The file's text, extracted by GovTribe without its formatting.
Attachment X (This is just a sample TM Requirements Matrix. The proper matrix from the MIL-STD addressing the types of publications being acquired should be used.)
TM Content
-10
-12 Non- Ammo Ground -12&P
MIL-STD-40051-2D
Reference
Element Name
| FRONT MATTER |
| R |
| R |
| R |
| 5.2.1 |
| <paper.frnt> |
| Front cover |
| R |
| R |
| R |
| 5.2.1.1 |
| <frntcover> |
(MC) Signature page
Warning summary
Change transmittal page
| List of effective pages/ work packages |
| R |
| R |
| R |
| 5.2.1.6 |
| <loepwp> |
| Title page |
| R |
| R |
| R |
| 5.2.1.7 |
| <titleblk> |
| Table of contents |
| R |
| R |
| R |
| 5.2.1.9 |
| <contents> |
| How to use this manual |
| R |
| R |
| R |
| 5.2.1.10 |
| <howtouse> |
| CHAPTER 1. GENER- AL INFORMATION, EQUIPMENT DE- SCRIPTION, AND THEORY OF OPERATION |
| R |
| R |
| R |
| APPENDIX B |
| <gim> |
| GENERAL INFORMA- TION WORK PACKAGE |
| R |
| R |
| R |
| B.5.2 |
| <ginfowp> |
| Scope |
| R |
| R |
| R |
| B.5.2.3 |
| <scope> |
| Maintenance forms, records, and reports |
| R |
| R |
| R |
| B.5.2.4 |
| <mfrr> |
| Reporting Equipment Improvement Recom- mendations (EIR) |
| R |
| R |
| R |
| B.5.2.5 |
| <eir> |
Hand Receipt (HR) manuals
| Corrosion Prevention and Control (CPC) |
| R |
| R |
| R |
| B.5.2.7 |
| <cpcdata> |
Ozone Depleting Sub- stances (ODS)
| Destruction of equip- ment to prevent enemy use |
| R |
| R |
| R |
| B.5.2.9 |
| <destructmat> |
| Preparation for storage or shipment |
| R |
| R |
| R |
| B.5.2.10 |
| <pssref> |
Attachment A (This is just a sample TM Requirements Matrix. The proper matrix from the MIL-STD addressing the types of publications being acquired should be used.)
Non- Ammo Ground
| Transportability guidance |
| R |
| R |
| R |
| B.5.2.11 |
| <transportability> |
Warranty information
Nomenclature cross- reference list
| List of abbreviations/ acronyms |
| R |
| R |
| R |
| B.5.2.14 |
| <loa> |
| R |
| B.5.2.16 |
| <qual.mat.info> |
| Safety, care, and handling |
| R |
| R |
| R |
| B.5.2.17 |
| <sftyinfo> |
Nuclear hardness
Calibration
Item unique identifica- tion (IUID)
| Mandatory Replace- ment Parts (MRP) |
| R |
| R |
| R |
| B.5.2.25 |
| <mrpref> |
| Supporting informa- tion for repair parts, special tools/kits, TMDE, and support equipment |
| P |
| R |
| P |
| B.5.2.28 |
| <supdata> |
Copyright credit line
| EQUIPMENT DE- SCRIPTION AND DATA WORK PACKAGE |
| R |
| R |
| R |
| B.5.3 |
| <descwp> |
| Equipment character- istics, capabilities, and features |
| R |
| R |
| R |
| B.5.3.3 |
| <eqpinfo> |
| Location and descrip- tion of major components |
| R |
| R |
| R |
| B.5.3.4 |
| <locdesc> |
Equipment differences
| Equipment data |
| R |
| R |
| R |
| B.5.3.6 |
| <eqpdata> |
| THEORY OF OPERA- TION WORK PACKAGE |
| R |
| R |
| R |
| B.5.4 |
| <thrywp> |
vAttachment X (This is just a sample TM Requirements Matrix. The proper matrix from the MIL-STD addressing the types of publications being acquired should be used.)
