The purpose of this document is to provide answers to supplier questions. Please see Questions and Answers included herein.
Note: This document is intended for informational purposes only. Any changes to the RFX must occur through a published addendum (or through publication of a new version of the RFX in Team Georgia Marketplace™). If multiple Q & A documents are posted, the most recent Q & A shall govern in the event of a conflict.
QUESTIONS AND ANSWERS
| # |
| Questions |
| Referenced RFX Section |
| Answers |
1. 1.
| There is a request for a 1688 camera box but there is no line item requesting a 1688 camera head. You will need both. Will someone add to the RFP? |
| General |
| Yes, We will need a 1688 camera head. |
2. 2.
| Shy mentioned you do NOT need a 50L insufflator but this is requested on the BID. Please let me know if this needs to be quoted, or no? |
| General |
| I believe after talking to Mr. Boyett the lab can use a medical air hose line to insufflate instead of needing the 50L CO2 tank. I believe there would be a connection to the boom for the medical air to be used for laparoscopic insufflation. |
3. 3.
| You have 2 scopes requested to be quoted. I would think you only need 1. Are you sure you need 2? |
| General |
| One is fine. |
4. 4.
I want to clarify the complete scope of work for this project as it isn’t clear in the RFP. The vendor that wins this bid would need to include the following, correct?
Disconnect gas and power to existing Nuvo boom, lights, and monitor suspension
| 5. |
| De-install Nuvo boom in a manner to Coastal Pines liking making decommissioning of the boom and related equipment easy |
| 6. |
| Rework existing mount & super structure to accept the new boom, lights, and monitor suspension, Super Structure must meet weights and moments that satisfy engineering requirements as outlined by vendor’s pre-install guidelines |
| 7. |
| Reconnect power and gas to meet all local building codes and state of Georgia requirements, configure electrical requirements to meet the new vendor’s booms, lights, and monitor suspension. |
| 8. |
| Patch and paint as needed for area where work is performed |
| 9. |
| Rework ceiling tiles and ceiling grid as needed in area where work is performed |
| 10. |
| Install and test all new equipment which includes Boom, Lights, Surgical Video Platform, and Monitors |