4" = 1"-0"
SCALE : 1/8" = 1"-0"
4 PARTIAL ROOF PLAN - DEMOLITION PARTIAL ROOF PLAN - NEW WORK
KEY PLAN
SCALE: NTS
E101 E101
E101 E101
WORKING AREA
(FLOOR AND ROOF)
| GENERAL-G001 |
| GENERAL-G002 |
| FIRE PROTECTION |
| FP-101 |
| MECHANICAL |
| M-001 |
| MD-101 |
| M-101 |
| M-601 |
| ELECTRICAL |
| E001 |
| E101 |
File details come from the government source that posted it. Updated .