Non- Ammo Ground
| CHAPTER X. OPERATOR INSTRUCTIONS |
| R |
| R |
| R |
| APPENDIX C |
| <opim> |
| DESCRIPTION AND USE OF OPERATOR CONTROLS AND INDI- CATORS WORK PACKAGE |
| R |
| R |
| R |
| C.5.2.2.1 |
| <ctrlindwp> |
| OPERATION UNDER USUAL CONDITIONS WORK PACKAGE |
| R |
| R |
| R |
| C.5.2.2.2 |
| <opusualwp> |
| Operation under usual conditions task |
| R |
| R |
| R |
| C.5.2.2.2.3 |
| <opertsk> |
Security measures for electronic data
Siting requirements
Shelter requirements
Assembly and prepa- ration for use
| C.5.2.2.2.3.4 |
| <prepforuse> |
Initial adjustments, be- fore use and self-test
| Operating procedures |
| R |
| R |
| R |
| C.5.2.2.2.3.6 |
| <oper> |
Operating auxiliary equipment
Preparation for movement
| OPERATION UNDER UNUSUAL CONDI- TIONS WORK PACKAGE |
| R |
| R |
| R |
| C.5.2.2.3 |
| <opunuwp> |
Security measures for electronic data
| Unusual environment/ weather |
| R |
| R |
| R |
| C.5.2.2.3.3.2 |
| <unusualenv> |
Fording and swimming
Non- Ammo Ground
Interim Chemical, Bi- ological, Radiological, Nuclear and Explo- sives (CBRNE) de- contamination procedures
Jamming and Elec- tronic Countermeas- ures (ECM) procedures
Degraded operation procedures
EMERGENCY WORK PACKAGE
DECAL/DATA PLATE GUIDE WORK PACKAGE
ON-VEHICLE EQUIP- MENT LOADING PLAN WORK PACKAGE
CHAPTER X. TROU- BLESHOOTING MASTER INDEX
| APPENDIX D D.5.4.4 |
| <tim><masterindex- category> |
| TROUBLESHOOTING INDEX WORK PACKAGE |
| R |
| R |
| R |
| D.5.5.5 |
| <tsindxwp> |
CHAPTER X. TROU- BLESHOOTING PROCEDURES
Note The notation (*) indi- cates that at least one of the these content items shall be included.
| R |
| APPENDIX D D.5.4.2 |
| <tim> |
<troublecategory>
INTRODUCTION WORK PACKAGE
TROUBLESHOOTING INDEX WORK PACKAGE
(This is just a sample TM Requirements Matrix. The proper matrix from the MIL-STD addressing the types of publications being acquired should be used.)
Non- Ammo Ground
*OPERATIONAL CHECKOUT WORK PACKAGES
*TROUBLESHOOTING WORK PACKAGES
*COMBINED OPERA- TIONAL CHECKOUT AND TROUBLESHOOT- ING WORK PACKAGES
CHAPTER X. PMCS MAINTENANCE INSTRUCTIONS
PMCS may be in its own chapter or may be com- bined with other mainte- nance work packages in a maintenance chapter but not both places.
<pmcscategory>
| PMCS INTRODUCTION WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.1 |
| <pmcsintrowp> |
| PMCS, INCLUDING LUBRICATION IN- STRUCTIONS, WORK PACKAGE |
| R |
| R |
| R |
| E.5.3.4.2 |
| <pmcswp> |
CHAPTER X. MAIN- TENANCE INSTRUCTIONS
Note PMCS is required as a minimum in one mainte- nance chapter. PMCS may be in its own chap- ter or may be combined with other maintenance work packages in a maintenance chapter but not both places.
E.5.2.3 <mim> <maintenancepmcsca- tegory> <maintenancecatego- ry>
(This is just a sample TM Requirements Matrix. The proper matrix from the MIL-STD addressing the types of publications being acquired should be used.)
Non- Ammo Ground
SERVICE UPON RE- CEIPT WORK PACK- AGE (MAINTAINER LEVEL ONLY)
Service upon receipt tasks
Siting
Shelter requirements
Service upon receipt of materiel
Installation instructions
E.5.3.2.3.4
Preliminary servicing of equipment
Preliminary checks and adjustment of equipment
Preliminary calibra- tion of equipment
Circuit alignment
| Ammunition Service upon receipt |
| P |
Additional mainte- nance task
| E.5.3.2.3.10 |
| <other.surtsk> |
Follow-on maintenance
| E.5.3.2.3.11 |
| <followon.maintsk> |
EQUIPMENT/USER FITTING INSTRUC- TIONS WORK PACKAGE
| PMCS INTRODUCTION WORK PACKAGE |
| R |
| MAINTENANCE WORK PACKAGES |
| R |
| R |
| R |
| E.5.3.5 |
| <maintwp> |
| Maintenance tasks |
| R |
| R |
| R |
| E.5.3.5.3 |
| <maintsk> |
Non- Ammo Ground
Inspect
Test
Service
Adjust
Align
Calibrate
| E.5.3.5.3.7 |
| <calibration> |
Remove
Install
Replace
Repair
Paint
Lubricate
Mark
Pack
Unpack
Preserve
| E.5.3.5.3.19 |
| <preservation> |
Prepare for use
| E.5.3.5.3.20 |
| <prepforuse> |
Assemble
Disassemble
Clean
Nondestructive inspection
Radio interference suppression
Place in service
Towing
Jacking
Parking
Mooring
Non- Ammo Ground
Covering
Hoisting
Sling loading
External power
Preparation for storage
Preparation for shipment
Transport
Arm
Load
Unload
Install peripheral device
| E.5.3.5.3.41 |
| <installperdev> |
Uninstall peripheral device
| E.5.3.5.3.42 |
| <uninstallperdev> |
Upgrade/patch software
Configure software
Debug software
Additional mainte- nance task
| E.5.3.5.3.46 |
| <other.maintsk> |
Follow-on maintenance
| E.5.3.5.3.47 |
| <followon.maintsk> |
GENERAL MAINTE- NANCE WORK PACKAGE
LUBRICATION IN- STRUCTIONS WORK PACKAGE
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACK- AGE (MAINTAINER LEVEL) |
| P |
E.5.3.10
Non- Ammo Ground
| Illustrated list of man- ufactured items intro- duction work package |
| P |
| R |
| R |
| E.5.3.10.1 |
| <manu_items_ introwp> |
| Manufacturing proce- dures work package |
| P |
| R |
| R |
| E.5.3.10.2 |
| <manuwp> |
| TORQUE LIMITS WORK PACKAGE (MAINTAINER LEVEL) |
| P |
| WIRING DIAGRAMS WORK PACKAGE (MAINTAINER LEVEL) |
| P |
CHAPTER X. AUXIL- IARY EQUIPMENT MAINTENANCE INSTRUCTIONS
<auxiliarycategory>
AUXILIARY EQUIP- MENT MAINTENANCE WORK PACKAGE
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACK- AGE (MAINTAINER LEVEL) |
| P |
E.5.3.10
| Illustrated list of man- ufactured items intro- duction work package |
| P |
| R |
| R |
| E.5.3.10.1 |
| <manu_items_ introwp> |
| Manufacturing proce- dures work package |
| P |
| R |
| R |
| E.5.3.10.2 |
| <manuwp> |
| TORQUE LIMITS WORK PACKAGE (MAINTAINER LEVEL) |
| P |
| WIRING DIAGRAMS WORK PACKAGE (MAINTAINER LEVEL) |
| P |
CHAPTER X. AMMU- NITION MAINTE- NANCE INSTRUCTIONS
<ammunitioncatego- ry>
Non- Ammo Ground
AMMUNITION IDENTI- FICATION WORK PACKAGE
AMMUNITION MAIN- TENANCE WORK PACKAGE
FOREIGN AMMUNI- TION WORK PACKAGE
CHAPTER X. TEST AND INSPECTION MAINTENANCE INSTRUCTIONS
<testinspectionca- tegory>
| MAINTENANCE WORK PACKAGES |
| R |
Inspection
Test
| CHAPTER X. SHIP- MENT/MOVEMENT AND STORAGE MAINTENANCE INSTRUCTIONS |
| R |
<shipmentmovement- storagecategory>
| MAINTENANCE WORK PACKAGES |
| R |
| Preparation for storage |
| R |
| R |
| E.5.3.5.3.35 |
| <prepstore> |
| Preparation for shipment |
| R |
| R |
| E.5.3.5.3.36 |
| <prepship> |
| R |
| E.5.3.5.3.37 |
| <transport> |
CHAPTER X. DE- STRUCTION OF EQUIPMENT TO PREVENT ENEMY USE
If a separate destruction of material manual is not developed for this equip- ment, then the destruc- tion chapter must be included.
Non- Ammo Ground
| DESTRUCTION PRO- CEDURES INTRODUC- TION WORK PACKAGE |
| R |
| R |
| R |
| H.5.3 |
| <destruct-introwp> |
| Authority to destroy |
| R |
| R |
| R |
| H.5.3.3 |
| <authorize_to_ destroy> |
| Reporting destruction |
| R |
| R |
| R |
| H.5.3.4 |
| <report_destruct> |
| General destruction information |
| R |
| R |
| R |
| H.5.3.5 |
| <general_destruct_ info> |
| Degree of destruction |
| R |
| R |
| R |
| H.5.3.6 |
| <degree_of_ destruct> |
Essential components and spare parts
| H.5.3.7 |
| <component_spares> |
| DESTRUCTION PRO- CEDURES WORK PACKAGE |
| R |
| R |
| R |
| H.5.4 |
| <destruct- materialwp> |
Parts list
| H.5.4.3 |
| <essential_spares> |
| Specific destruction procedures |
| R |
| R |
| R |
| H.5.4.4 |
| <proc> |
CHAPTER X. SOFTWARE INFORMATION
<softwarecategory>
| SOFTWARE GENERAL INFORMATION WORK PACKAGE |
| R |
| R |
| R |
| M.5.3.1 |
| <softginfowp> |
| System Overview |
| R |
| R |
| R |
| M.5.3.1.6 |
| <softsysover> |
| Document Overview |
| R |
| R |
| R |
| M.5.3.1.7 |
| <softdocover> |
| SOFTWARE SUMMARY WORK PACKAGE |
| R |
| R |
| R |
| M.5.3.2 |
| <softsumwp> |
SOFTWARE EFFECTIV- ITY WORK PACKAGE
DIFFERENCES BE- TWEEN SOFTWARE VERSIONS WORK PACKAGE
| M.5.3.4 |
| <softdiffversionwp> |
FEATURES AND CAPA- BILITIES WORK PACKAGE
| M.5.4.1 |
| <softfeaturescapwp> |
Non- Ammo Ground
SCREEN DISPLAYS WORK PACKAGE
| M.5.4.2 |
| <softscreendis- playwp> |
MENUS/DIRECTORIES WORK PACKAGE
TOOLS AND BUTTONS WORK PACKAGES
| SECURITY AND PRI- VACY PROCEDURES WORK PACKAGE |
| R |
| R |
| R |
| M.5.5.1 |
| <softsecprivwp> |
SUPERVISORY CON- TROLS WORK PACKAGE
| R |
| R |
| M.5.5.2 |
| <softsuperctrlswp> |
| POWERUP/STARTUP AND POWERDOWN/ SHUTDOWN PROCE- DURES WORK PACKAGE |
| R |
| R |
| R |
| M.5.5.3 |
| <softpowerupwp> |
| ACCESSING/EXITING SOFTWARE WORK PACKAGE |
| R |
| R |
| R |
| M.5.5.4 |
| <softaccesswp> |
KEY COMMANDS WORK PACKAGE
PROCESSES AND COMMANDS WORK PACKAGE
USER INTERFACE WORK PACKAGE
SOFTWARE OPERAT- ING CONVENTIONS WORK PACKAGE
| M.5.5.8 |
| <softopconven- tionswp> |
ADDITIONAL SOFT- WARE OPERATION WP
MESSAGES WORK PACKAGE
| R |
| R |
| M.5.6.3 |
| <softmessageswp> |
RECOVERY FROM ER- RORS, MALFUNC- TIONS, AND EMERGENCIES WORK PACKAGE
| CHAPTER X. RPSTL |
| P |
| P |
| R |
| APPENDIX F |
| <pim> |
Non- Ammo Ground
| INTRODUCTION WORK PACKAGE |
| P |
| P |
| R |
| F.5.3.5 |
| <introwp> |
| REPAIR PARTS LIST WORK PACKAGE |
| P |
| P |
| R |
| F.5.3.6 |
| <plwp> |
| REPAIR PARTS FOR SPECIAL TOOLS WORK PACKAGE |
| P |
| P |
| KIT PARTS LIST WORK PACKAGE |
| P |
| P |
| BULK ITEM WORK PACKAGE |
| P |
| P |
| SPECIAL TOOLS LIST WORK PACKAGE |
| P |
| P |
| NSN INDEX WORK PACKAGE |
| P |
| P |
| R |
| F.5.3.11.1 |
| <nsnindxwp> |
| P/N INDEX WORK PACKAGE |
| P |
| P |
| R |
| F.5.3.11.2 |
| <pnindxwp> |
| REFERENCE DESIG- NATOR INDEX WORK PACKAGE |
| P |
| P |
| F.5.3.11.3 |
| <refdesindxwp> |
CHAPTER X. SUPPORTING INFORMATION
Note Applicable supporting information work pack- ages shall be arranged in the order in which they are presented here and numbered accordingly.
| REFERENCES WORK PACKAGE |
| R |
| R |
| R |
| G.5.2 |
| <refwp> |
| INTRODUCTION FOR NON-AVIATION TWO- LEVEL MAINTENANCE MAC WORK PACKAGE |
| P |
| R |
| R |
| G.5.3.1 |
| <macintrowp> |
| MAC WORK PACKAGE (NON-AVIATION TWO- LEVEL) |
| P |
| R |
| R |
| G.5.3.3 |
| <macwp> |
Non- Ammo Ground
| COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) LISTS WORK PACKAGE |
| R |
| R |
| R |
| G.5.4 |
| <coeibiiwp> |
ADDITIONAL AU- THORIZATION LIST (AAL) WORK PACKAGE
| EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE |
| R |
| R |
| R |
| G.5.7 |
| <explistwp> |
| TOOL IDENTIFICA- TION LIST WORK PACKAGE |
| P |
| R |
| R |
| G.5.8 |
| <toolidwp> |
MANDATORY RE- PLACEMENT PARTS WORK PACKAGE
CRITICAL SAFETY ITEMS WORK PACKAGE
SUPPORT ITEMS WORK PACKAGE
ADDITIONAL SUP- PORTING WORK PACKAGES
| REAR MATTER |
| R |
| R |
| R |
| 5.2.2 |
| <rear> |
Glossary
Alphabetical index
Foldout pages
| DA Form 2028 |
| R |
| R |
| R |
| 5.2.2.3 |
| <da2028> |
| Authentication page |
| R |
| R |
| R |
| 5.2.2.4 |
| <authent> |
| Back cover |
| R |
| R |
| R |
| 5.2.2.6 |
| <back> |
Legend R - Required P - Prohibited Shaded - As Required